• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name cdaq

    Log entry time 23:20:21 on March 30, 2000

    Entry number 24125

    keyword=Run 32638: CH2 production. otr out.

    Run #32638 (sosonly) - /cdaqs1/data6/hnss_32638.log

    Beam Energy (MeV) 18701864
    SOS Momentum (GeV/c) 1.2401.240
    SOS Angle -1.001.85
    Target NUMBER 44
    SOS Q Set Current 444.20444.20
    SOS Q Field 7132.007132.00
    SOS B1 Set Current 588.70588.70
    SOS B1 Hall Probe 14129.0014129.50
    SOS B2 Set Current 498.09498.09
    SOS B2 Hall Probe -14385.50-14385.50
    Splitter Set Current 419.93300420.57000
    Splitter Current Readback 419.623420.279
    Enge Set Current 362.46362.43
    Enge Current Readback 360.16360.07

    CH2 production. otr out.

    Prescaled+4/4*GCbar*LC*ACbar (A+B)
    Collimator: Large
    Beam current: 0.45 uA
    ps1=1 ps2=1

    raster on
    SSD bias voltage = 80 V,
    SSD vth's are 340 mV