    User name lgan

    Log entry time 15:11:35 on February 25,2000

    Entry number 21569

    keyword=changes in run plan

    An controlled access have been called to fix HMS Q3. Beam was
    interupted. It may take about 30 min until we can get beam back.
    We decide to change the run plan. We will leave the beam spot size
    tunning for the latter time, and start to set up the beam transport
    to the dump line in order to utilize MCC man power. BeO target
    has been inserted in place. We will turn on the spliter magnet and
    start beam dump line tunning as soon as the beam comes back.
    We will finallize the beam optics setup later.