0800 | 0900 | 1000 | 1100 | 1200 | 1300 | 1400 | 1500 | Total Time | |
---|---|---|---|---|---|---|---|---|---|
Acceptable Beam in Use | 54 | 47 | 54 | 48 | 0 | 60 | 39 | 32 | 5.57 |
Beam Available but Not in Use | 6 | 13 | 6 | 12 | 0 | 0 | 8 | 10 | 0.92 |
Beam Not Available or Unacceptable | 0 | 0 | 0 | 0 | 60 | 0 | 13 | 18 | 1.52 |
Accelerator Con- figuration Chage | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.00 |
Experiment Ready | 1 | 1 | 1 | 1 | 1 | 1 | 52 | 50 | 7.70 |
Planned Config- uration Change | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.00 |
Unplanned Experiment Down | 0 | 0 | 0 | 0 | 0 | 0 | 8 | 10 | 0.30 |
Hall not ready reasons | |||||||||
Target | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.00 |
HMS | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.00 |
Npol | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.00 |
Data Acq | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.00 |
Other | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.00 |
Comments: 11:45 Moeller guy came and then began Moeller measurement with #37459. 12:18 Move spot. 13:00 start another moller measusrement with #37460 after moving spot. 13:23 start production run with #37461. 14:02 the Q1 trip and was rebooted. 14:47 beam stopped due to the cavity problem. 15:18 beam back. 3:50 Q3 tripped.
Data Entry by: hu