• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name cdaq

    Log entry time 06:41:47 on March 10, 2000

    Entry number 22887

    keyword=Run 31912: C production run

    Run #31912 (sosonly) - /cdaqs1/data4/hnss_31912.log

    Beam Energy (MeV) 18701864
    SOS Momentum (GeV/c) 1.2401.240
    SOS Angle -1.001.85
    Target NUMBER 44
    SOS Q Set Current 444.24444.24
    SOS Q Field 7132.007132.00
    SOS B1 Set Current 588.68588.68
    SOS B1 Hall Probe 14129.5014129.50
    SOS B2 Set Current 498.14498.14
    SOS B2 Hall Probe -14386.50-14386.50
    Splitter Set Current 420.40000420.40000
    Splitter Current Readback 420.203420.203
    Enge Set Current 362.46362.46
    Enge Current Readback 360.12360.12

    C production run
    Target: 12C
    Trigger: prescale B+A
    Collimator: Large
    Beam current: 0.50uA
    ps1=1 ps2=1

    3/4 + AC bar + GC bar + LC + SHLO bar
    SHLO threshold 240 mV

    raster off