46595 01/31/02 22:06 frw status of target work
46594 01/31/02 21:52 frw ramped up Moller solenoid
46593 01/31/02 20:19 comanl The status of the moller magnet
46592 01/31/02 16:42 ioana shift summary
46591 01/31/02 16:40 cdaq Beam Time Accounting
46590 01/31/02 12:12 ioana (Unsuccessful) Harp scan
46589 01/31/02 10:31 hcf moller solenoid ramp-down
46588 01/31/02 09:10 cdaq Beam Time Accounting
46587 01/31/02 08:12 yuan Shift Summary
46586 01/31/02 08:11 cdaq Beam Time Accounting
46585 01/31/02 07:38 cdaq End of Run 43396:
46584 01/31/02 07:28 yuan Run43395,43396:Carbon with He, Beam Current 200nA
46583 01/31/02 07:12 cdaq Run 43396: carbon, hms momentum 4723
46582 01/31/02 07:10 cdaq End of Run 43395:
46581 01/31/02 06:36 cdaq Run 43395: carbon target, hms momentum 4.723 GeV/c
46580 01/31/02 06:23 cdaq End of Run 43394:
46579 01/31/02 06:14 yuan Target Change to Carbon, HMS momentum change to 4.723
46578 01/31/02 04:45 cdaq Run 43394: Top cell p = -66.4
46577 01/31/02 04:38 yuan HMS quads trip
46576 01/31/02 04:01 cdaq End of Run 43393:
46575 01/31/02 03:45 jyun tgt pdp screen last 4 hours
46574 01/31/02 03:37 cdaq Run 43393: Top cell p = -66.9
46573 01/31/02 03:36 cdaq End of Run 43392:
46572 01/31/02 03:20 yuan Beam position and raster size test
46571 01/31/02 03:00 cdaq Run 43392: Top cell p = -66.9
46570 01/31/02 02:48 cdaq End of Run 43391:
46569 01/31/02 02:11 cdaq Run 43391: Top cell p = -66.1
46568 01/31/02 02:10 cdaq End of Run 43390:
46567 01/31/02 01:34 cdaq Run 43390: Top cell p = -71.1
46566 01/31/02 01:31 cdaq End of Run 43389:
46565 01/31/02 01:15 jyun target epics lost
46564 01/31/02 01:14 cdaq Run 43389: Top cell p = -65.8
46563 01/31/02 01:13 cdaq End of Run 43388:
46562 01/31/02 00:36 cdaq Run 43388: Top cell p = -64.45
46561 01/31/02 00:35 cdaq End of Run 43387:
46560 01/31/02 00:05 cdaq Computer reboots for 2002-01-30
46559 01/31/02 00:01 cdaq Run 43387: Top cell p = -63.9
46558 01/31/02 00:00 cdaq End of Run 43386:
Wednesday
46557 01/30/02 23:59 comanl Shift Summary
46556 01/30/02 23:58 cdaq Beam Time Accounting
46555 01/30/02 23:36 mckee magnet level problem
46554 01/30/02 23:21 cdaq Run 43386: Top cell p = -63.1
46553 01/30/02 23:19 cdaq End of Run 43385:
46552 01/30/02 23:13 mckee target screen
46551 01/30/02 22:43 comanl changed HMS momentum to 4.095
46550 01/30/02 22:42 cdaq Run 43385: Top cell p = -57.5
46549 01/30/02 22:38 mckee top target spinup
46548 01/30/02 22:36 cdaq Run 43384: Top cell p = -64.2
46547 01/30/02 22:24 mckee anneal 100K/15min
46546 01/30/02 22:02 mckee target screen
46545 01/30/02 20:54 comanl DAQ problems
46544 01/30/02 20:11 comanl correction
46543 01/30/02 19:22 mckee target screen
46542 01/30/02 19:22 mckee target screen
46541 01/30/02 19:12 comanl changed magnets current
46540 01/30/02 19:10 cdaq Run 43383: Bottom cell p = -73.5
46539 01/30/02 18:37 cdaq End of Run 43382:
46538 01/30/02 18:20 mckee target screen, -64%
46537 01/30/02 18:07 hcf LN2 followup
46536 01/30/02 18:05 cdaq Run 43382: Bottom cell p = -66.1
46535 01/30/02 18:04 cdaq End of Run 43381:
46534 01/30/02 17:41 cdaq Run 43381: Bottom cell p = -68.6
46533 01/30/02 17:39 cdaq End of Run 43380:
46532 01/30/02 17:16 hcf Moller LN2 dropping -- investigating
46531 01/30/02 17:02 cdaq Run 43380: Bottom cell p = -72
46530 01/30/02 17:01 cdaq End of Run 43379:
46529 01/30/02 16:22 cdaq Run 43379: Bottom cell p = -84
46528 01/30/02 16:01 ioana BCM calibration
46527 01/30/02 16:01 ioana shift summary
46526 01/30/02 16:00 cdaq Beam Time Accounting
46525 01/30/02 16:00 cdaq End of Run 43378:
46524 01/30/02 15:40 cdaq Run 43378: BCM calibration, C target
46523 01/30/02 15:17 smithg finished top proton (-), doing bcm calib
46522 01/30/02 14:54 smithg charge collected on top proton -
46521 01/30/02 14:35 cdaq End of Run 43377:
46520 01/30/02 14:28 smithg past hour's tgt screen
46519 01/30/02 14:19 cdaq Run 43377: Top cell p = -70.5
46518 01/30/02 14:17 cdaq End of Run 43376:
46517 01/30/02 13:42 cdaq Run 43376: Top cell p = -70.8
46516 01/30/02 13:41 cdaq End of Run 43375:
46515 01/30/02 13:25 smithg tgt pol screen last hour
46514 01/30/02 13:00 cdaq Run 43375: Top cell p = -71.2
46513 01/30/02 12:59 cdaq End of Run 43374:
46512 01/30/02 12:59 cdaq End of Run 43374:
46511 01/30/02 12:18 smithg tgt (re)pol. history past hour
46510 01/30/02 12:02 cdaq Run 43374: Top cell p = -74.5
46509 01/30/02 11:25 mckee New TE Constants
46508 01/30/02 11:20 mckee anneal on 29jan
46507 01/30/02 11:18 mckee separator valve problem
46506 01/30/02 10:54 cdaq End of Run 43373:
46505 01/30/02 10:49 cdaq Run 43373: Top cell p = -74.5
46504 01/30/02 10:47 cdaq End of Run 43372:
46503 01/30/02 10:36 smithg last hour pol. history
46502 01/30/02 10:09 cdaq Run 43372: Top cell p = -84.7
46501 01/30/02 10:06 smithg polarized top proton to -83.6
46500 01/30/02 09:09 smithg top cell charge 03:30-08:00
46499 01/30/02 08:48 smithg annealing
46498 01/30/02 08:03 E. Christy owl shift summary
46497 01/30/02 08:02 cdaq Beam Time Accounting
46496 01/30/02 07:37 cdaq End of Run 43371:
46495 01/30/02 07:28 aram End of 43371 run
46494 01/30/02 07:01 gwarren target polarization, Pt=-70.8
46493 01/30/02 06:44 gwarren charge on bottom cell
46492 01/30/02 06:43 cdaq Run 43371: Bottom cell p = -71.4
46491 01/30/02 06:41 cdaq End of Run 43370:
46490 01/30/02 06:41 cdaq End of Run 43370:
46489 01/30/02 06:09 gwarren target polarization, Pt = -72.4%
46488 01/30/02 05:58 cdaq Run 43370: Bottom cell p = -74.9
46487 01/30/02 05:52 cdaq End of Run 43369:
46486 01/30/02 05:19 gwarren target polarization, Pt=-74.0%
46485 01/30/02 05:14 cdaq Run 43369: Bottom cell p = -74.0
46484 01/30/02 05:14 cdaq End of Run 43368:
46483 01/30/02 05:13 cdaq End of Run 43368:
46482 01/30/02 04:33 cdaq Run 43368: Bottom cell p = -75.9
46481 01/30/02 04:30 cdaq End of Run 43367:
46480 01/30/02 04:30 cdaq End of Run 43367:
46479 01/30/02 04:03 gwarren target polarization, Pt=-79.4
46478 01/30/02 03:55 gwarren Polarizing Top Target, Pt_max = -83%
46477 01/30/02 03:54 cdaq Run 43367: Top cell p = -81.6
46476 01/30/02 03:11 M Jones leakage check
46475 01/30/02 02:59 gwarren polarization history for bottom target
46474 01/30/02 02:56 cdaq End of Run 43366:
46473 01/30/02 02:31 M Jones Sieve slits runs
46472 01/30/02 02:05 gwarren target polarization, Pt=-68.5
46471 01/30/02 01:51 cdaq Run 43366: Bottom cell p = -73.5
46470 01/30/02 01:43 cdaq End of Run 43365:
46469 01/30/02 01:06 cdaq Run 43365: Bottom Target: pol ~ -75%
46468 01/30/02 01:02 cdaq End of Run 43364:
46467 01/30/02 01:02 gwarren target polarization, Pt = -75.5
46466 01/30/02 00:29 gwarren Polarization as spin up bottom cell
46465 01/30/02 00:29 cdaq Run 43364: Bottom cell pol=-80.5
46464 01/30/02 00:17 cdaq End of Run 43363:
46463 01/30/02 00:05 cdaq Computer reboots for 2002-01-29
Tuesday
46462 01/29/02 23:56 Tang Run summary
46461 01/29/02 23:55 cdaq Beam Time Accounting
46460 01/29/02 23:50 cdaq Run 43363: C (no He)
46459 01/29/02 23:50 cdaq End of Run 43362:
46458 01/29/02 23:27 cdaq Run 43362: C (He)
46457 01/29/02 23:11 cdaq End of Run 43361:
46456 01/29/02 22:51 cdaq Run 43361: C (no He)
46455 01/29/02 22:45 M Jones Roc 2 crash
46454 01/29/02 22:43 cdaq Run 43360: C (no He)
46453 01/29/02 22:23 cdaq Run 43359: C (no He)
46452 01/29/02 22:11 cdaq End of Run 43358:
46451 01/29/02 21:56 cdaq Run 43358: C (no He) Optics run
46450 01/29/02 21:55 cdaq End of Run 43357:
46449 01/29/02 21:38 cdaq Run 43357: C (no He) Optics run
46448 01/29/02 21:06 cdaq End of Run 43356:
46447 01/29/02 20:54 cdaq Run 43356: C (no He) Optics run
46446 01/29/02 20:51 cdaq End of Run 43355:
46445 01/29/02 20:43 M Jones empty target run 43354
46444 01/29/02 20:36 cdaq Run 43355: C (no He) Optics run
46443 01/29/02 19:48 cdaq End of Run 43354:
46442 01/29/02 18:48 cdaq Run 43354: Empty cell
46441 01/29/02 16:26 zeier day shift summary
46440 01/29/02 16:23 cdaq Beam Time Accounting
46439 01/29/02 15:48 zeier hall dropped to restricted access accidentally
46438 01/29/02 15:01 zeier update
46437 01/29/02 11:42 Rondon Beam expected to be off for 6-8, try TE's
46436 01/29/02 11:13 zeier charge asymmetry
46435 01/29/02 11:02 zeier no beam at least up to the end of shift
46434 01/29/02 10:49 klein target
46433 01/29/02 10:48 cdaq End of Run 43353:
46432 01/29/02 10:42 cdaq Run 43353: Top NH3, pol= +82.7%
46431 01/29/02 10:41 cdaq End of Run 43352:
46430 01/29/02 10:41 cdaq End of Run 43352:
46429 01/29/02 10:06 zeier rf problems solved
46428 01/29/02 10:05 cdaq Run 43352: Top NH3, pol= +83.0%
46427 01/29/02 10:03 cdaq End of Run 43351:
46426 01/29/02 09:23 cdaq Run 43351: Top NH3, pol= +87.2%
46425 01/29/02 09:16 klein target screen
46424 01/29/02 09:00 zeier rf cavity lost
46423 01/29/02 08:27 cdaq End of Run 43350:
46422 01/29/02 08:08 gwarren Polarization on Top cell for Owl Shift
46421 01/29/02 08:06 cdaq Run 43350: Top NH3, pol= +82.1%
46420 01/29/02 08:05 gwarren target polarization, Pt=+82.5
46419 01/29/02 08:05 cdaq End of Run 43349:
46418 01/29/02 08:01 comanl Shift Summary
46417 01/29/02 08:00 cdaq Beam Time Accounting
46416 01/29/02 07:29 cdaq Run 43349: Top NH3, pol= +83.1%
46415 01/29/02 07:27 cdaq End of Run 43348:
46414 01/29/02 07:01 gwarren target polarization, Pt=+89.7 (beam off)
46413 01/29/02 06:43 cdaq Run 43348: Top NH3, pol= +85.1%
46412 01/29/02 06:41 cdaq End of Run 43347:
46411 01/29/02 06:08 gwarren target polarization, Pt=+86.0
46410 01/29/02 06:06 cdaq Run 43347: Top NH3, pol= +86.1%
46409 01/29/02 06:05 cdaq End of Run 43346:
46408 01/29/02 05:27 cdaq Run 43346: Top NH3, pol= +93.5%
46407 01/29/02 05:25 cdaq End of Run 43345:
46406 01/29/02 05:05 hamlet Change disk data9-->data10
46405 01/29/02 05:04 comanl BPM&BCM
46404 01/29/02 05:01 gwarren target polarization, Pt=+87.7
46403 01/29/02 04:58 cdaq Run 43345: Top NH3, pol= +87.2%
46402 01/29/02 04:54 cdaq End of Run 43344:
46401 01/29/02 04:26 cdaq Run 43344: Bottom NH3, pol= +89.2%
46400 01/29/02 04:24 cdaq End of Run 43343:
46399 01/29/02 04:04 gwarren target polarization, Pt=+90.3
46398 01/29/02 03:49 cdaq Run 43343: Top NH3, pol= 95.4%
46397 01/29/02 03:35 comanl Q3 trip
46396 01/29/02 03:34 cdaq End of Run 43342:
46395 01/29/02 03:13 gwarren Target Polarization, Pt=+91.5
46394 01/29/02 03:12 cdaq Run 43342: Top NH3, pol= 91%
46393 01/29/02 03:11 cdaq End of Run 43341:
46392 01/29/02 02:29 comanl HMS DC HV changed in crate #1 card A
46391 01/29/02 02:27 cdaq Run 43341: Top NH3, pol= 96%
46390 01/29/02 02:16 comanl DC' s HV problem
46389 01/29/02 02:07 cdaq End of Run 43340:
46388 01/29/02 02:05 gwarren target polarization. Last two hours. Pt=+92.4
46387 01/29/02 01:59 comanl changed beam position 3HOOB : x=-1.2 y=0
46386 01/29/02 01:55 comanl HMS DC's high voltage failure
46385 01/29/02 01:49 gwarren charge on bottom target
46384 01/29/02 01:45 gwarren Moved to Top target
46383 01/29/02 01:45 cdaq Run 43340: Top NH3, pol= 93.68%
46382 01/29/02 01:44 gwarren Polarizing top cell
46381 01/29/02 00:59 comanl changing to top target
46380 01/29/02 00:51 cdaq End of Run 43339:
46379 01/29/02 00:15 rohe eve shift summary
46378 01/29/02 00:14 cdaq Beam Time Accounting
0 01/29/02 00:13 no_name Beam Time Accounting
46375 01/29/02 00:05 cdaq Computer reboots for 2002-01-28
Monday
46374 01/28/02 23:49 klein charge on target
46373 01/28/02 23:30 klein pol target
46372 01/28/02 23:23 cdaq Run 43338: Bottom NH3, pol= +78.2%
46371 01/28/02 23:22 cdaq End of Run 43337:
46370 01/28/02 22:43 cdaq Run 43337: Bottom NH3, pol= +81.2%
46369 01/28/02 22:42 cdaq End of Run 43336:
46368 01/28/02 22:29 klein target screen
46367 01/28/02 21:57 cdaq Run 43336: Bottom NH3, pol= +80.1%
46366 01/28/02 21:56 cdaq End of Run 43335:
46365 01/28/02 21:20 rohe beam current leakage measurement
46364 01/28/02 21:16 cdaq Run 43335: Bottom NH3, pol= +87.9%
46363 01/28/02 20:42 cdaq End of Run 43334:
46362 01/28/02 20:32 cdaq Run 43334: Bottom NH3, pol= +82.8%
46361 01/28/02 20:30 cdaq End of Run 43333:
46360 01/28/02 19:50 cdaq Run 43333: Bottom NH3, pol= +84.7%
46359 01/28/02 19:49 cdaq End of Run 43332:
46358 01/28/02 19:07 cdaq Run 43332: Bottom NH3, pol= 85.4+
46357 01/28/02 19:06 cdaq End of Run 43331:
46356 01/28/02 18:24 cdaq Run 43331: Bottom NH3, pol= +87.6%
46355 01/28/02 18:23 cdaq End of Run 43330:
46353 01/28/02 17:47 cdaq Run 43330: Bottom NH3, pol= +91.5%
46352 01/28/02 17:46 cdaq End of Run 43329:
46351 01/28/02 17:17 cvxwrks Restoring vmec10 parameters after reboot
46349 01/28/02 17:08 cdaq Run 43329: Bottom NH3, pol= +92.2%
46348 01/28/02 17:06 cdaq End of Run 43328:
46346 01/28/02 16:27 cdaq Run 43328: Bottom NH3, pol= +101.7%
46345 01/28/02 16:15 rohe HMS mom set to 4.095 GeV
46344 01/28/02 16:01 zeier day shift summary
46343 01/28/02 16:00 cdaq Beam Time Accounting
46342 01/28/02 15:44 cdaq End of Run 43327:
46341 01/28/02 15:18 cdaq Run 43327: Bottom NH3, pol= +98.9%
46340 01/28/02 15:17 cdaq End of Run 43326:
46339 01/28/02 15:16 donal polarization
46338 01/28/02 14:19 cdaq Run 43326: Bottom NH3, pol= +101.7%
46337 01/28/02 14:17 zeier q2 trip
46336 01/28/02 14:03 cdaq End of Run 43325:
46335 01/28/02 13:59 donal polarization buildup
46334 01/28/02 13:56 cdaq Run 43325: Bottom NH3, pol= +99.4%
46333 01/28/02 13:48 cdaq End of Run 43324:
46332 01/28/02 13:10 cdaq Run 43324: 12C target (with He)
46331 01/28/02 13:02 donal bottom proton
46330 01/28/02 12:32 donal access
46329 01/28/02 12:15 cdaq End of Run 43323:
46328 01/28/02 11:43 cdaq Run 43323: 12C target (no He)
46327 01/28/02 11:42 nsavvinv shift checklist scan
46326 01/28/02 11:33 nsavvinv BPM screen
46325 01/28/02 11:32 cdaq End of Run 43322:
46324 01/28/02 11:28 cdaq Run 43322: hole target (no He)
46323 01/28/02 11:22 cdaq End of Run 43321:
46322 01/28/02 11:21 M Jones empty target run 32320
46321 01/28/02 11:11 cdaq Run 43321: hole target (no He)
46320 01/28/02 11:00 cdaq End of Run 43320:
46319 01/28/02 10:46 zeier moller summary
46318 01/28/02 10:45 cdaq Run 43320: empty target
46317 01/28/02 10:11 cdaq Moller Run 43319: moller
46316 01/28/02 09:54 cdaq Moller Run 43318: moller
46315 01/28/02 09:49 zeier moller control screens
46314 01/28/02 09:48 zeier moller bpms screen
46313 01/28/02 09:37 donal anneal
46312 01/28/02 09:33 cdaq Moller Run 43317: moller
46311 01/28/02 09:30 zeier bpm problem solved
46310 01/28/02 09:29 hcf moller LN2 and IOC problems
46309 01/28/02 09:28 zeier moller
46308 01/28/02 09:21 cdaq End of Run 43316:
46307 01/28/02 09:21 cdaq Run 43316: junk
46306 01/28/02 09:11 zeier BPM problems
46305 01/28/02 09:07 donal charge on target
46304 01/28/02 08:47 zeier starting target anneal
46303 01/28/02 08:45 cdaq End of Run 43315:
46302 01/28/02 08:27 cdaq Beam Time Accounting
46301 01/28/02 08:02 donal charge on target
46300 01/28/02 08:00 donal target screen
46299 01/28/02 07:59 boeglin Charge Asymmetry
46298 01/28/02 07:49 cdaq Run 43315: Top NH3, pol= -75.6%
46297 01/28/02 07:48 cdaq End of Run 43314:
46296 01/28/02 06:49 cdaq Run 43314: Top NH3, pol= -82.0%
46295 01/28/02 06:45 cdaq End of Run 43313:
46294 01/28/02 06:04 gwarren target polarization, Pt=-79.5
46293 01/28/02 05:45 cdaq Run 43313: Top NH3, pol= -77.9%
46292 01/28/02 05:43 cdaq End of Run 43312:
46291 01/28/02 05:43 cdaq End of Run 43312:
46290 01/28/02 05:03 gwarren target polarization, Pt=-78.4
46289 01/28/02 04:48 cdaq Run 43312: Top NH3, pol= -80.4%
46288 01/28/02 04:03 gwarren target polarization, Pt=-80.0
46287 01/28/02 03:56 cdaq Run 43311: Top NH3, pol= -80.4%
46286 01/28/02 03:55 cdaq End of Run 43310:
46285 01/28/02 03:55 cdaq End of Run 43310:
46284 01/28/02 03:06 aram Disk change
46283 01/28/02 03:03 gwarren target polarization, Pt=-83.3
46282 01/28/02 02:59 cdaq Run 43310: Top NH3, pol= -82.0%
46281 01/28/02 02:56 cdaq End of Run 43309:
46280 01/28/02 02:22 cdaq Run 43309: Top NH3, pol= -84.4%
46279 01/28/02 02:21 cdaq End of Run 43308:
46278 01/28/02 02:21 cdaq End of Run 43308:
46277 01/28/02 02:03 gwarren target polarization, Pt=-83.5
46276 01/28/02 01:38 aram BPM medm screen
46275 01/28/02 01:34 boeglin HV Alarm
46274 01/28/02 01:23 cdaq Run 43308: Top NH3, pol= -84.4%
46273 01/28/02 01:20 boeglin HV trip
46272 01/28/02 01:19 cdaq End of Run 43307:
46271 01/28/02 01:08 gwarren target polarization, Pt=-85.0
46270 01/28/02 01:01 cdaq Run 43307: Top NH3, pol= -84.8%
46269 01/28/02 00:59 cdaq End of Run 43306:
46268 01/28/02 00:50 gwarren Current Asymmetry Feedback was off
46267 01/28/02 00:08 cdaq Beam Time Accounting
46266 01/28/02 00:08 hamlet Shift summary
46265 01/28/02 00:05 cdaq Computer reboots for 2002-01-27
46264 01/28/02 00:04 cdaq Run 43306: Top NH3, pol= -86.1%
Sunday
46263 01/27/02 23:56 hamlet HMS hodoscope HV back to nominal values
46262 01/27/02 23:34 yprok target polarization
46261 01/27/02 23:25 cdaq Run 43305: Top NH3, pol= -88.0%
46260 01/27/02 23:20 cdaq End of Run 43304:
46259 01/27/02 23:20 cdaq End of Run 43304:
46258 01/27/02 22:41 yprok target polarization
46257 01/27/02 22:31 cdaq Run 43304: Top NH3, pol= -93%
46256 01/27/02 22:28 cdaq End of Run 43303:
46255 01/27/02 21:36 cdaq Run 43303: Top NH3, pol= -99%
46254 01/27/02 21:32 yprok target polarization
46253 01/27/02 21:29 yprok beamcount
46252 01/27/02 21:10 cdaq End of Run 43302:
46251 01/27/02 21:10 cdaq End of Run 43302:
46250 01/27/02 21:04 yprok target polarization
46249 01/27/02 20:30 hamlet More changes hhodo pmt's HV for some channels
46248 01/27/02 20:17 cdaq Run 43302: Bottom NH3, pol= -67.6%
46247 01/27/02 20:15 cdaq End of Run 43301:
46246 01/27/02 20:00 yprok target polarization
46245 01/27/02 19:24 cdaq Run 43301: Bottom NH3, pol= -69.2%
46244 01/27/02 19:22 cdaq End of Run 43300:
46243 01/27/02 19:09 yprok target polarization
46242 01/27/02 19:06 hamlet HMS hodoscope hits with new HV setting
46241 01/27/02 18:29 cdaq Run 43300: Bottom NH3, pol= -71.1%
46240 01/27/02 18:26 cdaq End of Run 43299:
46239 01/27/02 18:17 hamlet Change hhodo HV
46238 01/27/02 18:08 yprok target polarization
46237 01/27/02 17:33 cdaq Run 43299: Bottom NH3, pol= -73.4%
46236 01/27/02 17:32 cdaq End of Run 43298:
46235 01/27/02 16:59 yprok target polarization
46234 01/27/02 16:23 cdaq Run 43298: Bottom NH3, pol= -74.2%
46233 01/27/02 16:20 cdaq End of Run 43297:
46232 01/27/02 16:04 Testa shift summary
46231 01/27/02 16:04 cdaq Beam Time Accounting
46230 01/27/02 16:02 yprok target polarization
46229 01/27/02 15:30 Danagoulian A weird SEM-calib.ADC distribution
46228 01/27/02 15:24 cdaq Run 43297: Bottom NH3, pol= -74.7%
46227 01/27/02 15:22 cdaq End of Run 43296:
46226 01/27/02 15:12 Testa screen capture of beam current monitor
46225 01/27/02 15:09 Testa screen capture of hcbpms monitor
46224 01/27/02 15:07 elaasar PDP Display
46223 01/27/02 14:21 Testa Leakage measurement
46222 01/27/02 14:18 cdaq Run 43296: Bottom NH3, pol= -80.3%
46221 01/27/02 14:03 cdaq End of Run 43295:
46220 01/27/02 14:01 elaasar PDP Display
46219 01/27/02 13:27 M Jones G0 background measurement
46218 01/27/02 13:05 elaasar PDP Display
46217 01/27/02 13:05 cdaq Run 43295: Bottom NH3, pol= -77.0%
46216 01/27/02 13:04 cdaq End of Run 43294:
46215 01/27/02 12:23 Testa Adjusting the beam
46214 01/27/02 12:09 cdaq Run 43294: Bottom NH3, pol= -84.4%
46213 01/27/02 12:03 Testa Q2 tripped
46212 01/27/02 12:01 elaasar PDP Display
46211 01/27/02 11:53 cdaq End of Run 43293:
46210 01/27/02 11:31 Testa Dipole wasn't working
46209 01/27/02 11:27 cdaq Run 43293: Bottom NH3, pol= -88.2%
46208 01/27/02 11:02 elaasar PDP Display
46207 01/27/02 10:41 cdaq End of Run 43292:
46206 01/27/02 10:32 cdaq Run 43292: Bottom NH3, pol= -79.3%
46205 01/27/02 10:30 cdaq End of Run 43291:
46204 01/27/02 10:01 elaasar PDP Display
46203 01/27/02 09:04 elaasar PDP Display
46202 01/27/02 08:59 cdaq Run 43291: Bottom NH3, pol= -88.8%
46201 01/27/02 08:05 gwarren Charge on Bottom target so far
46200 01/27/02 08:05 boeglin Shift Summary
46199 01/27/02 08:00 cdaq Beam Time Accounting
46198 01/27/02 07:53 gwarren Run valve working again
46197 01/27/02 06:40 gwarren run valve stuck
46196 01/27/02 06:03 gwarren Hourly PDP Pt=-96.0
46195 01/27/02 05:09 gwarren Hourly PDP Pt=-90.9
46194 01/27/02 05:08 boeglin vacuum problem in accelerator
46193 01/27/02 05:08 cdaq End of Run 43290:
46192 01/27/02 04:12 gwarren increased slope on charge asymmetry feedback
46191 01/27/02 04:09 cdaq Run 43290: Bottom NH3, pol= -85.8%
46190 01/27/02 04:08 cdaq End of Run 43289:
46189 01/27/02 04:06 gwarren Hourly PDP Pt=-85.9%
46187 01/27/02 03:10 cdaq Run 43289: Bottom NH3, pol= -88.3%
46186 01/27/02 03:09 cdaq End of Run 43288:
46185 01/27/02 03:02 gwarren Hourly PDP Pt=-89.2
46184 01/27/02 02:11 cdaq Run 43288: Bottom NH3, pol= -92.7%
46183 01/27/02 02:10 cdaq End of Run 43287:
46182 01/27/02 02:01 gwarren hourly PDP Pt=-93.2
46181 01/27/02 01:26 rohe leakage measurement
46180 01/27/02 01:16 cdaq Run 43287: Bottom NH3, pol= -101.1%
46179 01/27/02 01:04 gwarren hourly PDP Pt=-102.8
46178 01/27/02 00:56 cdaq End of Run 43286:
46177 01/27/02 00:55 gwarren rebooted target computer
46176 01/27/02 00:49 Boeglin beam background
46175 01/27/02 00:05 cdaq Computer reboots for 2002-01-26
46174 01/27/02 00:04 gwarren Screen grab of spin up of bottom target
46173 01/27/02 00:00 hamlet Shift summary
Saturday
46172 01/26/02 23:59 cdaq Beam Time Accounting
46171 01/26/02 23:57 yprok target polarization
46170 01/26/02 23:57 cdaq Run 43286: Bottom NH3, pol= -94.6%
46169 01/26/02 23:45 cdaq End of Run 43285:
46168 01/26/02 23:12 cdaq Run 43285: Carbon,with He
46167 01/26/02 23:01 cdaq End of Run 43284:
46166 01/26/02 22:38 hamlet Beam polarization 65.68+-0.69
46165 01/26/02 22:28 cdaq Run 43284: Carbon,no He
46164 01/26/02 22:22 hamlet Moller runs
46163 01/26/02 22:00 cdaq Moller Run 43283: moller
46162 01/26/02 21:40 cdaq Moller Run 43282: moller
46161 01/26/02 21:24 yprok charge on the target
46160 01/26/02 21:16 cdaq Moller Run 43281: moller
46159 01/26/02 20:52 cdaq Moller Run 43280: moller
46158 01/26/02 20:34 cdaq Moller Run 43279: moller
46157 01/26/02 20:32 hamlet Moller BPM & settings.
46155 01/26/02 20:16 cdaq Moller Run 43278: moller
46154 01/26/02 19:49 hamlet Change disk data7 --> data8
46153 01/26/02 19:47 cdaq End of Run 43277:
46152 01/26/02 19:06 yprok target polarization
46151 01/26/02 19:00 cdaq Run 43277: Bottom NH3, pol= -80.6%
46150 01/26/02 18:58 cdaq End of Run 43276:
46149 01/26/02 18:51 hcf moller hodoscope hv's
46148 01/26/02 18:47 Danagoulian BPM screen
46147 01/26/02 18:40 Danagoulian Checklist page
46146 01/26/02 18:05 cdaq Run 43276: Bottom NH3, pol= -82.2%
46145 01/26/02 18:03 cdaq End of Run 43275:
46144 01/26/02 18:01 yprok target polarization
46143 01/26/02 17:14 yprok target polarization
46142 01/26/02 17:11 yprok charge on the target
46141 01/26/02 17:06 cdaq Run 43275: Bottom NH3, pol= -70.4%
46140 01/26/02 16:57 cdaq End of Run 43274:
46139 01/26/02 16:43 cdaq Run 43274: top NH3, pol= -77.4%
46138 01/26/02 16:40 cdaq End of Run 43273:
46137 01/26/02 16:21 donal witness field
46136 01/26/02 16:11 bosted Target Hourly Update
46135 01/26/02 16:01 cdaq Beam Time Accounting
46134 01/26/02 16:00 Testa shift summary
46133 01/26/02 15:43 cdaq Run 43273: top NH3, pol= -76.1%
46132 01/26/02 15:42 cdaq End of Run 43272:
46131 01/26/02 15:41 Testa beam condition - alot of spikes- see screen capture
46130 01/26/02 15:06 Danagoulian Thresholds
46129 01/26/02 15:05 bosted Target Hourly Update
46128 01/26/02 14:41 cdaq Run 43272: top NH3, pol= -79.0%
46127 01/26/02 14:39 cdaq End of Run 43271:
46126 01/26/02 14:02 bosted Target Hourly Update
46125 01/26/02 13:36 cdaq Run 43271: top NH3, pol= -76.4%
46124 01/26/02 13:36 donal magnet fill
46123 01/26/02 13:34 cdaq End of Run 43270:
46122 01/26/02 13:31 donal Moller energy
46121 01/26/02 13:01 bosted Target Hourly Update
46120 01/26/02 12:33 cdaq Run 43270: top NH3, pol= -71.7%
46119 01/26/02 12:31 cdaq End of Run 43269:
46118 01/26/02 12:09 bosted Target Hourly Update
46117 01/26/02 11:34 cdaq Run 43269: top NH3, pol= -58.0%
46116 01/26/02 11:31 M Jones charge asym
46115 01/26/02 11:13 Testa Q2 trips during run 43268
46114 01/26/02 11:08 bosted Target Hourly Update
46113 01/26/02 10:53 cdaq End of Run 43268:
46112 01/26/02 10:17 cdaq Run 43268: top NH3, pol= +89.8%
46111 01/26/02 10:16 cdaq End of Run 43267:
46110 01/26/02 10:10 bosted Target Hourly Status
46109 01/26/02 09:15 bosted Target Hourly Status
46108 01/26/02 09:08 cdaq Run 43267: top NH3, pol= +92.4%
46107 01/26/02 08:02 Boeglin Shift Summary
46106 01/26/02 08:01 cdaq Beam Time Accounting
46105 01/26/02 08:00 elaasar PDP Display
46104 01/26/02 07:50 cdaq End of Run 43266:
46103 01/26/02 07:36 cdaq Run 43266: top NH3, pol= +90.8%
46102 01/26/02 07:35 cdaq End of Run 43265:
46101 01/26/02 07:04 elaasar Beam Current and Liquids level
46100 01/26/02 07:02 elaasar PDP Display
46099 01/26/02 06:38 cdaq Run 43265: top NH3, pol= +91.5%
46098 01/26/02 06:36 cdaq End of Run 43264:
46097 01/26/02 06:06 elaasar Spikes in Polarization Display
46096 01/26/02 05:58 elaasar PDP Display
46095 01/26/02 05:22 cdaq Run 43264: top NH3, pol= +97.6%
46094 01/26/02 05:04 elaasar PDP Display
46093 01/26/02 04:15 cdaq End of Run 43263:
46092 01/26/02 04:00 elaasar PDP Display
46091 01/26/02 03:57 cdaq Run 43263: top NH3, pol= +93.7%
46090 01/26/02 03:56 cdaq End of Run 43262:
46089 01/26/02 03:05 elaasar PDP Display
46088 01/26/02 02:50 cdaq Run 43262: top NH3, pol= +93.9%
46087 01/26/02 02:49 cdaq End of Run 43261:
46086 01/26/02 02:06 elaasar Buffer Dewar and Separator Alarm
46085 01/26/02 01:59 elaasar PDP Display
46084 01/26/02 01:44 cdaq Run 43261: top NH3, pol= +97.9%
46083 01/26/02 01:41 cdaq End of Run 43260:
46082 01/26/02 00:58 elaasar PDP Display
46081 01/26/02 00:43 cdaq Run 43260: top NH3, pol= +89.0%
46080 01/26/02 00:05 cdaq Computer reboots for 2002-01-25
Friday
46079 01/25/02 23:59 cdaq Beam Time Accounting
46078 01/25/02 23:58 abdellah Evening shift summary
46077 01/25/02 23:50 samuel polarization screen for top proton
46076 01/25/02 22:50 samuel pol. screen for top proton target
46075 01/25/02 21:51 samuel pol.screen for top target
46074 01/25/02 20:43 M JOnes plotting BLM rates
46073 01/25/02 20:40 samuel pdp screen for NH3 top target
46072 01/25/02 20:35 cdaq End of Run 43259:
46071 01/25/02 20:11 cdaq Run 43259: top NH3, pol= +85,7%
46070 01/25/02 20:08 cdaq End of Run 43258:
46069 01/25/02 20:06 rohe beam leakage measurement
46068 01/25/02 19:57 samuel pol. screen top NH3
46067 01/25/02 19:56 cdaq Run 43258: top NH3, pol= +85,7%
46066 01/25/02 19:53 M Jones more careful look at empty target runs
46065 01/25/02 19:46 hcf moller runs
46064 01/25/02 19:34 hcf moller cryo LN2 followup
46063 01/25/02 19:30 cdaq Run 43257: leakage meas.,slit closed,laser on
46062 01/25/02 19:28 cdaq Moller Run 43256: dummy
46061 01/25/02 19:22 hcf moller cryo snapshot
46060 01/25/02 18:47 cdaq Moller Run 43255: moller
46059 01/25/02 18:16 cdaq Moller Run 43254: moller
46058 01/25/02 18:16 gwarren Day Shift Summary
46057 01/25/02 18:03 zeier linux pics grab fixed
46056 01/25/02 17:54 cdaq Beam Time Accounting
46055 01/25/02 17:54 cdaq Moller Run (Grab test)
46054 01/25/02 17:51 zeier no obvious 15s structure in hodoscope singles
46053 01/25/02 17:44 cdaq Moller Run 43253: moller
46052 01/25/02 17:30 hcf Moller run beam position and magnets
46051 01/25/02 17:11 hcf LED flasher was on during 43251
46050 01/25/02 17:10 cdaq Moller Run 43252: moller
46049 01/25/02 16:52 cdaq Moller Run 43251: moller
46048 01/25/02 16:38 cdaq Moller Run 43250: moller run
46047 01/25/02 16:30 cdaq End of Run 43249:
46046 01/25/02 16:12 gwarren Hamlet looked at S2y histos
46045 01/25/02 16:07 cdaq Run 43249: top NH3, pol= +90.6
46044 01/25/02 16:03 bosted Target Hoursly Screen Capture
46043 01/25/02 16:02 bosted Target Hoursly Screen Capture
46042 01/25/02 16:02 cdaq End of Run 43248:
46041 01/25/02 15:57 gwarren charge asymmetry
46040 01/25/02 15:53 gwarren hist tester
46039 01/25/02 15:50 gwarren Downstream BLMs see 15 s structure
46038 01/25/02 15:20 gwarren S2Y TDC hits funny?
46037 01/25/02 15:17 bosted Target Hoursly Sreen
46035 01/25/02 15:06 cdaq Run 43248: top NH3, pol=+79.1
46034 01/25/02 14:36 bosted Target Hoursly Screen
46033 01/25/02 13:47 bosted Target Charge
46032 01/25/02 13:22 bosted Target Change
46031 01/25/02 13:21 bosted Target Hoursly Screen Capture
46030 01/25/02 13:21 gwarren steered beam to look at ion chambers
46029 01/25/02 13:07 cdaq End of Run 43247:
46028 01/25/02 12:46 cdaq Run 43247: bottom NH3, pol= +80.5%
46027 01/25/02 12:44 cdaq End of Run 43246:
46026 01/25/02 12:05 bosted Target Hoursly Screen
46025 01/25/02 11:49 cdaq Run 43246: bottom NH3, pol= +81.2%
46024 01/25/02 11:48 cdaq End of Run 43245:
46023 01/25/02 11:04 bosted Target Hourly Screen Capture
46022 01/25/02 10:53 cdaq Run 43245: bottom NH3, pol= +89.2%
46021 01/25/02 10:50 cdaq End of Run 43244:
46020 01/25/02 10:41 cdaq Run 43244: studying ion chamber
46019 01/25/02 10:22 gwarren beam off for vacuum problems
46018 01/25/02 10:20 cdaq End of Run 43243:
46017 01/25/02 10:14 gwarren MCC sees 15 s sawtooth on downstream ion chambers
46016 01/25/02 10:05 bosted Target Hourly Screen Capture
46015 01/25/02 09:54 cdaq Run 43243: bottom NH3, pol= +97
46014 01/25/02 09:50 cdaq End of Run 43242:
46013 01/25/02 09:44 cdaq Run 43242: bottom NH3, pol= +93.0% SR=0.7, 50 nA - check ion chambers.
46012 01/25/02 09:34 cdaq End of Run 43241:
46011 01/25/02 09:07 Bosted Hourly target pol.
46010 01/25/02 08:39 cdaq Run 43241: bottom NH3, pol= +95.3%
46009 01/25/02 08:26 cdaq End of Run 43240:
46008 01/25/02 08:15 marius polarization lost
46007 01/25/02 08:02 marius charge accumulated
46006 01/25/02 08:01 cdaq Beam Time Accounting
46005 01/25/02 08:00 Testa shift summary
46004 01/25/02 07:50 cdaq Run 43240: SR=10mm, FR=1mm, 100nA, bottom NH3, pol= +92.3%
46003 01/25/02 07:50 marius target screen
46002 01/25/02 07:16 cdaq End of Run 43239:
46001 01/25/02 07:11 hcf Moller cold return JT closed
46000 01/25/02 07:01 Testa Beam position very unstable
45999 01/25/02 06:58 cdaq Run 43239: SR=10mm, FR=1mm, 100nA, bottom NH3, pol= +85.3%
45998 01/25/02 06:54 marius target screen
45997 01/25/02 06:51 cdaq End of Run 43238:
45996 01/25/02 06:51 marius target VME reboot
45995 01/25/02 06:49 Testa Beam position gets worse
45994 01/25/02 06:27 Testa Beam current monitor - screen grab-
45993 01/25/02 06:25 Testa Beam position is ok now
45992 01/25/02 06:22 marius target polarization screen
45991 01/25/02 06:21 cdaq Run 43238: SR=10mm, FR=1mm, 100nA, bottom NH3, pol= +84.5%
45990 01/25/02 06:17 Testa x-position of run 43237 got to low.
45989 01/25/02 06:11 cdaq End of Run 43237:
45988 01/25/02 05:57 cdaq Run 43237: SR=10mm, FR=1mm, 100nA, bottom NH3, pol= +92.3%
45987 01/25/02 05:41 cdaq End of Run 43236:
45986 01/25/02 05:19 cdaq Run 43236: SR=10mm, FR=1mm, 100nA, bottom NH3, pol= +86.3%
45985 01/25/02 05:18 cdaq End of Run 43235:
45984 01/25/02 04:47 marius target screen
45983 01/25/02 04:43 cdaq Run 43235: SR=10mm, FR=1mm, 100nA, bottom NH3, pol= +88.7%
45982 01/25/02 04:17 cdaq End of Run 43234:
45981 01/25/02 03:53 cdaq Run 43234: SR=10mm, FR=1mm, 100nA, bottom NH3, pol= +84.7%
45980 01/25/02 03:52 cdaq End of Run 43233:
45979 01/25/02 03:22 marius target screen
45978 01/25/02 03:18 cdaq Run 43233: SR=10mm, FR=1mm, 100nA, bottom NH3, pol= +83.5%
45977 01/25/02 03:17 cdaq End of Run 43232:
45976 01/25/02 02:41 cdaq Run 43232: SR=10mm, FR=1mm, 100nA, bottom NH3, pol= +80%
45975 01/25/02 02:40 cdaq End of Run 43231:
45974 01/25/02 02:22 marius target screen
45973 01/25/02 02:07 cdaq Run 43231: SR=10mm, FR=1mm, 100nA, bottom NH3, pion collimator
45972 01/25/02 01:52 marius target move
45971 01/25/02 01:26 cdaq End of Run 43230:
45970 01/25/02 01:24 marius target screen
45969 01/25/02 00:54 cdaq Run 43230: SR=10mm, FR=1mm, 200nA, Carbon+ He, pion collimator
45968 01/25/02 00:49 saw Hall background vs. time
45967 01/25/02 00:41 cdaq End of Run 43229:
45966 01/25/02 00:13 cdaq Run 43229: SR=10mm, FR=1mm, 200nA, Carbon+ He, pion collimator
45965 01/25/02 00:05 cdaq Computer reboots for 2002-01-24
Thursday
45964 01/24/02 23:59 cdaq Beam Time Accounting
45963 01/24/02 23:59 Abdellah Evening Shift Summary
45962 01/24/02 23:59 cdaq End of Run 43228:
45961 01/24/02 23:58 cdaq Run 43228: Junk
45960 01/24/02 23:50 M Jones scan of empty target
45959 01/24/02 23:14 cdaq End of Run 43227:
45958 01/24/02 23:06 cdaq Run 43227: Carbon with Helium, BPM=(-1.5,0.0)
45957 01/24/02 22:48 cdaq End of Run 43226:
45956 01/24/02 22:31 cdaq Run 43226: HMS mom:5.0 GeV with field02, FR 1mm Lis,slow raster 1cm , Carbon,pion collimator. BPM=(-1.5,0.0)
45955 01/24/02 22:21 cdaq End of Run 43225:
45954 01/24/02 22:17 cdaq Run 43225: HMS mom:5.0 GeV with field02, FR 1mm Lis,slow raster 1cm , Hole target,pion collimator. BPM=(-1.5,0.0)
45953 01/24/02 21:52 cdaq End of Run 43224:
45952 01/24/02 21:43 cdaq Run 43224: HMS mom:5.0 GeV with field02, FR 1mm Lis,slow raster 1cm , Hole target,pion collimator. BPM=(-3.0,0.0)
45951 01/24/02 21:40 cdaq End of Run 43223:
45950 01/24/02 21:28 cdaq Run 43223: HMS mom:5.0 GeV with field02, FR 1mm Lis,slow raster 1cm , Hole target,pion collimator. BPM=(-1.0,0.0)
45949 01/24/02 21:12 cdaq End of Run 43222:
45948 01/24/02 21:04 cdaq Run 43222: HMS mom:5.0 GeV with field02, no fast raster,slow raster 1cm , Hole target,pion collimator. BPM=(-1.0,0.0)
45947 01/24/02 20:55 cdaq End of Run 43221:
45946 01/24/02 20:49 cdaq Run 43221: HMS mom:5.0 GeV with field02, no fast raster,slow raster 1cm , Hole target,pion collimator. BPM=(-2.5,0.0)
45945 01/24/02 20:45 bosted Target moved
45944 01/24/02 20:38 cdaq End of Run 43220:
45943 01/24/02 20:21 cdaq Run 43220: HMS mom:5.0 GeV with field02, no fast raster,slow raster 1cm , Empty target,pion collimator. BPM=(-2.5,0.0)
45942 01/24/02 20:17 cdaq End of Run 43219:
45941 01/24/02 20:00 cdaq Run 43219: HMS mom:5.0 GeV with field02, no fast raster,slow raster 1cm , Empty target,pion collimator 100 nA
45940 01/24/02 20:00 cdaq End of Run 43218:
45939 01/24/02 19:44 cdaq Run 43218: HMS mom:5.0 GeV with field02, no fast raster,slow raster 1cm , Empty target,pion collimator 100 nA
45938 01/24/02 18:50 bosted Target checkout
45937 01/24/02 17:02 D. Rohe checklist scan
45936 01/24/02 16:49 hcf Moller on warm return
45935 01/24/02 16:00 cdaq Beam Time Accounting
45934 01/24/02 15:59 gwarren Day shift summary
45933 01/24/02 15:48 gwarren HMS ready for 4.732. Ramping magnet.
45932 01/24/02 11:53 cdaq Beam Time Accounting
45931 01/24/02 11:52 cdaq Beam Time Accounting
45930 01/24/02 11:49 gwarren Cryo problems
45929 01/24/02 09:09 frw shift check list
45928 01/24/02 08:21 gwarren Camera on lower target platform is dead
45927 01/24/02 07:58 marius proton top target TE
45926 01/24/02 07:39 frw restricted access
45925 01/24/02 05:06 marius proton target TE calculations
45924 01/24/02 00:05 cdaq Computer reboots for 2002-01-23
Wednesday
45923 01/23/02 18:56 zeier moller solenoid ramped down
45922 01/23/02 17:02 zeier no beam tonight
45921 01/23/02 17:00 hcf ALL SHIFTERS: MONITOR MOLLER CRYO LEVELS
45920 01/23/02 16:25 zeier day shift summary
45919 01/23/02 16:23 cdaq Beam Time Accounting
45918 01/23/02 11:09 HGZ field deflection to the scattered electrons
45917 01/23/02 08:01 E. Christy Hall in Restricted Access
45916 01/23/02 08:00 cdaq Beam Time Accounting
45915 01/23/02 07:57 E. Christy Shift Summary
45914 01/23/02 07:11 M Jones picture for HMS sieve run 43201
45913 01/23/02 06:59 M Jones comparison of yptar vs ytar for field00 and field02
45912 01/23/02 06:29 cdaq End of Run 43217:
45911 01/23/02 04:57 frw scan of Moller data
45910 01/23/02 04:50 cdaq Run 43217: HMS mom:5.0 GeV with field02, no raster , carbon target, sieve slit, 200 nA.
45909 01/23/02 04:39 marius target motion
45908 01/23/02 04:34 E. Christy HMS optics checks continue
45907 01/23/02 04:31 E. Christy Hall in Controlled Access
45906 01/23/02 04:06 hamlet Moller Q1, Q2 and Solenoid "on", target out
45905 01/23/02 03:57 hamlet Moller results
45904 01/23/02 03:30 cdaq Moller Run 43216:
45903 01/23/02 03:03 cdaq Moller Run 43215: moller run
45902 01/23/02 02:48 cdaq Moller Run 43214: moller run; Q2 at 1250V
45901 01/23/02 02:18 cdaq Moller Run 43213:
45900 01/23/02 01:52 cdaq Moller Run 43212:
45899 01/23/02 01:31 cdaq Moller Run 43211:
45898 01/23/02 01:20 hamlet Moller BPM's and settings at start
45897 01/23/02 01:16 cdaq Moller Run 43210: moller run
45896 01/23/02 00:05 cdaq Computer reboots for 2002-01-22
45895 01/23/02 00:01 testa shift summary
45894 01/23/02 00:01 cdaq Beam Time Accounting
Tuesday
45893 01/22/02 23:53 testa empty target run with "wires plot"
45892 01/22/02 23:43 cdaq End of Run 43209:
45891 01/22/02 23:22 Testa Moving HMS to pion collimator
45890 01/22/02 23:20 cdaq Run 43209: HMS mom:5.0 GeV with field02, no fast raster,slow raster 1cm , Empty target,pion collimator 100 nA
45889 01/22/02 23:18 cdaq End of Run 43208:
45888 01/22/02 23:09 cdaq Run 43208: HMS mom:5.0 GeV with field02, no fast raster,slow raster 1cm , Empty target,100 nA
45887 01/22/02 23:06 mckee target fridge status
45886 01/22/02 23:00 Testa adjusting the beam- settings informations
45885 01/22/02 21:04 Testa target window covers removed
45884 01/22/02 20:22 hamlet Change max current set for HMS Dipole
45883 01/22/02 16:54 zeier day shift summary
45882 01/22/02 16:53 cdaq Beam Time Accounting
45881 01/22/02 16:20 hcf Moller Q1 PS in remote mode.
45880 01/22/02 13:49 hcf Moller solenoid ramped successfully
45879 01/22/02 11:22 hcf Moller cryo operators take note
45878 01/22/02 11:15 hcf Moller ramp rates
45877 01/22/02 11:05 hcf Moller quench and status
45876 01/22/02 10:16 ent HMS sieve run
45875 01/22/02 09:58 M Jones BZ magnet
45874 01/22/02 09:43 beaufait hms drift chamber threshold
45873 01/22/02 08:47 zeier don't forget protective windows!!!
45872 01/22/02 08:24 zeier dc threshold
45871 01/22/02 08:15 rohe owl shift summary
45870 01/22/02 08:12 cdaq Beam Time Accounting
45869 01/22/02 07:20 frw RSS results
45868 01/22/02 07:14 cdaq End of Run 43207:
45867 01/22/02 06:55 hcf Moller cryo followup
45866 01/22/02 06:51 frw HMS momentum settings
45865 01/22/02 06:49 cdaq Run 43207: HMS mom:5.0 GeV with field00, no raster,100 nA
45864 01/22/02 06:40 frw re-enabled beam histograms
45863 01/22/02 06:36 frw raster calibration
45862 01/22/02 05:33 cdaq End of Run 43206:
45861 01/22/02 05:11 cdaq Run 43206: Calibration for HMS:SR=1cm,FR=0.5mm,500nA,pioncoll
45860 01/22/02 05:11 cdaq End of Run 43205:
45859 01/22/02 05:08 cdaq Run 43205: Calibration for HMS:SR=1cm,FR=0.5mm,500nA,pioncoll
45858 01/22/02 04:43 cdaq End of Run 43204:
45857 01/22/02 03:43 cdaq Run 43204: Calibration for HMS:SR=1cm,FR=0.5mm,100nA,pioncoll
45856 01/22/02 03:30 cdaq End of Run 43203:
45855 01/22/02 03:06 rohe New driftmap
45854 01/22/02 02:30 cdaq Run 43203: Calibration for HMS:SR=1cm,FR=0.5mm,100nA,pioncoll
45853 01/22/02 02:14 cdaq End of Run 43202:
45852 01/22/02 01:54 cdaq Run 43202: Calibration for HMS:SR=1cm,FR=0.5mm,200nA,pioncoll
45851 01/22/02 01:48 rohe sieve slit run 43201
45850 01/22/02 01:37 cdaq End of Run 43201:
45849 01/22/02 01:16 cdaq Run 43201: Sieve slit, carbon,200nA,no SR,no FR,BPMA_x=-2.3
45848 01/22/02 00:53 cdaq End of Run 43200:
45847 01/22/02 00:37 cdaq Run 43200: bottom target, (moved from bottom target then back)
45846 01/22/02 00:05 cdaq Computer reboots for 2002-01-21
Monday
45845 01/21/02 23:57 cdaq End of Run 43199:
45844 01/21/02 23:55 zeier swing shift summary
45843 01/21/02 23:54 cdaq Beam Time Accounting
45842 01/21/02 23:40 cdaq Run 43199: bottom target, beam vertically centered again
45841 01/21/02 23:31 cdaq End of Run 43198:
45840 01/21/02 23:27 cdaq Run 43198: bottom target, beam still down
45839 01/21/02 23:18 zeier pictures from runs 43196 and 43197
45838 01/21/02 23:08 cdaq End of Run 43197:
45837 01/21/02 22:59 cdaq Run 43197: empty target with crosshairs, moved beam down
45836 01/21/02 22:58 cdaq End of Run 43196:
45835 01/21/02 22:38 cdaq Run 43196: empty target with crosshairs, moved beam up
45834 01/21/02 22:12 zeier target rotation after access
45833 01/21/02 21:58 cdaq End of Run 43195:
45832 01/21/02 21:52 bosted Target oreientation
45831 01/21/02 21:50 cdaq Run 43195: empty target with crosshairs, after access
45830 01/21/02 21:22 zeier ask for access to correct target rotation
45829 01/21/02 21:11 zeier picture
45828 01/21/02 21:09 zeier target position with hole
45827 01/21/02 20:53 cdaq End of Run 43194:
45826 01/21/02 20:44 cdaq Run 43194: 10mm hole target, 3mm above nominal position
45825 01/21/02 20:34 zeier centered beam on target
45824 01/21/02 20:26 cdaq End of Run 43193:
45823 01/21/02 20:12 cdaq Run 43193: Empty target with cross hairs
45822 01/21/02 20:09 cdaq End of Run 43192:
45821 01/21/02 19:51 cdaq Run 43192: Empty target with cross hairs
45820 01/21/02 19:50 cdaq End of Run 43191:
45819 01/21/02 19:38 cdaq Run 43191: Empty target with cross hairs
45818 01/21/02 19:26 cdaq End of Run 43190:
45817 01/21/02 19:14 cdaq Run 43190: Empty target with cross hairs
45816 01/21/02 17:15 cdaq End of Run 43189:
45815 01/21/02 17:07 cdaq Run 43189: Empty target with cross hairs
45814 01/21/02 17:06 cdaq End of Run 43188:
45813 01/21/02 16:53 cdaq Run 43188: Empty target with cross hairs
45812 01/21/02 16:46 cdaq End of Run 43187:
45811 01/21/02 16:45 cdaq Run 43187: Empty target with cross hairs
45810 01/21/02 16:39 cdaq End of Run 43186:
45809 01/21/02 16:36 cdaq Run 43186: Empty target with cross hairs
45808 01/21/02 16:28 gwarren Day shift summary
45807 01/21/02 16:24 cdaq Beam Time Accounting
45806 01/21/02 14:21 gwarren horizontal foils at encoder=2.852
45805 01/21/02 14:20 cdaq End of Run 43185:
45804 01/21/02 14:12 cdaq Run 43185: Carbon target,x=-2.6y=0, SR=1.0 - Top target
45803 01/21/02 14:06 cdaq End of Run 43184:
45802 01/21/02 14:00 cdaq Run 43184: Carbon target,x=-2.6y=0, SR=1.0 - Top target
45801 01/21/02 13:57 cdaq End of Run 43183:
45800 01/21/02 13:45 cdaq Run 43183: Carbon target,x=-2.5y=0, SR=1.0 - horizontal foils
45799 01/21/02 13:43 cdaq End of Run 43182:
45798 01/21/02 13:36 cdaq Run 43182: Carbon target,x=-2.5y=0, SR=1.0 - horizontal foils
45797 01/21/02 13:32 cdaq End of Run 43181:
45796 01/21/02 13:25 cdaq Run 43181: Carbon target,x=-2.5y=0, SR=1.0 - lower target 2mm
45795 01/21/02 13:22 cdaq End of Run 43180:
45794 01/21/02 13:19 gwarren Summary of flange study
45793 01/21/02 12:57 cdaq Run 43180: Carbon target,x=-2.5y=0, SR=1.0 - looking for flange
45792 01/21/02 12:32 cdaq End of Run 43179:
45791 01/21/02 12:16 cdaq Run 43179: no target,x=+2.5y=0, SR=1.0 - looking for flange
45790 01/21/02 12:14 cdaq End of Run 43178:
45789 01/21/02 12:03 cdaq Run 43178: no target,x=+1.5y=0, SR=1.0 - looking for flange
45788 01/21/02 12:01 cdaq End of Run 43177:
45787 01/21/02 12:00 M Jones Changed histogram nDet srADC xy calib
45786 01/21/02 11:45 cdaq Run 43177: no target,x=-1.5y=0, SR=1.0 - looking for flange
45785 01/21/02 11:40 cdaq End of Run 43176:
45784 01/21/02 11:34 cdaq Run 43176: no target,x=-1y=0, SR=1.0 - looking for flange
45783 01/21/02 11:32 cdaq End of Run 43175:
45782 01/21/02 10:50 cdaq Run 43175: no target,x=-1y=0, SR=1.0 - looking for flange
45781 01/21/02 10:49 cdaq End of Run 43174:
45780 01/21/02 10:34 cdaq Run 43174: no target,x=-0.50y=0, SR=1.0 - looking for flange
45779 01/21/02 10:34 cdaq Beam Time Accounting
45778 01/21/02 10:31 cdaq End of Run 43173:
45777 01/21/02 10:27 M Jones Also cerenkov was off
45776 01/21/02 10:25 gwarren Changed some parameter files.
45775 01/21/02 10:24 M JOnes Drift chambers tripped
45774 01/21/02 10:23 gwarren wire chamber HV tripped since run 43169
45773 01/21/02 10:17 cdaq Run 43173: no target,x=0.0y=0, SR=1.0 - looking for flange
45772 01/21/02 10:11 cdaq End of Run 43172:
45771 01/21/02 10:00 cdaq Run 43172: no target,x=1.0y=0, SR=1.0 - looking for flange
45770 01/21/02 09:56 cdaq End of Run 43171:
45769 01/21/02 09:45 cdaq Run 43171: lower geom target,x=1.0y=0, SR=1.0 - looking for flange
45768 01/21/02 09:43 cdaq End of Run 43170:
45767 01/21/02 09:32 cdaq Run 43170: lower geom target,x=0.5y=0, SR=1.0 - looking for flange
45766 01/21/02 09:20 cdaq End of Run 43169:
45765 01/21/02 09:03 cdaq Run 43169: lower geom target,x=0,y=0, SR=1.0 - looking for flange
45764 01/21/02 08:57 rohe Fitparamters for SEM-Raster calib
45763 01/21/02 08:57 cdaq End of Run 43168:
45762 01/21/02 08:52 cdaq Beam Time Accounting
45761 01/21/02 08:48 rohe SEM-raster calibration
45760 01/21/02 08:39 rohe 3. picture for target position
45759 01/21/02 08:36 rohe owl shift summary
45758 01/21/02 07:19 cdaq Run 43168: lower geom target,x=-2.3
45757 01/21/02 06:21 aram BPM screen
45756 01/21/02 06:05 cdaq Run 43167: lower geom target,x=-2.3
45755 01/21/02 05:50 aram Helium bottle
45754 01/21/02 05:49 cdaq End of Run 43166:
45753 01/21/02 05:38 cdaq Run 43166: upper geom target
45752 01/21/02 05:36 cdaq End of Run 43165:
45751 01/21/02 05:21 cdaq Run 43165: Seeking for target
45750 01/21/02 05:18 cdaq End of Run 43164:
45749 01/21/02 05:13 cdaq Run 43164: SEM/rate checkout - SR off, BPM B +1.5,+3.0
45748 01/21/02 04:54 cdaq End of Run 43163:
45747 01/21/02 04:34 cdaq Run 43163: Seeking for target,hole position
45746 01/21/02 04:32 cdaq End of Run 43162:
45745 01/21/02 04:25 cdaq Run 43162: Seeking for target
45744 01/21/02 04:24 cdaq End of Run 43161:
45743 01/21/02 03:51 cdaq Run 43161: SEM/rate calib. - SR =1cm,BPMA:x=+2,5
45742 01/21/02 03:49 cdaq End of Run 43160:
45741 01/21/02 03:33 cdaq Run 43160: SEM/rate calib. - SR =1cm,BPMA:x=-2,5
45740 01/21/02 03:24 cdaq End of Run 43159:
45739 01/21/02 03:20 yprok target update
45738 01/21/02 03:03 cdaq Run 43159: SEM/rate calib. - SR =1cm
45737 01/21/02 02:28 Cole Gen98 Geometry Target
45736 01/21/02 02:07 Cole/Rohe raster spectra with empty wire target
45735 01/21/02 00:34 cdaq Beam Time Accounting
45734 01/21/02 00:33 zeier swing shift summary
45733 01/21/02 00:05 cdaq Computer reboots for 2002-01-20
Sunday
45732 01/20/02 23:41 zeier target update
45731 01/20/02 21:07 zeier sem channel disconnected
45730 01/20/02 20:55 zeier target problems
45729 01/20/02 20:55 frw SEM troubles resolved
45728 01/20/02 19:58 zeier access
45727 01/20/02 19:39 cdaq End of Run 43158:
45726 01/20/02 19:31 cdaq Run 43158: SEM/rate checkout -
45725 01/20/02 19:01 cdaq End of Run 43157:
45724 01/20/02 18:53 cdaq Run 43157: SEM/rate checkout -
45723 01/20/02 17:11 cdaq End of Run 43156:
45722 01/20/02 17:08 cdaq Run 43156: SEM check
45721 01/20/02 16:52 gwarren SR pictures from today's studies
45720 01/20/02 16:51 cdaq End of Run 43155:
45719 01/20/02 16:50 cdaq Run 43155: SEM check
45718 01/20/02 16:45 cdaq End of Run 43154:
45717 01/20/02 16:44 cdaq Run 43154: SEM check
45716 01/20/02 16:43 cdaq End of Run 43153:
45715 01/20/02 16:33 cdaq Run 43153: junk run to look at SEM
45714 01/20/02 16:31 cdaq End of Run 43152:
45713 01/20/02 16:30 gwarren Day Shift summary
45712 01/20/02 16:27 cdaq Run 43152: junk run to look at SEM
45711 01/20/02 16:27 cdaq End of Run 43151:
45710 01/20/02 16:16 cdaq Run 43151: junk run to look at SEM
45709 01/20/02 16:14 cdaq End of Run 43150:
45708 01/20/02 16:05 cdaq Beam Time Accounting
45707 01/20/02 16:00 cdaq Run 43150: junk run to look at SEM
45706 01/20/02 15:59 cdaq End of Run 43149:
45705 01/20/02 15:55 cdaq Run 43149: SEM/rate checkout - SR 1.0, BPM B -1.0,+0.8
45704 01/20/02 15:36 cdaq End of Run 43148:
45703 01/20/02 15:31 cdaq Run 43148: SEM/rate checkout - SR 1.0, BPM B +0.0,+3.0
45702 01/20/02 15:26 cdaq End of Run 43147:
45701 01/20/02 15:23 cdaq Run 43147: SEM/rate checkout - SR=0.5, BPM B +0.0,+3.0
45700 01/20/02 14:57 cdaq End of Run 43146:
45699 01/20/02 14:53 cdaq Run 43146: SEM/rate checkout - SR 0.5, BPM B +0.0,+3.0
45698 01/20/02 14:46 cdaq End of Run 43145:
45697 01/20/02 14:42 cdaq Run 43145: SEM/rate checkout - SR off, BPM B +1.5,+3.0
45696 01/20/02 14:20 cdaq End of Run 43144:
45695 01/20/02 14:10 cdaq Run 43144: SEM/rate checkout - SR=off, BPM B -1.,+0.8
45694 01/20/02 14:08 cdaq End of Run 43143:
45693 01/20/02 14:05 cdaq Run 43143: SEM/rate checkout - SR=1.0cm, BPM B -1.,+0.8
45692 01/20/02 14:03 cdaq End of Run 43142:
45691 01/20/02 13:56 cdaq Run 43142: SEM/rate checkout - SR off, BPM B -1.0,+0.7
45690 01/20/02 13:22 cdaq End of Run 43141:
45689 01/20/02 13:19 cdaq Run 43141: SEM/rate checkout - SR 0.5cm, BPM B +0.0,+3.0
45688 01/20/02 13:15 hamlet New Argon bottle on service
45687 01/20/02 12:51 cdaq End of Run 43140:
45686 01/20/02 12:48 cdaq Run 43140: SEM/rate checkout - SR off, BPM B +2.5,+3.0
45685 01/20/02 12:47 cdaq End of Run 43139:
45684 01/20/02 12:44 cdaq Run 43139: SEM/rate checkout - SR off, BPM B +1.5,+3.0
45683 01/20/02 12:39 cdaq End of Run 43138:
45682 01/20/02 12:37 cdaq Run 43138: SEM/rate checkout - SR off, BPM B +1.5,+4.5
45681 01/20/02 12:31 cdaq End of Run 43137:
45680 01/20/02 12:28 cdaq Run 43137: SEM/rate checkout - SR off, BPM B +1.5,+3.0
45679 01/20/02 12:03 cdaq End of Run 43136:
45678 01/20/02 12:01 cdaq Run 43136: SEM/rate checkout - SR off, BPM B +1.5,-0.1
45677 01/20/02 11:51 cdaq End of Run 43135:
45676 01/20/02 11:50 cdaq Run 43135: SEM/rate checkout - SR off, BPM B -2.5,-0.1
45675 01/20/02 11:43 cdaq End of Run 43134:
45674 01/20/02 11:40 cdaq Run 43134: SEM/rate checkout - SR off, BPM B -0.6,-0.05
45673 01/20/02 11:31 gwarren Downstream BLMs hot
45672 01/20/02 11:29 cdaq End of Run 43133:
45671 01/20/02 11:18 cdaq Run 43133: SEM/rate checkout - hole target, 100 nA, SR=1.0 cm
45670 01/20/02 10:38 cdaq End of Run 43132:
45669 01/20/02 10:25 gwarren Run 43131 was SR 0.5
45668 01/20/02 10:24 cdaq Run 43132: SEM/rate checkout - hole target, 100 nA, SR=1.0 cm
45667 01/20/02 10:23 cdaq End of Run 43131:
45666 01/20/02 10:15 cdaq Run 43131: SEM/rate checkout - hole target, 100 nA, SR=1.0 cm
45665 01/20/02 10:12 cdaq End of Run 43130:
45664 01/20/02 10:08 cdaq Run 43130: SEM/rate checkout - hole target, 100 nA, SR=0.5 nA
45663 01/20/02 10:06 cdaq End of Run 43129:
45662 01/20/02 09:49 cdaq Run 43129: SEM-raster calib.,SENx=-1.0,SEMy=-1.1,eventmode,50nA
45661 01/20/02 09:36 gwarren set SEM gate width to 180 ns
45660 01/20/02 09:33 cdaq End of Run 43128:
45659 01/20/02 09:28 cdaq Run 43128: SEM-raster calib.,SENx=-1.0,SEMy=-1.1,eventmode,50nA
45658 01/20/02 09:10 cdaq Beam Time Accounting
45657 01/20/02 08:26 rohe owl shift summary
45656 01/20/02 06:43 cdaq End of Run 43127:
45655 01/20/02 06:41 cdaq Run 43127: SEM-raster calib.,SENx=-1.0,SEMy=-1.1,eventmode,50nA
45654 01/20/02 06:40 cdaq End of Run 43126:
45653 01/20/02 06:31 cdaq Run 43126: SEM-raster calib.,SENx=-1.0,SEMy=-1.1,eventmode,50nA
45652 01/20/02 06:30 cdaq End of Run 43125:
45651 01/20/02 06:29 cdaq Run 43125: SEM-raster calib.,SENx=-1.0,SEMy=-1.1,eventmode,50nA
45650 01/20/02 06:28 cdaq End of Run 43124:
45649 01/20/02 06:20 cdaq Run 43124: SEM-raster calib.,SENx=-1.0,SEMy=-1.1,eventmode,50nA
45648 01/20/02 06:20 cdaq End of Run 43123:
45647 01/20/02 05:56 cdaq Run 43123: SEM-raster calib.,SENx=-1.0,SEMy=-1.1,eventmode,50nA
45646 01/20/02 05:55 cdaq End of Run 43122:
45645 01/20/02 05:55 cdaq Run 43122: SEM-raster calib.,SENx=-1.0,SEMy=-1.1,eventmode,50nA
45644 01/20/02 05:52 cdaq End of Run 43121:
45643 01/20/02 05:47 cdaq Run 43121: SEM-raster calib.,SENx=-1.0,SEMy=-1.1,eventmode,50nA
45642 01/20/02 05:31 cdaq End of Run 43120:
45641 01/20/02 05:29 yprok target cooldown
45640 01/20/02 05:14 cdaq Run 43120: SEM-raster calib.,SENx=-1.0,SEMy=-1.1,eventmode,100nA
45639 01/20/02 05:09 cdaq End of Run 43117:
45638 01/20/02 04:55 Testa HMS wire chambers threshold
45637 01/20/02 04:52 Testa check Argon bottle during day shift, please.
45636 01/20/02 04:47 cdaq Run 43117: SEM-raster calib.,SENx=-1.0,SEMy=-1.1,eventmode,100nA
45635 01/20/02 04:35 cdaq End of Run 43116:
45634 01/20/02 04:28 cdaq Run 43116: SEM-raster calib.,SENx=-1.0,SEMy=-1.1,eventmode,100nA
45633 01/20/02 04:26 cdaq End of Run 43115:
45632 01/20/02 04:19 cdaq Run 43115: SEM-raster calib.,SENx=-1.0,SEMy=-1.1,eventmode,100nA
45631 01/20/02 04:18 cdaq End of Run 43114:
45630 01/20/02 04:18 cdaq Run 43114: SEM-raster calib.,SENx=-1.0,SEMy=-1.1,eventmode,100nA
45629 01/20/02 04:00 cdaq End of Run 43113:
45628 01/20/02 03:50 cdaq Run 43113: SEM-raster calib.,SENx=-1.0,SEMy=-1.1,eventmode,100nA
45627 01/20/02 03:49 cdaq End of Run 43112:
45626 01/20/02 03:41 cdaq Run 43112: SEM-raster calib.,SENx=-1.0,SEMy=-1.1,eventmode,100nA
45625 01/20/02 03:40 cdaq End of Run 43111:
45624 01/20/02 03:28 yprok target cooldown
45623 01/20/02 03:26 cdaq Run 43111: SEM-raster calib.,SENx=-1.0,SEMy=-1.1,eventmode,100nA
45622 01/20/02 03:17 cdaq End of Run 43110:
45621 01/20/02 03:10 cdaq Run 43110: SEM-raster calib.,SENx=-1.0,SEMy=-1.1,eventmode,100nA
45620 01/20/02 03:04 cdaq End of Run 43109:
45619 01/20/02 02:55 Cole/Rohe BLM rates
45618 01/20/02 02:40 cdaq Run 43109: SEM-raster calib.,SENx=-1.0,SEMy=-1.1,eventmode,100nA
45617 01/20/02 01:11 yprok target cooldown
45616 01/20/02 00:24 zeier swing shift summary
45615 01/20/02 00:05 cdaq Computer reboots for 2002-01-19
45614 01/20/02 00:00 cdaq Beam Time Accounting
Saturday
45613 01/19/02 23:29 zeier moller solenoid
45612 01/19/02 22:26 zeier moller magnet troubles
45611 01/19/02 19:12 cdaq End of Run 43108:
45610 01/19/02 18:55 cdaq Run 43108: first cw beam, not optimized yet
45609 01/19/02 16:53 cdaq End of Run 43107:
45608 01/19/02 16:47 M JOnes Hall goes to beam permit
45607 01/19/02 16:45 M Jones Moller solenoid on
45606 01/19/02 16:35 cdaq Beam Time Accounting
45605 01/19/02 16:12 M Jones Hall status
45604 01/19/02 15:35 M Jones Hall status
45603 01/19/02 14:56 smithg tgt magnet cooling faster
45602 01/19/02 14:41 M Jones Chicane magnets
45601 01/19/02 12:52 M Jones BLM info
45600 01/19/02 12:00 smithg target magnet cooldown rate
45599 01/19/02 11:26 M Jones Collimator control
45598 01/19/02 09:25 M Jones Hall and beam status
45597 01/19/02 08:40 cdaq Run 43107: cosmic, HMS detector checkout
45596 01/19/02 08:40 cdaq End of Run 43106:
45595 01/19/02 08:10 rohe owl shift summary
45594 01/19/02 08:05 cdaq Beam Time Accounting
45593 01/19/02 02:09 cdaq Beam Time Accounting
45592 01/19/02 01:30 zeier swing shift summary
45591 01/19/02 01:29 zeier cable problems fixed
45590 01/19/02 00:05 cdaq Run 43106: daq test
45589 01/19/02 00:05 cdaq Computer reboots for 2002-01-18
Friday
45588 01/18/02 23:50 L .Cole RSS optics target
45587 01/18/02 21:04 zeier sem remote display not functional
45586 01/18/02 15:10 cdaq Moller Run 43105: moller daq test
45585 01/18/02 14:27 cdaq Moller Run 43104: moller daq test
45584 01/18/02 14:23 cdaq Moller Run 43103: moller daq test
45583 01/18/02 14:20 cdaq Moller Run 43102: moller daq test
45582 01/18/02 14:13 cdaq Moller Run 43101: moller daq test
45581 01/18/02 12:38 hamlet HMS drift chambers plastic shit out
45580 01/18/02 12:30 cdaq End of Run 43099:
45579 01/18/02 12:29 hamlet Problem in 'hs2Y06-' fixed
45578 01/18/02 11:41 cdaq Run 43099: cosmic, HMS detector checkout
45577 01/18/02 11:41 cdaq End of Run 43098:
45576 01/18/02 11:13 cdaq Run 43098: cosmic, HMS detector checkout
45575 01/18/02 11:08 cdaq Moller Run 43097: moller daq test
45574 01/18/02 11:05 cdaq Moller Run 43096: moller daq test
45573 01/18/02 11:03 cdaq Moller Run 43095: moller daq test
45572 01/18/02 10:57 cdaq End of Run 43094:
45571 01/18/02 10:50 cdaq Run 43094: cosmic, HMS detector checkout
45570 01/18/02 10:43 cdaq Moller Run 43093: moller daq test
45569 01/18/02 10:31 cdaq Moller Run 43092: moller daq test
45568 01/18/02 10:25 cdaq End of Run 43091:
45567 01/18/02 10:20 cdaq Run 43091: cosmic, HMS detector checkout
45566 01/18/02 10:20 cdaq End of Run 43090:
45565 01/18/02 10:13 cdaq Run 43090: cosmic, HMS detector checkout
45564 01/18/02 10:13 cdaq End of Run 43089:
45563 01/18/02 10:07 cdaq Run 43089: cosmic, HMS detector checkout
45562 01/18/02 10:06 cdaq End of Run 43088:
45561 01/18/02 10:01 cdaq Run 43088: cosmic, HMS detector checkout
45560 01/18/02 10:00 cdaq End of Run 43087:
45559 01/18/02 08:40 cdaq Run 43087: cosmic, HMS detector checkout
45558 01/18/02 08:35 cdaq End of Run 43086:
45557 01/18/02 08:28 cdaq Run 43086: cosmic, HMS detector checkout
45556 01/18/02 08:27 cdaq End of Run 43085:
45555 01/18/02 00:05 cdaq Computer reboots for 2002-01-17
Thursday
45554 01/17/02 20:40 cdaq Run 43085: cosmic, HMS detector checkout
45553 01/17/02 20:39 cdaq End of Run 43084:
45552 01/17/02 20:33 cdaq Run 43084: cosmic, HMS detector checkout
45551 01/17/02 20:32 cdaq End of Run 43083:
45550 01/17/02 19:15 cdaq Run 43083: cosmic, HMS detector checkout
45549 01/17/02 17:05 cdaq Moller Run 43082: moller daq test
45548 01/17/02 17:03 cdaq Moller Run 43081: moller daq test
45547 01/17/02 14:44 cdaq Moller Run 43077: moller daq test
45546 01/17/02 14:27 cdaq Moller Run 43074: moller daq test
45545 01/17/02 14:02 cdaq Moller Run 43073: moller daq test
45544 01/17/02 13:46 cdaq Moller Run 43072: moller daq test
45543 01/17/02 13:36 cdaq Moller Run 43071: moller daq test
45542 01/17/02 13:25 cdaq Moller Run 43070: moller daq test
45541 01/17/02 13:19 cdaq Moller Run 43069: moller daq test
45540 01/17/02 09:18 cdaq Moller Run 43068: moller daq test
45539 01/17/02 09:04 cdaq Moller Run 43067: moller rdaq test
45538 01/17/02 07:38 cdaq End of Run 43066:
45537 01/17/02 00:05 cdaq Computer reboots for 2002-01-16
Wednesday
45536 01/16/02 17:30 cdaq Run 43066: cosmic, HMS detector checkout
45535 01/16/02 17:16 cdaq Moller Run 43065: moller daq test
45534 01/16/02 17:11 cdaq Moller Run 43064: moller daq test
45533 01/16/02 16:34 cdaq Moller Run 43063: moller daq test
45532 01/16/02 16:07 cdaq Moller Run 43062: test of moller daq
45531 01/16/02 16:01 cdaq End of Run 43061:
45530 01/16/02 09:12 hamlet Turned 'on' DC high voltage
45529 01/16/02 09:01 cdaq Run 43061: cosmic, HMS detector checkout
45528 01/16/02 09:00 cdaq End of Run 43060:
45527 01/16/02 08:59 beaufait hv spares
45526 01/16/02 08:40 hamlet Turned 'off' drift chambers HV
45525 01/16/02 08:19 cdaq Run 43060: cosmic, HMS detector checkout
45524 01/16/02 08:19 cdaq End of Run 43059:
45523 01/16/02 07:41 cdaq Run 43059: cosmic, HMS detector checkout
45522 01/16/02 07:39 hamlet Turned 'on' HMS drift chambers HV
45521 01/16/02 00:05 cdaq Computer reboots for 2002-01-15
Tuesday
45520 01/15/02 20:34 hamlet Turned 'off' hv on HMS DC
45519 01/15/02 20:27 cdaq End of Run 43058:
45518 01/15/02 20:12 cdaq Run 43058: cosmic, HMS detector checkout
45517 01/15/02 20:05 cdaq End of Run 43057:
45516 01/15/02 19:41 cdaq Run 43057: cosmic, HMS detector checkout
45515 01/15/02 19:41 cdaq End of Run 43056:
45514 01/15/02 19:12 cdaq Run 43056: cosmic, HMS detector checkout
45513 01/15/02 19:12 cdaq End of Run 43055:
45512 01/15/02 18:13 cdaq Run 43055: cosmic, HMS detector checkout
45511 01/15/02 18:13 cdaq End of Run 43054:
45510 01/15/02 17:32 hamlet All HMS detectors HV turned 'ON'
45509 01/15/02 17:23 cdaq Run 43054: cosmic, HMS detector checkout
45508 01/15/02 17:21 cdaq End of Run 43053:
45507 01/15/02 15:57 cdaq Run 43053: test run
45506 01/15/02 15:56 cdaq End of Run 43052:
45505 01/15/02 15:40 cdaq Run 43052: test run
45504 01/15/02 15:38 cdaq End of Run 43051:
45503 01/15/02 07:29 cdaq Run 43051: test run
45502 01/15/02 07:28 cdaq End of Run 43050:
45501 01/15/02 07:21 cdaq Run 43050: test run
45500 01/15/02 00:05 cdaq Computer reboots for 2002-01-14
Monday
45499 01/14/02 20:03 M JOnes turned on gas to HMS drift chambers
45498 01/14/02 17:04 cdaq End of Run 43049:
45497 01/14/02 16:11 cdaq Run 43049: bottom ND3 target, P=+25.0%
45496 01/14/02 15:55 cdaq End of Run 43048:
45495 01/14/02 15:49 cdaq Run 43048: DAQ test. Testing hmsonly runtype
45494 01/14/02 15:15 hamlet, saw DAQ setup
45493 01/14/02 15:10 vulcan LCW turned on
45492 01/14/02 00:05 cdaq Computer reboots for 2002-01-13
Sunday
45491 01/13/02 00:05 cdaq Computer reboots for 2002-01-12
Saturday
45490 01/12/02 00:05 cdaq Computer reboots for 2002-01-11
Friday
45489 01/11/02 00:05 cdaq Computer reboots for 2002-01-10
Thursday
45488 01/10/02 00:05 cdaq Computer reboots for 2002-01-09
Wednesday
45487 01/09/02 09:27 hcf Moller Cold Return Valve Readback Fixed
45486 01/09/02 00:05 cdaq Computer reboots for 2002-01-08
Tuesday
45485 01/08/02 11:13 saw Electronics turn on - bad NIM crate
45484 01/08/02 00:05 cdaq Computer reboots for 2002-01-07
Monday
45483 01/07/02 16:59 saw Test
5482 01/07/02 00:05 cdaq Computer reboots for 2002-01-06
Sunday
5481 01/06/02 00:05 cdaq Computer reboots for 2002-01-05
Saturday
5480 01/05/02 00:05 cdaq Computer reboots for 2002-01-04
Friday
5479 01/04/02 11:28 Lassiter hms q3 cryo
Wednesday
5478 01/02/02 15:33 Vulcan LCW system
55477 01/02/02 00:05 cdaq Computer reboots for 2002-01-01
Tuesday
55476 01/01/02 00:05 cdaq Computer reboots for 2001-12-31