    Log entry time 17:50:12 on December 10, 2000

    Entry number 31656

    keyword=Beam Time Accounting
    Hall C

    12/10/2000 0800-1600
    Experiment #: E93-038
    Shift Leader: hu
    Shift Workers: yan, churchwell

    08000900100011001200130014001500Total Time
    Acceptable Beam
    in Use
    54 47 54 48 0 60 39 32 5.57
    Beam Available
    but Not in Use
    6 13 6 12 0 0 8 10 0.92
    Beam Not Available
    or Unacceptable
    0 0 0 0 60 0 13 18 1.52
    Accelerator Con-
    figuration Chage
    0 0 0 0 0 0 0 0 0.00
    Experiment
    Ready
    1 1 1 1 1 1 52 50 7.70
    Planned Config-
    uration Change
    0 0 0 0 0 0 0 0 0.00
    Unplanned
    Experiment Down
    0 0 0 0 0 0 8 100.30
    Hall not
    ready reasons
    Target 0 0 0 0 0 0 0 0 0.00
    HMS 0 0 0 0 0 0 0 0 0.00
    Npol 0 0 0 0 0 0 0 0 0.00
    Data Acq 0 0 0 0 0 0 0 0 0.00
    Other 0 0 0 0 0 0 0 0 0.00

    Comments: 11:45 Moeller guy came and then began Moeller measurement with #37459. 12:18 Move spot. 13:00 start another moller measusrement with #37460 after moving spot. 13:23 start production run with #37461. 14:02 the Q1 trip and was rebooted. 14:47 beam stopped due to the cavity problem. 15:18 beam back. 3:50 Q3 tripped.

    Data Entry by: hu