The SHMS HB magnet ,bellows and collimator were removed from the NPS experiment which ran form Sept 2024 to May 2024. The HB magnet , bellows and collimator were installed in Sept -Oct 2024. The collimator was surveyed in Nov 2024. The survey is attached.