Next: About this document ...
Up: Experiment Safety Assessment Document
Previous: Responsible Personnel
-
- 1
- "Hall C Operating Manual"
- 2
- HMS Superconducting Magnet Safety Review - Quadrupoles (1994)
- 3
- HMS Superconducting Magnet Safety Review - Dipole (1994)
- 4
- Danfysik Magnet Power Supply 8000 Section 5,``Maintenance".
- 5
- C. D. Cothran, D. Day, and J. H. Mitchell,
``Temporary Operating Safety
Procedure for the HMS Cerenkov Detector Pressure Testing"
- 6
- R.D. Mc Carty, "Hydrogen Technology Survey: Thermophysical
Properties," N76-11297, NBS 1975
- 7
- W. Schmitt and C. Williamson " Boiloff Rates of
Cryogenic Targets Subjected to Catastrophic Vacuum Failure,"
Bates Internal Report
90-02, Sept 1990
Hall-C Staff
2008-01-17