• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name cdaq

    Log entry time 03:04:10 on March 28, 2000

    Entry number 24010

    keyword=Run 32593: Production run on CH2

    Run #32593 (sosonly) - /cdaqs1/data4/hnss_32593.log

    Beam Energy (MeV) 18701864
    SOS Momentum (GeV/c) 1.2401.240
    SOS Angle -1.001.85
    Target NUMBER 33
    SOS Q Set Current 444.20444.20
    SOS Q Field 7132.007132.00
    SOS B1 Set Current 588.70588.70
    SOS B1 Hall Probe 14129.0014129.50
    SOS B2 Set Current 498.09498.09
    SOS B2 Hall Probe -14385.50-14385.50
    Splitter Set Current 420.57000420.57000
    Splitter Current Readback 420.279420.279
    Enge Set Current 362.46362.43
    Enge Current Readback 360.16360.07

    Production run on CH2
    Target: CH2
    Trigger:

    Prescaled+4/4*GCbar*LC*ACbar (A+B)
    Collimator: Large
    Beam current: 0.5uA
    ps1=1 ps2=1

    raster on
    SSD bias voltage = 80 V,
    SSD vth's are 340 mV

    OTR in