Experiment Readiness Checklist

A Checklist on safety and operational items shall be completed before an experiment can start data taking. The following items must be included in the pre experiment checklist. The Hall C Physics Liaison is responsible for ensuring that the checklist has been completed.

[    ]
VESDA system activated?
[    ]
Hydrogen sniffers not past calibration date?
[    ]
Manual valves between cryogenic targets and recovery tanks locked in the open position before the targets are filled?
[    ]
All magnets equipped with functioning warning beacon?
[    ]
All magnet current leads covered by non-conductive or grounded shields?
[    ]
All of above shields equipped with properwarning signs?
[    ]
All magnet power supply doors are closed and properly interlocked?
[    ]
All power leads of fastbus power supplies covered by shields?
[    ]
Visual inspection of all vacuum windows performed?
[    ]
Dates of removal on tags of vacuum windows not expired or close to expiring?
[    ]
Proper warning signs installed close to all thin vacuum windows?
[    ]
Ear plugs available close to all thin vacuum windows?
[    ]
HMS shutter in HMS detector hut operational?
[    ]
Air-conditioning on in both HMS and SOS detector hut?
[    ]
Hardware switches installed to limit spectrometer rotation?
[    ]
HMS and SOS hardware angle limitations verified?
[    ]
HMS and SOS angle ranges loaded in rotation PLC?
[    ]
No oil leaks in SOS door hydraulics?
[    ]
Safety rails removed where they conflict with required angle ranges by experiment?