1600 | 1700 | 1800 | 1900 | 2000 | 2100 | 2200 | 2300 | Total Time | |
---|---|---|---|---|---|---|---|---|---|
Acceptable Beam in Use | 0 | 1 | 50 | 50 | 53 | 1 | 1 | 1 | 6.55 |
Beam Available but Not in Use | 0 | 0 | 10 | 0 | 0 | 0 | 0 | 0 | 0.17 |
Beam Not Available or Unacceptable | 1 | 0 | 0 | 10 | 7 | 0 | 0 | 0 | 1.28 |
Accelerator Con- figuration Chage | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.00 |
Experiment Ready | 0 | 1 | 50 | 1 | 1 | 1 | 1 | 1 | 6.83 |
Planned Config- uration Change | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.00 |
Unplanned Experiment Down | 1 | 0 | 10 | 0 | 0 | 0 | 0 | 0 | 1.17 |
Hall not ready reasons | |||||||||
Target | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.00 |
HMS | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 1.00 |
Npol | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.00 |
Data Acq | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.00 |
Other | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.00 |
Comments: The HMS DC tripped, The Moller Q2 tripped
Data Entry by: abdellah