Main INDEX
Monthly INDEX
PREV
NEXT
User name saw
Log entry time 16:20:55 on December 6,2000
Entry number 31369
keyword=Shift Summary
Finished 11M event set of LD2 Charybdis off data.
Ran Moller
Returned to new set of 11 M events on LD2. Accumulated 5.9M by end of shift. (Up to run 27392).
Lost two hours due to HMS dipole controls problem. (Replaced an ELDATIC 15V/24V power supply module).
Early in shift asked for 50 microamps. They seem to be able to give us only about 47.
Trip rate at beginning of shift was quite low. A little worse later in the day.