0000 | 0100 | 0200 | 0300 | 0400 | 0500 | 0600 | 0700 | Total Time | |
---|---|---|---|---|---|---|---|---|---|
Acceptable Beam in Use | 0 | 0 | 0 | 0 | 15 | 45 | 45 | 60 | 2.75 |
Beam Available but Not in Use | 60 | 60 | 60 | 60 | 45 | 0 | 15 | 0 | 5.00 |
Beam Not Available or Unacceptable | 0 | 0 | 0 | 0 | 0 | 15 | 0 | 0 | 0.25 |
Accelerator Con- figuration Chage | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.00 |
Experiment Ready | 0 | 0 | 0 | 0 | 15 | 60 | 45 | 60 | 3.00 |
Planned Config- uration Change | 60 | 60 | 60 | 60 | 0 | 0 | 15 | 0 | 4.25 |
Unplanned Experiment Down | 0 | 0 | 0 | 0 | 45 | 0 | 0 | 0 | 0.75 |
Hall not ready reasons | |||||||||
Target | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.00 |
HMS | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.00 |
Ndet | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.00 |
Data Acq | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.00 |
Other | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.00 |
Comments: long anneal process starting at shift beginning. target run valve stuck. called in Don Crabb. 04:45 production on carbon, then hole target 06:00 beam off to start polarizing 06:15 production on bottom target
Data Entry by: mack