    Log entry time 23:20:43 on March 11, 2000

    Entry number 23025

    keyword=Run 32000: C production run

    Run #32000 (sosonly) - /cdaqs1/data7/hnss_32000.log

    Beam Energy (MeV) 18701864
    SOS Momentum (GeV/c) 1.2401.240
    SOS Angle -1.001.85
    Target NUMBER 44
    SOS Q Set Current 444.24444.24
    SOS Q Field 7132.007132.00
    SOS B1 Set Current 588.68588.68
    SOS B1 Hall Probe 14129.0014129.50
    SOS B2 Set Current 498.14498.14
    SOS B2 Hall Probe -14386.00-14386.50
    Splitter Set Current 420.40000420.40000
    Splitter Current Readback 420.188420.233
    Enge Set Current 362.39362.46
    Enge Current Readback 360.04360.16

    C production run
    Target: C
    Trigger: prescale B+A
    Collimator: Large
    Beam current: 0.50uA
    ps1=1 ps2=1

    3/4 + AC bar + GC bar + LC + SHLO bar
    SHLO threshold 240 mV

    raster off