• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name cdaq

    Log entry time 17:14:55 on March 24, 2000

    Entry number 23895

    keyword=Run 32536: Production run on CH2

    Run #32536 (sosonly) - /cdaqs1/data3/hnss_32536.log

    Beam Energy (MeV) 18701864
    SOS Momentum (GeV/c) 1.2401.240
    SOS Angle -1.001.85
    Target NUMBER 33
    SOS Q Set Current 444.20444.20
    SOS Q Field 7132.007132.00
    SOS B1 Set Current 588.70588.70
    SOS B1 Hall Probe 14129.0014129.00
    SOS B2 Set Current 498.09498.09
    SOS B2 Hall Probe -14385.00-14385.00
    Splitter Set Current 420.57000420.57000
    Splitter Current Readback 420.279420.279
    Enge Set Current 362.45362.45
    Enge Current Readback 360.13360.13

    Production run on CH2
    Target: CH2
    Trigger:
    Prescaled
    +4/4*GCbar*LC*ACbar (A+B)
    Collimator: Large
    Beam current: 0.5uA
    ps1=1 ps2=1

    raster on
    SSD bias voltage = 80 V,
    SSD vth's are 340 mV

    MCC is running the crust test (30 min)