Beam Energy (MeV) | 1870 | 1864 |
SOS Momentum (GeV/c) | 1.240 | 1.240 |
SOS Angle | -1.00 | 1.85 |
Target NUMBER | 3 | 3 |
SOS Q Set Current | 444.20 | 444.20 |
SOS Q Field | 7132.00 | 7132.00 |
SOS B1 Set Current | 588.70 | 588.70 |
SOS B1 Hall Probe | 14129.00 | 14129.50 |
SOS B2 Set Current | 498.09 | 498.09 |
SOS B2 Hall Probe | -14385.50 | -14385.50 |
Splitter Set Current | 420.57000 | 420.57000 |
Splitter Current Readback | 420.279 | 420.279 |
Enge Set Current | 362.46 | 362.43 |
Enge Current Readback | 360.16 | 360.07 |
Production run on CH2
Target: CH2
Trigger:
Prescaled+4/4*GCbar*LC*ACbar (A+B)
Collimator: Large
Beam current: 0.5uA
ps1=1 ps2=1
raster on
SSD bias voltage = 80 V,
SSD vth's are 340 mV
OTR in