0000 | 0100 | 0200 | 0300 | 0400 | 0500 | 0600 | 0700 | Total Time | |
---|---|---|---|---|---|---|---|---|---|
Acceptable Beam in Use | 1 | 5 | 0 | 0 | 0 | 0 | 0 | 0 | 1.08333333333333 |
Beam Available but Not in Use | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Beam Not Available or Unacceptable | 0 | 55 | 1 | 1 | 1 | 1 | 1 | 1 | 6.91666666666667 |
Accelerator Con- figuration Chage | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Experiment Ready | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 8 |
Planned Config- uration Change | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Unplanned Experiment Down | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Hall not ready reasons | |||||||||
Target | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
HNSS | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
SOS | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Data Acq | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Other | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Comments: 0:00. The energy is locked by Hall A. At 0:40 the FFB is locked to Hall C, Hall A takes 40 min to change the configuration of the spectrometer. At 1:05 the network at MCC is down, no control over the beam At 3:22 we are gonna have a pulsed beam. We did have a pulsed beam, but then that's it. Until end of the shift.
Data Entry by: S.Danagoulian