• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name saw

    Log entry time 16:20:55 on December 6,2000

    Entry number 31369

    keyword=Shift Summary

    Finished 11M event set of LD2 Charybdis off data.

    Ran Moller

    Returned to new set of 11 M events on LD2. Accumulated 5.9M by end of shift. (Up to run 27392).

    Lost two hours due to HMS dipole controls problem. (Replaced an ELDATIC 15V/24V power supply module).

    Early in shift asked for 50 microamps. They seem to be able to give us only about 47.

    Trip rate at beginning of shift was quite low. A little worse later in the day.