• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name cdaq

    Log entry time 15:01:56 on March 6, 2000

    Entry number 22462

    keyword=Run 31625: Production run on CH2 target

    Run #31625 (sosonly) - /cdaqs1/data3/hnss_31625.log

    Beam Energy (MeV) 18701864
    SOS Momentum (GeV/c) 1.2401.240
    SOS Angle -1.001.85
    Target NUMBER 33
    SOS Q Set Current 444.24444.24
    SOS Q Field 7136.007136.00
    SOS B1 Set Current 588.68588.68
    SOS B1 Hall Probe 14130.0014130.00
    SOS B2 Set Current 498.14498.14
    SOS B2 Hall Probe -14386.00-14386.00
    Splitter Set Current 419.93300419.93300
    Splitter Current Readback 419.776419.776
    Enge Set Current 362.46362.46
    Enge Current Readback 360.04360.13

    Production run on CH2 target
    Target: CH2
    Trigger: (3/4)*GCbar*ACbar*LC + prescaled 3/4 (A+B)
    Collimator: Large
    Beam current: 1.0 uA
    ps1=1 ps2=1
    Raster On
    LC Vth=10mv