Beam Energy (MeV) | 1870 | 1864 |
SOS Momentum (GeV/c) | 1.240 | 1.240 |
SOS Angle | -1.00 | 1.85 |
Target NUMBER | 4 | 4 |
SOS Q Set Current | 444.24 | 444.24 |
SOS Q Field | 7136.00 | 7136.00 |
SOS B1 Set Current | 588.68 | 588.68 |
SOS B1 Hall Probe | 14130.00 | 14130.00 |
SOS B2 Set Current | 498.14 | 498.14 |
SOS B2 Hall Probe | -14386.50 | -14386.50 |
Splitter Set Current | 419.93300 | 419.93300 |
Splitter Current Readback | 419.760 | 419.776 |
Enge Set Current | 362.57 | 362.46 |
Enge Current Readback | 360.13 | 360.16 |
Production run on C target
Target: C
Trigger: (3/4)*GCbar*ACbar + prescaled 3/4 (A+B)
Collimator: Large
Beam current: 0.35 uA
ps1=1 ps2=1
Raster On
No LC
Beam position x=0.593 y=-1.401
OTR x=0.75