Main INDEX,
Monthly INDEX,
PREV,
NEXT
Make New Entry,
Make Followup Entry
User name M Jones
Log entry time 16:33:03 on October 13, 2006
Entry number 124262
keyword=Day shift summary
Owl Shift Summary
October 12th Day Shift Summary
SL: Mark Jones
Target: John Schaub
RC: Betsy Beise
Highlights
- Production 8-9am
- Do BPM and BCM calibration from 12:08
- REsume production at 15:17
Time-line
- 08:00 continuation of run 31436
- At 9:03 call MCC to put HW plate IN.
- At around 9:07 MCC starts to investigate Hall B problems.
Could lead to beam interupts to Hall C.
- Ran flipper program. Had to run it twice to update the PC Pos
setting.
- 09:08 Run 31437 started , but last 70 minutes of run have no beam.
- 12:08 beam back. Will do BCM and BPM calibration
- 12:20 run 31438 started. Beam problems. Junk run.
- 12:58 Run 31439 started. Beam problems at beginning of run. MCC
found a PID loop was still on and fixed it at about 15 minutes into
run.
- 15:17 Run 31440 started. Production.
- 15:33 Beam down to reLEM the north linac
- 15:45 Run 31441 started.
Run list
- Run 31436: Production run at 60uA; PS=1000; HWP is OUT (329K)
- Run 31437: Production run at 60uA; PS=1000; HWP is IN (135K)
- Run 31438: BPM and BCM calibration PS=1000; HWP is IN junk
- Run 31439: BPM and BCM calibration, PS=1000; HWP is IN. Both Hall
A & B in controlled access during the run.
- Run 31440: Production run at 60uA; PS=1000; HWP is IN (74K)
- Run 31441: Production run at 60uA; PS=1000; HWP is IN