2008 Schedule Template Rev. 3

Start: June 9, 2008
Finish: November 6, 2008
Report Date: June 14, 2008

Gantt Chart

WBS Name Work
     
1 2008 Jun. to Oct. Hall-C SANE installation and HHS/HES Prep.
2 Meeting with Hall C Staff, RADCON, ALIGN, ACC, EH&S, Target group
3 Beam line and target Radiation cool down 6d
4 Prepare safety / work documentation for this schedule 6d
5 GEP decommissioning June 9 to July 3
6 Clear truck ramp, move in areal platforms, tools and equipment into Hall 1d
7 RADCON support required 1d
8 Crane HES dipole sections to beam left side 1d
9 Move HMS to 45 deg. 1d
10 Crane BIG CAL close to wall (to clear space) 1d
11 Crane 45' JLG and 45' Groove to downstream beam line 1d
12 Disassemble beam line from pivot to dump and store in Hall 2d
13 RADCON support required 2d
14 Install and commission Secondary emission monitor
15 Disconnect and remove up stream girder 1d
16 RADCON support required 1d
17 Mount SEM onto new girder and bolt girder assembly into position 1d
18 Connect girder beam line and cables 2d
19 Align and secure girder 1d
20 FPP removal and standard HMS detector reinstallation
21 Move all 4 wire chamber boxes from storage Bld to Hall C HMS side
22 Crane 45' JLG's into position 1d
23 Crane HMS shield house wall sections down and secure to frame 1d
24 Disconnect and remove FPP Electronic racks 1d
25 RADCON support required 1d
26 Disconnect and remove HMS trigger electronics 1d
27 RADCON support required 1d
28 Remove small scintillator assembly in front of exit window 1d
29 Position and connect installation fixtures 67502-00019 2d
30 Disconnect and remove wire chambers 2d
31 Place chambers in shipping crate and cover 2d
32 RADCON support required 2d
33 Set up and align installation fixtures for CH2 blocks 2d
34 RADCON support required 2d
35 Unbolt and slide out all CH2 blocks then crane out storage 2d
36 RADCON support required 2d
37 Remove installation fixture 1d
38 Unbolt and remove wire chamber ALU support frame 1d
39 Restore position for first hodoscope plane 1d
40 Reinstall Cerenkov detector 1d
41 Align Cerenkov detector and secure 1d
42 Reinstall aerogell chamber 1d
43 Install 2nd hodoscopes plane 1d
44 HMS detector hut light bulbs 1d
45 BIG CAL glass anneal
46 Uncover and prepare lead glass detector stack 2d
47 Crane and install and connect UV lights 1d
48 Reposition UV lights during anneal as required 50d
49 Disconnect UV lights and crane of BIG CAL 1d
50 Cover and seal lead glass stack 3d
51 Cryo Target disassembly and removal (from Dave Meekins) 17d
52 Warm up Cryo Target an vent scatting chamber 2d
53 Target Radiation cool down period 5d
54 Install pivot extensions and railing 1d
55 RADCON support required 1d
56 Remove scatting chamber windows 1d
57 RADCON support required 1d
58 Post run survey of target cells 2d
59 Crane in and place Groove 45' areal platform in place (beam left) 1d
60 Place 60' JLG (beam right) 1d
61 With Cryo group support un-sting target valve box from distribution can 1d
62 Disconnect plumbing and electronics from top of target 1d
63 Disconnect the refrigeration transfer lines and store on top of cable tray 1d
64 Tie back the plumbing and electrical lines for target 1d
65 Use lifting fixture and crane to remove target from pivot 1d
66 Disconnect cells and cell blocks and transfer them to the EEL Rad area. 1d
67 RADCON support required 1d
68 Place target on forklift and transfer it to EEL target group area 1d
69 Polarized Target installation and commissioning 52d
70 Transport target equipment deck, pivot and upper ALU deck to Hall C 2d
71 Relocate signal cables between shield hut and pivot to clear platform install. 2d
72 Layout and bolt equipment deck support legs to the floor 1d
73 Crane in and bolt deck onto support legs 1d
74 Weld end flanges to the pivot deck 1d
75 RADCON support required 1d
76 Install staircase, weld to deck then bolt to floor 1d
77 Install scattering chamber base on pivot 1d
78 Crane in scattering chamber and bolt to base 1d
79 Place LHE dewer and electronics racks onto equipment deck 2d
80 Install target control systems 11d
81 Place target into chamber 1d
82 Connect to vacuum system 3d
83 Connect cryogenic system, U-tubes etc. 1d
84 Pump out scattering chamber and leak check 4d
85 Target test cool down 6d
86 G-0 Magnet move from Hall C to long term storage (52 tons)
87 Move HMS to large angle to max floor space 1d
88 Clear floor space, move beam line and RAD parts to a secure location 1d
89 RADCON support required 1d
90 Move HKS magnets and FW close to the wall 1d
91 Assure BIG CAL and cable train are safe 1d
92 Move G-0 magnet into position and secure 1d
93 Remove 22" lead pipe, pack into box and move to lead storage Bld. 1d
94 RADCON support required 1d
95 Remove downstream end cap and lay onto cribbing 1d
96 RADCON support required 2d
97 Remove upstream end cap and lay onto cribbing 1d
98 RADCON support required 2d
99 Unbolt lead, pack into containers and move lead storage Bld. 2d
100 RADCON support required 1d
101 Remove all 8 titanium windows and place into storage box 1d
102 RADCON support required 1d
103 Bolt both end caps together, seal and move to lead storage Bld. 1d
104 RADCON support required 1d
105 Install shipping frame onto magnet, torque bolts and seal gaps 3d
106 Truck cribbing mats and rails into Hall and lay out for position 1 2d
107 Move 2 hydraulic towers, pump, H beam and swivel in and setup 1d
108 Lineup towers, connect magnet to swivel and takeout slack 1d
109 Unbolt magnet from base, lift, rotate and move to the Hall center 1d
110 Set magnet on cribbing, disconnect and remove hydraulic towers. 1d
111 Move cribbing mats and rails to position 2 1d
112 Set up 2 pairs of hydraulic towers with H beams 1d
113 Lift and rotate magnet 90 derg. then onto rollers and secure 1d
114 Pull magnet up the truck ramp and into position for loading 1d
115 Load magnet onto trailer, secure and move lead storage Bld. 1d
116 RADCON support required 1d
117 Unload magnet and roll into lead storage Bld. 1d
118 RADCON support required 1d
119 Remove all Lockwood equipment from Hall C 1d
120 Shrink-wrap G-0 magnet 1d
121 Setup N2 flow from CHL through magnet 2d
122 HES / HKS preparation (concrete, magnet assembly etc)
123 Drill and tap for hoist rings, then place 7/8" steel under new HES base 2d
124 Assemble HES magnets base with hilman rollers and hydraulic system 2d
125 Place lower dipole half in position and bolt down 1d
126 Move upper dipole half on top and torque down 1d
127 Crane Q1 into position next to dipole, align and torque down 1d
128 Crane Q2 into position next to dipole, align and torque down 1d
129 Connect vacuum chambers and leak check 4d
130 Fiducialize magnet assembly 2d
131 Layout of 9.5" concrete pad extension for new location of the HKS dipole 1d
132 Roll HES magnet assembly and HKS dipole close to the wall to clear space 1d
133 Brake open and remove concrete over the SOS rail section 2d
134 Unbolt and remove SOS rail section and transport to bone yard 1d
135 RADCON support required 1d
136 Remove all bolts and nuts from the SOS rail base plate 1d
137 Place plastic sheeting over the base plate, then temporary cove gap 1d
138 Build concrete forms as marked for new HKS dipole position and place rebar 4d
139 Fill SOS rail base gap with concrete and level 1d
140 Pore concrete into HKS extension forms, level and finish 2d
141 SANE beam line and low power dump installation
142 Remove only necessary railing and pivot extensions to fit detector platform 1d
143 Install and align Cerenkov detector platform 2d
144 Crane in and bolt down support beam and post for lead shielding boxes 1d
145 Align and weld box beam security brackets to pivot acc. to drwg. 1d
146 RADCON support required 1d
147 Weld security brackets for lead ALU shield boxes (SOS side) to pivot 1d
148 RADCON support required 1d
149 Place and secure ALU shield boxes on box beam and bolt down 1d
150 Place and bolt down lead shield boxes on the SOS side 1d
151 Assemble target chamber exit beam line section and support 1d
152 Assemble He beam line unistrud support frame on the floor (dwg. 6750400050) 3d
153 Layout anchor hole pattern for unistrud support frame 1d
154 Lift up beam line support frame with 25' spreader bar and bolt to floor 1d
155 Roll out He beam line bag and hang onto frame with crane (dwg. 6750400050) 1d
156 Align and secure entire beam line 1d
157 RADCON support required for work in beam dump area 1d
158 Align Cerenkov detector mirrors (on the floor) 3d
159 Place Cerenkov detector on platform 1d
160 Align Cerenkov detector and secure 1d
161 Connect all cables and detector gas system 1d
162 Mount lucite detectors onto BIG CAL 1d
163 Layout for 2nd beam line dump 1d
164 Crane in S4 steel blocks and place with 4 ton wall cane 3d
165 Install He-supply pipe for He bag (from gas Bld to beam dump) 2d
166 SOS disassembly
167 Remove SOS detectors 5d
168 RADCON support required 4d
169 Place rail section to large angle and shim to level 1d
170 Place all toe-clamps 1d
171 shim level and align Rail, then torque down toe-clamps 1d
172 Move SOS to smaller angle 1d
173 Remove hydraulic fluid 1d
174 RADCON support required 1d
175 Remove hydraulic tank and pump 1d
176 RADCON support required 1d
177 Disconnect and remove A/C unit 1d
178 RADCON support required 1d
179 Remove SOS doors 1d
180 RADCON support required 1d
Week 25, 2008 Week 26, 2008 Week 27, 2008 Week 28, 2008 Week 29, 2008 Week 30, 2008 Week 31, 2008 Week 32, 2008 Week 33, 2008 Week 34, 2008 Week 35, 2008 Week 36, 2008 Week 37, 2008 Week 38, 2008 Week 39, 2008 Week 40, 2008 Week 41, 2008 Week 42, 2008 Week 43, 2008 Week 44, 2008 Week 45, 2008
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6
M
R
H
H
R
H
D
H
H
H
R
A
R
A
A
A
H
H
H
R
E
R
H
H
H
H
R
H
R
H
R
H
H
H
H
H
H
H
H
E
E
E
E
E
C
T
R
H
R
C
R
A
H
H
T
C
C
C
C
C
R
C
C
H
H
H
H
H
R
H
C
C
H
C
C
C
T
C
C
D
H
R
H
H
H
H
R
H
R
H
R
H
R
H
R
H
R
H
L
L
L
L
L
L
L
L
L
L
R
L
R
L
C
H
H
H
H
H
H
H
H
A
A
H
H
H
R
H
H
C
C
C
H
H
H
H
R
H
R
H
H
H
H
A
H
H
A
R
E
H
A
H
H
H
H
H
H
R
H
H
A
H
H
R
H
R
H
R
H
R

Tasks

WBS Name Start Finish Work Priority Complete Cost
1 2008 Jun. to Oct. Hall-C SANE installation and HHS/HES Prep. Jun 9 Sep 23 500 0%
2 Meeting with Hall C Staff, RADCON, ALIGN, ACC, EH&S, Target group Jun 9 Jun 9 500 0%
3 Beam line and target Radiation cool down Jun 9 Jun 16 6d 500 0%
4 Prepare safety / work documentation for this schedule Jun 9 Jun 16 6d 500 0%
5 GEP decommissioning June 9 to July 3 Jun 9 Jun 24 500 0%
6 Clear truck ramp, move in areal platforms, tools and equipment into Hall Jun 9 Jun 9 1d 500 0%
7 RADCON support required Jun 9 Jun 9 1d 500 0%
8 Crane HES dipole sections to beam left side Jun 17 Jun 17 1d 500 0%
9 Move HMS to 45 deg. Jun 17 Jun 17 1d 500 0%
10 Crane BIG CAL close to wall (to clear space) Jun 17 Jun 17 1d 500 0%
11 Crane 45' JLG and 45' Groove to downstream beam line Jun 20 Jun 20 1d 500 0%
12 Disassemble beam line from pivot to dump and store in Hall Jun 25 Jun 26 2d 500 0%
13 RADCON support required Jun 25 Jun 26 2d 500 0%
14 Install and commission Secondary emission monitor Jul 7 Jul 16 500 0%
15 Disconnect and remove up stream girder Aug 11 Aug 11 1d 500 0%
16 RADCON support required Aug 11 Aug 11 1d 500 0%
17 Mount SEM onto new girder and bolt girder assembly into position Aug 12 Aug 12 1d 500 0%
18 Connect girder beam line and cables Aug 15 Aug 18 2d 500 0%
19 Align and secure girder Aug 15 Aug 15 1d 500 0%
20 FPP removal and standard HMS detector reinstallation Jun 16 Jul 4 500 0%
21 Move all 4 wire chamber boxes from storage Bld to Hall C HMS side Jun 16 Jun 16 500 0%
22 Crane 45' JLG's into position Jun 18 Jun 18 1d 500 0%
23 Crane HMS shield house wall sections down and secure to frame Jun 18 Jun 18 1d 500 0%
24 Disconnect and remove FPP Electronic racks Jun 19 Jun 19 1d 500 0%
25 RADCON support required Jun 20 Jun 20 1d 500 0%
26 Disconnect and remove HMS trigger electronics Jun 19 Jun 19 1d 500 0%
27 RADCON support required Jun 19 Jun 19 1d 500 0%
28 Remove small scintillator assembly in front of exit window Jun 20 Jun 20 1d 500 0%
29 Position and connect installation fixtures 67502-00019 Jun 23 Jun 24 2d 500 0%
30 Disconnect and remove wire chambers Jun 23 Jun 24 2d 500 0%
31 Place chambers in shipping crate and cover Jun 23 Jun 24 2d 500 0%
32 RADCON support required Jun 23 Jun 24 2d 500 0%
33 Set up and align installation fixtures for CH2 blocks Jun 25 Jun 26 2d 500 0%
34 RADCON support required Jun 25 Jun 26 2d 500 0%
35 Unbolt and slide out all CH2 blocks then crane out storage Jun 25 Jun 26 2d 500 0%
36 RADCON support required Jun 25 Jun 26 2d 500 0%
37 Remove installation fixture Jun 26 Jun 26 1d 500 0%
38 Unbolt and remove wire chamber ALU support frame Jun 26 Jun 26 1d 500 0%
39 Restore position for first hodoscope plane Jun 26 Jun 26 1d 500 0%
40 Reinstall Cerenkov detector Jun 26 Jun 26 1d 500 0%
41 Align Cerenkov detector and secure Jun 27 Jun 27 1d 500 0%
42 Reinstall aerogell chamber Jun 30 Jun 30 1d 500 0%
43 Install 2nd hodoscopes plane Jun 30 Jun 30 1d 500 0%
44 HMS detector hut light bulbs Jul 1 Jul 1 1d 500 0%
45 BIG CAL glass anneal Sep 1 Nov 5 500 0%
46 Uncover and prepare lead glass detector stack Jun 17 Jun 18 2d 500 0%
47 Crane and install and connect UV lights Jun 18 Jun 18 1d 500 0%
48 Reposition UV lights during anneal as required Jun 18 Aug 19 50d 500 0%
49 Disconnect UV lights and crane of BIG CAL Aug 26 Aug 26 1d 500 0%
50 Cover and seal lead glass stack Sep 1 Sep 3 3d 500 0%
51 Cryo Target disassembly and removal (from Dave Meekins) Jul 2 Jul 23 17d 500 0%
52 Warm up Cryo Target an vent scatting chamber Jun 9 Jun 10 2d 500 0%
53 Target Radiation cool down period Jun 17 Jun 23 5d 500 0%
54 Install pivot extensions and railing Jun 17 Jun 17 1d 500 0%
55 RADCON support required Jun 17 Jun 17 1d 500 0%
56 Remove scatting chamber windows Jun 18 Jun 18 1d 500 0%
57 RADCON support required Jun 18 Jun 18 1d 500 0%
58 Post run survey of target cells Jun 19 Jun 20 2d 500 0%
59 Crane in and place Groove 45' areal platform in place (beam left) Jun 23 Jun 23 1d 500 0%
60 Place 60' JLG (beam right) Jun 23 Jun 23 1d 500 0%
61 With Cryo group support un-sting target valve box from distribution can Jun 23 Jun 23 1d 500 0%
62 Disconnect plumbing and electronics from top of target Jun 24 Jun 24 1d 500 0%
63 Disconnect the refrigeration transfer lines and store on top of cable tray Jun 25 Jun 25 1d 500 0%
64 Tie back the plumbing and electrical lines for target Jun 25 Jun 25 1d 500 0%
65 Use lifting fixture and crane to remove target from pivot Jun 26 Jun 26 1d 500 0%
66 Disconnect cells and cell blocks and transfer them to the EEL Rad area. Jun 27 Jun 27 1d 500 0%
67 RADCON support required Jun 26 Jun 26 1d 500 0%
68 Place target on forklift and transfer it to EEL target group area Jun 30 Jun 30 1d 500 0%
69 Polarized Target installation and commissioning Jul 15 Sep 17 52d 500 0%
70 Transport target equipment deck, pivot and upper ALU deck to Hall C Jul 8 Jul 9 2d 500 0%
71 Relocate signal cables between shield hut and pivot to clear platform install. Jul 10 Jul 11 2d 500 0%
72 Layout and bolt equipment deck support legs to the floor Jul 14 Jul 14 1d 500 0%
73 Crane in and bolt deck onto support legs Jul 14 Jul 14 1d 500 0%
74 Weld end flanges to the pivot deck Jul 15 Jul 15 1d 500 0%
75 RADCON support required Jul 15 Jul 15 1d 500 0%
76 Install staircase, weld to deck then bolt to floor Jul 15 Jul 15 1d 500 0%
77 Install scattering chamber base on pivot Jul 16 Jul 16 1d 500 0%
78 Crane in scattering chamber and bolt to base Jul 16 Jul 16 1d 500 0%
79 Place LHE dewer and electronics racks onto equipment deck Jul 17 Jul 18 2d 500 0%
80 Install target control systems Jul 18 Jul 31 11d 500 0%
81 Place target into chamber Jul 21 Jul 21 1d 500 0%
82 Connect to vacuum system Jul 22 Jul 24 3d 500 0%
83 Connect cryogenic system, U-tubes etc. Jul 24 Jul 24 1d 500 0%
84 Pump out scattering chamber and leak check Jul 29 Aug 1 4d 500 0%
85 Target test cool down Oct 1 Oct 8 6d 500 0%
86 G-0 Magnet move from Hall C to long term storage (52 tons) Jul 7 Aug 1 500 0%
87 Move HMS to large angle to max floor space Jul 7 Jul 7 1d 500 0%
88 Clear floor space, move beam line and RAD parts to a secure location Jul 7 Jul 7 1d 500 0%
89 RADCON support required Jul 7 Jul 7 1d 500 0%
90 Move HKS magnets and FW close to the wall Jul 8 Jul 8 1d 500 0%
91 Assure BIG CAL and cable train are safe Jul 9 Jul 9 1d 500 0%
92 Move G-0 magnet into position and secure Jul 9 Jul 9 1d 500 0%
93 Remove 22" lead pipe, pack into box and move to lead storage Bld. Jul 9 Jul 9 1d 500 0%
94 RADCON support required Jul 9 Jul 9 1d 500 0%
95 Remove downstream end cap and lay onto cribbing Jul 7 Jul 7 1d 500 0%
96 RADCON support required Jul 11 Jul 14 2d 500 0%
97 Remove upstream end cap and lay onto cribbing Jul 9 Jul 9 1d 500 0%
98 RADCON support required Jul 11 Jul 14 2d 500 0%
99 Unbolt lead, pack into containers and move lead storage Bld. Jul 11 Jul 14 2d 500 0%
100 RADCON support required Jul 10 Jul 10 1d 500 0%
101 Remove all 8 titanium windows and place into storage box Jun 10 Jun 10 1d 500 0%
102 RADCON support required Jul 11 Jul 11 1d 500 0%
103 Bolt both end caps together, seal and move to lead storage Bld. Jul 11 Jul 11 1d 500 0%
104 RADCON support required Jul 11 Jul 11 1d 500 0%
105 Install shipping frame onto magnet, torque bolts and seal gaps Jul 18 Jul 22 3d 500 0%
106 Truck cribbing mats and rails into Hall and lay out for position 1 Jul 23 Jul 24 2d 500 0%
107 Move 2 hydraulic towers, pump, H beam and swivel in and setup Jul 23 Jul 23 1d 500 0%
108 Lineup towers, connect magnet to swivel and takeout slack Jul 24 Jul 24 1d 500 0%
109 Unbolt magnet from base, lift, rotate and move to the Hall center Jul 24 Jul 24 1d 500 0%
110 Set magnet on cribbing, disconnect and remove hydraulic towers. Jul 25 Jul 25 1d 500 0%
111 Move cribbing mats and rails to position 2 Jul 28 Jul 28 1d 500 0%
112 Set up 2 pairs of hydraulic towers with H beams Jul 28 Jul 28 1d 500 0%
113 Lift and rotate magnet 90 derg. then onto rollers and secure Jul 29 Jul 29 1d 500 0%
114 Pull magnet up the truck ramp and into position for loading Jul 29 Jul 29 1d 500 0%
115 Load magnet onto trailer, secure and move lead storage Bld. Jul 30 Jul 30 1d 500 0%
116 RADCON support required Jul 30 Jul 30 1d 500 0%
117 Unload magnet and roll into lead storage Bld. Jul 30 Jul 30 1d 500 0%
118 RADCON support required Jul 30 Jul 30 1d 500 0%
119 Remove all Lockwood equipment from Hall C Jul 30 Jul 30 1d 500 0%
120 Shrink-wrap G-0 magnet Aug 1 Aug 1 1d 500 0%
121 Setup N2 flow from CHL through magnet Aug 6 Aug 7 2d 500 0%
122 HES / HKS preparation (concrete, magnet assembly etc) Sep 8 Oct 6 500 0%
123 Drill and tap for hoist rings, then place 7/8" steel under new HES base Aug 6 Aug 7 2d 500 0%
124 Assemble HES magnets base with hilman rollers and hydraulic system Aug 11 Aug 12 2d 500 0%
125 Place lower dipole half in position and bolt down Aug 11 Aug 11 1d 500 0%
126 Move upper dipole half on top and torque down Aug 12 Aug 12 1d 500 0%
127 Crane Q1 into position next to dipole, align and torque down Aug 12 Aug 12 1d 500 0%
128 Crane Q2 into position next to dipole, align and torque down Aug 13 Aug 13 1d 500 0%
129 Connect vacuum chambers and leak check Aug 20 Aug 25 4d 500 0%
130 Fiducialize magnet assembly Aug 22 Aug 25 2d 500 0%
131 Layout of 9.5" concrete pad extension for new location of the HKS dipole Aug 22 Aug 22 1d 500 0%
132 Roll HES magnet assembly and HKS dipole close to the wall to clear space Aug 22 Aug 22 1d 500 0%
133 Brake open and remove concrete over the SOS rail section Aug 25 Aug 26 2d 500 0%
134 Unbolt and remove SOS rail section and transport to bone yard Aug 27 Aug 27 1d 500 0%
135 RADCON support required Aug 27 Aug 27 1d 500 0%
136 Remove all bolts and nuts from the SOS rail base plate Aug 27 Aug 27 1d 500 0%
137 Place plastic sheeting over the base plate, then temporary cove gap Aug 27 Aug 27 1d 500 0%
138 Build concrete forms as marked for new HKS dipole position and place rebar Sep 3 Sep 8 4d 500 0%
139 Fill SOS rail base gap with concrete and level Sep 4 Sep 4 1d 500 0%
140 Pore concrete into HKS extension forms, level and finish Sep 4 Sep 5 2d 500 0%
141 SANE beam line and low power dump installation Oct 7 Nov 6 500 0%
142 Remove only necessary railing and pivot extensions to fit detector platform Sep 2 Sep 2 1d 500 0%
143 Install and align Cerenkov detector platform Sep 2 Sep 3 2d 500 0%
144 Crane in and bolt down support beam and post for lead shielding boxes Sep 2 Sep 2 1d 500 0%
145 Align and weld box beam security brackets to pivot acc. to drwg. Sep 3 Sep 3 1d 500 0%
146 RADCON support required Sep 3 Sep 3 1d 500 0%
147 Weld security brackets for lead ALU shield boxes (SOS side) to pivot Sep 3 Sep 3 1d 500 0%
148 RADCON support required Sep 3 Sep 3 1d 500 0%
149 Place and secure ALU shield boxes on box beam and bolt down Sep 3 Sep 3 1d 500 0%
150 Place and bolt down lead shield boxes on the SOS side Sep 4 Sep 4 1d 500 0%
151 Assemble target chamber exit beam line section and support Sep 4 Sep 4 1d 500 0%
152 Assemble He beam line unistrud support frame on the floor (dwg. 6750400050) Sep 10 Sep 12 3d 500 0%
153 Layout anchor hole pattern for unistrud support frame Sep 9 Sep 9 1d 500 0%
154 Lift up beam line support frame with 25' spreader bar and bolt to floor Sep 10 Sep 10 1d 500 0%
155 Roll out He beam line bag and hang onto frame with crane (dwg. 6750400050) Sep 10 Sep 10 1d 500 0%
156 Align and secure entire beam line Sep 10 Sep 10 1d 500 0%
157 RADCON support required for work in beam dump area Sep 10 Sep 10 1d 500 0%
158 Align Cerenkov detector mirrors (on the floor) Sep 9 Sep 11 3d 500 0%
159 Place Cerenkov detector on platform Sep 8 Sep 8 1d 500 0%
160 Align Cerenkov detector and secure Sep 9 Sep 9 1d 500 0%
161 Connect all cables and detector gas system Sep 10 Sep 10 1d 500 0%
162 Mount lucite detectors onto BIG CAL Sep 9 Sep 9 1d 500 0%
163 Layout for 2nd beam line dump Sep 9 Sep 9 1d 500 0%
164 Crane in S4 steel blocks and place with 4 ton wall cane Sep 12 Sep 16 3d 500 0%
165 Install He-supply pipe for He bag (from gas Bld to beam dump) Sep 16 Sep 17 2d 500 0%
166 SOS disassembly Sep 26 Oct 7 500 0%
167 Remove SOS detectors Sep 26 Oct 2 5d 500 0%
168 RADCON support required Sep 22 Sep 25 4d 500 0%
169 Place rail section to large angle and shim to level Sep 29 Sep 29 1d 500 0%
170 Place all toe-clamps Sep 29 Sep 29 1d 500 0%
171 shim level and align Rail, then torque down toe-clamps Sep 29 Sep 29 1d 500 0%
172 Move SOS to smaller angle Sep 29 Sep 29 1d 500 0%
173 Remove hydraulic fluid Sep 29 Sep 29 1d 500 0%
174 RADCON support required Sep 29 Sep 29 1d 500 0%
175 Remove hydraulic tank and pump Sep 29 Sep 29 1d 500 0%
176 RADCON support required Sep 29 Sep 29 1d 500 0%
177 Disconnect and remove A/C unit Sep 29 Sep 29 1d 500 0%
178 RADCON support required Sep 29 Sep 29 1d 500 0%
179 Remove SOS doors Sep 29 Sep 29 1d 500 0%
180 RADCON support required Sep 29 Sep 29 1d 500 0%

Resources

Name Short name Type Group Email Cost
ACC tech's A Work 0
Align. Group / Hall C Tech's A Work 0
Alignment Group A Work 0
Alignment Group / Hall C Tech's A Work 0
Contractor C Work 0
Cryo Target Tech's C Work 0
Design/Eng group D Work 0
Eric Christy / Paul Hood E Work 0
Experimenters E Work 0
Experimenters/ H C Tech's E Work 0
Hall C Tech's H Work 0
Hall C Tech's / ESH&Q H Work 0
Hall C Tech's / Electri. H Work 0
Hall C Tech's / Experim. H Work 0
Hall C Tech's / Hamlet H Work 0
Hall C Tech's / RADCO H Work 0
Hall C Tech's / RADCON H Work 0
Hall-C tech's H Work 0
Lockwood L Work 0
Lockwood / Hall C Tech's L Work 0
Miscellaneous M Work 0
RADCON R Work 0
RADCON tech's R Work 0
Survey group S Work 0
Target Group / Cryo group T Work 0
Target Group / Experim. T Work 0
Target Group / Experimenters T Work 0
Users/Hall C tech's U Work 0