Jefferson Lab Hall C Logbook for April 00 - runstarts omitted
Main INDEX
Sunday
25553 04/30/00 23:55 hamlet shift summary
25552 04/30/00 23:55 cdaq Beam Time Accounting
25551 04/30/00 23:54 hamlet SSD seems geting worse
25547 04/30/00 22:07 Razmik BPM
25542 04/30/00 20:01 Miyoshi SSD : bias status with 0.8uA beam
25540 04/30/00 19:59 Miyoshi SSD : replaced SSD #104 to #116
25539 04/30/00 19:35 hamlet ssd fixed !
25534 04/30/00 19:04 hamlet accidental "restricted access" access access
25532 04/30/00 18:59 hamlet enge magnet "on"
25529 04/30/00 17:11 hamlet enge magnet off for SSD
25528 04/30/00 17:09 hamlet ask MCC for access
25527 04/30/00 16:45 hamlet ssd problem not fixed
25525 04/30/00 16:29 hamlet controlled access for SSD
25524 04/30/00 16:28 hamlet ssd hit patern problem
25523 04/30/00 16:04 Razmik BPM
25522 04/30/00 15:55 cdaq Beam Time Accounting
25515 04/30/00 13:32 xfzhu BPM and Energy monitor screen
25512 04/30/00 08:44 yuan MCC Takes beam off at 8:33 for HallB beam energy change
25511 04/30/00 08:41 xfzhu Disk change
25509 04/30/00 07:59 cdaq Beam Time Accounting
25507 04/30/00 07:24 PETKOVIC BPMScreen
25499 04/30/00 03:41 PETKOVIC BPMScreen
Saturday
25492 04/29/00 23:59 cdaq Beam Time Accounting
25491 04/29/00 23:58 hamlet shift summary
25489 04/29/00 23:45 Razmik BPM
25488 04/29/00 23:39 hamlet unstable beam for #33491
25486 04/29/00 21:00 hamlet Still no beam
25485 04/29/00 20:37 hamlet ssd problem fixed
25482 04/29/00 19:10 hamlet run #33486-488 junk
25481 04/29/00 19:09 hamlet ssd bias problem
25478 04/29/00 18:25 hamlet changed disk
25473 04/29/00 16:56 Razmik BPM
25471 04/29/00 16:05 cdaq Beam Time Accounting
25468 04/29/00 15:58 ysato OTR out before the production run
25463 04/29/00 15:24 Fujii HNSS hodoscope rate(7Li,0.77uA)
25462 04/29/00 14:40 Fujii HNSS hodoscope rate(7Li,0.35uA)
25460 04/29/00 14:03 yuan Effect of Beam Current on Real Coin. Yield
25459 04/29/00 13:55 xfzhu Energy monitor screen
25457 04/29/00 13:50 Fujii HNSS hodoscope rate (6Li,0.33uA)
25456 04/29/00 13:46 Fujii HNSS hodoscope rate (6Li,0.73uA)
25455 04/29/00 13:29 yuan BPM Screen
25454 04/29/00 13:22 Fujii HNSS hodoscope rate (6Li,1.06uA)
25452 04/29/00 13:02 Fujii HNSS hodoscope rate (Si,1.5uA)
25449 04/29/00 12:22 Fujii HNSS hodoscope rate (Si,1.0uA)
25448 04/29/00 12:07 Fujii ENGE hodoscope ADC gate timing changed from Run33471
25443 04/29/00 10:31 ukai SSD bias statua (sorry i forgot to put figure)
25442 04/29/00 10:28 ukai SSD bias status no beam
25441 04/29/00 10:24 yuan he trigger for run33466 is positron trigger: 4/4*GC
25438 04/29/00 09:44 yuan CW beam at Hallc from 9:40 am
25436 04/29/00 09:01 yuan Take carbon data with pulse beam I=0.08 uA
25434 04/29/00 07:50 cdaq Beam Time Accounting
Friday
25433 04/28/00 19:06 ukai SSD bias status no beam
25431 04/28/00 14:43 Fujii Hodoscope rate study summary
25430 04/28/00 14:23 Fujii Hodoscope rate study summary
25429 04/28/00 11:59 ukai SSD bias status
25421 04/28/00 08:18 Fujii SOS & ENGE magnet DATA
Thursday
25414 04/27/00 18:11 ukai SSD bias status
25409 04/27/00 14:54 ukai SSD bias status
25405 04/27/00 13:54 ukai SSD bias status no beam
25402 04/27/00 11:44 ukai Fan comes back.
25400 04/27/00 11:36 ukai SSD bias status no beam
25398 04/27/00 10:47 mack magnetic card reader disabled for tour
Wednesday
25397 04/26/00 19:03 ukai Fan for ECL driver board was out of order .
25396 04/26/00 18:26 ysato BGO detector histogram
25395 04/26/00 17:39 ukai SSD bias status
25392 04/26/00 11:01 Miyoshi Reset SSD HV
25391 04/26/00 10:42 saw BGO detector
Tuesday
25389 04/25/00 15:45 Ukai SSD simple noise test results
25388 04/25/00 09:05 Miyoshi SSD : bias status : No beam
25386 04/25/00 08:59 Miyoshi run 33432 and 33433 : cosmic run
Monday
25384 04/24/00 11:27 vulcan sdc2v1 problems
25382 04/24/00 10:19 Mack Vulcan's v-plane quandary
25381 04/24/00 08:58 cdaq Beam Time Accounting
25367 04/24/00 06:15 Miyoshi SSD : bias status : No beam
25365 04/24/00 06:05 ysato CH2 w/o raster accident.
25364 04/24/00 06:04 ukai SSD bias status np beam
25363 04/24/00 06:02 Fujii Trigger rate study
25361 04/24/00 05:38 Miyoshi SSD : bias status : 0.6uA beam
25358 04/24/00 05:02 Fujii HNSS hodoscope rate(9Be,2.0uA)
25355 04/24/00 04:40 Fujii HNSS hodoscope rate(9Be,1.0uA)
25353 04/24/00 04:03 Fujii HNSS hodoscope rate(11B,0.25uA)
25352 04/24/00 03:41 Fujii HNSS hodoscope rate(B11,0.5uA)
25350 04/24/00 03:22 Fujii HNSS hodoscope rate(11B,0.73uA)
25348 04/24/00 03:08 Fujii HNSS hodoscope rate(11B,1.0uA)
25346 04/24/00 03:06 Fujii HNSS hodoscope rate (11B,1.3uA)
25344 04/24/00 02:46 Fujii HNSS hodoscope rate(10B,1.3uA)
25342 04/24/00 02:14 Fujii HNSS hodoscope rate(10B,0.6uA)
25339 04/24/00 01:38 Fujii HNSS hodoscope rate(10B,0.3uA)
25338 04/24/00 01:22 Fujii HNSS hodoscope rate(10B,1.0uA)
25336 04/24/00 01:04 Fujii HNSS hodoscope rate(C,0.1uA)
25333 04/24/00 00:27 Fujii HNSS hodoscope rate(C,0.2uA)
25332 04/24/00 00:00 Fujii HNSS hodoscope rate(C,0.3uA)
Sunday
25330 04/23/00 23:58 cdaq Beam Time Accounting
25328 04/23/00 23:37 Fujii HNSS hodoscope rate(C,0.4uA)
25326 04/23/00 23:35 Yamaguchi Hodoscope channel
25319 04/23/00 22:37 Fujii HNSS hodoscope rate (C,0.5uA)
25318 04/23/00 22:16 Fujii HNSS hodoscope rate(C,I=0.7uA)
25316 04/23/00 22:14 murad current dependence study
25315 04/23/00 22:13 murad BPM screen.
25314 04/23/00 22:09 Fujii HNSS hodoscope rates
25302 04/23/00 16:41 Guanghua Xu Energy Monitor screen
25300 04/23/00 16:38 Guanghua Xu BPM screen
25298 04/23/00 15:56 hamlet shift summary
25297 04/23/00 15:56 cdaq Beam Time Accounting
25293 04/23/00 14:41 hamlet splter/enge&bcm
25292 04/23/00 14:38 hamlet energy/bpm screen
25285 04/23/00 11:46 Razmik BPM
25281 04/23/00 10:37 hamlet Rebooted all ROC's
25276 04/23/00 09:16 hamlet disk change
25272 04/23/00 08:12 Razmik BPM
25271 04/23/00 07:59 cdaq Beam Time Accounting
Saturday
25250 04/22/00 23:59 cdaq Beam Time Accounting
25247 04/22/00 23:09 smithg bpm & energy log
25239 04/22/00 20:02 smithg bpm & energy log
25236 04/22/00 19:08 smithg mcc computers crash
25234 04/22/00 18:48 ukai SSD bias status no beam
25231 04/22/00 17:27 Ukai SSD noise check result
25230 04/22/00 17:19 Guanghua Xu Energy Monitor screen
25229 04/22/00 17:17 Guanghua Xu BPM screen
25226 04/22/00 17:09 smithg otr
25225 04/22/00 16:48 Ukai SSD efficiency%threshold
25224 04/22/00 16:48 smithg bpm & energy log
25222 04/22/00 15:54 cdaq Beam Time Accounting
25221 04/22/00 15:54 hamlet shift summary
25220 04/22/00 15:30 hamlet will be no beam ~ 1. hours
25219 04/22/00 15:19 hamlet will be no Beam ~15min?
25214 04/22/00 13:29 Razmik Beam current
25213 04/22/00 13:26 Razmik BPM
25211 04/22/00 12:43 hamlet enge magnet trip
25206 04/22/00 10:39 razmik Beam current
25205 04/22/00 10:36 razmik BPM
25198 04/22/00 07:58 Danagoulian Shift summary
25197 04/22/00 07:57 cdaq Beam Time Accounting
25196 04/22/00 07:41 petkovic BPMScreen
25189 04/22/00 05:24 mharvey BPMENERGYSCREEN
25181 04/22/00 00:47 petkovic ScanChecklist
Friday
25180 04/21/00 23:56 cdaq Beam Time Accounting
25179 04/21/00 20:44 markowitz lightning strike
25171 04/21/00 17:05 Guanghua Xu Energy Monitor screen
25170 04/21/00 17:02 Guanghua Xu BPM screen
25166 04/21/00 16:06 hamlet shift summary
25165 04/21/00 16:06 cdaq Beam Time Accounting
25163 04/21/00 15:31 hamlet will be no beam up to ~16:00
25157 04/21/00 14:08 ukai SSD bias status no beam
25155 04/21/00 14:06 hamlet will be no beam ~1.0 hours
25153 04/21/00 13:40 hamlet split-pole magnet trip
25149 04/21/00 12:32 xfzhu C missing mass spectrum update
25145 04/21/00 11:14 hamlet BCM/Spliter
25144 04/21/00 11:12 razmik energy/bpm screen
25138 04/21/00 09:00 hamlet run #33260-261 junk
25134 04/21/00 08:10 Hamlet BPM
25133 04/21/00 07:57 cdaq Beam Time Accounting
25132 04/21/00 07:56 Danagoulian Shift Summary
25124 04/21/00 05:27 Petkovic BPM Energy Screen
25120 04/21/00 04:00 Danagoulian Energy Monitor
25114 04/21/00 01:59 petkovic BPM Energy monitor screen
25108 04/21/00 00:04 garrow shift summary
25107 04/21/00 00:04 cdaq Beam Time Accounting
Thursday
25106 04/20/00 23:40 garrow bpm/energy screens
25101 04/20/00 21:36 garrow bpm/energy screens
25097 04/20/00 19:40 garrow 7:35 MCC takes beam cryo problem in south linac
25096 04/20/00 19:35 garrow bpm/energy screens
25090 04/20/00 17:40 Miyoshi the manual is found.
25089 04/20/00 17:33 Miyoshi HNSS special operating manual missing...???
25086 04/20/00 16:45 garrow bpm/energy screens
25085 04/20/00 16:39 garrow STRANGE DISK PROBLEM
25083 04/20/00 16:29 ysato online kumac file fixed
25081 04/20/00 16:01 cdaq Beam Time Accounting
25080 04/20/00 15:56 hgj KUMAC file missing
25075 04/20/00 14:16 hgj energy monitor & bpm
25072 04/20/00 13:20 hgj Online, KUMAC file missing
25070 04/20/00 13:05 hgj disk change
25068 04/20/00 12:39 xfzhu New C missing mass spectrum
25059 04/20/00 09:11 hgj SSD threshold
25057 04/20/00 08:43 hgj Roc 3
25054 04/20/00 08:05 cdaq Beam Time Accounting
25053 04/20/00 08:04 Danagoulian Shift summary
25043 04/20/00 04:32 danagoulian BPM, Energy, current monitor screen
25036 04/20/00 02:30 danagoulian BPM, Energy monitor screen
Wednesday
25029 04/19/00 23:56 cdaq Beam Time Accounting
25028 04/19/00 23:56 garrow shift summary
25025 04/19/00 22:49 garrow bpm/energy screens
25018 04/19/00 20:23 garrow bpm/energy screens
25013 04/19/00 18:42 cdaq Beam Time Accounting
25009 04/19/00 17:15 garrow bpm/energy screens
25008 04/19/00 17:12 smithg roc3 crash
25006 04/19/00 16:44 Miyoshi Runinfo : run33166
25003 04/19/00 16:23 Miyoshi Runinfo:run33165
25001 04/19/00 15:25 Miyoshi SSD : threshold = 340mV
24999 04/19/00 15:19 Miyoshi SSD : threshold =300mV
24998 04/19/00 14:59 ysato HNSS hodoscope offset parameters for 0.5uA Carbon data
24995 04/19/00 13:57 hgj energy monitor & bpm
24992 04/19/00 13:00 razmik data disk changed
24989 04/19/00 12:07 hgj BPM
24983 04/19/00 10:08 hgj energy monitor & bpm
24977 04/19/00 07:56 cdaq Beam Time Accounting
24971 04/19/00 05:32 markowitz sos quad field
24969 04/19/00 05:24 markowitz screen shots
24968 04/19/00 05:23 markowitz bpm
24958 04/19/00 01:23 cdaq Beam Time Accounting
Tuesday
24950 04/18/00 22:27 samuel run 33120 - 33124 was junk
24941 04/18/00 19:32 Guanghua Xu Energy Monitor screen
24938 04/18/00 18:53 samuel BPM screen
24937 04/18/00 18:44 samuel BPM screen
24930 04/18/00 16:58 xfzhu C missing mass spectrum from low current runs
24927 04/18/00 16:03 hgj BPM gone
24926 04/18/00 16:01 cdaq Beam Time Accounting
24924 04/18/00 15:18 hgj energy monitor & bpm
24923 04/18/00 15:03 hgj EB1 problem
24916 04/18/00 12:46 hgj beam current - watch it
24915 04/18/00 12:43 Tang Increase beam current
24913 04/18/00 12:16 hgj energy monitor & bpm
24912 04/18/00 12:14 hgj new beam current
24906 04/18/00 09:23 hgj energy monitor & bpm
24904 04/18/00 08:50 Miyoshi SSD : bias status : 0.5uA beam
24901 04/18/00 07:51 cdaq Beam Time Accounting
24896 04/18/00 06:13 markowitz enge
24895 04/18/00 06:12 markowitz bpm
24893 04/18/00 00:27 cdaq Beam Time Accounting
Monday
24892 04/17/00 20:40 Jinghua SOS and ENGE magnets on
24891 04/17/00 20:38 Jinghua Target change to 12C
24890 04/17/00 16:11 hgj chc1hp stalled
24889 04/17/00 16:03 cdaq Beam Time Accounting
24888 04/17/00 15:36 mack hall c entrance magnetic card system disabled
24887 04/17/00 14:13 hickson gas system
24886 04/17/00 14:02 hickson water leak, splitter magnet
24884 04/17/00 11:52 Miyoshi SSD : bias status : No beam
24877 04/17/00 10:57 hgj Water leak
24876 04/17/00 10:28 hgj Water leak, splitter magnet
24872 04/17/00 08:15 hgj energy monitor & bpm (mem prob!)
24871 04/17/00 07:56 hamlet shift summary
24870 04/17/00 07:56 cdaq Beam Time Accounting
24868 04/17/00 07:28 hamlet beamcurrent/magnets
24867 04/17/00 07:26 hamlet energy/bpm screen
24860 04/17/00 04:24 jroche water in the hall ??
24859 04/17/00 04:00 jroche beam screen 2
24858 04/17/00 03:59 jroche beam screen
24852 04/17/00 00:33 jroche beam screens 2
24851 04/17/00 00:31 jroche beam screens
Sunday
24849 04/16/00 23:58 cdaq Beam Time Accounting
24848 04/16/00 23:56 baker Shift Summary
24843 04/16/00 21:11 baker SOS ethane gas
24839 04/16/00 18:41 Miyoshi SSD : bias scan results
24837 04/16/00 17:53 Miyoshi SSD : bias status : 0.95uA beam
24836 04/16/00 17:30 Guanghua Xu Energy Monitor screen
24835 04/16/00 17:28 Guanghua Xu BPM screen
24827 04/16/00 16:05 cdaq Beam Time Accounting
24821 04/16/00 13:02 smithg bpm & energy screens
24816 04/16/00 10:03 markowitz enge
24815 04/16/00 10:01 markowitz bpm
24813 04/16/00 09:54 markowitz daily rf check
24811 04/16/00 09:38 markowitz beam back
24810 04/16/00 09:33 markowitz mcc update
24809 04/16/00 08:48 markowitz beam gone
24806 04/16/00 07:50 Keppel Shift Summary
24805 04/16/00 07:49 cdaq Beam Time Accounting
24803 04/16/00 06:36 Jinghua BPM screens
24793 04/16/00 00:58 Keppel beam position
24792 04/16/00 00:49 Keppel minor daq problem
24790 04/16/00 00:41 Keppel Enge trip
Saturday
24788 04/15/00 23:41 cdaq Beam Time Accounting
24786 04/15/00 23:12 cdaq Beam Time Accounting
24775 04/15/00 17:09 Miyoshi Run info. : Run32967 - Run33004
24774 04/15/00 16:58 Abdellah bpm run 33012
24771 04/15/00 15:55 yuan missing mass spectrum from old high current Ch2 runs( run 32170-32255)
24769 04/15/00 14:59 gueye Hodoscopes + Target
24768 04/15/00 14:42 gueye BPM & Energy screens
24767 04/15/00 14:39 gueye Change disk to data6
24765 04/15/00 14:39 gueye SSD ADCs and target offset
24764 04/15/00 14:33 gueye Target offset effect
24762 04/15/00 14:13 Miyoshi SSD : bias status : 1.0uA beam
24758 04/15/00 12:57 gueye ROC3 problem solved ?
24755 04/15/00 12:01 gueye DAQ problem
24752 04/15/00 11:10 gueye BPM & Energy screens
24749 04/15/00 10:47 markowitz beam back
24748 04/15/00 10:39 markowitz beam gone -- trim magnets
24744 04/15/00 09:31 gueye Computer problem
24741 04/15/00 09:20 gueye ROC3 out
24739 04/15/00 09:14 markowitz daily beam test
24734 04/15/00 07:35 cdaq Beam Time Accounting
24730 04/15/00 06:32 MF,AM,NS change disc
24724 04/15/00 04:37 MF,AM,NS BPM
24719 04/15/00 03:13 AM,MF,NS ROC 3 Failed 3 runs miss.
24712 04/15/00 01:18 Jinghua,Furi Roc 3 trip
24711 04/15/00 01:16 Jinghua,Furi Run length increased
24706 04/15/00 00:35 Jinghua,Furi Target now CH2
Friday
24704 04/14/00 23:22 cdaq Beam Time Accounting
24703 04/14/00 23:00 cdaq Beam Time Accounting
24694 04/14/00 16:01 cdaq Beam Time Accounting
24692 04/14/00 15:56 gueye Beam off
24690 04/14/00 15:18 gueye BPM & Energy screens
24688 04/14/00 14:39 Markowitz beam back
24687 04/14/00 12:14 markowitz beam gone
24685 04/14/00 10:44 markowitz beam screen shots
24682 04/14/00 09:31 Markowitz beam back
24681 04/14/00 09:07 Markowitz enge tripped
24680 04/14/00 08:52 markowitz beam gone
24679 04/14/00 08:50 Miyoshi SSD : bias status : 0.22uA
24677 04/14/00 07:47 cdaq Beam Time Accounting
24674 04/14/00 06:06 Furic,Murad BPM
24672 04/14/00 04:51 Furic,Murad FFB on
24670 04/14/00 04:07 Furic,Murad BPM
24668 04/14/00 02:44 Furic,Murad FFB off
24666 04/14/00 02:17 Furic , Mura Beam problems
24665 04/14/00 02:00 Furic,Murad BPM,energy
Thursday
24661 04/13/00 23:18 cdaq Beam Time Accounting
24658 04/13/00 21:20 Abdellah BPM run 32939
24650 04/13/00 15:57 cdaq Beam Time Accounting
24648 04/13/00 14:48 hcf screens
24646 04/13/00 14:09 hcf Cerenk pressure vs. barometric pressure
24644 04/13/00 13:32 saw cdaqs1 monitor
24641 04/13/00 11:23 hcf we DID add cerenkov gas
24640 04/13/00 11:19 mack sos wc visual check
24639 04/13/00 10:13 hcf Cerenkov pressure
24638 04/13/00 09:59 mack DAQ monitor swapped
24637 04/13/00 09:40 hcf shift check list 4/11-4/12
24636 04/13/00 09:38 hcf shift check list 4/7-4/11
24635 04/13/00 09:27 hcf shift check list 4/1-4/7
24634 04/13/00 09:23 hcf Shift check list 3/30-3/31
24633 04/13/00 09:19 hcf Shift check lists 3/27-30
24631 04/13/00 09:13 hcf Scanner Fixed
24630 04/13/00 09:10 hcf shift check list 3/25-27/00
24629 04/13/00 08:50 Miyoshi SSD : bias status : 0.22uA beam
24627 04/13/00 08:00 cdaq Beam Time Accounting
24622 04/13/00 04:21 Furic BPM
24621 04/13/00 03:46 Furic data disk changed
24618 04/13/00 02:18 Furic,Razmik BPM
24617 04/13/00 02:01 Razmik FFB on
24615 04/13/00 01:34 furic FFB development
24612 04/13/00 00:00 cdaq Beam Time Accounting
Wednesday
24607 04/12/00 19:08 smithg roc3 crash
24606 04/12/00 19:03 smithg bpm & energy thingies
24602 04/12/00 16:23 cdaq Beam Time Accounting
24599 04/12/00 14:38 hcf BPM & Energy
24594 04/12/00 09:20 Miyoshi SSD : noise check result (04/11/00)
24593 04/12/00 08:35 hcf bpm & energy
24592 04/12/00 08:33 Miyoshi SSD : bias status : with 0.22uA beam
24590 04/12/00 07:59 cdaq Beam Time Accounting
24587 04/12/00 05:52 furic,razmik BPM,ENERGY
24584 04/12/00 04:17 razmik,furic BPM,Energy
24581 04/12/00 02:18 Furic BPM
24580 04/12/00 02:04 Furic/Razmik Daq problem(32894,32895)
24574 04/12/00 00:02 cdaq Beam Time Accounting
Tuesday
24570 04/11/00 19:57 Tang Summary of Y scan
24569 04/11/00 19:57 spw bpm and energy screens
24566 04/11/00 18:54 spw vertical scan, y=-2.5
24564 04/11/00 18:31 spw vertical scan y=-2.5
24562 04/11/00 18:22 spw vertical scan y=2.5
24560 04/11/00 17:38 spw vertical scan
24558 04/11/00 17:18 Tang S/A scan by beam y on target
24557 04/11/00 17:10 spw vertical scan
24554 04/11/00 16:06 cdaq Beam Time Accounting
24547 04/11/00 12:25 mack killed DAQ and restarted prior to 32874
24544 04/11/00 11:58 Miyoshi SSD : bias status : No beam
24540 04/11/00 10:04 mack got paper. no snacks in hall A
24539 04/11/00 08:47 ysato The location of ROC6 reboot switch
24538 04/11/00 08:00 cdaq Beam Time Accounting
24537 04/11/00 07:08 Furic Roc6 failed
24535 04/11/00 06:09 Furic BPM
24533 04/11/00 05:02 Furic,Razmik Data disk changed
24531 04/11/00 03:58 Furic,Razmik BPM
24528 04/11/00 02:15 Furic,Razmik BPM
24526 04/11/00 01:11 Miyoshi SSD : bias status : 0.22uA beam
24524 04/11/00 00:03 cdaq Beam Time Accounting
Monday
24522 04/10/00 23:47 spw beam back
24521 04/10/00 23:41 spw magnet trip
24520 04/10/00 23:36 spw magnet trip
24516 04/10/00 20:24 lgan energy monitor screen
24513 04/10/00 18:34 Miyoshi SSD : bias status : 0.23uA beam
24511 04/10/00 18:30 lgan energy monitor screen
24508 04/10/00 16:05 danagu Shift summary
24507 04/10/00 16:02 cdaq Beam Time Accounting
24505 04/10/00 15:28 danagu energy monitor screen
24501 04/10/00 12:25 Tang LC removed from the trigger
24498 04/10/00 11:05 Miyoshi When was LC removed from trigger?
24497 04/10/00 10:26 danagu Energy monitor screen and BPM
24493 04/10/00 08:04 cdaq Beam Time Accounting
24491 04/10/00 06:17 hgj Roc 4 down
24489 04/10/00 05:33 hgj energy monitor & bpm
24487 04/10/00 04:39 hgj energy monitor & bpm
24484 04/10/00 02:59 hgj energy monitor & bpm
24483 04/10/00 02:58 hgj energy monitor & bpm
24479 04/10/00 00:05 Miyoshi SSD : bias status : 0.23uA
Sunday
24477 04/09/00 23:59 Danagoulian Shift summary
24476 04/09/00 23:58 cdaq Beam Time Accounting
24475 04/09/00 23:21 lgan energy monitor screen
24471 04/09/00 20:29 spw disk change
24469 04/09/00 20:04 lgan energy monitor screens
24465 04/09/00 18:02 lgan beam energy monitor screen
24462 04/09/00 15:59 gueye Shift Summary
24461 04/09/00 15:59 cdaq Beam Time Accounting
24457 04/09/00 13:22 gueye BPM & Energy screens
24452 04/09/00 09:49 gueye BPM & energy screens
24451 04/09/00 09:41 gueye FFB is back
24449 04/09/00 09:27 gueye FFB work during run 32813
24446 04/09/00 08:07 cdaq Beam Time Accounting
24445 04/09/00 07:35 hgj energy monitor & bpm
24444 04/09/00 07:33 hgj Roc 3 problem
24440 04/09/00 06:27 hgj energy monitor & bpm
24438 04/09/00 04:42 hgj energy monitor & bpm
24435 04/09/00 03:29 hgj energy monitor & bpm
24432 04/09/00 01:18 hgj energy monitor & bmp, oscillating
24430 04/09/00 00:01 cdaq Beam Time Accounting
24429 04/09/00 00:00 Danagoulian Shift summary
Saturday
24423 04/08/00 20:19 lgan energy monitor screen
24422 04/08/00 20:09 Danagoulian Energy monitor screen
24419 04/08/00 18:18 danagoulian BPM and energy monitor
24416 04/08/00 17:10 lgan beam energy monitor screen
24414 04/08/00 15:51 Keppel shift summary
24413 04/08/00 15:50 cdaq Beam Time Accounting
24411 04/08/00 15:36 Miyoshi SSD : bias status : no beam
24410 04/08/00 14:15 hamlet Will be no beam ~1 hour
24408 04/08/00 13:50 hamlet Prod.Runs start #32779
24407 04/08/00 13:39 hamlet Rebooted ROC6
24404 04/08/00 12:21 hamlet No beam up to 02:00pm?
24403 04/08/00 11:51 hamlet DISK MONITOR
24402 04/08/00 11:32 hamlet energy/bpm screen
24401 04/08/00 11:17 hamlet run #32785-87 junk
24396 04/08/00 09:17 hamlet energy/bpm screen
24394 04/08/00 08:06 cdaq Beam Time Accounting
24392 04/08/00 07:36 hgj SOS slits status
24391 04/08/00 07:05 hgj energy monitor & bpm
24389 04/08/00 04:37 hgj energy monitor & bpm
24388 04/08/00 01:01 Tang Trigger study
24386 04/08/00 00:51 hgj Roc6 failure
24385 04/08/00 00:26 cdaq Beam Time Accounting
Friday
24383 04/07/00 23:44 lgan beam energy monitor
24378 04/07/00 20:08 Msar mom. pos. parameters
24377 04/07/00 18:37 lgan beam monitor screen
24372 04/07/00 16:17 ysato HNSS hodoscope offset parameter
24371 04/07/00 16:06 gueye Stil no beam ...
24370 04/07/00 16:02 cdaq Beam Time Accounting
24369 04/07/00 14:06 Miyoshi SSD : hit pattern
24368 04/07/00 13:47 Miyoshi Analysis : HNSS hodoscope gate parameters
24367 04/07/00 13:25 Miyoshi SSD : bias status : No beam
24365 04/07/00 12:43 gueye Ready for K+
24364 04/07/00 12:34 gueye Timing calibration done. Beam off
24361 04/07/00 11:22 gueye BPM & Energy screens
24360 04/07/00 10:54 gueye Beam off at begening of run 32767
24358 04/07/00 10:47 gueye Sieve slit in: e+ calibration
24357 04/07/00 10:28 gueye Beam back. Timing calibration ctnd
24355 04/07/00 10:22 gueye Beam off.
24354 04/07/00 10:21 gueye Notes on calibration runs
24352 04/07/00 10:10 hamlet energy/bpm screen
24351 04/07/00 09:48 gueye beam back. beta calibration ctnd
24349 04/07/00 09:37 gueye Beam off
24348 04/07/00 09:34 gueye FF off for run 32763
24347 04/07/00 09:24 gueye Beam back
24345 04/07/00 09:00 ysato f77 compiler on cdaqs1 and cdaqs2
24344 04/07/00 08:57 gueye 1st hour summary
24343 04/07/00 08:28 Miyoshi SSD : bias status : 0.22uA
24341 04/07/00 07:52 cdaq Beam Time Accounting
24339 04/07/00 01:04 ysato cdaqs1,2 f77 problem
Thursday
24337 04/06/00 20:24 Miyoshi SSD : noise test results (2)
24334 04/06/00 17:45 Miyoshi SSD : bias status : no beam
24333 04/06/00 17:14 Miyoshi SSD : noise test results
24325 04/06/00 11:37 xfzhu SSD high voltage tripped
Wednesday
24323 04/05/00 17:58 ysato SOS HV
24322 04/05/00 17:29 ysato SOS HV on except for DC
24320 04/05/00 12:12 Miyoshi SSD : bias status : No beam
24318 04/05/00 10:50 Miyoshi replay : LD library changed
Tuesday
24316 04/04/00 17:13 hcf Enge/Moller locked off
24314 04/04/00 16:19 Vulcan SX208pos cable change
24313 04/04/00 16:17 yuan sos beta resolution for current CH2 runs and sos collimator positon
24311 04/04/00 10:28 hcf replay broken??
24310 04/04/00 01:28 Miyoshi SSD : bias status : No beam
24309 04/04/00 01:22 Miyoshi SSD noise check results
24305 04/04/00 00:33 Miyoshi SSD alignment check
Monday
24303 04/03/00 21:27 Miyoshi Enge magnet power is off now.
24291 04/03/00 18:29 Tang Summary of CH2 results 4
24290 04/03/00 17:36 Tang Summary of CH2 results 3
24289 04/03/00 17:06 Tang Summary of CH2 results 2
24287 04/03/00 14:51 Tang Figure 1 and 2
24286 04/03/00 14:29 hcf s2x8+ extra cable removed!!
24285 04/03/00 14:19 Tang Summary of CH2 results 1
24283 04/03/00 07:45 cdaq Beam Time Accounting
24282 04/03/00 07:01 Miyoshi SSD efficiency
24280 04/03/00 06:40 Miyoshi SSD and Hodoscope hit pattern
24277 04/03/00 03:56 msar BPM/energy screnn
24273 04/03/00 00:50 msar BPM screen
Sunday
24271 04/02/00 23:58 cdaq Beam Time Accounting
24266 04/02/00 19:36 hinton bpm/energy screens
24263 04/02/00 18:26 Miyoshi SSD : bias status : 0.33uA beam
24259 04/02/00 15:39 vulcan shift summary
24258 04/02/00 15:08 cdaq Beam Time Accounting
24249 04/02/00 09:10 liang energy and bpm screen
24247 04/02/00 08:06 cdaq Beam Time Accounting
24243 04/02/00 05:53 Miyoshi SSD : bias status : 0.43uA
24236 04/02/00 01:16 ysato Bad trigger timing problem
24233 04/02/00 00:04 cdaq Beam Time Accounting
Saturday
24230 04/01/00 21:49 hinton bpm/energy screen
24225 04/01/00 16:19 Jinghua shift check list 3-29 to 3-30
24224 04/01/00 16:07 cdaq Beam Time Accounting
24222 04/01/00 15:17 uzzle energy change
24221 04/01/00 15:16 uzzle bpm screen
24220 04/01/00 15:08 ysato DAQ problem (ROC3 bad gate signals)
24211 04/01/00 12:08 uzzle lost beam
24209 04/01/00 11:10 uzzle energy and bpm screens
24207 04/01/00 10:26 uzzle scer pressure
24205 04/01/00 09:55 Uzzle scer pressure
24204 04/01/00 09:36 jinghua shift check list 3-30 to 3-31
24203 04/01/00 09:32 Jinghua shift check list 3-27 to 3-28
24202 04/01/00 09:27 Jinghua Shift check list 3-25 to 3-27
24200 04/01/00 08:26 uzzle magnet trip
24199 04/01/00 08:07 hamlet shift summary
24198 04/01/00 08:04 cdaq Beam Time Accounting
24196 04/01/00 07:14 hamlet SCER pressure is normal
24194 04/01/00 06:50 hamlet SCER Pressure<-0.03 !
24193 04/01/00 06:33 hamlet energy/bpm screen
24192 04/01/00 06:23 hamlet Gas cerenkov pressure
24191 04/01/00 05:49 hamle Beam off
24189 04/01/00 05:02 Miyoshi SSD : bias status : 0.36uA
24188 04/01/00 04:34 hamlet energy/bpm screen
24183 04/01/00 01:48 ysato DAQ data size limit
24182 04/01/00 01:43 hamlet energy/bpm screen
24180 04/01/00 00:00 cdaq Beam Time Accounting