Jefferson Lab Hall C Logbook for November 01 - runstarts omitted
Main INDEX
Friday
43788 11/30/01 23:52 zeier nominal beam positions
43784 11/30/01 23:02 saw 42586 crash, 42587 new beam pos
43783 11/30/01 22:55 zeier target move story
43779 11/30/01 21:43 J. Roche beam polarization : the plan
43777 11/30/01 20:45 saw Gas complaints
43764 11/30/01 16:14 khandaker Day Shift Summary
43763 11/30/01 14:07 Hamlet hdc2y1 channel #40 fixed
43760 11/30/01 12:44 khandaker Hall Restricted Access
43758 11/30/01 11:03 khandaker target needs to be moved!
43757 11/30/01 10:40 Danagoulian Paddle efficiency
43756 11/30/01 10:38 khandaker Q3 is ready!
43751 11/30/01 07:46 nsavvinv owl shift summary
43750 11/30/01 06:42 HGZ access survey
43749 11/30/01 06:41 HGZ access survey incident
43747 11/30/01 06:07 nsavvinv switching Q3 to cold return
43744 11/30/01 05:18 Danagoulian He gas bottle change
43743 11/30/01 05:05 Danagoulian Drift Chambers
43735 11/30/01 00:06 saw Shift summary and cool down report
43734 11/30/01 00:05 cdaq Computer reboots for 2001-11-29
Thursday
43733 11/29/01 23:54 saw DAQ problem -> NIM bin PS replacement
43729 11/29/01 22:15 zeier target position puzzle
43728 11/29/01 22:04 Sawatzky Flaky HMS DC1 Vth readout
43718 11/29/01 20:21 zeier moller summary
43717 11/29/01 19:49 zeier Hall A leakage
43715 11/29/01 19:00 saw EPICS archiver
43707 11/29/01 16:09 gwarren Target shift summary- day
43706 11/29/01 16:02 HGZ shift summary
43704 11/29/01 13:43 hcf pause moller runs
43703 11/29/01 13:33 hcf moller tuneup / run notes
43697 11/29/01 11:43 hcf solenoid up. MCC to tune beam
43696 11/29/01 11:42 hcf moller setup begins
43695 11/29/01 11:42 jroche getting beam line tuned up
43694 11/29/01 10:25 gwarren Access incident
43693 11/29/01 09:01 mckee Work on target computer
43692 11/29/01 07:56 nsavvinv shift summary
43690 11/29/01 05:23 danagoulian BPM 3H00B
43689 11/29/01 05:07 danagoulian BPM IPM3HOOB
43688 11/29/01 01:38 jroche current in q1,q2 and dipole
43687 11/29/01 01:29 hamlet Moller run results
43683 11/29/01 00:23 hamlet Shift summury
43680 11/29/01 00:05 cdaq Computer reboots for 2001-11-28
Wednesday
43676 11/28/01 21:45 hamlet Moller Magnets and BPM at start
43674 11/28/01 20:47 hamlet Ask MCC for Moller run
43672 11/28/01 18:40 mckee Microwave switch failure
43671 11/28/01 18:37 mckee Target stick picture
43668 11/28/01 17:16 kramer target
43666 11/28/01 16:36 frw TE pol
43665 11/28/01 16:31 frw TE Pol.
43664 11/28/01 16:29 frw TE 3rd set bottom
43662 11/28/01 16:06 gwarren Shift Summary
43661 11/28/01 12:45 frw TE top 1st set
43657 11/28/01 11:32 gwarren Q3 is warm
43651 11/28/01 10:08 frw TE 3rd set bottom
43648 11/28/01 09:53 frw changed disk from 1 to 2
43641 11/28/01 08:19 samuel TE pol
43640 11/28/01 08:08 gwarren third attempt to gain match
43637 11/28/01 06:53 samuel TE Pol.
43636 11/28/01 06:03 samuel TE diference for bottom target
43635 11/28/01 04:31 samuel TE Pol
43634 11/28/01 03:12 samuel TE Pol.
43633 11/28/01 01:48 samuel TE Pol.
43632 11/28/01 00:05 cdaq Computer reboots for 2001-11-27
Tuesday
43631 11/27/01 23:46 kramer tgt
43630 11/27/01 22:31 kramer tgt
43629 11/27/01 21:18 kramer target
0 11/27/01 17:48 no_name no_key
43624 11/27/01 17:09 Donal Change target stick
43622 11/27/01 14:46 saw Scaler GUI memory leaks
43621 11/27/01 14:32 hcf gasmaster
43620 11/27/01 12:50 zeier The plot that made them pull the stick
43619 11/27/01 12:28 klim TE bottom
43616 11/27/01 11:28 gwarren Losing target material
43615 11/27/01 11:14 gwarren ndet HV gui okay
43614 11/27/01 11:00 klim TE bottom
43613 11/27/01 10:20 Donal Target
43612 11/27/01 09:49 donal RF voltmeter
43611 11/27/01 09:25 klim TE top
43610 11/27/01 07:52 samuel TE Pol.
43609 11/27/01 06:28 samuel TE Pol.
43608 11/27/01 05:06 samuel TE Pol. measurements
43607 11/27/01 03:44 samuel TE pol. for top target
43606 11/27/01 02:18 samuel TE for top target
43605 11/27/01 00:56 Don/Sam TE Pol.
43604 11/27/01 00:05 cdaq Computer reboots for 2001-11-26
Monday
43603 11/26/01 23:41 kramer target
43602 11/26/01 22:24 kramer target
43601 11/26/01 21:05 kramer target
43600 11/26/01 19:57 kramer target
43599 11/26/01 18:19 gwarren new problems with ndet HV
43598 11/26/01 18:18 Donal RF voltmeter
43596 11/26/01 16:41 Donal TE bottom
43592 11/26/01 16:12 hamlet HMS dc1 & dc2 HV --> ON
43591 11/26/01 16:07 Donal TE bottom
43579 11/26/01 11:28 Donal target preparation
43578 11/26/01 11:25 hamlet Gen laser back in operation
43577 11/26/01 11:23 hcf iochc10 was rebooted 11/20, restored 11/21
43576 11/26/01 11:09 hamlet NDET and HMS HV --> ON
43575 11/26/01 11:08 hcf power-cycled iochc10/11
43569 11/26/01 08:20 klim target shifts resumed
43568 11/26/01 00:05 cdaq Computer reboots for 2001-11-25
Sunday
43567 11/25/01 00:05 cdaq Computer reboots for 2001-11-24
Saturday
43566 11/24/01 00:05 cdaq Computer reboots for 2001-11-23
Friday
43565 11/23/01 00:05 cdaq Computer reboots for 2001-11-22
Thursday
43564 11/22/01 00:05 cdaq Computer reboots for 2001-11-21
Wednesday
43563 11/21/01 17:22 frw updated Gen01 online replay
43562 11/21/01 10:36 donal Holiday Shutdown
43561 11/21/01 09:33 Vulcan power off
43560 11/21/01 08:12 donal bottom positive
43559 11/21/01 07:58 Donal bottom negative
43558 11/21/01 07:28 tajima Switch to bottom target to perform polarization TEST
43556 11/21/01 07:13 yuan shift summary
43554 11/21/01 07:01 yuan Beam shut down at 7:00
43553 11/21/01 07:01 tajima target polarization
43550 11/21/01 05:59 tajima target polarization
43547 11/21/01 05:37 yuan HMS and Ndet HV Setttings backup before Thanksgiving shutdown
43546 11/21/01 05:00 tajima target polarization
43543 11/21/01 04:08 tajima target polarization
43542 11/21/01 04:05 tajima separator level fluctuates
43536 11/21/01 03:10 tajima TOP target fine
43535 11/21/01 02:43 tajima target changed and polarization problem
43534 11/21/01 02:19 yuan Move to Top Cell
43532 11/21/01 02:04 tajima target polarization
43531 11/21/01 01:19 yuan Shift checklist 11/19-11/20
43530 11/21/01 01:00 tajima target polarization
43525 11/21/01 00:26 testa RF problems -no beam-
43522 11/21/01 00:05 cdaq Computer reboots for 2001-11-20
43521 11/21/01 00:02 spw shift polarization history
43519 11/21/01 00:00 testa shift summary
Tuesday
43516 11/20/01 22:01 spw polarization screen
43513 11/20/01 20:59 spw polarizing bottom ND3
43509 11/20/01 20:17 hamlet/zeier moller of this evening
43508 11/20/01 20:07 spw target anneal
43503 11/20/01 18:54 hamlet Moller magnets and BPM at start
43499 11/20/01 18:09 donal Separator Valve
43492 11/20/01 17:22 Donal top deuteron
43489 11/20/01 17:01 spw polarization screen
43488 11/20/01 16:32 testa HMS's display for threshold voltage is bad
43487 11/20/01 16:23 testa From run 42490 to 42494 it's TOP ND3 and not bottom
43484 11/20/01 16:13 testa BPM screen scan
43483 11/20/01 16:01 N. Simicevic Target Shift Summury
43481 11/20/01 16:00 Keppel Shift Summary
43480 11/20/01 15:59 N. Simicevic Hourly Target Screen Dump
43479 11/20/01 15:01 N. Simicevic Hourly Target Screen Dump
43476 11/20/01 14:44 HGZ need to take more negative poltar data
43475 11/20/01 14:01 N. Simicevic Hourly Target Screen Dump
43472 11/20/01 13:02 N. Simicevic Hourly Target Screen Dump
43469 11/20/01 12:01 N. Simicevic Hourly Target Screen Dump
43466 11/20/01 11:02 N. Simicevic Hourly Target Screen Dump
43464 11/20/01 10:02 N. Simicevic Target: TOP-POSITIVE POLARIZTION
43462 11/20/01 09:04 Jourdan BPM screen
43461 11/20/01 09:01 N. Simicevic Hourly Target Screen Dump
43458 11/20/01 08:01 Avery shift summary
43456 11/20/01 07:47 T. Forest Target performance summary
43455 11/20/01 07:05 T. Forest Hourly Target screen dump
43452 11/20/01 06:04 T. Forest Hourly Target screen dump
43451 11/20/01 05:22 T. Forest Maintaining Nose level
43448 11/20/01 05:04 T. Forest Hourly Target screen dump
43447 11/20/01 04:41 T. Forest Fast Nose fill after an anneal
43445 11/20/01 04:04 T. Forest Hourly Target screen dump
43443 11/20/01 03:05 T. Forest Hourly Target screen dump
43442 11/20/01 02:56 Avery correction
43441 11/20/01 02:49 Avery run 42483 stopped
43436 11/20/01 00:48 Avery changed disk
43429 11/20/01 00:05 cdaq Computer reboots for 2001-11-19
Monday
43428 11/19/01 23:58 Testa shift summary
43420 11/19/01 23:11 spw polarization shift history
43418 11/19/01 22:56 testa Annealing the target
43416 11/19/01 22:01 spw polarization screen
43413 11/19/01 21:01 spw polarization screen
43412 11/19/01 20:59 testa Leakage current
43407 11/19/01 20:01 spw polarization screen
43404 11/19/01 19:01 spw polarization screen
43401 11/19/01 18:01 spw polarization screen
43400 11/19/01 17:38 testa Q1 restored
43398 11/19/01 17:01 spw polarization screen
43397 11/19/01 16:53 testa Q1 tripped
43393 11/19/01 16:05 E. Christy Shift Summary
43392 11/19/01 16:02 Testa BPM screen scan
43391 11/19/01 16:00 N. Simicevic Hourly Target Screen Dump
43388 11/19/01 15:05 N. Simicevic Hourly Target Screen Dump
43387 11/19/01 14:28 N. Simicevic Target: TOP-NEGATIVE POLARIZATION
43385 11/19/01 14:00 N. Simicevic Hourly Target Screen Dump
43384 11/19/01 13:32 boeglin Leakage Measurement
43383 11/19/01 13:01 boeglin Leakage Current
43382 11/19/01 13:00 N. Simicevic Hourly Target Screen Dump
43379 11/19/01 12:01 N. Simicevic Horly Target Screen Dump
43376 11/19/01 11:09 Jourdan shift check list p2
43375 11/19/01 11:06 jourdan shift check list p1
43374 11/19/01 11:01 N. Simicevic Hourly Target Screen Dump
43373 11/19/01 11:00 Jourdan BPM screen scan
43372 11/19/01 10:52 hcf PHTerr scaler
43371 11/19/01 10:24 gwarren HMS Momentum is okay
43368 11/19/01 10:01 N. Simicevic Hourly Target Screen Dump
43365 11/19/01 09:01 N. Simicevic Hourly Target Screen Dump
43364 11/19/01 08:42 hcf reset Moller collimator control parameter
43363 11/19/01 08:36 Bitao shift summary
43360 11/19/01 07:54 T. Forest Target Performance during shift
43359 11/19/01 07:31 Jourdan HMS
43355 11/19/01 07:11 T. Forest Hourly Target Screen Dump
43354 11/19/01 05:59 T. Forest Hourly Target Screen Dump
43351 11/19/01 04:30 Jourdan ROC2
43349 11/19/01 04:02 T. Forest Hourly Target Screen Dump
43348 11/19/01 03:49 Liang HMS HV trip
43343 11/19/01 03:02 T. Forest Hourly Target Screen Dump
43342 11/19/01 02:49 T. Forest Anneal observation
43341 11/19/01 02:47 T. Forest A fast Target nose fill after an anneal
43336 11/19/01 00:05 cdaq Computer reboots for 2001-11-18
Sunday
43335 11/18/01 23:58 testa shift summary
43332 11/18/01 23:53 spw eveing shift polarization summary
43328 11/18/01 23:36 testa Annealing the target -starting at 23:11-
43323 11/18/01 23:01 spw polarization screen
43320 11/18/01 22:03 spw polarization screen
43319 11/18/01 21:17 testa Leakage current
43316 11/18/01 21:01 spw polarization screen
43315 11/18/01 20:49 testa Fill out runlist sheet correctly!
43314 11/18/01 20:30 testa ndet-single-rates program causes problems to cdaqs1 *How to solve the problem*
43312 11/18/01 20:01 spw polarization screen
43304 11/18/01 19:03 spw polarization screen
43301 11/18/01 18:02 spw polarization screen
43300 11/18/01 17:07 testa Leakage current
43298 11/18/01 16:59 spw polarization screen
43296 11/18/01 16:22 testa BPM -screeen scan-
43294 11/18/01 16:01 gasparian shift summary
43293 11/18/01 16:00 N. Simicevic Hourly Target Screen Dump
43290 11/18/01 15:01 N. Simicevic Hourly Target Screen Dump
43287 11/18/01 14:00 N. Simicevic Hourly Target Screen Dump
43285 11/18/01 13:33 N. Simicevic Target: TOP- POSITIVE POLARIZATION
43283 11/18/01 13:02 N. Simicevic Hourly Target Screen Dump
43282 11/18/01 12:26 gasparian HMS WC threshold
43280 11/18/01 12:05 N. Simicevic Hourly Target Screen Grab
43276 11/18/01 11:05 jourdan beam lost
43275 11/18/01 11:01 N. Simicevic Hourly Target Screen Dump
43272 11/18/01 10:02 N. Simicevic Hourly Target Screen Dump
43269 11/18/01 09:00 N. Simicevic Hourly Target Screen Dump
0 11/18/01 08:01 no_name no_key
43264 11/18/01 07:00 T. Forest Hourly Target screen Dump
43261 11/18/01 06:00 T. Forest Hourly Target screen Dump
43260 11/18/01 05:05 T. Forest Hourly Target screen Dump
43257 11/18/01 04:07 bitao paddle efficiencies
43256 11/18/01 04:02 T. Forest Hourly Target screen Dump
43253 11/18/01 03:06 T. Forest Hourly Target screen dump
43250 11/18/01 00:05 spw polarization shift summary
43249 11/18/01 00:05 cdaq Computer reboots for 2001-11-17
43248 11/18/01 00:03 spw polarization screen
Saturday
43246 11/17/01 23:57 Testa shift summary
43245 11/17/01 23:21 testa Leakage current
43242 11/17/01 23:01 spw polarization screen
43241 11/17/01 22:58 spw NMR flakiness
43238 11/17/01 22:01 spw polarization screen
43235 11/17/01 21:06 spw polarization screen
43232 11/17/01 20:01 spw polararization screen
43231 11/17/01 19:00 spw polarization screen
43228 11/17/01 18:27 spw NMR readout flaky
43227 11/17/01 18:08 spw polarization display problem
43224 11/17/01 17:39 spw polarization screen
43223 11/17/01 17:11 spw target display panel update problems
43222 11/17/01 16:59 Testa ND3 Top target in
43215 11/17/01 16:27 testa changing target
43212 11/17/01 16:01 testa scan of BPM screen
43210 11/17/01 15:35 gasparian shift summary, data disk changed
43208 11/17/01 15:02 Chant Shift Summary
43207 11/17/01 15:01 N. Simicevic Hourly Target Screen Dump
43205 11/17/01 14:02 N. Simicevic Hourly Target Screen Dump
43202 11/17/01 13:09 N. Simicevic Hourly Targer Screen Grab
43201 11/17/01 13:02 N. Simicevic Hourly Target Screen Grab
43198 11/17/01 12:21 N. Simicevic Hourly Target Screen Grab
43197 11/17/01 12:18 N. Simicevic Hourly Target Screen Dump
43196 11/17/01 12:13 N. Simicevic Hourly Target Screen Grab
43195 11/17/01 12:10 N. Simicevic Hourly Target Screen Grab
43194 11/17/01 12:01 N. Simicevic Target status
43191 11/17/01 11:26 N. Simicevic Target status
43186 11/17/01 08:26 Jourdan Leakeage current
43183 11/17/01 07:58 T.Forest Target Shift Polarization Summary
43179 11/17/01 07:02 T. Forest Hourly Target Screen dump
43178 11/17/01 06:01 T. Forest Hourly Target Screen dump
43175 11/17/01 05:29 bitao bpm screen
43174 11/17/01 05:09 T. Forest Hourly Target Screen dump
43171 11/17/01 04:08 T. Forest Hourly Target Screen dump
43168 11/17/01 03:01 T. Forest Hourly Target Screen dump
43167 11/17/01 02:05 T. Forest Hourly Target Screen dump
43164 11/17/01 01:36 T. Forest Hourly Target Screen dump
43159 11/17/01 00:05 cdaq Computer reboots for 2001-11-16
Friday
43157 11/16/01 23:53 marius target screen
43152 11/16/01 21:29 marius collected charge on top target
43151 11/16/01 21:09 Chant Hall entry - limit switch
43148 11/16/01 19:43 marius restarting VNC viewer
43145 11/16/01 18:58 marius target screen
43142 11/16/01 18:02 marius target screen
43141 11/16/01 17:10 marius target screen
43140 11/16/01 17:04 marius target VME reboot
43136 11/16/01 16:11 norum Leakage current
43135 11/16/01 16:07 Norum Shift summary
43133 11/16/01 15:57 smithg beam on tgt during day shift (top (+))
43132 11/16/01 15:54 smithg tgt pol screen over past 8 hours
43130 11/16/01 15:20 smithg pol tgt screen last hour
43127 11/16/01 14:11 smithg pol tgt screen past hour
43124 11/16/01 13:03 smithg pol tgt screen past hour
43123 11/16/01 12:10 smithg pol tgt screen past hour
43120 11/16/01 10:56 smithg tgt pol screen 4 the past hour
43117 11/16/01 09:34 Liu owl shift summary
43116 11/16/01 09:29 smithg top (+) tgt polarization screen
43115 11/16/01 09:18 testa Target currently at +31.0 %
43106 11/16/01 08:12 testa changing target
43103 11/16/01 08:01 T.Forest Target shift summary
43101 11/16/01 07:04 Liu leakage test
43099 11/16/01 07:03 T. Forest Hourly Target Screen Dump
43097 11/16/01 06:13 T. Forest Hourly Target Screen Dump
43094 11/16/01 05:04 T. Forest Hourly Target Screen Dump
43093 11/16/01 04:49 testa BPM medm screen -scan-
43090 11/16/01 04:02 T. Forest Hourly Target Screen Dump
43088 11/16/01 03:25 Liu beam off
43084 11/16/01 03:01 T. Forest Hourly Target Screen Dump
43083 11/16/01 02:59 T. Forest Hourly Target Screen Dump
43082 11/16/01 02:46 Liu paddle efficency measurement
43081 11/16/01 02:12 T. Forest Hourly Target Screen Dump
43078 11/16/01 01:02 T. Forest Hourly Target Screen Dump
43075 11/16/01 00:05 cdaq Computer reboots for 2001-11-15
Thursday
43073 11/15/01 23:53 comanm target screen
43072 11/15/01 23:52 Nick Chant ROC2 reboot
43067 11/15/01 23:00 comanm target screen
43062 11/15/01 19:36 comanm charge on top (negative pol) target
43060 11/15/01 18:54 comanm target screen
43057 11/15/01 17:57 comanm Target screen
43054 11/15/01 16:52 comanm target screen
43052 11/15/01 16:01 smithg total charge collected on day shift
43051 11/15/01 15:58 Norum Shift summary
43049 11/15/01 15:55 smithg pol tgt screen last 8 hours, top (-)
43048 11/15/01 15:53 smithg tgt pol last hour
43044 11/15/01 15:04 smithg pol tgt screen past hour
43041 11/15/01 14:08 smithg tgt pol last hour
43038 11/15/01 13:11 smithg tgt pol. last couple hours
43034 11/15/01 11:02 smithg pol tgt screen past hour. Now polarizing top (-)
43033 11/15/01 10:06 smithg pol tgt screen past hour
43029 11/15/01 09:07 smithg pol tgt screen last hour
43027 11/15/01 08:04 T. Forest Target Polarization during shift
43026 11/15/01 08:02 Liu owl shift summary
43023 11/15/01 07:08 T. Forest Hourly Target Screen
43020 11/15/01 06:02 Liu beam off
43019 11/15/01 06:01 T. Forest Hourly Target Screen
43017 11/15/01 05:48 Liu change disk
43013 11/15/01 05:19 T. Forest Hourly Target Screen
43012 11/15/01 04:22 Testa leakage measurement
43009 11/15/01 04:03 T. Forest Hourly Target Screen
43008 11/15/01 03:08 T. Forest Hourly Target Screen
43005 11/15/01 02:07 T. Forest Hourly Target Screen
43003 11/15/01 01:50 Liu paddle efficency for run 42363
43002 11/15/01 01:39 Liu beam off
43000 11/15/01 01:02 T. Forest Hourly Target Screen
42997 11/15/01 00:05 cdaq Computer reboots for 2001-11-14
Wednesday
42995 11/14/01 23:54 comanm beam count for targget
42994 11/14/01 23:48 comanm target screen
42993 11/14/01 23:45 ioana wrong trigger
42992 11/14/01 23:43 ioana shift summary
42987 11/14/01 22:44 comanm target screen
42983 11/14/01 21:27 comanm target screen
42982 11/14/01 21:22 zeier/hamlet moller of today
42981 11/14/01 21:08 zeier Hall A leakage
42975 11/14/01 19:49 comanm target screen
42973 11/14/01 19:33 hamlet moller bpm & magnets at start
42971 11/14/01 19:01 comanm target screen
42970 11/14/01 18:55 HGZ target anneal
42950 11/14/01 16:02 smithg total charge on top tgt, pos. pol during day shift
42949 11/14/01 15:59 Norum Shift summary
42947 11/14/01 15:59 smithg tgt pol last 8 hours
42946 11/14/01 15:58 smithg tgt pol screen over last 8 hours
42945 11/14/01 15:56 smithg tgt pol screen last hour
42942 11/14/01 15:20 Tang Asymmetry improved
42941 11/14/01 15:16 hcf modified epics.dictionary
42939 11/14/01 15:04 smithg tgt pol this past hour
42937 11/14/01 14:57 Tang Asymmetry lock
42936 11/14/01 14:02 smithg tgt pol screen grab 4 last hour
42933 11/14/01 13:16 gwarren Daily Summary: Tues 11/13/01
42932 11/14/01 13:01 smithg tgt pol screen the past hour
42929 11/14/01 12:05 smithg pol tgt screen the past hour
42928 11/14/01 11:51 gwarren History of Charge Asymmetry
42925 11/14/01 11:12 smithg pol tgt screen this past hour
42922 11/14/01 10:12 smithg pol tgt screen for the past hour
42920 11/14/01 09:07 testa beam restored at 09:05
42919 11/14/01 09:04 smithg pol tgt screen last hour really this time
42918 11/14/01 09:02 smithg pol tgt screen past hour
42917 11/14/01 08:45 testa beam off
42913 11/14/01 08:02 Liu owl shift summary
42911 11/14/01 07:59 Liu leakage test
42909 11/14/01 07:53 T. Forest Target performance last 8 hours
42907 11/14/01 07:49 testa hcbpms -grab screen-
42906 11/14/01 07:18 T. Forest Hourly Target Screen Dump
42905 11/14/01 06:53 testa run 42334 started with positive polarisation +28.5%.
42904 11/14/01 06:52 T. Forest Polarization curve for Top ND3 target cell
42903 11/14/01 06:50 Liu cosmic run ends too soon?
42897 11/14/01 06:07 Liu move the target
42893 11/14/01 04:17 T. Forest Hourly Target Screen Dump
42890 11/14/01 02:58 T. Forest Hourly Target Screen Dump
42888 11/14/01 02:45 Liu Beam off
42887 11/14/01 02:43 Liu Changed the helium bottle
42885 11/14/01 02:20 T. Forest Hourly Target Screen Dump
42884 11/14/01 01:57 Liu change disk
42881 11/14/01 01:14 Liu computer deadtime
42879 11/14/01 01:04 T. Forest Hourly Target Screen Dump
42876 11/14/01 00:28 Liu leakage test
42874 11/14/01 00:10 comanm target screen
42873 11/14/01 00:05 cdaq Computer reboots for 2001-11-13
42872 11/14/01 00:03 Liu neutron paddle efficency
Tuesday
42870 11/13/01 23:56 comanm beam count (target)
42869 11/13/01 23:36 comanm target screen
42868 11/13/01 23:18 ioana leakage test
42867 11/13/01 23:15 ioana shift summary
42862 11/13/01 21:51 comanm target screen
42860 11/13/01 20:47 comanm target screen
42859 11/13/01 20:25 comanm target screen
42858 11/13/01 20:07 comanm target screen
42857 11/13/01 20:06 comanm target screen
42856 11/13/01 19:29 yuan Helium is in target nose
42854 11/13/01 18:49 Donal Charge on target
42851 11/13/01 16:18 comanm target screen
42850 11/13/01 16:13 Ioana leakage test
42849 11/13/01 16:13 smithg pol tgt screen for the past 8 hours
42847 11/13/01 16:06 smithg lost tgt vme computer
42846 11/13/01 16:02 smithg day shift total charge on top tgt plus pol
42845 11/13/01 16:00 smithg tgt pol screen for past hour
42844 11/13/01 15:52 yuan Shift Check List (11/12-11/13)
42842 11/13/01 15:45 Norum Polarization loss
42839 11/13/01 15:06 smithg pol tgt screen last hour
42836 11/13/01 14:04 smithg tgt pol screen past hour
42833 11/13/01 13:35 nsavvinv ndet timing calibration run #42278
42832 11/13/01 13:05 smithg tgt pol screen past hour
42831 11/13/01 12:36 Norum leakage
42827 11/13/01 12:05 smithg tgt pol screen last hour
42824 11/13/01 11:07 smithg tgt pol screen past hour
42823 11/13/01 10:47 smithg corrected owl shift total charge on targets
42822 11/13/01 10:45 gwarren Hall A will attempt 120 uA today
42821 11/13/01 10:44 gwarren Daily Summary: Mon 11/12/01
42820 11/13/01 10:36 Norum beam steering
42817 11/13/01 10:05 smithg target pol. last hour
42816 11/13/01 09:18 smithg target pol. screen last hour
42811 11/13/01 08:57 smithg owl shift total charge on targets
42805 11/13/01 08:02 T. Forest Target Polarization Last 8 hours
42804 11/13/01 08:01 Liu owl shift summary
42802 11/13/01 07:51 Liu leakage measurement
42800 11/13/01 06:44 T. Forest Target Screen Grab
42797 11/13/01 05:34 T. Forest Target Screen Grab
42793 11/13/01 04:45 Liu beam off
42791 11/13/01 04:40 Liu HMS HV alarm
42790 11/13/01 04:34 Liu change target to ND3 top
42788 11/13/01 04:29 Liu reboot dipole computer
42787 11/13/01 04:22 T. Forest Target Screen Grab
42783 11/13/01 01:45 saw DAQ problems
42782 11/13/01 01:43 T. Forest Target Screen Grab
42781 11/13/01 01:43 Liu location of roc9
42780 11/13/01 01:40 Liu daq problem roc9 failed to start
42776 11/13/01 00:07 J. cha swing total charge on bottom deuteron with nega. pol.
42775 11/13/01 00:05 cdaq Computer reboots for 2001-11-12
Monday
42773 11/12/01 23:58 Kelly swing shift summary
42772 11/12/01 23:52 J. Cha target screen (last 8hours)
42771 11/12/01 23:49 J. Cha target screen
42769 11/12/01 23:20 Kelly leakage versus charge asymmetry
42766 11/12/01 22:52 J. Cha Target screen
42764 11/12/01 21:44 J. Cha Target screen
42763 11/12/01 21:34 Kelly ROC9 hung
42759 11/12/01 21:13 roche paddle efficencies run 42296
42758 11/12/01 20:45 J. Cha Target screen
42756 11/12/01 19:55 Kelly DAQ problems
42755 11/12/01 19:45 J. Cha Target screen.
42754 11/12/01 19:31 Kelly run 42295 junk
42753 11/12/01 19:20 Kelly change data disk
42750 11/12/01 19:13 Kelly network problems?
42749 11/12/01 18:57 zeier ND3 statistics script
42748 11/12/01 18:24 J. Cha Target Screen
42745 11/12/01 17:33 gwarren Daily Summary: Sun 11/11/01
42744 11/12/01 17:23 Kelly further HV increase for h1x09+
42741 11/12/01 16:41 J. Cha Target Screen
42740 11/12/01 16:38 Kelly h1x09+
42734 11/12/01 15:47 jyun HMS hole?
42733 11/12/01 15:44 jyun shift summary
42731 11/12/01 15:17 klim target screen
42730 11/12/01 15:04 zeier moller of today
42729 11/12/01 14:55 klim target change
42725 11/12/01 14:07 klim target screen
42721 11/12/01 12:46 klim target screen
42718 11/12/01 12:21 hamlet Moler BPM after beam retune
42716 11/12/01 11:58 hamlet Moller magnets and BPM at start
42715 11/12/01 11:31 hamlet moller bpm when all magnets off
42714 11/12/01 11:25 klim target screen
42713 11/12/01 11:21 klim target screen (last 1 hour)
42712 11/12/01 10:53 zeier cmlog server dead
42710 11/12/01 08:39 E. Christy Shift summary
42707 11/12/01 08:11 klim target screen (last 4 hours)
42706 11/12/01 08:07 klim target screen
42705 11/12/01 07:44 E. Christy Aquistion configured for cosmics for 42276 and 42277
42702 11/12/01 06:26 Secrest Run 42278 42277
42699 11/12/01 05:37 Secrest Current Leakage
42696 11/12/01 04:00 E. Christy Beam returns after RF problems
42693 11/12/01 03:41 comanm target screen
42687 11/12/01 00:05 cdaq Computer reboots for 2001-11-11
Sunday
42686 11/11/01 23:58 J. Cha Changed target to Top Deuteron
42684 11/11/01 23:56 Kelly swing shift summary
42682 11/11/01 23:36 Kelly paddle efficiency
42681 11/11/01 23:25 J. Cha Target Screen
42677 11/11/01 21:58 Kelly leakage 1%
42675 11/11/01 21:09 J. Cha Target Screen
42672 11/11/01 19:42 J. Cha Target Screen
42667 11/11/01 17:58 J. Cha Target Screen
42666 11/11/01 17:25 Kelly change data disk
42663 11/11/01 17:01 J. Cha Target Screen
42660 11/11/01 15:56 Pitt Shift summary
42658 11/11/01 15:39 klim target screen
42655 11/11/01 15:10 Pitt Charge asymmetry
42654 11/11/01 14:49 klim target screen
42650 11/11/01 13:53 klim target screen
42648 11/11/01 12:57 klim target screen
42646 11/11/01 12:24 Pitt HV in run 42262
42645 11/11/01 12:04 vardan ND HV map updated
42644 11/11/01 11:56 Pitt/Secrest Leakage current
42643 11/11/01 11:55 gwarren Changed HV for 3:11R
42640 11/11/01 11:44 gwarren added new histograms to ndet#check
42639 11/11/01 11:29 klim target screen
42638 11/11/01 11:02 gwarren PD plans on "short" maintenance period on Tuesday
42637 11/11/01 10:49 gwarren HV for 1:25-27L, again
42636 11/11/01 10:45 Pitt Disk watch dies
42631 11/11/01 10:32 Secrest BPM Scan
42629 11/11/01 10:00 klim target screen
42627 11/11/01 09:51 gwarren to restart the betabrite display
42626 11/11/01 09:44 gwarren Daily Summary: Sat 11/10/01
42624 11/11/01 08:39 E. Christy Shift Summary
42622 11/11/01 08:10 klim target screen
42618 11/11/01 06:34 Raue target screen
42616 11/11/01 04:48 Secrest ROC Reboot
42607 11/11/01 02:56 E. Christy Cdaqs1 low memory problem
42606 11/11/01 02:52 E. Christy Beam and LCW leak status
42596 11/11/01 00:40 Kelly swing shift summary
42595 11/11/01 00:31 Kelly all hell breaks loose
42594 11/11/01 00:20 Kelly ROC9
42592 11/11/01 00:05 cdaq Computer reboots for 2001-11-10
42591 11/11/01 00:04 J. Cha target screen
Saturday
42590 11/10/01 23:59 saw DAQ problems
42585 11/10/01 22:55 Kelly ndet rate monitor
42584 11/10/01 22:44 Kelly paddle efficiency
42583 11/10/01 22:16 J. Cha Target Screen
42582 11/10/01 22:12 J. Cha Reboot target vme.
42580 11/10/01 21:55 Kelly change data disk
42576 11/10/01 20:41 J. Cha Target Screen
42574 11/10/01 20:28 Kelly leakage 1.5%
42573 11/10/01 20:23 J. Cha Problem with Run valve.
42570 11/10/01 19:14 Kelly RF problem and spurious (?) TS0 down message
42569 11/10/01 19:04 J. Cha Reboot Target VME
42567 11/10/01 18:59 J. Cha target screen
42564 11/10/01 17:50 Kelly trigger change
42563 11/10/01 17:46 Kelly HMS HV alarm
42560 11/10/01 17:33 J. Cha Target Screen
42557 11/10/01 16:24 J. Cha target screen
42556 11/10/01 15:54 pitt Shift summary
42550 11/10/01 15:42 klim target screen (1 hour)
42549 11/10/01 15:40 klim target screen
42546 11/10/01 15:21 klim target changed
42543 11/10/01 14:13 Pitt Leakage measurement
42540 11/10/01 13:53 gwarren Moved logic signal for Stick Right-Up PMT
42539 11/10/01 13:07 gwarren playing with sticks
42538 11/10/01 13:02 Pitt BPM screens after change
42535 11/10/01 12:36 gwarren HV problems in ndet
42530 11/10/01 11:41 Secrest HV Trip on Neutron Detectors
42529 11/10/01 11:41 klim target screen
42528 11/10/01 11:24 pitt Shift checklist, page 2
42527 11/10/01 11:22 pitt Shift checklist, page 1
42526 11/10/01 10:51 gwarren Daily Summary: Fri 11/9/01
42524 11/10/01 10:50 klim target screen
42522 11/10/01 09:47 klim target screen
42511 11/10/01 08:06 E. Christy Shift Summary
42509 11/10/01 07:31 raue target screen
42505 11/10/01 06:16 E. Christy Leakage current
42503 11/10/01 05:01 raue target screen
42500 11/10/01 03:57 Raue target valve problem
42498 11/10/01 03:24 E. Christy lost bpm signals
42497 11/10/01 03:09 E. Christy Hall in controlled access
42494 11/10/01 01:36 raue target run valve
42491 11/10/01 01:04 raue target screen
42490 11/10/01 00:29 J. Cha Target on Bottom
42489 11/10/01 00:05 cdaq Computer reboots for 2001-11-09
42487 11/10/01 00:01 Kelly swing shift summary
Friday
42482 11/09/01 23:01 J. Cha Target on Carbon
42480 11/09/01 22:29 J. Cha annealing target
42479 11/09/01 22:19 Kelly end run 42212 to anneal target
42478 11/09/01 22:18 Kelly changed data disk
42476 11/09/01 22:16 Kelly EPICS screens from MCC
42473 11/09/01 22:05 J. Cha Target Screen
42469 11/09/01 21:23 Kelly paddle efficiency
42468 11/09/01 21:10 J. Cha target screen
42467 11/09/01 20:41 gwarren Changed HV for sticks during 42210
42466 11/09/01 20:37 Kelly leakage from Hall A
42463 11/09/01 19:45 J. Cha Target Screen
42462 11/09/01 19:40 gwarren update scaler template files
42461 11/09/01 19:35 gwarren Daily Summary: Thur 11/8/01
42458 11/09/01 18:23 Kelly ROC2 hang ups
42457 11/09/01 18:10 gwarren HMS Dipole N2 level
42455 11/09/01 18:03 J. Cha Target Screen
42452 11/09/01 17:32 gwarren Monitoring the current asymmetry
42451 11/09/01 17:07 J. Cha Target Screen
42449 11/09/01 16:23 Kelly gas alarm & HV trip
42448 11/09/01 16:16 jyun oopss
42447 11/09/01 16:13 jyun ndet scaler change
42443 11/09/01 16:01 pitt SOS Fastbus crate
42442 11/09/01 15:59 pitt Shift summary
42441 11/09/01 15:58 klim target screen
42440 11/09/01 15:52 gwarren changed logic signal path for 3:19L and 1:17R
42437 11/09/01 15:03 klim target screen
42427 11/09/01 13:40 klim target_computer reboot
42426 11/09/01 13:36 gwarren reset ndet disc thresholds
42424 11/09/01 13:24 klim target screen
42422 11/09/01 13:18 klim power outage
42419 11/09/01 12:11 klim target screen
42417 11/09/01 11:15 klim polarizing the target
42416 11/09/01 10:48 klim target screen
42415 11/09/01 10:44 klim polarizing target
42413 11/09/01 10:11 klim target screen
42412 11/09/01 09:47 klim target switch problme
42407 11/09/01 08:06 E. Christy shift summary
42406 11/09/01 07:52 ent BPM screen
42403 11/09/01 06:22 Raue target screen
42400 11/09/01 05:30 ent ndet mean bar time
42395 11/09/01 04:32 E. Christy cmlog server down
42394 11/09/01 04:24 ent Run 42187 ndet mean bar time
42393 11/09/01 04:12 Raue target screen
42391 11/09/01 03:33 M Jones current leakage = 1.6%
42386 11/09/01 01:52 Raue target screen
42370 11/09/01 00:19 dunne Target Screen
42367 11/09/01 00:05 cdaq Computer reboots for 2001-11-08
Thursday
42365 11/08/01 23:51 yuan Shift Summary
42363 11/08/01 23:22 yuan switching to top deuterium
42362 11/08/01 23:18 yuan Beam trip at 22:44
42360 11/08/01 21:47 yuan leak current and charge asymmetry status
42358 11/08/01 21:08 dunne Target Screen
42357 11/08/01 20:57 yuan 20:45 RF trip
42355 11/08/01 19:59 dunne Target Screen
42352 11/08/01 19:08 dunne Target Screen
42351 11/08/01 19:01 zeier halfwave plate in
42350 11/08/01 18:58 hamlet new "hcer_param.01" in online replay
42349 11/08/01 18:40 yuan Reboot ROC9
42345 11/08/01 17:44 jyun charge asymmetry
42344 11/08/01 17:01 dunne Target Screen
42341 11/08/01 16:42 Secrest BPM Screen
42338 11/08/01 15:56 klein shift summary
42336 11/08/01 15:53 yun target screen
42334 11/08/01 15:13 hamlet / zei moller of today
42333 11/08/01 15:00 zeier errata runs 42169 and 42170
42330 11/08/01 14:30 yun tgt screen
42328 11/08/01 14:11 Secrest/Lung Shift CheckList Page 2
42327 11/08/01 14:09 Secrest/Lung Shift CheckList Page 1
42323 11/08/01 13:14 zeier Hall A leakage
42321 11/08/01 13:06 yun target screen
42319 11/08/01 12:33 hamlet BPM & Moller settings at start
42317 11/08/01 12:19 zeier new diskwatch
42316 11/08/01 12:19 yun tgt screen, +33.4%!
42314 11/08/01 11:53 gwarren Lowered HV for sticks
42313 11/08/01 11:50 mckee target performance after anneal
42312 11/08/01 11:48 zeier moller bpms
42310 11/08/01 11:04 gwarren Daily Summary: Wed 11/7/01
42309 11/08/01 10:46 saw Jeffylab reboot instructions
42308 11/08/01 10:46 hamlet Changed hcer.param in online replay
42304 11/08/01 10:00 yun tgt screen
42303 11/08/01 09:58 klein data disk change
42295 11/08/01 09:21 zeier leakage measurements: Quote currents!!!
42290 11/08/01 08:49 klein switch to cosmics
42286 11/08/01 08:44 klein leakage check
42285 11/08/01 08:37 gwarren charge asymmetry investigation
42284 11/08/01 08:16 Abdellah Owl Shift Summary
42282 11/08/01 08:12 yun target screen
42281 11/08/01 08:05 mckee Target cryo problem
42280 11/08/01 07:22 abdellah Dipole trip
42276 11/08/01 06:55 vardan target pdp screen
42273 11/08/01 06:12 cdaq paddles efficiency run42147
42272 11/08/01 06:02 vardan target pdp screen
42269 11/08/01 05:00 vardan target pdp screen
42266 11/08/01 04:03 vardan target pdp screen, last 2 hours
42263 11/08/01 03:40 vardan target criogenics adusted
42258 11/08/01 02:04 vardan target pdp screen
42255 11/08/01 00:57 vardan target pdp screen
42254 11/08/01 00:27 vardan target computer rebooted
42252 11/08/01 00:05 cdaq Computer reboots for 2001-11-07
42251 11/08/01 00:04 yuan Shift Summary
42250 11/08/01 00:04 dunne Target Screen
Wednesday
42246 11/07/01 23:05 dunne Target Screen
42244 11/07/01 22:32 yuan Paddle Efficiencies: run 42139
42242 11/07/01 22:15 gwarren We need carbon and empty runs
42241 11/07/01 22:03 dunne Target Screen
42240 11/07/01 21:39 dunne Target Screen
42239 11/07/01 21:39 yuan Leak Current
42237 11/07/01 21:17 gwarren Run Plan
42235 11/07/01 20:14 yuan HMS shower A and B HV trip
42232 11/07/01 20:00 dunne Target Screen
42231 11/07/01 19:36 yuan Reboot ROC9
42229 11/07/01 19:12 dunne Target Screen
42226 11/07/01 18:44 yuan DAQ problem :Error 3801
42221 11/07/01 18:03 dunne Target Screen
42216 11/07/01 16:09 dunne Target Screen
42214 11/07/01 15:53 yun target screen
42213 11/07/01 15:53 klein shift summary
42212 11/07/01 15:29 klein leakage
42211 11/07/01 15:26 gwarren Reduce Hall C Leakage only when > 2%
42207 11/07/01 14:53 yun target screen
42206 11/07/01 14:35 jyun current feedback
42205 11/07/01 14:30 gwarren tweaking HV for 3:11R
42202 11/07/01 13:59 yun target screen
42201 11/07/01 13:01 klim target pdp screen
42198 11/07/01 12:06 klein continuing with pol target and beam
42196 11/07/01 12:04 klim target screen
42194 11/07/01 11:43 gwarren gain match is good
42193 11/07/01 09:27 comanm neg polarisation screen
42192 11/07/01 09:23 comanm polarisation screen
42191 11/07/01 09:20 gwarren How to do a cosmics run
42189 11/07/01 09:09 klein cosmic run now with coincidence set to 2
42187 11/07/01 08:54 klein routine
42177 11/07/01 07:53 Abdellah Owl Shift Summary
42150 11/07/01 03:59 vardan target screen
42147 11/07/01 03:44 M Jones No beam until approx 5:30
42143 11/07/01 03:17 M Jones Beam off
42141 11/07/01 03:00 vardan target screen
42140 11/07/01 02:22 M Jones run 42105 scaler problems
42137 11/07/01 02:05 vardan target screen for last 2 hours
42136 11/07/01 02:04 vardan target screen
42135 11/07/01 01:52 vardan lost data on PDP
42134 11/07/01 01:22 vardan target screen
42128 11/07/01 00:05 cdaq Computer reboots for 2001-11-06
42127 11/07/01 00:00 dunne Target Screen
Tuesday
42126 11/06/01 23:58 M Jones HMS cerenkov off for run 42103
42124 11/06/01 23:58 gwarren ndet gain matched ... I hope
42121 11/06/01 23:19 M Jones Drift chambers trip at end of run 42102
42119 11/06/01 23:11 gwarren gain matching ndet
42118 11/06/01 23:05 dunne Target Screen
42115 11/06/01 22:01 dunne Target Screen (8 - 10 pm)
42114 11/06/01 21:09 M Jones Beam Leakage about 1%
42112 11/06/01 21:03 zeier unsuccessful current asymmetry feedback calibration
42111 11/06/01 20:21 dunne Target Screen
42109 11/06/01 18:36 Hamlet Beam offset effect on moller
42108 11/06/01 18:00 reinhold more mott news
42107 11/06/01 17:48 dunne Target Run valve stuck
42106 11/06/01 17:48 hcf Moller beam angle vs. results
42105 11/06/01 17:33 reinhold halfwave plate; current feedback
42103 11/06/01 16:18 reinhold summary mott work (from the elog)
42102 11/06/01 16:01 jyun current feedback
42099 11/06/01 15:42 Lung HMS HV Trip
42098 11/06/01 14:31 donal Target work
42097 11/06/01 14:15 gwarren Attempt to Gain Match foiled by "severed power"
42096 11/06/01 13:16 kuhn Trigger
42088 11/06/01 12:07 kuhn HV restore
42084 11/06/01 11:25 kuhn Network outage
42070 11/06/01 09:00 kuhn HV change
42059 11/06/01 07:37 abdellah Shift Summary
42058 11/06/01 07:31 samuel pdp screen
42055 11/06/01 06:54 samuel polarization screen
42052 11/06/01 05:26 abdellah HMS Q1 trip
42049 11/06/01 05:08 samuel polarization screen
42048 11/06/01 04:26 samuel NMR screen
42046 11/06/01 03:55 samuel pdp screen
42042 11/06/01 02:58 samuel NMR screen
42037 11/06/01 01:16 samuel pdp screen
42034 11/06/01 00:40 zeier moller
42031 11/06/01 00:05 cdaq Computer reboots for 2001-11-05
Monday
42024 11/05/01 21:36 zeier moller settings
42023 11/05/01 21:33 zeier moller tune after magnets set
42018 11/05/01 19:10 zeier moller tune, magnets off
42017 11/05/01 18:37 zeier Hall A and B leakage
42016 11/05/01 18:30 donal anneal
42015 11/05/01 17:58 HGZ access to free up run valve
42014 11/05/01 16:14 kuhn Missing Shift Leader
42013 11/05/01 16:06 kuhn Shift Summary
42009 11/05/01 15:33 yun target screen
42006 11/05/01 14:32 yun target screen
42004 11/05/01 13:48 kuhn DAQ crashes
42003 11/05/01 13:39 gwarren HMS rates: Top vs. Bottom
42002 11/05/01 13:35 ioana nicule ndet efficiency
42000 11/05/01 13:18 yun target screen
41998 11/05/01 13:02 kuhn Leakage test - improved
41996 11/05/01 12:39 donal EIP counter
41994 11/05/01 12:08 yun bottom target 11 hours,
41993 11/05/01 12:00 zeier scaler changes
41992 11/05/01 11:57 kuhn repeated DAQ crashes
41991 11/05/01 11:56 nsavvinv ndet timing calibration run #41932
41989 11/05/01 11:47 yun target screen
41987 11/05/01 11:05 kuhn Leakage Test
41982 11/05/01 10:11 gwarren Checked ndet paddle efficiency
41981 11/05/01 10:06 yun target screen
41980 11/05/01 09:37 kuhn DAQ problem
41978 11/05/01 09:29 Yun target screen
41977 11/05/01 09:18 hcf Moller LHe PID was stuck
41974 11/05/01 07:59 abdellah Shift summary
41972 11/05/01 07:49 samuel NMR screen
41970 11/05/01 06:50 samuel pdp screen
41968 11/05/01 05:56 samuel pdp screen
41963 11/05/01 04:49 samuel polarization screen
41960 11/05/01 03:44 samuel Polarization screen
41957 11/05/01 02:36 samuel pdp screen
41955 11/05/01 01:51 Donal/Sam Target screen
41954 11/05/01 01:47 Donal Target anneal
41953 11/05/01 00:39 stout beam off
41951 11/05/01 00:05 cdaq Computer reboots for 2001-11-04
41949 11/05/01 00:00 mack shift summary
Sunday
41948 11/04/01 23:58 vardan target polarization
41945 11/04/01 22:59 vardan target polarization
41942 11/04/01 21:59 vardan target polarization
41940 11/04/01 21:03 vardan target polarization
41932 11/04/01 20:02 vardan target polarization
41929 11/04/01 18:58 vardan target polarization
41928 11/04/01 18:04 vardan target polarization
41925 11/04/01 17:50 vardan target computer rebooted
41924 11/04/01 16:57 vardan target polarization
41921 11/04/01 16:03 dunne Target Screen (3 - 4 pm)
41917 11/04/01 15:19 dunne Target Screen (2:15 - 3:15 pm)
41914 11/04/01 14:06 dunne Target Screen (1 - 2 pm)
41913 11/04/01 13:17 dunne Target Screen
41910 11/04/01 12:46 dunne Changed to bottom target
41909 11/04/01 12:36 dunne Target Screen (11 - noon)
41906 11/04/01 11:11 dunne Target Screen
41905 11/04/01 11:10 M JOnes leakage current about 1.4%
41902 11/04/01 10:07 dunne Target Screen
41901 11/04/01 09:56 dunne Target Screen (8 am - 9 am)
41900 11/04/01 09:45 dunne Target Screen (7 am - 8 am)
41898 11/04/01 09:42 M JOnes trigger change back to normal
41896 11/04/01 08:03 dunne Target Screen
41895 11/04/01 08:02 HGZ shift summary
41892 11/04/01 07:00 spw polarization screen
41890 11/04/01 06:02 spw polarization screen
41887 11/04/01 05:18 spw polarization screen
41884 11/04/01 04:33 HGZ helium bottle replaced
41881 11/04/01 03:01 spw polarization screen
41879 11/04/01 02:42 HGZ HMS shower counter HV trip
41875 11/04/01 02:13 HGZ HMS DC, Cerenkov HV trip
41873 11/04/01 02:01 spw polarization screen
41872 11/04/01 01:39 HGZ leakthru is 1.2%
41869 11/04/01 01:15 HGZ leagage is now 1.1%
41868 11/04/01 01:03 spw polarization screen
41867 11/04/01 00:56 spw target separator flakiness
41866 11/04/01 00:44 HGZ leakage is 1.3%
41863 11/04/01 00:05 cdaq Computer reboots for 2001-11-03
41862 11/04/01 00:04 Vardan target polarization
Saturday
41859 11/03/01 23:55 mack shift summary
41858 11/03/01 23:41 mack measure the leakage
41857 11/03/01 23:08 Vardan target polarization
41856 11/03/01 22:09 Vardan traget polarization, last 2 hours
41855 11/03/01 22:06 Vardan target polarization
41854 11/03/01 21:08 Vardan target polarization
41853 11/03/01 20:03 donal target work
41852 11/03/01 19:35 mack cosmics trigger was off
41850 11/03/01 19:12 mack Taking cosmics for Glen
41847 11/03/01 15:05 dunne Target Screen
41843 11/03/01 14:35 dunne Target Screen (top target history)
41842 11/03/01 13:59 Dunne Target Screen
41836 11/03/01 12:04 dunne Target Screen
41835 11/03/01 11:07 dunne Target Screen
41832 11/03/01 10:03 dunne Target Screen
41831 11/03/01 09:59 dunne Target screen
41825 11/03/01 08:03 spw polarization screen
41824 11/03/01 08:02 HGZ shift summary
41820 11/03/01 07:03 spw polarization screen
41819 11/03/01 06:48 HGZ leakthru is 0.9%
41818 11/03/01 06:46 ent bpm screen
41815 11/03/01 05:57 HGZ run 42004 & 42005 are trash
41806 11/03/01 05:00 spw polarization screen
41803 11/03/01 04:05 HGZ ND3 production efficiency
41802 11/03/01 04:00 spw polarization screen
41799 11/03/01 02:59 spw polarization screen
41798 11/03/01 02:47 HGZ leakthru is 1.2%
41797 11/03/01 02:00 spw target polarization screen
41794 11/03/01 01:04 spw polarization screen
41793 11/03/01 00:37 HGZ target EPICS variables
41791 11/03/01 00:10 spw target polarization screen
41790 11/03/01 00:05 cdaq Computer reboots for 2001-11-02
Friday
41788 11/02/01 23:52 mack shift summary
41786 11/02/01 23:39 samuel NMR
41785 11/02/01 22:57 samuel pdp screen
41784 11/02/01 22:39 mack Now running 85 nA
41780 11/02/01 21:56 samuel NMR screen
41779 11/02/01 21:00 samuel PDP screen
41778 11/02/01 20:58 mack leakage is .6%
41775 11/02/01 20:19 samuel PDP screen
41773 11/02/01 19:28 Donal target behavior
41772 11/02/01 19:08 zeier instructions for leakage measurements
41769 11/02/01 18:19 mack WC+cerenkov HV trip
41768 11/02/01 18:05 zeier Hall A leakage for moller optics
41767 11/02/01 17:35 hcf Beam polarization results
41764 11/02/01 16:40 hcf 41989-90 taken with Hall A off
41763 11/02/01 16:38 Rakhsha Moller run # 41989 and 41990 with no beam in Hall A
41761 11/02/01 16:29 Donal target
41759 11/02/01 16:22 donal target microwaves
41758 11/02/01 16:13 zeier BAD MOLLER ENTRIES
41754 11/02/01 15:37 hcf Moller analyzer
41751 11/02/01 15:24 Rakhsha Nass Tuned Setting For the Moller system
41750 11/02/01 15:22 reinhold no beam
41749 11/02/01 15:20 Rakhsha Nass Moller Collimator Scan data
41743 11/02/01 14:52 frw reboot target computer (NMR)
41733 11/02/01 09:40 mckee target pol
41732 11/02/01 09:17 hcf begin ramping moller solenoid up for training
41731 11/02/01 08:34 Donal target
41729 11/02/01 08:03 HGZ shift summary
41725 11/02/01 06:48 ent BPM screen
41724 11/02/01 06:46 ent run 41978 trigger + PId
41723 11/02/01 06:43 ent HMS trigger? Changed to SCIN
41718 11/02/01 05:55 spw target polarization screen
41717 11/02/01 05:30 HGZ checkd leakthru
41716 11/02/01 05:26 HGZ run 41976, not 41977
41715 11/02/01 05:24 HGZ DAQ error message
41712 11/02/01 04:35 HGZ run 41975 junk
41709 11/02/01 04:20 HGZ EB1 died
41707 11/02/01 03:58 spw polarization screen
41704 11/02/01 02:04 spw target polarization screen
41702 11/02/01 01:49 HGZ ROC 2 & 5 died during run 41971
41700 11/02/01 01:36 HGZ checked leakthru
41696 11/02/01 00:05 cdaq Computer reboots for 2001-11-01
Thursday
41694 11/01/01 23:52 mack shift summary
41693 11/01/01 23:49 samuel last hour of top target
41690 11/01/01 23:35 reinhold RUNPLAN for owl 11/02 - day 11/02
41689 11/01/01 23:10 samuel PDP screen
41682 11/01/01 20:01 mack checked leakage
41680 11/01/01 18:53 hcf Moller cryo cooldown underway
41678 11/01/01 18:26 mack raster screens for the record
41677 11/01/01 18:15 mack run 41963 is junk
41673 11/01/01 17:56 mack checked thresholds
41672 11/01/01 17:49 mack checked trigger
41671 11/01/01 17:18 mack WC HV trip
41670 11/01/01 17:15 samuel NMR
41666 11/01/01 16:11 Cha Target Shift.
41664 11/01/01 15:58 B. Vlahovic shift report
41663 11/01/01 15:52 mckee anneal plot
41658 11/01/01 14:12 gwarren Check ndet after threshold change. OK
41657 11/01/01 14:05 gwarren TDC start delay for ndet
41653 11/01/01 12:45 mckee target pol
41652 11/01/01 12:41 mckee target anneal
41651 11/01/01 12:28 gwarren Problem with 3:23 L&R - it is a Feature!
41650 11/01/01 12:14 gwarren TAKE COSMICS WHEN DOWN.
41649 11/01/01 12:11 gwarren Changed ndet bar thresholds from 35 to 45 mV
41648 11/01/01 11:32 M JOnes Stop 12C and start polarizing target
41644 11/01/01 09:56 gwarren I'm finished updating parameters
41643 11/01/01 09:45 J. Cha Nose is empty.
41641 11/01/01 09:16 M Jones Start target anneal
41639 11/01/01 08:43 mckee target pol
41636 11/01/01 08:14 gwarren in process of changing ndet.params for Q2=0.5
41635 11/01/01 08:03 HGZ shift summary
41631 11/01/01 06:32 HGZ beam instability
41627 11/01/01 04:58 HGZ leakthru check
41625 11/01/01 04:43 spw target polarization screen
41620 11/01/01 01:45 HGZ data rates
41616 11/01/01 00:21 HGZ leakthru check
41614 11/01/01 00:08 Tang Shift summary
41612 11/01/01 00:05 cdaq Computer reboots for 2001-10-31