• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name cdaq

    Log entry time 15:49:10 on March 18, 2000

    Entry number 23396

    keyword=Run 32256: production run on C12

    Run #32256 (sosonly) - /cdaqs1/data5/hnss_32256.log

    Beam Energy (MeV) 18701864
    SOS Momentum (GeV/c) 1.2401.240
    SOS Angle -1.001.85
    Target NUMBER 44
    SOS Q Set Current 444.20444.20
    SOS Q Field 7132.007136.00
    SOS B1 Set Current 588.70588.70
    SOS B1 Hall Probe 14129.0014129.00
    SOS B2 Set Current 498.09498.09
    SOS B2 Hall Probe -14385.00-14385.50
    Splitter Set Current 420.57000420.57000
    Splitter Current Readback 420.310420.310
    Enge Set Current 362.46362.40
    Enge Current Readback 360.09360.00

    production run on C12
    Target: C12
    Trigger: Prescaled (3/4)*GCbar
    +3/4*GCbar*LC*ACbar*SHLObar*S1Xbar (A+B)
    Collimator: Large
    Beam current: 0.65uA
    ps1=1 ps2=1

    raster on
    SSD bias voltage = 80 V,
    SSD vth's are 320 mV