User name Fatiha
Log entry time 00:08:16 on October 14, 2006
Entry number 124295
keyword=Swing Shift Summary
October 13th Swing Shift
Summary
SL: Fatiha Benmokhtar
Target: Mat Meuther
RC: Betsy Beise, Alex Coppens
Highlights
- Mcc couldn't deliver beam until 5pm.
- Noticed some bad halo from time to time starting at 7pm.
- Run 31440: Production run at 60uA; PS=1000; HWP is IN
(74K)
- mostly some problems with the fastfeed-back durign the shift.
MCC fixed this after 11pm.
Time-line
- Mcc couldn't deliver beam until 5pm.
- Noticed some bad halo from time to time starting at 7pm.
- PZT Scan at 10:20 pm
- 11:40 pm MCC called, the IOC for the BPMs froze, they need to
reboot it.
- 11:50 pm, back tp production
Run list
- Run 31443: Production run at 60uA; PS=1000; HWP is IN ... good
- Run 31444: Production run at 60uA; PS=1000; HWP is IN ...
good high halo from time to time
- Run 31445: Production run at 60uA; PS=1000; HWP is IN ...
good high halo sometimes
- Run 31446: Production run at 60uA; PS=1000; HWP is IN ...
good high halo from time to time
- Run 31447: Production run at 60uA; PS=1000; HWP is IN ...
good
- Run 31448: Production run at 60uA; PS=1000; HWP is IN ... good
- Run 31449: Production run at 60uA; PS=1000; HWP is IN ... good
- Run 31450: Fastfeed back was off, bad halo.
- Run 31451: Production run at 60uA; PS=1000; HWP is IN
- Run 31452: Production run at 60uA; PS=1000; goes to the next
shift.