1600 | 1700 | 1800 | 1900 | 2000 | 2100 | 2200 | 2300 | Total Time | |
---|---|---|---|---|---|---|---|---|---|
Acceptable Beam in Use | 45 | 0 | 0 | 0 | 50 | 1 | 1 | 1 | 4.58 |
Beam Available but Not in Use | 15 | 1 | 1 | 1 | 10 | 0 | 0 | 0 | 3.42 |
Beam Not Available or Unacceptable | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.00 |
Accelerator Con- figuration Chage | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.00 |
Experiment Ready | 45 | 0 | 0 | 0 | 50 | 1 | 1 | 1 | 4.58 |
Planned Config- uration Change | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.00 |
Unplanned Experiment Down | 15 | 1 | 1 | 1 | 10 | 0 | 0 | 0 | 3.42 |
Hall not ready reasons | |||||||||
Target | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.00 |
HMS | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.00 |
Npol | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.00 |
Data Acq | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.00 |
Other | 15 | 1 | 1 | 1 | 10 | 0 | 0 | 0 | 3.42 |
Comments: 1645 Moller Q1 refuses to come alive...controlled access to check it out 1800 Calling everyone on the list to get Q1 up and running 1900 Entered hall and manually turned the moller Q1 2015 beam back, resume data collection 2040 beam off to ramp soleniod down 2050 beam back and tuned nicely - thanks MCC! 2100 Good beam 67 - 68 micro amps 2200 Good beam 67 - 68 micro amps
Data Entry by: W. Tireman