• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name cdaq

    Log entry time 07:59:28 on March 6, 2000

    Entry number 22436

    keyword=Beam Time Accounting
    Hall C

    3/6/2000 0000-0800
    Experiment #: E89-009
    Shift Leader: Sam Danagoulian
    Shift Workers: Henry Juenst

    00000100020003000400050006000700Total Time
    Acceptable Beam
    in Use
    1 5 0 0 0 0 0 0 1.08333333333333
    Beam Available
    but Not in Use
    0 0 0 0 0 0 0 0 0
    Beam Not Available
    or Unacceptable
    0 55 1 1 1 1 1 1 6.91666666666667
    Accelerator Con-
    figuration Chage
    0 0 0 0 0 0 0 0 0
    Experiment
    Ready
    1 1 1 1 1 1 1 1 8
    Planned Config-
    uration Change
    0 0 0 0 0 0 0 0 0
    Unplanned
    Experiment Down
    0 0 0 0 0 0 0 00
    Hall not
    ready reasons
    Target 0 0 0 0 0 0 0 0 0
    HNSS 0 0 0 0 0 0 0 0 0
    SOS 0 0 0 0 0 0 0 0 0
    Data Acq 0 0 0 0 0 0 0 0 0
    Other 0 0 0 0 0 0 0 0 0

    Comments: 0:00. The energy is locked by Hall A. At 0:40 the FFB is locked to Hall C, Hall A takes 40 min to change the configuration of the spectrometer. At 1:05 the network at MCC is down, no control over the beam At 3:22 we are gonna have a pulsed beam. We did have a pulsed beam, but then that's it. Until end of the shift.

    Data Entry by: S.Danagoulian