Beam Energy (MeV) | ERR | 1864 |
SOS Momentum (GeV/c) | 1.240 | 1.240 |
SOS Angle | ERR | 1.85 |
Target NUMBER | 4 | 4 |
SOS Q Set Current | ERR | 444.20 |
SOS Q Field | ERR | 7132.00 |
SOS B1 Set Current | 588.70 | 588.70 |
SOS B1 Hall Probe | 14129.50 | 14129.50 |
SOS B2 Set Current | 498.09 | 498.09 |
SOS B2 Hall Probe | -14385.50 | -14385.50 |
Splitter Set Current | 420.57000 | 420.57000 |
Splitter Current Readback | 420.310 | 420.310 |
Enge Set Current | 362.46 | 362.46 |
Enge Current Readback | 360.13 | 360.13 |
production run on C12;
Target: C12
Trigger: 4/4*GCbar*LC*ACbar (A only)
Collimator: Large
Beam current: 0.60uA
ps1=1 ps2=1
raster off
SSD bias voltage = 80 V,
SSD vth's are 340 mV