During the running of Hall C experiments, significant
modifications, repairs, and/or changes to the operating status of equipment
may only be done by the
resident ``experts" or persons under their direct supervision. Note:
significant changes to the
operating status of equipment means changes beyond the nominal operating
parameters of the
subsystems. These ``experts" are primarily the JLab staff members or users
who were
principals in designing, building and testing the subsystems. More details,
the current lists and
procedures for adding to the list of experts individuals are available in
the ESAD.
This document expanded and
tailored to the
specific experiment should accompany the user generated ``Conduct of
Operations Document
(COO)." ``Operational Safety Procedures for Hall C"and the ``Safety
Assessment Document
for Hall C Base Equipment" are the core operations documents for Hall C equipment.