• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name cdaq

    Log entry time 15:18:31 on March 5, 2000

    Entry number 22381

    keyword=Run 31572: Production run on C target

    Run #31572 (sosonly) - /cdaqs1/data1/hnss_31572.log

    Beam Energy (MeV) 18701864
    SOS Momentum (GeV/c) 1.2401.240
    SOS Angle -1.001.85
    Target NUMBER 44
    SOS Q Set Current 444.24444.24
    SOS Q Field 7132.007132.00
    SOS B1 Set Current 588.68588.68
    SOS B1 Hall Probe 14129.5014130.00
    SOS B2 Set Current 498.14498.14
    SOS B2 Hall Probe -14386.50-14386.50
    Splitter Set Current 419.93300419.93300
    Splitter Current Readback 419.791419.791
    Enge Set Current 362.58362.58
    Enge Current Readback 360.22360.18

    Production run on C target
    Target: C
    Trigger: (4/4)*GCbar*ACbar*LC + prescaled 4/4 (A+B)
    Collimator: Large
    Beam current: 0.5 uA
    ps1=1 ps2=1
    Raster off
    SSD Vth=320mV(Except for plane #6,7,8, Vth(#8)=360mV)
    BPM 3H00C (0.542,-1.556)
    Beam central position on OTR 0.87mm,
    BPM IPM3C12.XPOS=-0.06mm