User name lgan
Log entry time 15:11:35 on February 25,2000
Entry number 21569
keyword=changes in run plan
An controlled access have been called to fix HMS Q3. Beam was
interupted. It may take about 30 min until we can get beam back.
We decide to change the run plan. We will leave the beam spot size
tunning for the latter time, and start to set up the beam transport
to the dump line in order to utilize MCC man power. BeO target
has been inserted in place. We will turn on the spliter magnet and
start beam dump line tunning as soon as the beam comes back.
We will finallize the beam optics setup later.