Main INDEX
Monthly INDEX
PREV
NEXT
User name Sawatzky
Log entry time 00:24:13 on December 3,2001
Entry number 43979
keyword=Shift Summary
16:36 Run 42630: Production, Top ND3, -25.9%
18:30 Problems with run vavle. Target chamber overfilled with LHe.
Attempting to boil off the excess LHe.
20:14 Run 42631: Production, Carbon (try to increase heat load w/ beam)
21:20 Using target anneal procedure to boil off excess LHe finally works!
23:24 Run 42632: Production, Empty target
23:56 Run 42633: Production, carbon target (while polarizing)