In preparation for a planned power outage affecting the Møller Polarimeter,
operators should:
- Ramp down Q1 and turn off power supply
- Ramp down Q2 and turn off power supply
- Put solenoid in non-persistent mode, ramp down, turn off.
- Move all collimators to RETRACTED position.
- Move target ladder to RETRACTED position.
- Depending upon expected duration of power outage:
- more than 5 minutes:
Close (0%) LN2 and LHe supply (JT) valves.
Close cold return valve.
Open (100%) warm return valve.
- 5 minutes or less: no change to cryo
Response to an unplanned power failure:
- While power is off there is no control nor is there anything
to be controlled. (i.e. there is nothing you can do).
- Be aware that if the solenoid was ON and in PERSISTENT mode,
it will remain on until the coils warm up from lack of helium.
At that point the magnet will quench, dumping its energy in
the leads and the power supply shunt resistor.
- Personnel entering the beam tunnel must be aware that the
solenoid field may still be on and that the solenoid is likely
to quench.
Recovery from a power failure (ONLY IF THE Møller WAS ON)