Jefferson Lab Hall C Logbook for February 02 - Full Listing

  • Main INDEX

    Thursday

  • 48676 02/28/02 22:58 cdaq Run 43988: top ND3 target P=-11.3%
  • 48675 02/28/02 22:57 J. Cha PDP Screen
  • 48674 02/28/02 22:57 cdaq End of Run 43987:
  • 48673 02/28/02 21:54 J. Cha PDP Screen
  • 48672 02/28/02 21:26 cdaq Run 43987: top ND3 target P=-12.3%
  • 48671 02/28/02 21:25 cdaq End of Run 43986:
  • 48670 02/28/02 21:07 J. Cha PDP Screen
  • 48669 02/28/02 20:06 J. Cha PDP Screen
  • 48668 02/28/02 19:57 cdaq Run 43986: top tND3 arget P=-12.5%
  • 48667 02/28/02 19:55 cdaq End of Run 43985:
  • 48666 02/28/02 18:57 J. Cha PDP Screen
  • 48665 02/28/02 18:55 J. Cha PDP Screen
  • 48664 02/28/02 18:27 cdaq Run 43985: top ND3 target P=-11.7%
  • 48663 02/28/02 18:26 cdaq End of Run 43984:
  • 48662 02/28/02 17:56 J. Cha PDP Screen
  • 48661 02/28/02 16:56 cdaq Run 43984: top ND3 target P=-9.6%
  • 48660 02/28/02 16:55 J. Cha PDP Screen( Target Annealed)
  • 48659 02/28/02 16:11 HGZ Shift Summary
  • 48658 02/28/02 16:08 cdaq Beam Time Accounting
  • 48657 02/28/02 15:39 mckee top target buildup
  • 48656 02/28/02 15:36 mckee anneal 95K/60min
  • 48655 02/28/02 14:34 nsavvinv PDP screen problems
  • 48654 02/28/02 14:27 HGZ change disk to data15
  • 48653 02/28/02 13:54 cdaq End of Run 43983:
  • 48652 02/28/02 13:24 cdaq Run 43983: Carbon with helium,
  • 48651 02/28/02 13:19 cdaq End of Run 43982:
  • 48650 02/28/02 12:48 cdaq Run 43982: Carbon with no helium,
  • 48649 02/28/02 12:26 cdaq End of Run 43981:
  • 48648 02/28/02 12:14 HGZ Moller results
  • 48647 02/28/02 12:11 cdaq Run 43981: Empty target
  • 48646 02/28/02 12:09 HGZ HMS momentum to 4.723
  • 48645 02/28/02 11:35 cdaq Moller Run 43980: moller run
  • 48644 02/28/02 11:16 HGZ moller BPM
  • 48643 02/28/02 11:15 HGZ moller GUI
  • 48642 02/28/02 11:14 HGZ realmoller
  • 48641 02/28/02 11:13 cdaq Moller Run 43979: moller run
  • 48640 02/28/02 10:36 hcf going to empty tgt
  • 48639 02/28/02 10:34 cdaq End of Run 43978:
  • 48638 02/28/02 10:24 cdaq Run 43978: top target P=10.4%
  • 48637 02/28/02 10:23 cdaq End of Run 43977:
  • 48636 02/28/02 10:01 nsavvinv target polarization screen
  • 48635 02/28/02 09:46 cdaq Run 43977: top target P=10.9%
  • 48634 02/28/02 09:45 cdaq End of Run 43976:
  • 48633 02/28/02 09:06 cdaq Run 43976: top target P=11.0%
  • 48632 02/28/02 09:06 nsavvinv target polarization screen
  • 48631 02/28/02 09:05 cdaq End of Run 43975:
  • 48630 02/28/02 08:23 cdaq Run 43975: top target P=11.5%
  • 48629 02/28/02 08:22 cdaq End of Run 43974:
  • 48628 02/28/02 08:06 Tang Shift summary
  • 48627 02/28/02 08:05 cdaq Beam Time Accounting
  • 48626 02/28/02 08:01 bosted Target Hourly Update
  • 48625 02/28/02 07:44 hcf begin 150nA running
  • 48624 02/28/02 07:44 cdaq Run 43974: top target P=12.8%, 150 nA
  • 48623 02/28/02 07:42 cdaq End of Run 43973:
  • 48622 02/28/02 07:18 cdaq Run 43973: top target P=13.5%
  • 48621 02/28/02 07:17 cdaq End of Run 43972:
  • 48620 02/28/02 07:02 bosted Target Hourly Update
  • 48619 02/28/02 06:56 hcf small iceball on top of B can
  • 48618 02/28/02 06:22 cdaq Run 43972: top target P=14.2%
  • 48617 02/28/02 06:21 cdaq End of Run 43971:
  • 48616 02/28/02 06:15 hcf checklist screens
  • 48615 02/28/02 06:02 bosted Target Hourly Update
  • 48614 02/28/02 05:24 cdaq Run 43971: top target P=14.8%
  • 48613 02/28/02 05:23 cdaq End of Run 43970:
  • 48612 02/28/02 05:03 bosted Target Hourly Update
  • 48611 02/28/02 04:38 hcf hdc1x1#114 now OK
  • 48610 02/28/02 04:25 cdaq Run 43970: top target P=16%
  • 48609 02/28/02 04:02 bosted Target Hourly Update
  • 48608 02/28/02 03:02 bosted Target Hoursly Update
  • 48607 02/28/02 02:02 bosted Target Hoursly Update
  • 48606 02/28/02 01:48 cdaq End of Run 43969:
  • 48605 02/28/02 01:11 cdaq Run 43969: top target P=14.6%
  • 48604 02/28/02 01:09 cdaq End of Run 43968:
  • 48603 02/28/02 01:03 bosted Target Hourly Log
  • 48602 02/28/02 00:15 cdaq Run 43968: top target P=13.5%
  • 48601 02/28/02 00:05 cdaq Computer reboots for 2002-02-27
  • Wednesday

  • 48600 02/27/02 23:57 cdaq Beam Time Accounting
  • 48599 02/27/02 23:54 E. Frlez shift summary
  • 48598 02/27/02 23:49 J. Cha Change target to Top Deuteron.
  • 48597 02/27/02 23:42 J. Cha PDP Screen for Bottom D.
  • 48596 02/27/02 23:03 cdaq End of Run 43967:
  • 48595 02/27/02 22:58 J. Cha PDP Screen
  • 48594 02/27/02 22:27 cdaq Run 43967: ND3 bot target P=-10.8%
  • 48593 02/27/02 22:25 cdaq End of Run 43966:
  • 48592 02/27/02 22:10 khandaker BPM, BCM screens
  • 48591 02/27/02 22:05 J. Cha PDP Screen
  • 48590 02/27/02 21:31 cdaq Run 43966: bot target ND3 P=-10.7%
  • 48589 02/27/02 21:30 cdaq End of Run 43965:
  • 48588 02/27/02 21:04 J. Cha PDP Screen
  • 48587 02/27/02 20:32 cdaq Run 43965: bot target ND3 P=-9.9%
  • 48586 02/27/02 20:30 cdaq End of Run 43964:
  • 48585 02/27/02 20:20 J. Cha PDP Screen
  • 48584 02/27/02 19:35 cdaq Run 43964: bot target ND3 P=-9.9%
  • 48583 02/27/02 19:34 cdaq End of Run 43963:
  • 48582 02/27/02 18:57 J. Cha PDP Screen
  • 48581 02/27/02 18:40 cdaq Run 43963: bot target ND3 P=-10.5%
  • 48580 02/27/02 18:38 cdaq End of Run 43962:
  • 48579 02/27/02 17:57 J. Cha PDP Screen
  • 48578 02/27/02 17:44 cdaq Run 43962: bot target ND3 P=-11.0%
  • 48577 02/27/02 17:42 cdaq End of Run 43961:
  • 48576 02/27/02 16:55 J. Cha PDP Screen
  • 48575 02/27/02 16:48 cdaq Run 43961: bot target P=-9.7%
  • 48574 02/27/02 16:39 cdaq End of Run 43960:
  • 48573 02/27/02 16:11 cdaq Run 43960: C target + He
  • 48572 02/27/02 16:00 cdaq Beam Time Accounting
  • 48571 02/27/02 16:00 Keppel Shift Summary
  • 48570 02/27/02 15:14 Keppel Moller Results
  • 48569 02/27/02 14:48 cdaq End of Run 43959:
  • 48568 02/27/02 14:15 cdaq Run 43959: Carbon
  • 48567 02/27/02 14:05 cdaq End of Run 43958:
  • 48566 02/27/02 13:54 cdaq Run 43958: bot target P=10.2%
  • 48565 02/27/02 13:53 cdaq End of Run 43957:
  • 48564 02/27/02 13:40 cdaq Run 43957: empty target
  • 48563 02/27/02 13:09 cdaq Moller Run 43956: moller run
  • 48562 02/27/02 12:53 cdaq Moller Run 43955: moller run
  • 48561 02/27/02 12:35 Keppel Moller hodo channel missing
  • 48560 02/27/02 12:18 cdaq Moller Run 43954: moller run
  • 48559 02/27/02 11:54 cdaq Moller Run 43953: moller run
  • 48558 02/27/02 11:52 hcf moller screens
  • 48557 02/27/02 11:39 cdaq End of Run 43952:
  • 48556 02/27/02 11:36 hcf Phms now 4.723
  • 48555 02/27/02 11:35 hcf trigger restored
  • 48554 02/27/02 11:33 saw ROC2
  • 48553 02/27/02 10:57 hcf 1/4 cosmic trig for daq test
  • 48552 02/27/02 10:54 cdaq Run 43952: daq test
  • 48551 02/27/02 10:35 hcf controlled access
  • 48550 02/27/02 10:10 cdaq End of Run 43951:
  • 48549 02/27/02 10:01 nsavvinv target polarization screen
  • 48548 02/27/02 09:57 cdaq Run 43951: bot target P=10.2%
  • 48547 02/27/02 09:56 cdaq End of Run 43950:
  • 48546 02/27/02 09:18 cdaq Run 43950: bot target P=12.3%
  • 48545 02/27/02 09:17 cdaq End of Run 43949:
  • 48544 02/27/02 09:01 nsavvinv target polarization screen
  • 48543 02/27/02 08:39 cdaq Run 43949: bot target P=12.3%
  • 48542 02/27/02 08:38 cdaq End of Run 43948:
  • 48541 02/27/02 08:20 cdaq Beam Time Accounting
  • 48540 02/27/02 07:54 hcf QE meas - beam down
  • 48539 02/27/02 07:53 cdaq Run 43948: bot target P=12.3%
  • 48538 02/27/02 07:52 hcf change to disk 13
  • 48537 02/27/02 07:50 cdaq End of Run 43947:
  • 48536 02/27/02 07:29 HGZ tgt screen
  • 48535 02/27/02 07:23 hcf spare HV channel at 100V??
  • 48534 02/27/02 07:13 cdaq Run 43947: bot target P=11.5%
  • 48533 02/27/02 07:12 cdaq End of Run 43946:
  • 48532 02/27/02 06:57 hcf beam screens
  • 48531 02/27/02 06:35 cdaq Run 43946: bot target P=12.3%
  • 48530 02/27/02 06:32 cdaq End of Run 43945:
  • 48529 02/27/02 06:31 HGZ tgt screen
  • 48528 02/27/02 05:58 hcf online_replay takes too long
  • 48527 02/27/02 05:53 cdaq Run 43945: bot target P=+12%
  • 48526 02/27/02 05:52 cdaq End of Run 43944:
  • 48525 02/27/02 05:31 HGZ tgt screen
  • 48524 02/27/02 05:25 hcf no ROC2 crashes for an hour!
  • 48523 02/27/02 05:13 cdaq Run 43944: bot target P=17.2%
  • 48522 02/27/02 05:10 cdaq End of Run 43943:
  • 48521 02/27/02 04:33 cdaq Run 43943: top target pol=15.2
  • 48520 02/27/02 04:31 HGZ spin up of top positive
  • 48519 02/27/02 04:24 cdaq 6 ROC2 crashes so far this shift
  • 48518 02/27/02 04:17 HGZ move to top ND3
  • 48517 02/27/02 04:16 hcf hv trip
  • 48516 02/27/02 04:00 HGZ tgt screen
  • 48515 02/27/02 03:23 cdaq Run 43942: bot target P=-13.2%
  • 48514 02/27/02 03:07 HGZ restart Labview
  • 48513 02/27/02 03:06 cdaq Run 43941: bot target P=-13.2%
  • 48512 02/27/02 03:01 HGZ tgt screen
  • 48511 02/27/02 02:24 cdaq Run 43940: bot target P=-10.0%
  • 48510 02/27/02 02:23 cdaq End of Run 43939:
  • 48509 02/27/02 02:00 HGZ tgt screen
  • 48508 02/27/02 01:27 cdaq Run 43939: bot target P=-13.2%
  • 48507 02/27/02 01:06 cdaq Run 43938: bot target P=-13.9%
  • 48506 02/27/02 00:55 Tang Polarity of run43936 was labled wrong
  • 48505 02/27/02 00:51 HGZ tgt screen, last 1.5 hrs
  • 48504 02/27/02 00:51 cdaq Run 43937: bot target P=-12%
  • 48503 02/27/02 00:05 cdaq Computer reboots for 2002-02-26
  • 48502 02/27/02 00:04 roche shift summary
  • 48501 02/27/02 00:02 cdaq Beam Time Accounting
  • Tuesday

  • 48500 02/26/02 23:58 cdaq Run 43936: bot target P=14%
  • 48499 02/26/02 23:56 roche new setting for magnet = 4.095 GeV/c
  • 48498 02/26/02 23:21 cdaq End of Run 43935:
  • 48497 02/26/02 22:37 roche noisy channel in hdc1x1
  • 48496 02/26/02 22:37 cdaq Run 43935: carbon + he
  • 48495 02/26/02 22:22 cdaq Run 43934: carbon + he
  • 48494 02/26/02 22:17 roche moller results + raw scalers
  • 48493 02/26/02 21:42 cdaq Moller Run 43933: moller run
  • 48492 02/26/02 21:20 cdaq Moller Run 43932: moller run
  • 48491 02/26/02 21:18 roche moller cryo +bpm
  • 48490 02/26/02 21:17 roche moller gui
  • 48489 02/26/02 21:17 roche real moller rates
  • 48488 02/26/02 21:05 mckee target anneal 95K/20min
  • 48487 02/26/02 20:54 roche magnet setting : 4.723 GeV
  • 48486 02/26/02 18:47 roche trigger changed to 3/4
  • 48485 02/26/02 18:46 cdaq End of Run 43931:
  • 48484 02/26/02 17:02 cdaq Run 43931: cosmic 1/3
  • 48483 02/26/02 17:01 cdaq End of Run 43930:
  • 48482 02/26/02 16:06 hcf shift summary
  • 48481 02/26/02 16:03 cdaq Beam Time Accounting
  • 48480 02/26/02 15:17 cdaq Run 43930: DAQ test
  • 48479 02/26/02 15:16 cdaq End of Run 43929:
  • 48478 02/26/02 13:25 cdaq Run 43929: daq test
  • 48477 02/26/02 13:24 cdaq End of Run 43928:
  • 48476 02/26/02 11:48 saw Trigger Change for DAQ tests
  • 48475 02/26/02 11:47 saw ROC2 problem
  • 48474 02/26/02 10:47 cdaq Run 43928: Test run
  • 48473 02/26/02 10:18 hcf HMS magnets set to zero
  • 48472 02/26/02 10:05 hcf new channel in HMS HV
  • 48471 02/26/02 08:55 hcf powered off Harp PMTs
  • 48470 02/26/02 08:13 hamlet Shift summary
  • 48469 02/26/02 08:12 cdaq Beam Time Accounting
  • 48468 02/26/02 07:42 HGZ gas shed helium gauge
  • 48467 02/26/02 07:33 hamlet Hole target on the 100nA beam for MCC
  • 48466 02/26/02 07:29 HGZ shift check list
  • 48465 02/26/02 07:12 hamlet Started TE measurement
  • 48464 02/26/02 07:08 hamlet Change disk data11--> data12
  • 48463 02/26/02 07:05 hamlet Beam off
  • 48462 02/26/02 07:04 HGZ helium bottle replaced
  • 48461 02/26/02 06:59 samuel pol. screen
  • 48460 02/26/02 06:59 cdaq End of Run 43927:
  • 48459 02/26/02 06:52 samuel pol.screen
  • 48458 02/26/02 06:39 HGZ BPM screen
  • 48457 02/26/02 06:11 cdaq Run 43927: top target P=10.1%
  • 48456 02/26/02 06:10 cdaq End of Run 43926:
  • 48455 02/26/02 05:58 samuel pol. screen
  • 48454 02/26/02 05:24 hamlet Run #43924 and 43925 ended due to ROC2 problem
  • 48453 02/26/02 05:08 cdaq Run 43926: top target P=10.6%
  • 48452 02/26/02 05:01 samuel pol.screen
  • 48451 02/26/02 04:25 cdaq Run 43925: top target P=11.1%
  • 48450 02/26/02 04:12 cdaq Run 43924: top target P=11.2%
  • 48449 02/26/02 04:11 cdaq End of Run 43923:
  • 48448 02/26/02 03:57 samuel pol. screen
  • 48447 02/26/02 03:05 cdaq Run 43923: top target P=11.7%
  • 48446 02/26/02 03:04 cdaq End of Run 43922:
  • 48445 02/26/02 02:58 samuel pol screen
  • 48444 02/26/02 02:05 cdaq Run 43922: top target P=11.0%
  • 48443 02/26/02 02:04 samuel pol. screen
  • 48442 02/26/02 02:02 mckee target anneal 90K/20min
  • 48441 02/26/02 00:42 Rondon Target performance after 80 K anneal
  • 48440 02/26/02 00:05 cdaq Computer reboots for 2002-02-25
  • Monday

  • 48439 02/25/02 23:59 cdaq Beam Time Accounting
  • 48438 02/25/02 23:59 hamlet Shift summary
  • 48437 02/25/02 23:58 hamlet Beam off for target anneal
  • 48436 02/25/02 23:54 cdaq End of Run 43921:
  • 48435 02/25/02 23:26 donal target screen
  • 48434 02/25/02 22:54 cdaq Run 43921: top target P=10.7%
  • 48433 02/25/02 22:53 cdaq End of Run 43920:
  • 48432 02/25/02 21:52 cdaq Run 43920: top target P=10.5%
  • 48431 02/25/02 21:40 donal top buildup
  • 48430 02/25/02 21:26 donal anneal and buildup
  • 48429 02/25/02 20:13 hamlet Beam off for target anneal
  • 48428 02/25/02 20:11 cdaq End of Run 43919:
  • 48427 02/25/02 20:11 donal target screen
  • 48426 02/25/02 19:09 cdaq Run 43919: top target P=10.1%
  • 48425 02/25/02 19:08 cdaq End of Run 43918:
  • 48424 02/25/02 18:13 mckee target polarization
  • 48423 02/25/02 18:02 cdaq Run 43918: top target P=11.1%
  • 48422 02/25/02 18:01 hamlet Beam current changed from 100nA to 150nA
  • 48421 02/25/02 17:59 cdaq End of Run 43917:
  • 48420 02/25/02 16:31 cdaq Run 43917: top target P=12.0%
  • 48419 02/25/02 16:16 donal screen grab
  • 48418 02/25/02 16:08 roche shift summary
  • 48417 02/25/02 16:08 cdaq Beam Time Accounting
  • 48416 02/25/02 15:50 kramer target screen
  • 48415 02/25/02 15:34 cdaq Run 43916: top target P=14.4%
  • 48414 02/25/02 15:17 kramer target screen
  • 48413 02/25/02 15:11 roche roc 2 crashes
  • 48412 02/25/02 15:10 cdaq Run 43915: top target P=11.5%
  • 48411 02/25/02 14:05 kramer kramer
  • 48410 02/25/02 13:48 roche run 43913 : TOP target
  • 48409 02/25/02 13:44 cdaq Run 43914: top target P=11.5%
  • 48408 02/25/02 13:10 cdaq Run 43913: bottom target P=11.1
  • 48407 02/25/02 13:07 kramer top target buildup
  • 48406 02/25/02 12:46 kramer target change
  • 48405 02/25/02 12:35 cdaq End of Run 43912:
  • 48404 02/25/02 12:32 cdaq Run 43912: bottom target P=6.9%
  • 48403 02/25/02 12:22 cdaq End of Run 43911:
  • 48402 02/25/02 12:20 roche ROC2 crashed
  • 48401 02/25/02 12:18 roche beam charge asymmetry fast feedback off
  • 48400 02/25/02 12:08 kramer target screen
  • 48399 02/25/02 12:07 cdaq Run 43911: bottom target P=6.9%
  • 48398 02/25/02 12:03 cdaq Run 43910: bottom target P=6.9%
  • 48397 02/25/02 11:46 cdaq Run 43909: Bottom target (pol=7.6%)
  • 48396 02/25/02 11:43 kramer target screen
  • 48395 02/25/02 11:17 cdaq End of Run 43908:
  • 48394 02/25/02 10:58 kramer target screen
  • 48393 02/25/02 10:47 cdaq Run 43908: Carbon Target with LHe
  • 48392 02/25/02 10:43 kramer target anneal
  • 48391 02/25/02 10:37 zeier moller results
  • 48390 02/25/02 10:35 roche magnet up again
  • 48389 02/25/02 10:26 roche moller hodoscope channel missing
  • 48388 02/25/02 10:07 cdaq Moller Run 43907: moller run
  • 48387 02/25/02 10:00 roche/zeier moller epics + raw scalers
  • 48386 02/25/02 09:49 roche/zeier moller rates
  • 48385 02/25/02 09:48 roche moller beam
  • 48384 02/25/02 09:47 roche moller setups
  • 48383 02/25/02 09:46 cdaq Moller Run 43906: moller run
  • 48382 02/25/02 09:39 J. Roche Low helium flow crashes dipole and q1
  • 48381 02/25/02 09:13 kramer target screen
  • 48380 02/25/02 09:12 cdaq End of Run 43905:
  • 48379 02/25/02 08:46 cdaq Run 43905: ND3 top Pol=+12.2%
  • 48378 02/25/02 08:45 cdaq End of Run 43904:
  • 48377 02/25/02 07:59 cdaq Beam Time Accounting
  • 48376 02/25/02 07:59 hamlet Shift summary
  • 48375 02/25/02 07:57 samuel top target pol. screen
  • 48374 02/25/02 07:47 zeier HMS electronics dead-time
  • 48373 02/25/02 07:29 samuel polarization behavior for top target
  • 48372 02/25/02 07:14 cdaq Run 43904: ND3 top Pol=+12.9%
  • 48371 02/25/02 07:12 cdaq End of Run 43903:
  • 48370 02/25/02 06:58 samuel p[olarization screen
  • 48369 02/25/02 06:00 samuel top target polarization
  • 48368 02/25/02 05:46 zeier BPM screen
  • 48367 02/25/02 05:40 cdaq Run 43903: ND3 top Pol=+13.5%
  • 48366 02/25/02 05:38 cdaq End of Run 43902:
  • 48365 02/25/02 05:00 samuel top target pol. screen
  • 48364 02/25/02 04:08 cdaq Run 43902: ND3 top Pol=+16.7%
  • 48363 02/25/02 04:00 hamlet Run #43901 junk, will be no beam ~10min
  • 48362 02/25/02 03:58 samuel top deutron target pol.
  • 48361 02/25/02 03:55 cdaq End of Run 43901:
  • 48360 02/25/02 03:52 cdaq Run 43901: ND3 top Pol=+16.2%
  • 48359 02/25/02 03:51 cdaq End of Run 43900:
  • 48358 02/25/02 03:04 samuel top target polarization
  • 48357 02/25/02 02:44 cdaq Run 43900: ND3 top Pol=+15.3%
  • 48356 02/25/02 02:10 cdaq Run 43899: ND3 top Pol=+16.9%
  • 48355 02/25/02 02:00 samuel top target screen
  • 48354 02/25/02 01:09 hamlet Beam off. MCC will reboot IOC
  • 48353 02/25/02 01:08 samuel top deutron polarization
  • 48352 02/25/02 01:05 cdaq End of Run 43898:
  • 48351 02/25/02 00:16 cdaq Run 43898: ND3 top Pol=+14.3%
  • 48350 02/25/02 00:05 cdaq Computer reboots for 2002-02-24
  • 48349 02/25/02 00:01 L. Tang Shift summary
  • 48348 02/25/02 00:00 cdaq Beam Time Accounting
  • Sunday

  • 48347 02/24/02 23:49 donal target top
  • 48346 02/24/02 23:37 donal move target
  • 48345 02/24/02 23:14 donal target grab
  • 48344 02/24/02 22:14 cdaq Run 43897: ND3 bottom Beam position x = -1.9mm y = 0.0mm.
  • 48343 02/24/02 22:07 donal target
  • 48342 02/24/02 21:37 cdaq Run 43896: ND3 bottom Beam position x = -1.9mm y = 0.0mm.
  • 48341 02/24/02 21:36 cdaq End of Run 43895:
  • 48340 02/24/02 21:09 donal target screen
  • 48339 02/24/02 20:33 cdaq Run 43895: ND3 bottom Beam position x = -1.9mm y = 0.0mm.
  • 48338 02/24/02 20:05 cdaq Run 43894: ND3 bottom Beam position x = -1.9mm y = 0.0mm.
  • 48337 02/24/02 20:01 cdaq End of Run 43893:
  • 48336 02/24/02 19:59 donal target screen
  • 48335 02/24/02 19:35 donal target performance
  • 48334 02/24/02 19:21 cdaq Run 43893: ND3 bottom Beam position x = -1.9mm y = 0.0mm.
  • 48333 02/24/02 19:02 cdaq Run 43892: ND3 bottom Beam position x = -1.9mm y = 0.0mm.
  • 48332 02/24/02 18:18 cdaq Run 43891: ND3 bottom Beam position x = -1.9mm y = 0.0mm.
  • 48331 02/24/02 18:03 donal target screen
  • 48330 02/24/02 17:58 donal entry for target work
  • 48329 02/24/02 16:15 cdaq End of Run 43890:
  • 48328 02/24/02 16:00 cdaq Beam Time Accounting
  • 48327 02/24/02 15:55 kramer target screen
  • 48326 02/24/02 15:55 R.A. Lindgre shift summary
  • 48325 02/24/02 15:53 cdaq Run 43890: ND3 bottom Beam position x = -1.9mm y = 0.0mm.
  • 48324 02/24/02 15:29 cdaq End of Run 43889:
  • 48323 02/24/02 15:26 cdaq Run 43889: ND3 bottom Beam position x = -1.9mm y = 0.0mm.
  • 48322 02/24/02 14:43 cdaq End of Run 43888:
  • 48321 02/24/02 14:09 cdaq Run 43888: carbon target, Beam position x = -1.9mm y = 0.0mm.
  • 48320 02/24/02 14:01 cdaq End of Run 43887:
  • 48319 02/24/02 13:27 cdaq Run 43887: carbon target, Beam position x = -1.9mm y = 0.0mm.
  • 48318 02/24/02 13:18 cdaq End of Run 43886:
  • 48317 02/24/02 13:05 cdaq Run 43886: Empty target, Beam position x = -1.9mm y = 0.0mm.
  • 48316 02/24/02 12:56 kramer anneal
  • 48315 02/24/02 12:56 bloch Moller run 43885 polarization
  • 48314 02/24/02 12:34 Bloch Moller run 43884 polarization
  • 48313 02/24/02 12:32 cdaq Moller Run 43885: moller run
  • 48312 02/24/02 12:09 R.A.Lindgren Injector Parameters
  • 48311 02/24/02 12:06 cdaq Moller Run 43884: moller run
  • 48310 02/24/02 12:02 R.A. Lindgre GUI and Moller cryo
  • 48309 02/24/02 11:58 frw moller bpms
  • 48308 02/24/02 11:57 R.A.Lindgren Moller scalers
  • 48307 02/24/02 11:18 cdaq End of Run 43883:
  • 48306 02/24/02 10:42 cdaq Run 43883: ND3 Top target, Beam position x = -1.9mm y = 0.0mm.
  • 48305 02/24/02 10:40 cdaq End of Run 43882:
  • 48304 02/24/02 10:24 kramer target screen
  • 48303 02/24/02 09:45 cdaq Run 43882: ND3 Top target, Beam position x = -1.9mm y = 0.0mm.
  • 48302 02/24/02 09:44 cdaq End of Run 43881:
  • 48301 02/24/02 09:08 kramer target screen
  • 48300 02/24/02 08:47 cdaq Run 43881: ND3 Top target, Beam position x = -1.9mm y = 0.0mm.
  • 48299 02/24/02 08:46 cdaq End of Run 43880:
  • 48298 02/24/02 08:09 kramer target
  • 48297 02/24/02 08:05 cdaq Beam Time Accounting
  • 48296 02/24/02 08:05 hamlet Shift summary
  • 48295 02/24/02 07:50 cdaq Run 43880: ND3 Top target, Beam position x = -1.9mm y = 0.0mm.
  • 48294 02/24/02 07:45 hamlet Beam off for MCC QE measurements
  • 48293 02/24/02 07:43 cdaq End of Run 43879:
  • 48292 02/24/02 07:42 hamlet hs1y8+ HV was of during run 43878
  • 48291 02/24/02 07:23 cdaq Run 43879: ND3 Top target, Beam position x = -1.9mm y = 0.0mm.
  • 48290 02/24/02 07:22 cdaq End of Run 43878:
  • 48289 02/24/02 07:20 D.E.McNulty poltarg
  • 48288 02/24/02 06:27 cdaq Run 43878: ND3 Top target, Beam position x = -1.9mm y = 0.0mm.
  • 48287 02/24/02 06:25 cdaq End of Run 43877:
  • 48286 02/24/02 05:40 D.E.McNulty poltarg
  • 48285 02/24/02 05:30 cdaq Run 43877: ND3 Top target, Beam position x = -1.9mm y = 0.0mm.
  • 48284 02/24/02 04:37 cdaq Run 43876: ND3 Top target, Beam position x = -1.9mm y = 0.0mm.
  • 48283 02/24/02 04:36 cdaq End of Run 43875:
  • 48282 02/24/02 03:34 cdaq Run 43875: ND3 Top target, Beam position x = -1.9mm y = 0.0mm.
  • 48281 02/24/02 03:31 cdaq End of Run 43874:
  • 48280 02/24/02 03:16 D.E.McNulty poltarg
  • 48279 02/24/02 02:36 cdaq Run 43874: ND3 Top target, Beam position x = -1.9mm y = 0.0mm.
  • 48278 02/24/02 02:18 D.E. McNulty poltarg
  • 48277 02/24/02 02:09 cdaq End of Run 43873:
  • 48276 02/24/02 01:14 cdaq Run 43873: ND3 Bot target, Beam position x = -1.9mm y = 0.0mm.
  • 48275 02/24/02 00:58 cdaq Run 43872: ND3 Bot target, Beam position x = -1.9mm y = 0.0mm.
  • 48274 02/24/02 00:47 cdaq Run 43871: ND3 Bot target, Beam position x = -1.9mm y = 0.0mm.
  • 48273 02/24/02 00:06 cdaq Run 43870: ND3 Bot target, Beam position x = -1.9mm y = 0.0mm.
  • 48272 02/24/02 00:05 cdaq Computer reboots for 2002-02-23
  • 48271 02/24/02 00:03 cdaq End of Run 43869:
  • 48270 02/24/02 00:01 donal polarization this shift
  • 48269 02/24/02 00:00 cdaq Beam Time Accounting
  • 48268 02/24/02 00:00 donal target screen
  • Saturday

  • 48267 02/23/02 23:56 lgan shift summary
  • 48266 02/23/02 23:07 cdaq Run 43869: ND3 Bot target, Beam position x = -1.9mm y = 0.0mm.
  • 48265 02/23/02 23:06 cdaq End of Run 43868:
  • 48264 02/23/02 23:02 donal target screen
  • 48263 02/23/02 22:14 lgan DAQ
  • 48262 02/23/02 22:13 cdaq Run 43868: ND3 Bot target, Beam position x = -1.9mm y = 0.0mm.
  • 48261 02/23/02 22:05 donal polarization
  • 48260 02/23/02 22:02 donal target screen
  • 48259 02/23/02 21:32 cdaq Run 43867: ND3 Bot target, Beam position x = -1.9mm y = 0.0mm.
  • 48258 02/23/02 21:31 cdaq End of Run 43866:
  • 48257 02/23/02 21:06 donal target
  • 48256 02/23/02 21:04 donal target screen
  • 48255 02/23/02 20:38 cdaq Run 43866: ND3 Bot target, Beam position x = -1.9mm y = 0.0mm.
  • 48254 02/23/02 20:36 cdaq End of Run 43865:
  • 48253 02/23/02 20:10 donal target screen
  • 48252 02/23/02 20:05 bloch HMS collimater controler
  • 48251 02/23/02 19:42 cdaq Run 43865: ND3 Bot target, Beam position x = -1.9mm y = 0.0mm.
  • 48250 02/23/02 19:41 cdaq End of Run 43864:
  • 48249 02/23/02 19:00 donal target screen
  • 48248 02/23/02 18:49 cdaq Run 43864: ND3 Bot target, Beam position x = -1.9mm y = 0.0mm.
  • 48247 02/23/02 18:47 cdaq End of Run 43863:
  • 48246 02/23/02 18:00 donal target screen
  • 48245 02/23/02 17:52 cdaq Run 43863: ND3 Bot target, Beam position x = -1.9mm y = 0.0mm.
  • 48244 02/23/02 17:50 cdaq End of Run 43862:
  • 48243 02/23/02 17:50 cdaq End of Run 43862:
  • 48242 02/23/02 17:06 MJones Charge asymmetry feedback is OFF
  • 48241 02/23/02 16:57 donal target screen
  • 48240 02/23/02 16:52 cdaq Run 43862: ND3 Bot target, Beam position x = -1.9mm y = 0.0mm.
  • 48239 02/23/02 16:17 cdaq End of Run 43861:
  • 48238 02/23/02 16:15 cdaq Beam Time Accounting
  • 48237 02/23/02 16:06 R.A. Lindgre shift summary
  • 48236 02/23/02 16:05 cdaq Beam Time Accounting
  • 48235 02/23/02 15:44 cdaq Run 43861: carbon, Beam position x = -1.8mm y = 0.1mm.
  • 48234 02/23/02 15:40 donal anneal
  • 48233 02/23/02 15:37 cdaq End of Run 43860:
  • 48232 02/23/02 15:07 cdaq Run 43860: carbon, Beam position x = -1.8mm y = 0.1mm.
  • 48231 02/23/02 14:59 cdaq End of Run 43859:
  • 48230 02/23/02 14:44 cdaq Run 43859: empty, Beam position x = -1.8mm y = 0.1mm.
  • 48229 02/23/02 14:42 bloch moller polarization (run 43858)
  • 48228 02/23/02 14:37 bloch beam current during the moller runs
  • 48227 02/23/02 14:19 bloch moller polarization
  • 48226 02/23/02 14:12 cdaq Moller Run 43858: moller run
  • 48225 02/23/02 13:42 cdaq Moller Run 43857: moller run
  • 48224 02/23/02 13:39 bloch moller cryo
  • 48223 02/23/02 13:39 bloch moller gui and bpm screens
  • 48222 02/23/02 13:35 bloch moller scalers
  • 48221 02/23/02 13:00 bloch moller parameters
  • 48220 02/23/02 12:49 cdaq End of Run 43856:
  • 48219 02/23/02 12:07 cdaq Run 43856: ND3, Polar=-11.6%. top, Beam position x = -1.9mm y = 0.0mm.
  • 48218 02/23/02 12:07 kramer target
  • 48217 02/23/02 12:06 cdaq End of Run 43855:
  • 48216 02/23/02 11:17 kramer target
  • 48215 02/23/02 10:38 cdaq Run 43855: ND3, Polar=-12.6%. top, Beam position x = -1.9mm y = 0.0mm.
  • 48214 02/23/02 10:36 cdaq End of Run 43854:
  • 48213 02/23/02 10:11 kramer Target POl.
  • 48212 02/23/02 10:10 Rondon Correction to beamcount.pl
  • 48211 02/23/02 08:59 Rondon BPM/BCM screens
  • 48210 02/23/02 08:58 cdaq Run 43854: ND3, Polar=-12.27%. top, Beam position x = -1.9mm y = 0.0mm.
  • 48209 02/23/02 08:56 cdaq End of Run 43853:
  • 48208 02/23/02 08:54 kramer target
  • 48207 02/23/02 08:01 kristoff shift summary
  • 48206 02/23/02 08:00 cdaq Beam Time Accounting
  • 48205 02/23/02 07:26 cdaq Run 43853: ND3, Polar=-13.2%. bottom, Beam position x = -1.9mm y = 0.0mm.
  • 48204 02/23/02 07:12 cdaq End of Run 43852:
  • 48203 02/23/02 06:50 cdaq Run 43852: ND3, Polar=-12.7%. bottom, Beam position x = -1.9mm y = 0.0mm.
  • 48202 02/23/02 06:48 cdaq End of Run 43851:
  • 48201 02/23/02 06:13 D.E.McNulty poltarg
  • 48200 02/23/02 05:21 cdaq Run 43851: ND3, Polar=-11.72%. bottom, Beam position x = -1.9mm y = 0.0mm.
  • 48199 02/23/02 05:19 cdaq End of Run 43850:
  • 48198 02/23/02 05:14 D.E.McNulty poltarg
  • 48197 02/23/02 04:45 cdaq Run 43850: ND3, Polar=11.2%. bottom, Beam position x = -1.9mm y = 0.0mm.
  • 48196 02/23/02 03:57 D.E. McNulty poltarg
  • 48195 02/23/02 03:30 cdaq End of Run 43849:
  • 48194 02/23/02 02:57 D.E. McNulty poltarg
  • 48193 02/23/02 01:58 cdaq Run 43849: ND3, Polar=10.1%. bottom, Beam position x = -1.9mm y = 0.0mm.
  • 48192 02/23/02 01:57 cdaq End of Run 43848:
  • 48191 02/23/02 01:18 D.E.McNulty Poltarg
  • 48190 02/23/02 00:33 cdaq Run 43848: ND3, Polar=13.2%. bottom, Beam position x = -1.9mm y = 0.0mm.
  • 48189 02/23/02 00:31 cdaq End of Run 43847:
  • 48188 02/23/02 00:05 cdaq Computer reboots for 2002-02-22
  • 48187 02/23/02 00:02 cdaq Beam Time Accounting
  • Friday

  • 48186 02/22/02 23:54 lgan shift summary
  • 48185 02/22/02 23:45 kramer target
  • 48184 02/22/02 23:03 cdaq Run 43847: ND3, Polar=13.2%. bottom, Beam position x = -1.9mm y = 0.0mm.
  • 48183 02/22/02 22:46 kramer target
  • 48182 02/22/02 22:17 cdaq End of Run 43846:
  • 48181 02/22/02 19:33 lgan shift status
  • 48180 02/22/02 18:38 Rondon TE calibrations to take advantage of HMS interlocks problem
  • 48179 02/22/02 17:56 cdaq Run 43846: No beam because HMS dipole problem. This is cosmic run
  • 48178 02/22/02 17:09 kramer target
  • 48177 02/22/02 16:16 cdaq Beam Time Accounting
  • 48176 02/22/02 16:09 hamlet Shift summary
  • 48175 02/22/02 15:22 mckee target polarization
  • 48174 02/22/02 14:56 hamlet Controlled access for HMS Dipole
  • 48173 02/22/02 14:40 hamlet HMS Dipole problem
  • 48172 02/22/02 13:42 hamlet Controlled access for target magnet
  • 48171 02/22/02 13:36 cdaq End of Run 43845:
  • 48170 02/22/02 13:03 cdaq Run 43845: ND3, Polar=16.2%.Beam position x = -1.8mm y = 0.0mm.
  • 48169 02/22/02 12:59 Rondon Target pol. last 4 h
  • 48168 02/22/02 12:43 cdaq End of Run 43844:
  • 48167 02/22/02 12:36 cdaq Run 43844: ND3, Polar=6.6%.Beam position x = -1.8mm y = 0.0mm.
  • 48166 02/22/02 12:34 cdaq End of Run 43843:
  • 48165 02/22/02 12:10 cdaq Run 43843: ND3, Polar=7.5%.Beam position x = -1.8mm y = 0.0mm.
  • 48164 02/22/02 11:52 cdaq Run 43842: ND3, Polar=7.5%.Beam position x = -1.8mm y = 0.0mm.
  • 48163 02/22/02 11:46 mckee bottom deuteron buildup
  • 48162 02/22/02 11:40 mckee target anneal, 90K/60min
  • 48161 02/22/02 11:37 cdaq Run 43841: ND3, Polar=6.4%.Beam position x = -1.8mm y = 0.0mm.
  • 48160 02/22/02 11:35 cdaq End of Run 43840:
  • 48159 02/22/02 11:13 cdaq Run 43840: ND3, Polar=5.3%.Beam position x = -1.8mm y = 0.0mm.
  • 48158 02/22/02 11:08 cdaq End of Run 43839:
  • 48157 02/22/02 10:41 saw ROC Fastbus power cycled
  • 48156 02/22/02 10:19 cdaq Run 43839: test run
  • 48155 02/22/02 09:38 hamlet Controlled access for QAD
  • 48154 02/22/02 09:31 saw DAQ problems
  • 48153 02/22/02 09:26 saw DAQ problems. EN1 problem
  • 48152 02/22/02 09:17 cdaq Run 43838: Hole target, Beam position x = -1.8mm y = 0.0mm.
  • 48151 02/22/02 09:13 cdaq End of Run 43837:
  • 48150 02/22/02 08:47 cdaq Run 43837: Empty, Beam position x = -1.8mm y = 0.0mm.
  • 48149 02/22/02 08:46 cdaq End of Run 43836:
  • 48148 02/22/02 08:42 cdaq Run 43836: test
  • 48147 02/22/02 08:27 cdaq Run 43835: test
  • 48146 02/22/02 08:05 kristoff shift summary
  • 48145 02/22/02 08:04 cdaq Beam Time Accounting
  • 48144 02/22/02 08:04 J. Cha Target Screen
  • 48143 02/22/02 07:46 J. Cha Target Screen
  • 48142 02/22/02 07:40 cdaq Run 43834: C12 without He, Beam position x = -1.8mm y = 0.0mm.
  • 48141 02/22/02 07:24 cdaq Run 43833: C12, Beam position x = -1.8mm y = 0.0mm.
  • 48140 02/22/02 06:53 cdaq Run 43832: C12, Beam position x = -1.8mm y = 0.0mm.
  • 48139 02/22/02 06:27 cdaq Run 43831: C12, Beam position x = -1.8mm y = 0.0mm.
  • 48138 02/22/02 06:14 kristoff ROC2 died, TSO also
  • 48137 02/22/02 06:12 kristoff HV off during run 43829
  • 48136 02/22/02 06:07 cdaq Run 43830: C12, Beam position x = -1.8mm y = 0.0mm.
  • 48135 02/22/02 05:50 dunne Target Screen
  • 48134 02/22/02 05:01 dunne Target Screen
  • 48133 02/22/02 04:27 cdaq Run 43829: Top ND3, Beam position x = -1.8mm y = 0.0mm.
  • 48132 02/22/02 04:26 cdaq End of Run 43828:
  • 48131 02/22/02 04:03 dunne Target Screen
  • 48130 02/22/02 03:02 dunne Target Screen
  • 48129 02/22/02 02:55 cdaq Run 43828: Top ND3, Beam position x = -1.8mm y = 0.0mm.
  • 48128 02/22/02 02:54 cdaq End of Run 43827:
  • 48127 02/22/02 02:01 dunne Target Screen
  • 48126 02/22/02 01:28 cdaq Run 43827: Top ND3, Beam position x = -1.8mm y = 0.0mm.
  • 48125 02/22/02 01:26 cdaq End of Run 43826:
  • 48124 02/22/02 01:01 dunne Target Screen
  • 48123 02/22/02 00:32 cdaq Run 43826: Top ND3, Beam position x = -1.8mm y = 0.0mm.
  • 48122 02/22/02 00:28 cdaq End of Run 43825:
  • 48121 02/22/02 00:15 mckee spinup of bottom deuteron
  • 48120 02/22/02 00:05 cdaq Computer reboots for 2002-02-21
  • Thursday

  • 48119 02/21/02 23:56 cdaq Beam Time Accounting
  • 48118 02/21/02 23:56 Tang Shift summary
  • 48117 02/21/02 23:45 cdaq Run 43825: Top ND3, Beam position x = -1.8mm y = 0.0mm.
  • 48116 02/21/02 22:13 cdaq End of Run 43824:
  • 48115 02/21/02 21:58 cdaq Run 43824: Bot ND3, Beam position x = -1.8mm y = 0.0mm.
  • 48114 02/21/02 21:12 cdaq Run 43823: Bot ND3, Beam position x = -1.8mm y = 0.0mm.
  • 48113 02/21/02 21:10 cdaq End of Run 43822:
  • 48112 02/21/02 19:48 cdaq Run 43822: Bot ND3, Beam position x = -1.8mm y = 0.0mm.
  • 48111 02/21/02 19:46 Rondon EIP not reading frequency regularly
  • 48110 02/21/02 19:34 Rondon Target pol. screen
  • 48109 02/21/02 19:13 cdaq Run 43821: Bot ND3, Beam position x = -1.8mm y = 0.0mm.
  • 48108 02/21/02 18:39 cdaq Run 43820: Bot ND3, Beam position x = -1.8mm y = 0.0mm.
  • 48107 02/21/02 18:27 cdaq Moller beam pol. 69.8% run 43819
  • 48106 02/21/02 18:07 cdaq Moller beam pol. 71.09%
  • 48105 02/21/02 18:07 cdaq Moller Run 43819: moller run
  • 48104 02/21/02 17:49 cdaq Beam Time Accounting
  • 48103 02/21/02 17:47 cdaq Moller Run 43818: moller run
  • 48102 02/21/02 17:45 gomez Real Moller
  • 48101 02/21/02 17:44 gomez Moller Cryo GUI
  • 48100 02/21/02 17:43 gomez Moller BPMs + GUI
  • 48099 02/21/02 17:37 Tang realmoller output
  • 48098 02/21/02 16:30 gomez Injector Parameters - Moller run
  • 48097 02/21/02 16:26 cdaq End of Run 43817:
  • 48096 02/21/02 16:03 cdaq Run 43817: Carbon, Beam position x = -1.8mm y = 0.0mm.
  • 48095 02/21/02 15:50 cdaq End of Run 43816:
  • 48094 02/21/02 15:44 cdaq Run 43816: Bot ND3, Beam position x = -1.8mm y = 0.0mm.
  • 48093 02/21/02 15:43 cdaq beam at x = -1.8, y =0.0, FR on, SR 10 mm Top
  • 48092 02/21/02 15:39 cdaq End of Run 43815:
  • 48091 02/21/02 15:33 cdaq Run 43815: top ND3, Beam position x = -1.8mm y = 0.0mm.
  • 48090 02/21/02 15:31 cdaq beam position x =-1.8, y =0.0, FR on, SR = 10 mm
  • 48089 02/21/02 15:26 cdaq End of Run 43814:
  • 48088 02/21/02 15:14 cdaq Run 43814: Empty (with He), Beam position x = -1.8mm y = 0.0mm.
  • 48087 02/21/02 15:12 cdaq beam position x=-1.8, y = 0.0, FR on
  • 48086 02/21/02 15:09 cdaq End of Run 43813:
  • 48085 02/21/02 14:54 cdaq Run 43813: Empty (No He), Beam position x = -1.8mm y = 0.0mm.
  • 48084 02/21/02 14:51 cdaq End of Run 43812:
  • 48083 02/21/02 14:50 cdaq Run 43812: Empty (No He), Beam position x = -1.5mm y = 0.0mm.
  • 48082 02/21/02 14:48 cdaq End of Run 43811:
  • 48081 02/21/02 14:34 cdaq Run 43811: Empty (No He), Beam position x = -1.7mm y = 0.0mm.
  • 48080 02/21/02 14:32 cdaq End of Run 43810:
  • 48079 02/21/02 14:20 cdaq Run 43810: Empty (No He), Beam position x = -1.5mm y = 0.0mm.
  • 48078 02/21/02 14:19 cdaq Beam positions for (-2.2,0)
  • 48077 02/21/02 14:15 cdaq End of Run 43809:
  • 48076 02/21/02 14:01 cdaq Run 43809: Empty (No He), Beam position x = -2.2mm y = 0.0mm.
  • 48075 02/21/02 13:46 cdaq Run 43808: Empty (No He), Beam position x = -2.2mm y = 0.0mm.
  • 48074 02/21/02 13:31 cdaq End of Run 43807:
  • 48073 02/21/02 13:22 cdaq Run 43807: Empty (No He), Beam position x = -2.2mm y = -1.0mm.
  • 48072 02/21/02 13:18 cdaq End of Run 43806:
  • 48071 02/21/02 13:11 cdaq Run 43806: Empty (No He), Beam position x = -1.2mm y = -0.0,
  • 48070 02/21/02 12:03 mckee bottom deteron improved
  • 48069 02/21/02 08:06 cdaq Beam Time Accounting
  • 48068 02/21/02 07:46 dunne TE top ND3
  • 48067 02/21/02 02:21 dunne TE bottom proton
  • 48066 02/21/02 00:05 cdaq Computer reboots for 2002-02-20
  • Wednesday

  • 48065 02/20/02 23:55 cdaq Beam Time Accounting
  • 48064 02/20/02 23:10 yuan Shift summary
  • 48063 02/20/02 20:56 yuan HMS fields Ramped up
  • 48062 02/20/02 18:07 saw cdaqs1 system disk replaced
  • 48061 02/20/02 17:03 klein pol target TE
  • 48060 02/20/02 17:01 HGZ Effective run time
  • 48059 02/20/02 16:11 hamlet Installet in Hall G0 PMT's amplifier for test
  • 48058 02/20/02 16:01 reinhold top target baseline
  • 48057 02/20/02 13:26 reinhold HMS return valve power supply
  • 48056 02/20/02 12:00 hcf moller target was not in for long
  • 48055 02/20/02 11:53 reinhold target TE on top proton
  • 48054 02/20/02 11:06 hcf moller solenoid on
  • 48053 02/20/02 10:58 hcf moller target ready
  • 48052 02/20/02 10:10 reinhold HMS magnets off
  • 48051 02/20/02 09:18 reinhold figure for last entry
  • 48050 02/20/02 09:17 reinhold target NMR event with new baseline
  • 48049 02/20/02 08:57 reinhold target base line
  • 48048 02/20/02 08:39 HGZ RC weekly Summary
  • 48047 02/20/02 08:32 reinhold target baseline
  • 48046 02/20/02 08:27 kristoff owl shift summary
  • 48045 02/20/02 08:27 cdaq Beam Time Accounting
  • 48044 02/20/02 07:15 dunne Target Screen
  • 48043 02/20/02 07:05 cdaq End of Run 43805:
  • 48042 02/20/02 06:15 dunne Target Screen
  • 48041 02/20/02 06:07 cdaq Run 43805: BOTTOM TARGET
  • 48040 02/20/02 06:06 cdaq End of Run 43804:
  • 48039 02/20/02 05:05 dunne Target Screen
  • 48038 02/20/02 04:07 cdaq Run 43804: BOTTOM TARGET
  • 48037 02/20/02 04:03 dunne Target Screen
  • 48036 02/20/02 03:57 cdaq End of Run 43803:
  • 48035 02/20/02 03:01 dunne Target Screen
  • 48034 02/20/02 02:39 cdaq Run 43803: BOTTOM TARGET
  • 48033 02/20/02 00:36 cdaq Beam Time Accounting
  • 48032 02/20/02 00:05 cdaq Computer reboots for 2002-02-19
  • 48031 02/20/02 00:01 yuan Evening Shift Summary
  • Tuesday

  • 48030 02/19/02 23:59 cdaq Beam Time Accounting
  • 48029 02/19/02 23:43 klein pol tgt
  • 48028 02/19/02 21:06 klein change target
  • 48027 02/19/02 20:24 yuan LCW leaking in the east arc
  • 48026 02/19/02 20:22 cdaq End of Run 43802:
  • 48025 02/19/02 19:58 cdaq Run 43802: BOTTOM TARGET
  • 48024 02/19/02 19:57 cdaq End of Run 43801:
  • 48023 02/19/02 18:48 klein pol tgt
  • 48022 02/19/02 17:58 cdaq Run 43801: BOTTOM TARGET
  • 48021 02/19/02 17:57 cdaq End of Run 43800:
  • 48020 02/19/02 17:39 jpchen BCM SCREEN
  • 48019 02/19/02 17:37 klein snap shot pol tgt
  • 48018 02/19/02 16:23 Lindgren Shift summary
  • 48017 02/19/02 16:07 cdaq Beam Time Accounting
  • 48016 02/19/02 16:05 cdaq Run 43800: BOTTOM TARGET
  • 48015 02/19/02 15:59 klein polarized target
  • 48014 02/19/02 15:28 cdaq End of Run 43799:
  • 48013 02/19/02 15:03 cdaq Run 43799: CARBON TARGET WITH HE RUN
  • 48012 02/19/02 14:49 cdaq End of Run 43798:
  • 48011 02/19/02 14:17 cdaq Run 43798: CARBON TARGET RUN
  • 48010 02/19/02 14:01 hcf moller target unstuck
  • 48009 02/19/02 11:57 cdaq End of Run 43797:
  • 48008 02/19/02 11:52 reinhold correction entry 48004 (pol. pos.)
  • 48007 02/19/02 11:41 cdaq Run 43797: CARBON target run
  • 48006 02/19/02 11:40 reinhold carbon target in
  • 48005 02/19/02 11:35 cdaq End of Run 43796:
  • 48004 02/19/02 11:34 reinhold beamcount for top target neg pol (owl)
  • 48003 02/19/02 11:19 cdaq Run 43796: Empty target run
  • 48002 02/19/02 11:12 reinhold empty target in
  • 48001 02/19/02 11:09 bloch Moller run
  • 48000 02/19/02 11:09 reinhold slow raster on
  • 47999 02/19/02 10:55 Lindgren Moller run
  • 47998 02/19/02 10:39 cdaq Moller Run 43795: moller run
  • 47997 02/19/02 10:30 reinhold Target anneal screen
  • 47996 02/19/02 10:23 bloch real moller
  • 47995 02/19/02 10:21 bloch real moller
  • 47994 02/19/02 10:19 bloch real moller
  • 47993 02/19/02 10:17 cdaq Moller Run 43794: moller run
  • 47992 02/19/02 09:47 Bloch Moller
  • 47991 02/19/02 09:20 reinhold PDP screen before anneal
  • 47990 02/19/02 09:17 cdaq End of Run 43793:
  • 47989 02/19/02 09:01 reinhold target PDP screen
  • 47988 02/19/02 08:40 cdaq Run 43793: NH3 top 70.8%= polarization
  • 47987 02/19/02 08:38 cdaq End of Run 43792:
  • 47985 02/19/02 08:03 cdaq Beam Time Accounting
  • 47984 02/19/02 08:01 reinhold target PDP screen
  • 47983 02/19/02 07:23 cdaq Run 43792: NH3 top 71,8%= polarization
  • 47982 02/19/02 07:22 cdaq End of Run 43791:
  • 47981 02/19/02 07:02 dunne Target Screen
  • 47980 02/19/02 06:09 cdaq Run 43791: NH3 top 74%= polarization
  • 47979 02/19/02 06:05 cdaq End of Run 43790:
  • 47978 02/19/02 05:47 cdaq Run 43790: NH3 top74.4%= polarization
  • 47977 02/19/02 05:45 cdaq End of Run 43789:
  • 47976 02/19/02 05:44 dunne Target Screen
  • 47973 02/19/02 04:32 cdaq Run 43789: NH3 top 80.2%= polarization
  • 47972 02/19/02 04:32 cdaq End of Run 43788:
  • 47969 02/19/02 03:10 cdaq Run 43788: NH3 top 80.2%= polarization
  • 47968 02/19/02 03:07 cdaq End of Run 43787:
  • 47966 02/19/02 01:53 cdaq Run 43787: NH3 top 82%= polarization
  • 47965 02/19/02 01:13 cdaq Beam Time Accounting
  • 47964 02/19/02 01:09 cdaq End of Run 43784:
  • 47962 02/19/02 00:16 cdaq Run 43784: NH3 Bottom -64%= polarization
  • 47961 02/19/02 00:15 cdaq End of Run 43783:
  • 47960 02/19/02 00:05 cdaq Computer reboots for 2002-02-18
  • Monday

  • 47959 02/18/02 23:55 vulcan Shift summary
  • 47958 02/18/02 23:54 samuel polarization screen
  • 47957 02/18/02 23:05 cdaq Run 43783: NH3 Bottom -65.2%= polarization
  • 47956 02/18/02 23:04 cdaq End of Run 43782:
  • 47955 02/18/02 22:58 samuel bottom target polarization.
  • 47954 02/18/02 22:50 samuel pol. screen
  • 47953 02/18/02 21:59 samuel bottom target polarization
  • 47952 02/18/02 21:55 cdaq Run 43782: NH3 Bottom -66.5%= polarization
  • 47951 02/18/02 21:53 cdaq End of Run 43781:
  • 47950 02/18/02 20:58 samuel pol. screen
  • 47949 02/18/02 20:41 cdaq Run 43781: NH3 Bottom -67.9%= polarization
  • 47948 02/18/02 20:39 cdaq End of Run 43780:
  • 47947 02/18/02 20:02 samuel polarization screen
  • 47946 02/18/02 19:28 cdaq Run 43780: NH3 Bottom -70.4% polarization
  • 47945 02/18/02 19:26 cdaq End of Run 43779:
  • 47944 02/18/02 18:57 samuel pol. screen
  • 47943 02/18/02 18:17 cdaq Run 43779: NH3 Bottom -70.6% polarization
  • 47942 02/18/02 18:15 cdaq End of Run 43778:
  • 47941 02/18/02 17:57 samuel polarization screen
  • 47940 02/18/02 17:30 Rondon SEM x works well at 200 nA
  • 47939 02/18/02 17:06 samuel polarization for bottom target
  • 47938 02/18/02 17:05 cdaq Run 43778: NH3 Bottom -73.5% polarization
  • 47937 02/18/02 17:04 cdaq End of Run 43777:
  • 47936 02/18/02 16:15 cdaq Shift Summary
  • 47935 02/18/02 16:05 hcf He (gas) supply pressure
  • 47934 02/18/02 16:04 cdaq Beam Time Accounting
  • 47933 02/18/02 15:59 cdaq beam screens
  • 47932 02/18/02 15:48 cdaq Run 43777: NH3 Bottom -93.3% polarization
  • 47931 02/18/02 15:23 crabb -90% polarization
  • 47930 02/18/02 15:02 crabb Bottom target polarization after anneal
  • 47929 02/18/02 14:59 hcf polarization vs. gate width
  • 47928 02/18/02 14:40 cdaq End of Run 43776:
  • 47926 02/18/02 14:12 cdaq Run 43776: carbon tgt. with helium
  • 47925 02/18/02 14:10 cdaq End of Run 43775:
  • 47924 02/18/02 13:49 hcf moller diagnostic scalers fixed
  • 47923 02/18/02 13:48 cdaq Run 43775: Carbon with He
  • 47922 02/18/02 13:42 cdaq End of Run 43774:
  • 47921 02/18/02 13:13 Rondon Empty target image; SEM x looks OK
  • 47920 02/18/02 13:09 cdaq Run 43774: Carbon target, no He, 200 nA
  • 47919 02/18/02 13:07 cdaq End of Run 43773:
  • 47918 02/18/02 12:49 cdaq Run 43773: empty target, 200 nA
  • 47917 02/18/02 12:35 hcf moller results
  • 47916 02/18/02 12:11 cdaq Moller Run 43772: moller run
  • 47915 02/18/02 11:53 cdaq realmoller screen capture
  • 47914 02/18/02 11:52 cdaq Moller MEDM screens
  • 47913 02/18/02 11:50 cdaq Moller Run 43771: moller run
  • 47912 02/18/02 11:44 cdaq injector parameters for Moller
  • 47911 02/18/02 11:25 crabb polarization history
  • 47910 02/18/02 11:23 cdaq End of Run 43770:
  • 47909 02/18/02 10:39 crabb Maintaining polarization
  • 47908 02/18/02 09:29 cdaq Run 43770: NH3 Top +75.9% polarization
  • 47907 02/18/02 09:29 cdaq End of Run 43769:
  • 47906 02/18/02 09:19 hcf s2y'+' vs '-' TDC hits
  • 47904 02/18/02 08:01 cdaq Beam Time Accounting
  • 47903 02/18/02 08:00 hamlet Shift summary
  • 47902 02/18/02 08:00 Raue target screen
  • 47901 02/18/02 07:22 cdaq Run 43769: NH3 Top +70.8% polarization
  • 47900 02/18/02 07:04 Raue run valve problems.
  • 47899 02/18/02 05:31 hamlet Controlled access for target
  • 47898 02/18/02 05:28 cdaq End of Run 43768:
  • 47897 02/18/02 05:03 Raue target screen
  • 47896 02/18/02 04:35 reinhold bpm & bcm screen
  • 47895 02/18/02 04:14 cdaq Run 43768: NH3 Top +71.3% polarization
  • 47894 02/18/02 04:06 hamlet Beam off for QE measurement
  • 47893 02/18/02 04:03 cdaq End of Run 43767:
  • 47892 02/18/02 03:37 Raue target screen
  • 47891 02/18/02 02:38 Raue target screen
  • 47890 02/18/02 02:07 cdaq Run 43767: NH3 Top +70.9% polarization
  • 47889 02/18/02 02:06 cdaq End of Run 43766:
  • 47888 02/18/02 01:36 Raue target screen
  • 47887 02/18/02 00:24 cdaq Beam Time Accounting
  • 47886 02/18/02 00:16 E. Christy Shift Summary
  • 47885 02/18/02 00:09 cdaq Run 43766: NH3 Top +73.3% polarization
  • 47884 02/18/02 00:07 cdaq End of Run 43765:
  • 47883 02/18/02 00:05 cdaq Computer reboots for 2002-02-17
  • Sunday

  • 47882 02/17/02 23:54 samuel top target pol. screen
  • 47881 02/17/02 23:01 E. Christy Next Target anneal: ~8AM Monday.
  • 47880 02/17/02 22:57 samuel polarization screen
  • 47879 02/17/02 21:55 cdaq Run 43765: NH3 Top +75.0% polarization
  • 47878 02/17/02 21:55 samuel top target polarization screen
  • 47877 02/17/02 21:52 cdaq End of Run 43764:
  • 47876 02/17/02 20:53 samuel polarization screen
  • 47875 02/17/02 19:57 samuel polarization for last hour
  • 47874 02/17/02 19:52 cdaq Run 43764: NH3 Top +80.8% polarization
  • 47873 02/17/02 19:49 cdaq End of Run 43763:
  • 47872 02/17/02 18:58 samuel polarization screen
  • 47871 02/17/02 18:55 samuel top target screen of polarization
  • 47870 02/17/02 18:05 samuel polarization screen
  • 47869 02/17/02 17:51 cdaq Run 43763: NH3 Top +80.8% polarization
  • 47868 02/17/02 17:50 cdaq End of Run 43762:
  • 47867 02/17/02 17:44 M Jones Top target raster x=-2.2 y=-1.0 SR rad = 9.5mm
  • 47866 02/17/02 17:34 cdaq Run 43762: NH3 Top +80.8% polarization
  • 47865 02/17/02 17:25 cdaq Run 43761: NH3 Top +80.8% polarization
  • 47864 02/17/02 16:59 samuel top target polarization
  • 47863 02/17/02 16:55 cdaq Run 43760: NH3 Top +82.4% polarization
  • 47862 02/17/02 16:02 cdaq Beam Time Accounting
  • 47861 02/17/02 16:01 jpchen Day shift summary
  • 47860 02/17/02 15:58 crabb Top Target Polarization
  • 47859 02/17/02 15:57 jpchen Hall C beam steering
  • 47858 02/17/02 14:57 cdaq Run 43759: NH3 Top +84.9% polarization
  • 47857 02/17/02 14:31 jpchen Wien angle changing back to 60
  • 47856 02/17/02 14:25 cdaq End of Run 43758:
  • 47855 02/17/02 14:19 cdaq Run 43758: NH3 Top +80.7% polarization
  • 47854 02/17/02 14:19 Crabb Polarization buildup
  • 47853 02/17/02 14:14 jpchen target switched to top and positive pol.
  • 47852 02/17/02 14:11 cdaq Run 43757: NH3 Top +79.4% polarization
  • 47851 02/17/02 13:49 M Jones Empty target and
  • 47850 02/17/02 13:09 jpchen Moller measurement
  • 47849 02/17/02 12:43 cdaq Moller Run 43756: moller
  • 47848 02/17/02 12:42 M JOnes Moller cryo
  • 47847 02/17/02 12:39 M Jones Moller BPM and GUI
  • 47846 02/17/02 12:35 jpchen Injector parameter before Moller
  • 47845 02/17/02 12:01 jpchen Wien angle change, get ready for Moller, moved into Carbon
  • 47844 02/17/02 11:56 cdaq End of Run 43755:
  • 47843 02/17/02 11:35 Crabb Polarization decay
  • 47842 02/17/02 10:45 cdaq Run 43755: NH3 Bot -57.7% polarization
  • 47841 02/17/02 10:05 reinhold moller BPM
  • 47840 02/17/02 10:04 reinhold BPM & BCM screen
  • 47839 02/17/02 09:35 Crabb Polarization history
  • 47838 02/17/02 09:11 cdaq Run 43754: NH3 Bot -59.8% polarization
  • 47837 02/17/02 08:48 jpchen beam back
  • 47836 02/17/02 08:43 cdaq Run 43753: NH3 Bot -60.7% polarization
  • 47835 02/17/02 08:03 L. Gan Shift summary
  • 47834 02/17/02 08:02 B Raue target screen
  • 47833 02/17/02 08:00 cdaq Beam Time Accounting
  • 47832 02/17/02 07:29 cdaq End of Run 43752:
  • 47831 02/17/02 06:25 Raue Target screen
  • 47830 02/17/02 05:45 Raue target screen
  • 47829 02/17/02 05:44 cdaq Run 43752: NH3 Bot -62.6% polarization
  • 47828 02/17/02 05:43 cdaq End of Run 43751:
  • 47827 02/17/02 04:47 Raue target screen
  • 47826 02/17/02 03:34 cdaq Run 43751: NH3 Bot -63.7% polarization
  • 47825 02/17/02 03:31 Raue target screen
  • 47824 02/17/02 03:12 cdaq Run 43750: NH3 Bot -63.7% polarization
  • 47823 02/17/02 02:43 Raue target screen
  • 47822 02/17/02 02:41 Raue Figure of merit study
  • 47821 02/17/02 02:04 cdaq Run 43749: NH3 Bot -65.5% polarization
  • 47820 02/17/02 02:01 cdaq End of Run 43748:
  • 47819 02/17/02 01:38 cdaq Run 43748: NH3 Bot -78.5% polarization
  • 47818 02/17/02 01:25 Brian Raue Stuck run valve
  • 47817 02/17/02 01:24 Rondon Beam current to 85 nA to try better FOM
  • 47816 02/17/02 00:52 cdaq End of Run 43747:
  • 47815 02/17/02 00:05 cdaq Computer reboots for 2002-02-16
  • 47814 02/17/02 00:01 BW Run 43747 NH3 BOT -67%
  • Saturday

  • 47813 02/16/02 23:59 ent shift summary
  • 47812 02/16/02 23:59 cdaq Beam Time Accounting
  • 47811 02/16/02 23:56 cdaq Run 43747: CARBON 0% polarization
  • 47810 02/16/02 23:55 cdaq End of Run 43746:
  • 47809 02/16/02 23:53 samuel polarization screen
  • 47808 02/16/02 23:42 saw cdaqs1 status
  • 47807 02/16/02 22:58 samuel polarization screen
  • 47806 02/16/02 22:54 cdaq Run 43746: NH3 BOT -55% polarization
  • 47805 02/16/02 22:21 cdaq Moller Run 43745: moller
  • 47804 02/16/02 21:59 cdaq Moller Run 43744: moller
  • 47803 02/16/02 21:42 cdaq End of Run 43743:
  • 47802 02/16/02 21:09 cdaq Run 43743: CARBON 0% polarization
  • 47801 02/16/02 21:06 cdaq End of Run 43742:
  • 47800 02/16/02 20:49 crabb Anneal
  • 47799 02/16/02 20:47 cdaq Run 43742: EMPTY 0% polarization
  • 47798 02/16/02 19:29 cdaq End of Run 43741:
  • 47797 02/16/02 19:29 samuel pol screen for top target
  • 47796 02/16/02 19:01 samuel pol.screen
  • 47795 02/16/02 18:52 cdaq Run 43741: Top NH3 -45% polarization
  • 47794 02/16/02 18:49 cdaq End of Run 43740:
  • 47793 02/16/02 17:54 samuel polarization screen
  • 47792 02/16/02 17:46 cdaq Run 43740: Top NH3 -47% polarization
  • 47791 02/16/02 17:45 cdaq End of Run 43739:
  • 47790 02/16/02 16:54 samuel polarization screen
  • 47789 02/16/02 16:42 cdaq Run 43739: Top NH3 -54.4% polarization
  • 47788 02/16/02 16:40 cdaq End of Run 43738:
  • 47787 02/16/02 16:14 jpchen target move
  • 47786 02/16/02 16:11 M Jones Closer look at raster on targets
  • 47785 02/16/02 16:10 crabb Polarization history
  • 47784 02/16/02 16:07 cdaq Beam Time Accounting
  • 47783 02/16/02 16:07 jpchen Day shift summary
  • 47782 02/16/02 15:38 cdaq Run 43738: Top NH3 -61.4% polarization
  • 47781 02/16/02 14:49 cdaq End of Run 43737:
  • 47780 02/16/02 14:23 crabb target screen
  • 47779 02/16/02 13:50 cdaq Run 43737: Bottom NH3 +52% polarization
  • 47778 02/16/02 13:44 cdaq End of Run 43736:
  • 47777 02/16/02 13:42 jpchen Error message on DAQ screen
  • 47776 02/16/02 13:00 cdaq Run 43736: Bottom NH3 +53.5% polarization
  • 47775 02/16/02 12:57 cdaq End of Run 43735:
  • 47774 02/16/02 12:06 crabb Polarization after anneal
  • 47773 02/16/02 12:01 cdaq Run 43735: Bottom NH3 +58% polarization
  • 47772 02/16/02 11:59 crabb Target Polarization
  • 47771 02/16/02 11:58 cdaq End of Run 43734:
  • 47770 02/16/02 11:37 jpchen ROC2 failed and rebooted
  • 47769 02/16/02 11:26 cdaq Run 43734: Top NH3 +77% polarization
  • 47768 02/16/02 11:14 cdaq Run 43733: Top NH3 +77% polarization
  • 47767 02/16/02 11:13 cdaq End of Run 43732:
  • 47766 02/16/02 10:14 cdaq Run 43732: Bottom NH3 +77% polarization
  • 47765 02/16/02 10:06 jpchen HMS magnets set for p=-4.095 GeV
  • 47764 02/16/02 10:01 reinhold Moller: x=y diagonal ok
  • 47763 02/16/02 09:58 reinhold Moller result: ( 72.64 +- 1.31 )% when accidentals removed
  • 47761 02/16/02 09:35 reinhold Moller: realmoller for run 43731
  • 47760 02/16/02 09:34 reinhold Moller: controls & cryo
  • 47759 02/16/02 09:31 reinhold Moller: moller parameters
  • 47758 02/16/02 09:29 cdaq Moller Run 43731: moller
  • 47757 02/16/02 09:27 reinhold Moller: injectyor parameters
  • 47756 02/16/02 09:14 cdaq End of Run 43730:
  • 47755 02/16/02 09:13 jpchen DAQ error message, coda crash.
  • 47754 02/16/02 09:08 cdaq Run 43730: Test Coda, Junk Run
  • 47753 02/16/02 08:39 reinhold BPM & BCM screen
  • 47752 02/16/02 08:26 cdaq End of Run 43728:
  • 47751 02/16/02 08:26 cdaq End of Run 43728:
  • 47750 02/16/02 08:04 Brian Raue Target summary/problem
  • 47749 02/16/02 08:01 cdaq Beam Time Accounting
  • 47748 02/16/02 07:58 L. Gan Shift Summary
  • 47747 02/16/02 07:36 Raue target screen
  • 47746 02/16/02 06:50 cdaq Run 43728: Top NH3 negative 60.1% polarization
  • 47745 02/16/02 06:47 cdaq End of Run 43727:
  • 47744 02/16/02 06:11 Brian Raue target screen
  • 47743 02/16/02 05:10 cdaq Run 43727: Top NH3 negative 60.2% polarization
  • 47742 02/16/02 05:09 cdaq End of Run 43726:
  • 47741 02/16/02 04:38 Brian Raue target screen
  • 47740 02/16/02 03:34 Brian Raue screen grab
  • 47739 02/16/02 03:19 cdaq Run 43726: Top NH3 negative 60.4% polarization
  • 47738 02/16/02 03:17 cdaq End of Run 43725:
  • 47737 02/16/02 02:36 Brian Raue target screen
  • 47736 02/16/02 01:39 Brian Raue target screen
  • 47735 02/16/02 01:39 cdaq Run 43725: Top NH3 negative 61.4% polarization
  • 47734 02/16/02 01:38 cdaq End of Run 43724:
  • 47733 02/16/02 00:34 Brian Raue target screen
  • 47732 02/16/02 00:13 Keppel Shift Summary
  • 47731 02/16/02 00:06 cdaq Beam Time Accounting
  • 47730 02/16/02 00:05 cdaq Computer reboots for 2002-02-15
  • 47729 02/16/02 00:01 cdaq Run 43724: Top NH3 negative 61.4% polarization
  • Friday

  • 47728 02/15/02 23:59 Keppel ROC2 problems
  • 47727 02/15/02 23:56 cdaq Run 43723: Top NH3 negative 61.4% polarization
  • 47726 02/15/02 23:51 Keppel new beam position
  • 47725 02/15/02 23:49 samuel polarization screen.
  • 47724 02/15/02 23:41 cdaq Run 43722: New Target! Top NH3 negative 64% polarization
  • 47723 02/15/02 23:35 cdaq Run 43721: New Target! Top NH3 negative 64% polarization
  • 47722 02/15/02 23:33 cdaq End of Run 43720:
  • 47721 02/15/02 23:10 zeier sem access
  • 47720 02/15/02 22:57 samuel polarization screen
  • 47719 02/15/02 22:49 cdaq Run 43720: TEST RUN ONLY
  • 47718 02/15/02 22:10 Keppel Hall access, target change
  • 47717 02/15/02 22:06 cdaq End of Run 43719:
  • 47716 02/15/02 21:56 samuel pol. screen .
  • 47715 02/15/02 21:21 cdaq Run 43719: beam position tests tgt: Bot NH3 -2.2 0.0
  • 47714 02/15/02 21:18 cdaq End of Run 43718:
  • 47713 02/15/02 21:10 samuel pol. screen
  • 47712 02/15/02 20:00 samuel polarization screen
  • 47711 02/15/02 19:35 cdaq Run 43718: beam position tests tgt: Bot NH3 -2.2 0.0
  • 47710 02/15/02 19:13 cdaq Run 43717: beam position tests tgt: Bot NH3 -2.2 0.0
  • 47709 02/15/02 19:08 cdaq Run 43716: beam position tests tgt: Bot NH3 -2.2 0.0
  • 47708 02/15/02 18:54 samuel polarization screen
  • 47707 02/15/02 18:54 Keppel beam off if not using
  • 47706 02/15/02 18:51 cdaq Run 43715: beam position tests tgt: Bot NH3 -2.2 0.0
  • 47705 02/15/02 18:46 cdaq Run 43714: beam position tests tgt: Bot NH3 -2.2 0.0
  • 47704 02/15/02 18:40 Rondon Target encoder values, new calibration constants
  • 47703 02/15/02 18:06 samuel pol. screen
  • 47702 02/15/02 18:05 samuel pol.screen
  • 47701 02/15/02 17:38 cdaq Run 43713: beam position tests tgt: Bot NH3 -2.2 0.0
  • 47700 02/15/02 17:37 cdaq End of Run 43712:
  • 47699 02/15/02 17:14 samuel polarization correction for bottom proton target
  • 47698 02/15/02 17:08 samuel calibration constants for bottom target
  • 47697 02/15/02 16:45 samuel polarization screen for bottom proton target
  • 47696 02/15/02 16:13 hcf Shift Summary
  • 47695 02/15/02 16:00 cdaq Beam Time Accounting
  • 47694 02/15/02 15:57 hcf moller diag scalers changed
  • 47693 02/15/02 15:53 smithg tgt screen since noon
  • 47692 02/15/02 15:51 cdaq Run 43712: beam position tests tgt: Bot NH3 -2.2 0.0
  • 47691 02/15/02 14:52 hcf waiting for beam
  • 47690 02/15/02 13:27 smithg tgt screen since nmr computer reboot
  • 47689 02/15/02 13:24 M Jones W spectra for NH3 run 43711
  • 47688 02/15/02 13:03 smithg separator valve
  • 47687 02/15/02 13:01 smithg rebooted nmr computer
  • 47686 02/15/02 12:48 cdaq End of Run 43711:
  • 47685 02/15/02 12:31 cdaq Beam pos. variable during 43710
  • 47684 02/15/02 12:25 cdaq Run 43711: beam position tests tgt: Bot NH3 beam position -2.2 0.0
  • 47683 02/15/02 12:22 cdaq End of Run 43710:
  • 47682 02/15/02 11:36 cdaq Run 43710: beam position tests tgt: Bot NH3 -2.2 0.0
  • 47681 02/15/02 10:46 smithg tgt problems fixed
  • 47680 02/15/02 09:49 smithg target problems: separator xfer line
  • 47677 02/15/02 08:18 M Jones Moller results
  • 47676 02/15/02 08:07 reinhold shift check list
  • 47675 02/15/02 07:57 reinhold shift checklist
  • 47674 02/15/02 07:56 cdaq Beam Time Accounting
  • 47673 02/15/02 07:54 cdaq End of Run 43709:
  • 47672 02/15/02 07:42 reinhold bpm & bcm screen
  • 47671 02/15/02 06:50 cdaq Run 43709: last carbon before polarized target -2.2 -1.0
  • 47670 02/15/02 06:30 hcf Moller troubleshooting
  • 47669 02/15/02 06:18 cdaq Moller Run 43708: moller
  • 47668 02/15/02 06:15 frw reboot target VME
  • 47667 02/15/02 05:50 reinhold Moller realmoller
  • 47666 02/15/02 05:38 cdaq Moller Run 43707: moller
  • 47665 02/15/02 05:28 frw attempts at Mollering
  • 47664 02/15/02 04:52 reinhold Moller cryo
  • 47663 02/15/02 04:50 reinhold moller GUI & BPMs
  • 47662 02/15/02 04:49 cdaq Moller Run 43706: moller
  • 47661 02/15/02 04:43 frw pre-Moller epics
  • 47660 02/15/02 04:32 frw carbon position test
  • 47659 02/15/02 04:29 reinhold Moller: injector parameters
  • 47658 02/15/02 04:26 cdaq End of Run 43705:
  • 47657 02/15/02 04:16 cdaq Run 43705: beam position tests CARBON -2.2 -1.0
  • 47656 02/15/02 04:13 cdaq End of Run 43704:
  • 47655 02/15/02 04:13 frw bottom position test
  • 47654 02/15/02 04:08 frw hole position test
  • 47653 02/15/02 04:00 cdaq Run 43704: beam position tests BOTTOM -2.2 -1.0
  • 47652 02/15/02 03:56 cdaq End of Run 43703:
  • 47651 02/15/02 03:40 frw no tracks -- HVs off
  • 47650 02/15/02 03:37 cdaq Run 43703: beam position tests HOLE -2.2 -1.0
  • 47649 02/15/02 03:36 frw top position test
  • 47648 02/15/02 03:35 cdaq End of Run 43702:
  • 47647 02/15/02 03:21 cdaq Run 43702: beam position tests TOP -2.2 -1.0
  • 47646 02/15/02 03:09 frw beam position -2.2 -1.0 FR on
  • 47645 02/15/02 03:08 cdaq End of Run 43701:
  • 47644 02/15/02 03:04 frw beam position study on MT target
  • 47643 02/15/02 02:55 frw beam position -2.0 -1.1
  • 47642 02/15/02 02:53 cdaq Run 43701: beam position tests -2.2 -1.0 FR on
  • 47641 02/15/02 02:51 cdaq End of Run 43700:
  • 47640 02/15/02 02:38 cdaq Run 43700: beam position tests -2.1 -1.0
  • 47639 02/15/02 02:33 frw changed He bottle
  • 47638 02/15/02 02:31 cdaq End of Run 43699:
  • 47637 02/15/02 02:31 frw beam positiom -2.2 -1.5 target nominal
  • 47636 02/15/02 02:10 cdaq Run 43699: beam position tests -2.2 -1.5 target nominal
  • 47635 02/15/02 02:07 cdaq End of Run 43698:
  • 47634 02/15/02 02:07 frw beam position -2.2 0.0 target +0.055
  • 47633 02/15/02 01:48 frw beam position -2.2 0.0
  • 47632 02/15/02 01:46 cdaq Run 43698: beam position tests -2.2, 0.0 target +.055
  • 47631 02/15/02 01:44 cdaq End of Run 43697:
  • 47630 02/15/02 01:30 cdaq Run 43697: beam position tests -2.2, 0.0
  • 47629 02/15/02 01:21 frw beam position for -1.2,0.0
  • 47628 02/15/02 01:16 cdaq End of Run 43696:
  • 47627 02/15/02 01:01 cdaq Run 43696: beam position tests
  • 47626 02/15/02 00:43 frw problem restarting diskwatch
  • 47625 02/15/02 00:41 cdaq End of Run 43695:
  • 47624 02/15/02 00:40 cdaq Run 43695: test
  • 47623 02/15/02 00:05 cdaq Computer reboots for 2002-02-14
  • Thursday

  • 47622 02/14/02 23:57 cdaq End of Run 43694:
  • 47621 02/14/02 23:56 cdaq Run 43694: Cosmic
  • 47619 02/14/02 20:04 jroche hms ready
  • 47618 02/14/02 19:35 zeier new BCM calibs in epics
  • 47617 02/14/02 16:35 reinhold shift check list
  • 47616 02/14/02 16:30 reinhold moved HMS pion collimator in
  • 47615 02/14/02 15:44 Mack updated BCM calibration
  • 47614 02/14/02 15:14 J. Cha HMS maget computer.
  • 47613 02/14/02 14:05 J. Cha The Target Magnet is ON
  • 47612 02/14/02 10:54 HGZ status of the experiment
  • 47611 02/14/02 00:05 cdaq Computer reboots for 2002-02-13
  • Wednesday

  • 47610 02/13/02 22:49 Rondon Separator stable with flow at 55
  • 47609 02/13/02 22:32 Rondon Liquid He in tailpiece.
  • 47608 02/13/02 21:26 donal target leak
  • 47607 02/13/02 16:37 J. Cha Finished Day target shift.
  • 47606 02/13/02 13:35 hcf HMS slits
  • 47605 02/13/02 12:56 reinhold shift checklist
  • 47604 02/13/02 12:37 reinhold HMS slit
  • 47603 02/13/02 11:36 cdaq End of Run 43693:
  • 47602 02/13/02 11:25 mckee target pipline leak
  • 47601 02/13/02 11:08 cdaq Run 43693: Cosmic
  • 47600 02/13/02 10:52 cdaq End of Run 43692:
  • 47599 02/13/02 10:51 cdaq Run 43692: HMS hodoscope test
  • 47598 02/13/02 10:51 cdaq End of Run 43691:
  • 47597 02/13/02 10:50 cdaq Run 43691: HMS hodoscope test
  • 47596 02/13/02 10:50 cdaq End of Run 43690:
  • 47595 02/13/02 10:49 cdaq Run 43690: HMS hodoscope test
  • 47594 02/13/02 10:49 cdaq End of Run 43689:
  • 47593 02/13/02 10:48 cdaq Run 43689: HMS hodoscope test
  • 47592 02/13/02 10:47 cdaq End of Run 43688:
  • 47591 02/13/02 10:47 cdaq Run 43688: HMS hodoscope test
  • 47590 02/13/02 10:45 cdaq End of Run 43687:
  • 47589 02/13/02 10:44 cdaq Run 43687: HMS hodoscope test
  • 47588 02/13/02 10:44 cdaq End of Run 43686:
  • 47587 02/13/02 10:43 cdaq Run 43686: HMS hodoscope test
  • 47586 02/13/02 10:42 cdaq End of Run 43685:
  • 47585 02/13/02 10:42 cdaq Run 43685: HMS hodoscope test
  • 47584 02/13/02 10:41 cdaq End of Run 43684:
  • 47583 02/13/02 10:40 cdaq Run 43684: HMS hodoscope test
  • 47582 02/13/02 10:40 cdaq End of Run 43683:
  • 47581 02/13/02 10:39 cdaq Run 43683: HMS hodoscope test
  • 47580 02/13/02 09:45 cdaq End of Run 43682:
  • 47579 02/13/02 09:43 cdaq Run 43682: HMS hodoscope test
  • 47578 02/13/02 09:42 cdaq End of Run 43681:
  • 47577 02/13/02 09:41 cdaq Run 43681: HMS hodoscope test
  • 47576 02/13/02 09:41 cdaq End of Run 43680:
  • 47575 02/13/02 09:40 cdaq Run 43680: HMS hodoscope test
  • 47574 02/13/02 09:39 cdaq End of Run 43679:
  • 47573 02/13/02 09:39 cdaq Run 43679: HMS hodoscope test
  • 47572 02/13/02 09:38 cdaq End of Run 43678:
  • 47571 02/13/02 09:37 cdaq Run 43678: HMS hodoscope test
  • 47570 02/13/02 09:37 cdaq End of Run 43677:
  • 47569 02/13/02 09:36 cdaq Run 43677: HMS hodoscope test
  • 47568 02/13/02 09:36 cdaq End of Run 43676:
  • 47567 02/13/02 09:35 cdaq Run 43676: HMS hodoscope test
  • 47566 02/13/02 09:34 cdaq End of Run 43675:
  • 47565 02/13/02 09:34 cdaq Run 43675: HMS hodoscope test
  • 47564 02/13/02 09:33 cdaq End of Run 43674:
  • 47563 02/13/02 09:32 cdaq Run 43674: HMS hodoscope test
  • 47562 02/13/02 09:32 cdaq End of Run 43673:
  • 47561 02/13/02 09:31 cdaq Run 43673: HMS hodoscope test
  • 47560 02/13/02 09:31 cdaq End of Run 43672:
  • 47559 02/13/02 09:30 cdaq Run 43672: HMS hodoscope test
  • 47558 02/13/02 09:29 cdaq End of Run 43671:
  • 47557 02/13/02 09:29 cdaq Run 43671: HMS hodoscope test
  • 47556 02/13/02 09:28 cdaq End of Run 43670:
  • 47555 02/13/02 09:27 cdaq Run 43670: HMS hodoscope test
  • 47554 02/13/02 09:27 cdaq End of Run 43669:
  • 47553 02/13/02 09:26 cdaq Run 43669: HMS hodoscope test
  • 47552 02/13/02 09:25 cdaq End of Run 43668:
  • 47551 02/13/02 09:25 cdaq Run 43668: HMS hodoscope test
  • 47550 02/13/02 09:24 cdaq End of Run 43667:
  • 47549 02/13/02 09:24 cdaq Run 43667: HMS hodoscope test
  • 47548 02/13/02 09:23 cdaq End of Run 43666:
  • 47547 02/13/02 09:22 cdaq Run 43666: HMS hodoscope test
  • 47546 02/13/02 09:22 cdaq End of Run 43665:
  • 47545 02/13/02 09:21 cdaq Run 43665: HMS hodoscope test
  • 47544 02/13/02 09:20 cdaq End of Run 43664:
  • 47543 02/13/02 09:20 cdaq Run 43664: HMS hodoscope test
  • 47542 02/13/02 09:19 cdaq End of Run 43663:
  • 47541 02/13/02 09:19 cdaq Run 43663: HMS hodoscope test
  • 47540 02/13/02 09:18 cdaq End of Run 43662:
  • 47539 02/13/02 09:17 cdaq Run 43662: HMS hodoscope test
  • 47538 02/13/02 09:17 gwarren Things to be aware of
  • 47537 02/13/02 09:16 cdaq End of Run 43661:
  • 47536 02/13/02 09:16 cdaq Run 43661: HMS hodoscope test
  • 47535 02/13/02 09:15 cdaq End of Run 43660:
  • 47534 02/13/02 09:14 cdaq Run 43660: HMS hodoscope test
  • 47533 02/13/02 09:14 cdaq End of Run 43659:
  • 47532 02/13/02 09:13 cdaq Run 43659: HMS hodoscope test
  • 47531 02/13/02 09:12 cdaq End of Run 43658:
  • 47530 02/13/02 09:11 cdaq Run 43658: HMS hodoscope test
  • 47529 02/13/02 09:11 cdaq End of Run 43657:
  • 47528 02/13/02 09:10 cdaq Run 43657: HMS hodoscope test
  • 47527 02/13/02 09:08 cdaq End of Run 43656:
  • 47526 02/13/02 09:07 cdaq Run 43656: HMS hodoscope test
  • 47525 02/13/02 07:58 dfawcett magnet run down
  • 47524 02/13/02 06:10 dfawcett TE data points
  • 47523 02/13/02 04:52 dfawcett TE data points
  • 47522 02/13/02 03:58 dfawcett second TE
  • 47521 02/13/02 02:27 dfawcett TE calculation
  • 47520 02/13/02 00:05 cdaq Computer reboots for 2002-02-12
  • Tuesday

  • 47519 02/12/02 20:53 zeier SEM work
  • 47518 02/12/02 20:48 cdaq End of Run 43655:
  • 47517 02/12/02 20:47 cdaq Run 43655: HMS hodoscope test
  • 47516 02/12/02 20:47 cdaq End of Run 43654:
  • 47515 02/12/02 20:46 cdaq Run 43654: HMS hodoscope test
  • 47514 02/12/02 20:46 cdaq End of Run 43653:
  • 47513 02/12/02 20:45 cdaq Run 43653: HMS hodoscope test
  • 47512 02/12/02 20:44 cdaq End of Run 43652:
  • 47511 02/12/02 20:43 cdaq Run 43652: HMS hodoscope test
  • 47510 02/12/02 20:43 cdaq End of Run 43651:
  • 47509 02/12/02 20:40 cdaq Run 43651: HMS hodoscope test
  • 47508 02/12/02 20:40 cdaq End of Run 43650:
  • 47507 02/12/02 20:39 cdaq Run 43650: HMS hodoscope test
  • 47506 02/12/02 20:38 cdaq End of Run 43649:
  • 47505 02/12/02 20:37 cdaq Run 43649: HMS hodoscope test
  • 47504 02/12/02 20:37 cdaq End of Run 43648:
  • 47503 02/12/02 20:36 cdaq Run 43648: HMS hodoscope test
  • 47502 02/12/02 20:35 cdaq End of Run 43647:
  • 47501 02/12/02 20:31 cdaq Run 43647: HMS hodoscope test
  • 47500 02/12/02 20:30 cdaq End of Run 43646:
  • 47499 02/12/02 20:29 cdaq Run 43646: HMS hodoscope test
  • 47498 02/12/02 20:28 cdaq End of Run 43645:
  • 47497 02/12/02 20:27 cdaq Run 43645: HMS hodoscope test
  • 47496 02/12/02 20:27 cdaq End of Run 43644:
  • 47495 02/12/02 20:26 cdaq Run 43644: HMS hodoscope test
  • 47494 02/12/02 20:25 cdaq End of Run 43643:
  • 47493 02/12/02 20:25 cdaq Run 43643: HMS hodoscope test
  • 47492 02/12/02 20:24 cdaq End of Run 43642:
  • 47491 02/12/02 20:23 cdaq Run 43642: HMS hodoscope test
  • 47490 02/12/02 20:23 cdaq End of Run 43641:
  • 47489 02/12/02 20:21 cdaq Run 43641: HMS hodoscope test
  • 47488 02/12/02 20:21 cdaq End of Run 43640:
  • 47487 02/12/02 20:18 cdaq Run 43640: HMS hodoscope test
  • 47486 02/12/02 20:18 cdaq End of Run 43639:
  • 47485 02/12/02 20:17 cdaq Run 43639: HMS hodoscope test
  • 47484 02/12/02 20:16 cdaq End of Run 43638:
  • 47483 02/12/02 20:15 cdaq Run 43638: HMS hodoscope test
  • 47482 02/12/02 20:14 cdaq End of Run 43637:
  • 47481 02/12/02 20:13 cdaq Run 43637: HMS hodoscope test
  • 47480 02/12/02 20:13 cdaq End of Run 43636:
  • 47479 02/12/02 20:12 cdaq Run 43636: HMS hodoscope test
  • 47478 02/12/02 20:12 cdaq End of Run 43635:
  • 47477 02/12/02 20:11 cdaq Run 43635: HMS hodoscope test
  • 47476 02/12/02 20:10 cdaq End of Run 43634:
  • 47475 02/12/02 20:09 cdaq Run 43634: HMS hodoscope test
  • 47474 02/12/02 20:08 cdaq End of Run 43633:
  • 47473 02/12/02 20:08 cdaq Run 43633: HMS hodoscope test
  • 47472 02/12/02 20:07 cdaq End of Run 43632:
  • 47471 02/12/02 20:06 cdaq Run 43632: HMS hodoscope test
  • 47470 02/12/02 20:06 cdaq End of Run 43631:
  • 47469 02/12/02 20:05 cdaq Run 43631: HMS hodoscope test
  • 47468 02/12/02 20:04 cdaq End of Run 43630:
  • 47467 02/12/02 20:03 cdaq Run 43630: HMS hodoscope test
  • 47466 02/12/02 20:03 cdaq End of Run 43629:
  • 47465 02/12/02 20:02 cdaq Run 43629: HMS hodoscope test
  • 47464 02/12/02 20:01 cdaq End of Run 43628:
  • 47463 02/12/02 20:01 cdaq Run 43628: HMS hodoscope test
  • 47462 02/12/02 20:00 cdaq End of Run 43627:
  • 47461 02/12/02 19:59 cdaq Run 43627: HMS hodoscope test
  • 47460 02/12/02 19:59 cdaq End of Run 43626:
  • 47459 02/12/02 19:55 cdaq Run 43626: HMS hodoscope test
  • 47458 02/12/02 19:55 cdaq End of Run 43625:
  • 47457 02/12/02 19:54 cdaq Run 43625: HMS hodoscope test
  • 47456 02/12/02 19:53 cdaq End of Run 43624:
  • 47455 02/12/02 19:51 cdaq Run 43624: HMS hodoscope test
  • 47454 02/12/02 19:47 cdaq End of Run 43623:
  • 47453 02/12/02 19:45 cdaq Run 43623: HMS hodoscope test
  • 47452 02/12/02 19:44 cdaq End of Run 43622:
  • 47451 02/12/02 19:38 cdaq Run 43622: HMS hodoscope test
  • 47450 02/12/02 19:37 cdaq End of Run 43621:
  • 47449 02/12/02 19:31 cdaq Run 43621: HMS hodoscope test
  • 47448 02/12/02 19:29 cdaq End of Run 43620:
  • 47447 02/12/02 19:26 cdaq Run 43620: HMS hodoscope test
  • 47446 02/12/02 19:25 cdaq End of Run 43619:
  • 47445 02/12/02 19:12 cdaq Run 43619: HMS hodoscope test
  • 47444 02/12/02 19:12 cdaq End of Run 43618:
  • 47443 02/12/02 19:08 cdaq Run 43618: HMS hodoscope test
  • 47442 02/12/02 19:08 cdaq End of Run 43617:
  • 47441 02/12/02 18:57 cdaq Run 43617: HMS hodoscope test
  • 47440 02/12/02 18:57 cdaq End of Run 43616:
  • 47439 02/12/02 18:53 cdaq Run 43616: HMS hodoscope test
  • 47438 02/12/02 18:27 cdaq End of Run 43615:
  • 47437 02/12/02 18:25 cdaq Run 43615: HMS hodoscope test
  • 47436 02/12/02 18:21 cdaq End of Run 43614:
  • 47435 02/12/02 17:55 cdaq Run 43614: HMS hodoscope test
  • 47434 02/12/02 17:47 cdaq Run 43613: HMS hodoscope test
  • 47433 02/12/02 17:39 cdaq End of Run 43612:
  • 47432 02/12/02 17:38 cdaq Run 43612: HMS hodoscope test
  • 47431 02/12/02 16:12 cdaq Beam Time Accounting
  • 47430 02/12/02 16:07 reinhold shift checklist
  • 47429 02/12/02 12:12 reinhold HMS shutter closed; door opened
  • 47428 02/12/02 07:40 gwarren Hall is open
  • 47427 02/12/02 06:47 cdaq Beam Time Accounting
  • 47426 02/12/02 06:20 yprok target status
  • 47425 02/12/02 06:03 cdaq End of Run 43611:
  • 47424 02/12/02 05:59 Norum Run
  • 47423 02/12/02 05:13 yprok target polarization
  • 47422 02/12/02 04:47 cdaq Run 43611: Bottom ND3 pol=26.2%
  • 47421 02/12/02 04:45 cdaq End of Run 43610:
  • 47420 02/12/02 03:58 yprok target polarization
  • 47419 02/12/02 03:43 Norum moeller measurement: 69.2+-1.3%
  • 47418 02/12/02 03:12 cdaq Run 43610: Bottom ND3 pol=-39.5%
  • 47417 02/12/02 02:53 yprok target polarization
  • 47416 02/12/02 02:17 mack real moeller screen
  • 47415 02/12/02 02:15 cdaq Moller Run 43609: moller
  • 47414 02/12/02 02:13 mack moeller and cryo gui
  • 47413 02/12/02 00:10 cdaq Beam Time Accounting
  • 47412 02/12/02 00:08 E. Christy Shift Summary
  • 47411 02/12/02 00:05 cdaq Computer reboots for 2002-02-11
  • Monday

  • 47410 02/11/02 23:43 cdaq End of Run 43608:
  • 47409 02/11/02 23:17 mack bpm screen
  • 47408 02/11/02 23:08 cdaq Run 43608: Bottom ND3 pol=-20.2%
  • 47407 02/11/02 22:51 cdaq End of Run 43607:
  • 47406 02/11/02 22:19 mckee target screen
  • 47405 02/11/02 21:42 mckee target motion mask readout
  • 47404 02/11/02 21:16 cdaq Run 43607: Bottom ND3 pol=-22.1%
  • 47403 02/11/02 21:14 cdaq End of Run 43606:
  • 47402 02/11/02 20:47 mckee target screen
  • 47401 02/11/02 19:38 Sawatzky Leakage: 1.0%
  • 47400 02/11/02 19:31 cdaq Run 43606: Bottom ND3 pol=-23.8%
  • 47399 02/11/02 19:25 mckee target buildup
  • 47398 02/11/02 18:55 mckee Anneal 95K/60min
  • 47397 02/11/02 17:57 gwarren HV trip feature
  • 47396 02/11/02 17:30 Sawatzky Reboot Q3 control computer
  • 47395 02/11/02 16:45 Sawatzky Wire chamber HVs tripped off. Minor gui issue
  • 47394 02/11/02 16:30 cdaq End of Run 43605:
  • 47393 02/11/02 16:17 Sawatzky Q3 readout display frozen
  • 47392 02/11/02 16:14 Sawatzky Shift checklist scan
  • 47391 02/11/02 16:06 cdaq Beam Time Accounting
  • 47390 02/11/02 16:04 reinhold shift summary
  • 47389 02/11/02 16:01 J. Cha Day target shift summary
  • 47388 02/11/02 15:43 cdaq Run 43605: Bottom ND3 pol=+22.1%
  • 47387 02/11/02 15:42 reinhold increase current to 150nA
  • 47386 02/11/02 15:37 cdaq End of Run 43604:
  • 47385 02/11/02 15:29 Sawatzky BPM snap
  • 47384 02/11/02 15:11 Sawatzky Downstream Right BLM very low
  • 47383 02/11/02 14:59 J. Cha PDP Screen
  • 47382 02/11/02 14:22 cdaq Run 43604: Bottom ND3 pol=+21.1%
  • 47381 02/11/02 14:05 J. Cha PDP Screen
  • 47380 02/11/02 13:40 reinhold no beam (Hall A energy)
  • 47379 02/11/02 13:34 cdaq End of Run 43603:
  • 47378 02/11/02 13:28 cdaq Run 43603: Bottom ND3 pol=+31.1%
  • 47377 02/11/02 13:25 reinhold run43602 stopped x=-2.2!!
  • 47376 02/11/02 13:23 cdaq End of Run 43602:
  • 47375 02/11/02 12:53 J. Cha PDP Screen
  • 47374 02/11/02 12:24 cdaq Run 43602: Bottom ND3 pol=+23.7%
  • 47373 02/11/02 12:23 cdaq End of Run 43601:
  • 47372 02/11/02 12:21 reinhold beam position unstable
  • 47371 02/11/02 12:18 J. Cha Summary of Anneal
  • 47370 02/11/02 11:51 J. Cha PDP Screen
  • 47369 02/11/02 10:50 J. Cha PDP Screen
  • 47368 02/11/02 10:46 cdaq Run 43601: Bottom ND3 pol=+31.1%
  • 47367 02/11/02 10:36 hcf Moller: analyzer or hardware?
  • 47366 02/11/02 10:16 J. Cha PDP Screen
  • 47365 02/11/02 10:12 J. Cha Finishied Anneal
  • 47364 02/11/02 08:47 Sawatzky Owl Shift Summary
  • 47363 02/11/02 08:44 cdaq Beam Time Accounting
  • 47362 02/11/02 08:30 reinhold moller analyzer broken
  • 47361 02/11/02 08:04 cdaq Moller Run 43600: moller 100 nA
  • 47360 02/11/02 07:46 cdaq Moller Run 43599: moller
  • 47359 02/11/02 06:41 cdaq End of Run 43598:
  • 47358 02/11/02 06:28 jyun tgt screen
  • 47357 02/11/02 05:50 cdaq Run 43598: Bottom ND3 pol=-14.2%
  • 47356 02/11/02 05:48 cdaq End of Run 43597:
  • 47355 02/11/02 04:49 jyun tgt screen
  • 47354 02/11/02 04:12 cdaq Run 43597: Bottom ND3 pol=-15.5%
  • 47353 02/11/02 04:10 cdaq End of Run 43596:
  • 47352 02/11/02 02:39 Sawatzky Leakage test ( < 1%)
  • 47351 02/11/02 02:33 cdaq Run 43596: Bottom ND3 pol=-19.4%
  • 47350 02/11/02 02:22 cdaq End of Run 43595:
  • 47349 02/11/02 02:05 Sawatzky Fix: Can't telnet in to hctsv3
  • 47348 02/11/02 00:45 cdaq Run 43595: Bottom ND3 pol=-19.5%
  • 47347 02/11/02 00:44 cdaq End of Run 43594:
  • 47346 02/11/02 00:05 cdaq Computer reboots for 2002-02-10
  • 47345 02/11/02 00:03 Danagoulian SHIFT SUMMARY
  • 47344 02/11/02 00:00 cdaq Beam Time Accounting
  • Sunday

  • 47343 02/10/02 23:15 jyun tgt screen
  • 47342 02/10/02 23:03 cdaq Run 43594: Bottom ND3 pol=-21.3%
  • 47341 02/10/02 23:02 cdaq End of Run 43593:
  • 47340 02/10/02 22:22 Sawatzky BPM screen snap
  • 47339 02/10/02 21:26 cdaq Run 43593: Bottom ND3 pol=-22.6%
  • 47338 02/10/02 21:25 jyun tgt screen
  • 47337 02/10/02 20:35 Danagoulian Moller run
  • 47336 02/10/02 20:19 Danagoulian Moller run
  • 47335 02/10/02 20:15 cdaq Moller Run 43592: moller
  • 47334 02/10/02 20:06 cdaq Moller Run 43590: moller
  • 47333 02/10/02 19:30 cdaq Moller Run 43588: moller
  • 47332 02/10/02 19:02 Danagoulian Leakage test
  • 47331 02/10/02 18:43 cdaq End of Run 43587:
  • 47330 02/10/02 17:54 cdaq Run 43587: Empty target
  • 47329 02/10/02 17:40 cdaq End of Run 43586:
  • 47328 02/10/02 16:17 cdaq Beam Time Accounting
  • 47327 02/10/02 16:15 cdaq Run 43586: Bottom ND3 pol=+18.7%
  • 47326 02/10/02 15:58 jyun tgt screen
  • 47325 02/10/02 15:57 lcsmith Shift Summary
  • 47324 02/10/02 15:25 cdaq End of Run 43585:
  • 47323 02/10/02 14:57 Elaasar Target PDP
  • 47322 02/10/02 13:52 Elaasar Target PDP
  • 47321 02/10/02 13:44 cdaq Run 43585: Bottom ND3 pol=-26%
  • 47320 02/10/02 13:43 cdaq End of Run 43584:
  • 47319 02/10/02 13:01 Elaasar PDP
  • 47318 02/10/02 12:26 nsavvinv BPM screen
  • 47317 02/10/02 12:07 Elaasar PDP
  • 47316 02/10/02 12:05 Elaasar Target computer crashed
  • 47315 02/10/02 11:56 cdaq Run 43584: Bottom ND3 pol=-32%
  • 47314 02/10/02 11:41 cdaq End of Run 43583:
  • 47313 02/10/02 11:38 cdaq Run 43583: Bottom ND3 pol=+35%
  • 47312 02/10/02 11:03 Elaasar PDP
  • 47311 02/10/02 10:52 lcsmith Status
  • 47310 02/10/02 10:44 elaasar PDP after annealing
  • 47309 02/10/02 08:24 D.E.McNulty target
  • 47308 02/10/02 08:05 mack shift summary
  • 47307 02/10/02 08:02 cdaq Beam Time Accounting
  • 47306 02/10/02 07:42 cdaq End of Run 43582:
  • 47305 02/10/02 06:25 cdaq Run 43582: Bottom ND3 pol=-18.5%
  • 47304 02/10/02 06:24 cdaq End of Run 43581:
  • 47303 02/10/02 05:03 cdaq Run 43581: Bottom ND3 pol=-19.3
  • 47302 02/10/02 05:02 cdaq End of Run 43580:
  • 47301 02/10/02 03:54 cdaq Run 43580: Bottom ND3 pol=-19.4%
  • 47300 02/10/02 03:53 cdaq End of Run 43579:
  • 47299 02/10/02 02:37 cdaq Run 43579: Bottom ND3 pol=-20.5%
  • 47298 02/10/02 02:35 cdaq End of Run 43578:
  • 47297 02/10/02 02:26 Sawatzky BPM screen snap
  • 47296 02/10/02 02:23 Sawatzky Can't telnet in to hctsv3 to check HMS slit position
  • 47295 02/10/02 01:31 Sawatzky Leakage: 1.4%
  • 47294 02/10/02 01:29 cdaq Run 43578: Bottom ND3 pol=+19.2%
  • 47293 02/10/02 01:14 Sawatzky Leakage: 9.8%
  • 47292 02/10/02 00:20 Danagoulian Shift summary
  • 47291 02/10/02 00:19 cdaq Beam Time Accounting
  • 47290 02/10/02 00:05 cdaq Computer reboots for 2002-02-09
  • Saturday

  • 47289 02/09/02 23:32 Sawatzky Moller run: P=67.75+- 1.17
  • 47288 02/09/02 23:08 M Jones Moller: Bpm and GUI
  • 47287 02/09/02 23:08 Sawatzky realmoller snapshot
  • 47286 02/09/02 23:06 cdaq Moller Run 43577: moller
  • 47285 02/09/02 23:02 Sawatzky Moeller: injector settings 2
  • 47284 02/09/02 22:55 Sawatzky Leakage test: 3.5%
  • 47283 02/09/02 22:47 Sawatzky Moeller: injector params
  • 47282 02/09/02 22:43 cdaq End of Run 43576:
  • 47281 02/09/02 21:54 cdaq Run 43576: empty target
  • 47280 02/09/02 21:42 Sawatzky Problem with He gas bottle (leak?)
  • 47279 02/09/02 21:26 cdaq End of Run 43575:
  • 47278 02/09/02 21:18 cdaq Run 43575: Bottom ND3 pol=+19.2%
  • 47277 02/09/02 21:16 cdaq End of Run 43574:
  • 47276 02/09/02 20:32 cdaq Run 43574: Bottom ND3 pol=+19.4%
  • 47275 02/09/02 20:27 cdaq End of Run 43573:
  • 47274 02/09/02 19:19 cdaq Run 43573: Bottom ND3 pol=+21.7%
  • 47273 02/09/02 19:14 cdaq End of Run 43572:
  • 47272 02/09/02 18:54 jyun tgt screen last 3 hours
  • 47271 02/09/02 18:40 cdaq Run 43572: Bottom ND3 pol=+24.8%
  • 47270 02/09/02 18:39 cdaq End of Run 43571:
  • 47269 02/09/02 18:10 nsavvinv shift checklist scan
  • 47268 02/09/02 18:03 nsavvinv BPM screen
  • 47267 02/09/02 17:29 cdaq Run 43571: Bottom ND3 pol=+26.2%
  • 47266 02/09/02 17:22 cdaq End of Run 43570:
  • 47265 02/09/02 16:13 cdaq Run 43570: Bottom ND3 pol=+36.6%
  • 47264 02/09/02 16:07 Elaasar Empty target position
  • 47263 02/09/02 16:07 cdaq Beam Time Accounting
  • 47262 02/09/02 16:05 lcsmith Shift Summary
  • 47261 02/09/02 16:05 elaasar PDP Display
  • 47260 02/09/02 15:40 cdaq End of Run 43569:
  • 47259 02/09/02 15:03 Elaasar PDP Display
  • 47258 02/09/02 15:01 cdaq Run 43569: Bottom ND3 pol=+35%
  • 47257 02/09/02 14:55 Elaasar Frequency meter
  • 47256 02/09/02 14:47 Elaasar PDP after annealing
  • 47255 02/09/02 14:17 lcsmith Moller BPMs
  • 47254 02/09/02 14:16 lcsmith Moller rates
  • 47253 02/09/02 13:57 cdaq Moller Run 43568: moller run at 150 nA
  • 47252 02/09/02 13:54 Elaasar Charge on the target
  • 47251 02/09/02 13:36 lcsmith Moller screens
  • 47250 02/09/02 13:34 cdaq Moller Run 43567: moller Run 1 100 nA
  • 47249 02/09/02 13:14 lcsmith Hall A Leakage
  • 47248 02/09/02 12:39 elaasar PDP before anneal
  • 47247 02/09/02 12:33 cdaq Run 43566: Bottom ND3 pol=-14.1%
  • 47246 02/09/02 11:56 cdaq End of Run 43565:
  • 47245 02/09/02 11:03 Elaasar PDP Display
  • 47244 02/09/02 10:48 cdaq Run 43565: Bottom ND3 pol=-14.1%
  • 47243 02/09/02 10:46 cdaq End of Run 43564:
  • 47242 02/09/02 10:28 elaasar PDP Display after rebooting the target Computer
  • 47241 02/09/02 10:24 Elaasar Target VME
  • 47240 02/09/02 10:22 Elaasar PDP Computer crashed
  • 47239 02/09/02 09:30 cdaq Run 43564: Bottom ND3 pol=-16.0%
  • 47238 02/09/02 09:29 cdaq End of Run 43563:
  • 47237 02/09/02 09:02 Elaasar PDP Display
  • 47236 02/09/02 08:25 cdaq Run 43563: Bottom ND3 pol=-18.5%
  • 47235 02/09/02 08:24 cdaq End of Run 43562:
  • 47234 02/09/02 08:15 mack owl shift summary
  • 47233 02/09/02 08:14 cdaq Beam Time Accounting
  • 47232 02/09/02 07:18 khandaker BCM, BPM screen shots
  • 47231 02/09/02 07:11 cdaq Run 43562: Bottom ND3 pol=-17.9%
  • 47230 02/09/02 07:07 cdaq End of Run 43561:
  • 47229 02/09/02 06:00 cdaq Run 43561: Bottom ND3 pol=-14.1%
  • 47228 02/09/02 05:58 cdaq End of Run 43560:
  • 47227 02/09/02 04:54 cdaq Run 43560: Bottom ND3 pol=-16.0%
  • 47226 02/09/02 04:51 cdaq End of Run 43559:
  • 47225 02/09/02 03:43 cdaq Run 43559: Bottom ND3 pol=-19.1%
  • 47224 02/09/02 02:31 cdaq End of Run 43558:
  • 47223 02/09/02 02:18 cdaq Run 43558: Bottom ND3 pol=-19.6%
  • 47222 02/09/02 02:14 cdaq End of Run 43557:
  • 47221 02/09/02 01:12 cdaq Run 43557: Bottom ND3 pol=-22.6%
  • 47220 02/09/02 00:53 abdellah checklist
  • 47219 02/09/02 00:39 cdaq Beam Time Accounting
  • 47218 02/09/02 00:39 E. Christy Shift summary
  • 47217 02/09/02 00:05 cdaq Computer reboots for 2002-02-08
  • 47216 02/09/02 00:01 nsavvinv target anneal & polarization buildup
  • Friday

  • 47215 02/08/02 22:57 E. Christy Current leakage: 1.2%
  • 47214 02/08/02 22:29 cdaq End of Run 43556:
  • 47213 02/08/02 21:45 cdaq Run 43556: Empty target(no He)
  • 47212 02/08/02 21:21 cdaq End of Run 43555:
  • 47211 02/08/02 21:00 nsavvinv target polarization screen
  • 47210 02/08/02 20:38 cdaq Run 43555: Bottom ND3
  • 47209 02/08/02 20:37 cdaq End of Run 43554:
  • 47208 02/08/02 20:00 nsavvinv target polarization screen
  • 47207 02/08/02 19:58 E. Christy Beam Current increased to 150 nA, Polarization at 17%
  • 47206 02/08/02 19:54 cdaq Run 43554: Bottom ND3
  • 47205 02/08/02 19:35 nsavvinv polarization problems
  • 47204 02/08/02 19:26 cdaq End of Run 43553:
  • 47203 02/08/02 18:35 cdaq Run 43553: Bottom ND3
  • 47202 02/08/02 18:34 cdaq End of Run 43552:
  • 47201 02/08/02 18:03 nsavvinv target polarization screen
  • 47200 02/08/02 17:33 cdaq Run 43552: Bottom ND3
  • 47199 02/08/02 17:21 nsavvinv mw frequency readout
  • 47198 02/08/02 17:20 cdaq End of Run 43551:
  • 47197 02/08/02 16:59 nsavvinv target polarization screen
  • 47196 02/08/02 16:26 cdaq Run 43551: Bottom ND3
  • 47195 02/08/02 16:23 cdaq End of Run 43550:
  • 47194 02/08/02 16:07 gomez BPM@run# 43550
  • 47193 02/08/02 16:04 elaasar PDP Display
  • 47192 02/08/02 16:01 lcsmith Shift Summary
  • 47191 02/08/02 16:01 cdaq Beam Time Accounting
  • 47190 02/08/02 15:47 elaasar Target shift summary
  • 47189 02/08/02 15:20 cdaq Run 43550: Bottom ND3
  • 47188 02/08/02 15:19 cdaq End of Run 43549:
  • 47187 02/08/02 15:03 elaasar PDP Display
  • 47186 02/08/02 14:50 elaasar The Charge on the target
  • 47185 02/08/02 14:21 elaasar PDP Display
  • 47184 02/08/02 14:16 cdaq Run 43549: Bottom ND3
  • 47183 02/08/02 13:38 hcf LN2 limit set back down
  • 47182 02/08/02 13:21 cdaq End of Run 43548:
  • 47181 02/08/02 12:50 cdaq Run 43548: Carbon helium
  • 47180 02/08/02 12:40 cdaq End of Run 43547:
  • 47179 02/08/02 12:10 cdaq Run 43547: Carbon w/o helium
  • 47178 02/08/02 11:35 J Lichtensta Moller runs,Beam polarization
  • 47177 02/08/02 11:05 cdaq Moller Run 43546: moller run 2
  • 47176 02/08/02 10:50 lcsmith Moller cryo screen
  • 47175 02/08/02 10:49 lcsmith Moller screens
  • 47174 02/08/02 10:44 cdaq Moller Run 43545: moller
  • 47173 02/08/02 09:34 lcsmith data logger
  • 47172 02/08/02 08:15 cdaq End of Run 43544:
  • 47171 02/08/02 08:09 jroche owl ahift summary
  • 47170 02/08/02 08:08 cdaq Beam Time Accounting
  • 47169 02/08/02 07:54 cdaq Run 43544: Bot Cell, I=100 nA, tgt pol -19.0%
  • 47168 02/08/02 07:53 cdaq End of Run 43543:
  • 47167 02/08/02 07:51 samuel polarization screen
  • 47166 02/08/02 07:34 samuel total charge throgh the target
  • 47165 02/08/02 07:25 J Lichtensta gas
  • 47164 02/08/02 06:59 jroche bpm screens
  • 47163 02/08/02 06:58 samuel pdp screen
  • 47162 02/08/02 06:07 jroche hall A leakage
  • 47161 02/08/02 06:05 cdaq Run 43543: Bot Cell, I=100 nA, tgt pol -19.2%
  • 47160 02/08/02 05:55 samuel pol.screen
  • 47159 02/08/02 05:55 cdaq End of Run 43542:
  • 47158 02/08/02 05:01 samuel pol. screen
  • 47157 02/08/02 04:05 jroche epics value at beginning of run 43542
  • 47156 02/08/02 04:01 cdaq Run 43542: Bot Cell, I=100 nA, tgt pol -19.0%
  • 47155 02/08/02 03:59 cdaq End of Run 43541:
  • 47154 02/08/02 03:55 samuel polarization screen
  • 47153 02/08/02 03:03 samuel pol. screen
  • 47152 02/08/02 02:11 cdaq Run 43541: Bot Cell, I=100 nA, tgt pol -19.9%
  • 47151 02/08/02 02:10 cdaq End of Run 43540:
  • 47150 02/08/02 01:54 samuel pol. screen
  • 47149 02/08/02 01:05 samuel polarization screen
  • 47148 02/08/02 00:28 cdaq Run 43540: Bot Cell, I=100 nA, tgt pol -17.5%
  • 47147 02/08/02 00:26 cdaq End of Run 43539:
  • 47146 02/08/02 00:07 cdaq Beam Time Accounting
  • 47145 02/08/02 00:06 E. Christy Shift Summary
  • 47144 02/08/02 00:05 cdaq Computer reboots for 2002-02-07
  • Thursday

  • 47143 02/07/02 22:59 nsavvinv target polarization screen
  • 47142 02/07/02 22:51 E. Christy Back to Production ND2 running
  • 47141 02/07/02 22:39 nsavvinv target anneal and polarization buildup
  • 47140 02/07/02 22:33 cdaq Run 43539: Bot Cell, I=100 nA, tgt pol -19.0%
  • 47139 02/07/02 22:26 cdaq End of Run 43538:
  • 47138 02/07/02 22:02 cdaq Run 43538: Carbon, I=200 nA,
  • 47137 02/07/02 21:22 E. Christy Beam of while polarizing bottom target
  • 47136 02/07/02 21:08 abdellah checklist
  • 47135 02/07/02 21:04 cdaq End of Run 43537:
  • 47134 02/07/02 21:01 abdellah bpm
  • 47133 02/07/02 20:54 cdaq Run 43537: Carbon, I=200 nA
  • 47132 02/07/02 20:41 cdaq End of Run 43536:
  • 47131 02/07/02 19:58 cdaq Run 43536: Carbon Target, No He, I=200 nA,
  • 47130 02/07/02 19:46 cdaq End of Run 43535:
  • 47129 02/07/02 19:33 cdaq Run 43535: Empty Target I=200 nA,
  • 47128 02/07/02 19:30 cdaq End of Run 43534:
  • 47127 02/07/02 18:50 cdaq Run 43534: Empty Target, no He, I=200 nA, tgt pol +14.5%
  • 47126 02/07/02 18:07 cdaq End of Run 43533:
  • 47125 02/07/02 17:43 Rondon Attention Perlscript experts: beamcount.pl issue
  • 47124 02/07/02 17:06 nsavvinv target polarization screen
  • 47123 02/07/02 16:58 cdaq Run 43533: Bot Cell, I=150 nA, tgt pol +14.5%
  • 47122 02/07/02 16:56 E. Christy Beam Current increased
  • 47121 02/07/02 16:51 cdaq End of Run 43532:
  • 47120 02/07/02 16:24 cdaq Run 43532: Bot Cell, I=100 nA, tgt pol +18.3%
  • 47119 02/07/02 16:22 cdaq End of Run 43531:
  • 47118 02/07/02 16:05 elaasar The Charge on the bottom target
  • 47117 02/07/02 16:01 elaasar PDP Display
  • 47116 02/07/02 15:54 lcsmith Shift Summary
  • 47115 02/07/02 15:54 cdaq Beam Time Accounting
  • 47114 02/07/02 14:58 elaasar PDP Display
  • 47113 02/07/02 14:41 cdaq Run 43531: Bot Cell, I=100 nA, tgt pol +20.8%
  • 47112 02/07/02 14:40 cdaq End of Run 43530:
  • 47111 02/07/02 14:00 elaasar PDP Display
  • 47110 02/07/02 13:27 gomez BPM screen @ run# 43530
  • 47109 02/07/02 13:01 cdaq Run 43530: Bot Cell, I=100 nA, tgt pol +24.0%
  • 47108 02/07/02 13:01 elaasar PDP Display
  • 47107 02/07/02 13:00 cdaq End of Run 43529:
  • 47106 02/07/02 12:32 lcsmith BLM UP L
  • 47105 02/07/02 11:59 elaasar PDP Display
  • 47104 02/07/02 11:13 cdaq Run 43529: Bot Cell, I=100 nA, tgt pol +28.8%
  • 47103 02/07/02 11:11 cdaq End of Run 43528:
  • 47102 02/07/02 11:03 elaasar PDP Display
  • 47101 02/07/02 10:28 cdaq Run 43528: carbon run w/helium at 200 nA
  • 47100 02/07/02 10:25 cdaq End of Run 43527:
  • 47099 02/07/02 10:21 elaasar PDP Display after the anneal
  • 47098 02/07/02 10:15 cdaq Run 43527: Carbon
  • 47097 02/07/02 09:51 lcsmith Moller results
  • 47096 02/07/02 09:30 cdaq Moller Run 43526: 3rd moller run . Hall A now at 20 uA.
  • 47095 02/07/02 09:13 cdaq Moller Run 43525: 2nd moller run
  • 47094 02/07/02 09:03 lcsmith Hall A leakage
  • 47093 02/07/02 09:00 M Jones Moller BPMs and Moller GUI
  • 47092 02/07/02 08:50 cdaq Moller Run 43524: moller
  • 47091 02/07/02 08:14 samuel charge throgh the target
  • 47090 02/07/02 08:07 cdaq Beam Time Accounting
  • 47089 02/07/02 08:07 jroche owl shift summary
  • 47088 02/07/02 08:06 cdaq End of Run 43523:
  • 47087 02/07/02 07:49 samuel polarization screen for bottom deutron target
  • 47086 02/07/02 07:35 samuel reboot target vme computer
  • 47085 02/07/02 07:13 cdaq Run 43523: Bot Cell, I=100 nA
  • 47084 02/07/02 07:11 cdaq End of Run 43522:
  • 47083 02/07/02 06:51 samuel pol. screen
  • 47082 02/07/02 06:14 jroche channel h2y04+
  • 47081 02/07/02 05:51 samuel pdp screen
  • 47080 02/07/02 05:32 jroche bpm screen (check list)
  • 47079 02/07/02 05:28 cdaq Run 43522: Bot Cell, I=100 nA
  • 47078 02/07/02 05:25 cdaq End of Run 43521:
  • 47077 02/07/02 04:51 samuel polarization behavior for last two hours
  • 47076 02/07/02 03:48 samuel pol. screen
  • 47075 02/07/02 03:40 cdaq Run 43521: Bot Cell, I=100 nA
  • 47074 02/07/02 03:39 cdaq End of Run 43520:
  • 47073 02/07/02 02:47 samuel pol. screen for bottom target
  • 47072 02/07/02 02:03 jroche hms 4.723 fine
  • 47071 02/07/02 01:53 cdaq Run 43520: Bot Cell, I=100 nA
  • 47070 02/07/02 01:47 samuel pol. screen for bottom target
  • 47069 02/07/02 01:39 jroche run 43519 is junk
  • 47068 02/07/02 01:37 cdaq End of Run 43519:
  • 47067 02/07/02 01:25 cdaq Run 43519: Bot Cell, I=100 nA
  • 47066 02/07/02 01:18 jroche hms momentum to 4.723 GeV/c
  • 47065 02/07/02 01:10 samuel pdp screen for bottom target
  • 47064 02/07/02 00:59 jroche tgt top encoder 3.596
  • 47063 02/07/02 00:57 jroche top tgt encoder 3.746
  • 47062 02/07/02 00:54 cdaq End of Run 43518:
  • 47061 02/07/02 00:46 cdaq Run 43518: Top Cell, Encoder=3.596, I=100 nA
  • 47060 02/07/02 00:45 cdaq End of Run 43517:
  • 47059 02/07/02 00:42 jroche top target encoder 3.443
  • 47058 02/07/02 00:40 cdaq Run 43517: Top Cell, Encoder=3.746, I=100 nA
  • 47057 02/07/02 00:39 cdaq End of Run 43516:
  • 47056 02/07/02 00:28 jroche top target encoder 3.343
  • 47055 02/07/02 00:27 cdaq Run 43516: Top Cell, Encoder=3.443, I=100 nA
  • 47054 02/07/02 00:26 cdaq End of Run 43515:
  • 47053 02/07/02 00:21 khandaker Swing Shift Summary
  • 47052 02/07/02 00:21 cdaq Beam Time Accounting
  • 47051 02/07/02 00:08 cdaq Run 43515: Top Cell, Encoder=3.343, I=100 nA
  • 47050 02/07/02 00:07 cdaq End of Run 43514:
  • 47049 02/07/02 00:06 khandaker Hole taregt raster pattern
  • 47048 02/07/02 00:05 cdaq Computer reboots for 2002-02-06
  • 47047 02/07/02 00:04 khandaker Top Cell Encoder=3.246
  • Wednesday

  • 47046 02/06/02 23:50 cdaq Run 43514: Top Cell, Encoder=3.246, I=100 nA
  • 47045 02/06/02 23:46 cdaq End of Run 43513:
  • 47044 02/06/02 23:40 HGZ target screen
  • 47043 02/06/02 23:35 cdaq Run 43513: hole tgt,I=200 nA
  • 47042 02/06/02 23:00 cdaq End of Run 43512:
  • 47041 02/06/02 22:45 cdaq Run 43512: Production on Bot ND3, p=-16.5%, I=100 nA
  • 47040 02/06/02 22:40 cdaq End of Run 43511:
  • 47039 02/06/02 22:06 HGZ target screen
  • 47038 02/06/02 21:36 cdaq Run 43511: Production on Bot ND3, p=-17.4%, I=100 nA
  • 47037 02/06/02 21:35 cdaq End of Run 43510:
  • 47036 02/06/02 21:26 frw Replay problem run 43507
  • 47035 02/06/02 20:41 HGZ reboot targte computer
  • 47034 02/06/02 20:39 HGZ target screen
  • 47033 02/06/02 20:30 cdaq Run 43510: Production on Bot ND3, p=-20.1%, I=100 nA
  • 47032 02/06/02 20:29 cdaq End of Run 43509:
  • 47031 02/06/02 20:14 khandaker Replay problem run 43507
  • 47030 02/06/02 20:03 HGZ target screen
  • 47029 02/06/02 19:45 zeier sem update
  • 47028 02/06/02 19:20 HGZ target screen
  • 47027 02/06/02 19:17 cdaq Run 43509: Production on Bot ND3, p=-19.4%, I=100 nA
  • 47026 02/06/02 19:16 cdaq End of Run 43508:
  • 47025 02/06/02 18:12 cdaq Run 43508: Production on Bot ND3, p=-19.9%, I=100 nA
  • 47024 02/06/02 18:09 cdaq End of Run 43507:
  • 47023 02/06/02 18:06 HGZ targte screen
  • 47022 02/06/02 17:33 khandaker BCM, BPM screen shots
  • 47021 02/06/02 16:59 cdaq Run 43507: Production on Bot ND3, p=-14.7%, I=100 nA
  • 47020 02/06/02 16:59 HGZ target screen
  • 47019 02/06/02 16:03 lcsmith Shift Summary
  • 47018 02/06/02 16:03 cdaq Beam Time Accounting
  • 47017 02/06/02 15:18 cdaq End of Run 43506:
  • 47016 02/06/02 15:00 cdaq Run 43506: Carbon target, no He,
  • 47015 02/06/02 14:55 cdaq End of Run 43505:
  • 47014 02/06/02 14:25 cdaq Run 43505: carbon target at 200 nA. Previous run had 5 min of LHe present.
  • 47013 02/06/02 14:21 cdaq End of Run 43504:
  • 47012 02/06/02 14:07 cdaq Run 43504: carbon target, 200 nA,
  • 47011 02/06/02 13:52 cdaq End of Run 43503:
  • 47010 02/06/02 13:48 cdaq Run 43503: sem test run 100nA
  • 47009 02/06/02 13:46 cdaq End of Run 43502:
  • 47008 02/06/02 13:42 cdaq Run 43502: sem test run 200nA
  • 47007 02/06/02 13:41 cdaq End of Run 43501:
  • 47006 02/06/02 13:37 cdaq Run 43501: sem test run 200nA
  • 47005 02/06/02 13:37 cdaq End of Run 43500:
  • 47004 02/06/02 13:31 cdaq Run 43500: sem test run 200nA
  • 47003 02/06/02 13:31 cdaq End of Run 43499:
  • 47002 02/06/02 13:24 cdaq Run 43499: sem test run 200nA
  • 47001 02/06/02 13:24 cdaq End of Run 43498:
  • 47000 02/06/02 13:23 comanl finished annealing
  • 46999 02/06/02 13:15 cdaq Run 43498: sem test run 200nA
  • 46998 02/06/02 13:14 cdaq End of Run 43497:
  • 46997 02/06/02 13:08 cdaq Run 43497: top target ND3, pol=+12.8
  • 46996 02/06/02 13:00 cdaq Run 43496: Empty target. Marco SEM tests.
  • 46995 02/06/02 12:31 lcsmith Energy measurement
  • 46994 02/06/02 11:52 lcsmith Target position
  • 46993 02/06/02 11:27 comanl target anneal
  • 46992 02/06/02 11:07 cdaq Run 43495: top target ND3, pol=+12.8
  • 46991 02/06/02 11:00 comanl bottom tatget - polarization screen
  • 46990 02/06/02 10:20 comanl changed target to Bottom
  • 46989 02/06/02 10:06 cdaq End of Run 43494:
  • 46988 02/06/02 09:16 comanl target screen
  • 46987 02/06/02 08:37 cdaq Run 43494: top target ND3, pol=+12.8
  • 46986 02/06/02 08:34 cdaq End of Run 43493:
  • 46985 02/06/02 08:30 cdaq Run 43493: top target ND3, pol=+12.8
  • 46984 02/06/02 08:28 cdaq End of Run 43492:
  • 46983 02/06/02 08:08 R.A Lindgren Shift Summary
  • 46982 02/06/02 08:00 cdaq Beam Time Accounting
  • 46981 02/06/02 07:55 bitao target screen
  • 46980 02/06/02 07:51 pocanic log scan
  • 46979 02/06/02 07:47 pocanic log scan
  • 46978 02/06/02 07:35 cdaq Run 43492: top target ND3, pol=+12.8
  • 46977 02/06/02 07:34 cdaq End of Run 43491:
  • 46976 02/06/02 07:21 cdaq Run 43491: top target ND3, pol=+12.8
  • 46975 02/06/02 07:20 cdaq End of Run 43490:
  • 46974 02/06/02 06:24 bitao target screen
  • 46973 02/06/02 06:21 cdaq Run 43490: top target ND3, pol=+12.8
  • 46972 02/06/02 06:14 cdaq End of Run 43489:
  • 46971 02/06/02 05:55 cdaq Run 43489: top target ND3, pol=+12.8
  • 46970 02/06/02 05:54 cdaq End of Run 43488:
  • 46969 02/06/02 05:18 bitao target screen
  • 46968 02/06/02 04:59 cdaq Run 43488: top target ND3, pol=+12.8
  • 46967 02/06/02 04:57 cdaq End of Run 43487:
  • 46966 02/06/02 04:17 bitao target screen
  • 46965 02/06/02 03:46 cdaq Run 43487: top target ND3, pol=+12.0
  • 46964 02/06/02 03:43 cdaq End of Run 43486:
  • 46963 02/06/02 02:59 cdaq Run 43486: top target ND3, pol=+10.1
  • 46962 02/06/02 02:58 cdaq End of Run 43485:
  • 46961 02/06/02 02:57 bitao target screen
  • 46960 02/06/02 02:17 cdaq Run 43485: top target ND3, pol=+6.9
  • 46959 02/06/02 02:04 bitao target screen
  • 46958 02/06/02 01:05 cdaq End of Run 43484:
  • 46957 02/06/02 00:34 cdaq Run 43484: carbon
  • 46956 02/06/02 00:18 khandaker Replay Run 43483 problem
  • 46955 02/06/02 00:14 khandaker Swing Shift Summary
  • 46954 02/06/02 00:14 cdaq Beam Time Accounting
  • 46953 02/06/02 00:05 cdaq Computer reboots for 2002-02-05
  • 46952 02/06/02 00:00 khandaker Beam raster pattern TOP/BOT tgt
  • Tuesday

  • 46951 02/05/02 23:43 khandaker HMS DC1, DC2 trip
  • 46950 02/05/02 23:18 mckee target comments accepted
  • 46949 02/05/02 21:34 mckee new target values
  • 46948 02/05/02 21:32 mckee transfer line valve reset
  • 46947 02/05/02 20:59 khandaker HMS set for p=4.723 GeV/c
  • 46946 02/05/02 19:43 khandaker HMS DC1, DC2 trip
  • 46945 02/05/02 18:47 mckee 2nd top target te
  • 46944 02/05/02 17:54 zeier SEM
  • 46943 02/05/02 17:12 mckee top target te
  • 46942 02/05/02 15:17 comanl Prepering for TE measurements on the top target
  • 46941 02/05/02 13:19 hcf moller LN2 limit
  • 46940 02/05/02 12:39 comanl target polarization after annealing
  • 46939 02/05/02 12:26 comanl finished the target anneal
  • 46938 02/05/02 12:01 comanl target anneal
  • 46937 02/05/02 11:42 comanl target screen
  • 46936 02/05/02 11:05 Pocanic, Smi beam raster
  • 46935 02/05/02 10:56 comanl target screen
  • 46934 02/05/02 10:14 comanl target polarization
  • 46933 02/05/02 09:28 comanl polarization history on bottom target
  • 46932 02/05/02 09:07 comanl target polarizarion on bottom cell
  • 46931 02/05/02 09:00 lcsmith HMS dipole
  • 46930 02/05/02 08:55 Lindgren shift summary
  • 46929 02/05/02 07:48 bitao target screen and charget deposit
  • 46928 02/05/02 07:20 cdaq End of Run 43483:
  • 46927 02/05/02 07:19 cdaq Beam Time Accounting
  • 46926 02/05/02 06:57 cdaq Run 43483: top target ND3, pol=-12.1
  • 46925 02/05/02 06:56 cdaq End of Run 43482:
  • 46924 02/05/02 06:13 cdaq Run 43482: top target ND3, pol=-11.0
  • 46923 02/05/02 06:12 cdaq End of Run 43481:
  • 46922 02/05/02 05:51 bitao target screen
  • 46921 02/05/02 05:26 cdaq Run 43481: top target ND3, pol=-11.0
  • 46920 02/05/02 05:24 cdaq End of Run 43480:
  • 46919 02/05/02 04:43 cdaq Run 43480: top target ND3, pol=-11.9
  • 46918 02/05/02 04:36 bitao ops forget grab in the target screen
  • 46917 02/05/02 04:35 bitao target screen
  • 46916 02/05/02 04:28 cdaq End of Run 43479:
  • 46915 02/05/02 04:03 cdaq Run 43479: top target ND3, pol=-11.6
  • 46914 02/05/02 04:02 cdaq End of Run 43478:
  • 46913 02/05/02 03:19 nsavvinv doubled the limit and changed disk
  • 46912 02/05/02 03:15 cdaq Run 43478: top target ND3, pol=-11.0
  • 46911 02/05/02 03:11 cdaq End of Run 43477:
  • 46910 02/05/02 03:02 bitao target screen
  • 46909 02/05/02 02:49 cdaq Run 43477: top target ND3, pol=-9.3
  • 46908 02/05/02 02:47 cdaq End of Run 43476:
  • 46907 02/05/02 02:23 cdaq Run 43476: top target ND3, pol=-9.8
  • 46906 02/05/02 02:22 cdaq End of Run 43475:
  • 46905 02/05/02 02:02 cdaq Run 43475: top target ND3, pol=-9.3
  • 46904 02/05/02 01:43 bitao target screen
  • 46903 02/05/02 01:39 bitao target screen
  • 46902 02/05/02 00:22 khandaker Swing Shift Summary
  • 46901 02/05/02 00:20 cdaq Beam Time Accounting
  • 46900 02/05/02 00:16 khandaker Moller 2nd run analyzed
  • 46899 02/05/02 00:05 cdaq Computer reboots for 2002-02-04
  • 46898 02/05/02 00:02 khandaker Moller data analyzed
  • Monday

  • 46897 02/04/02 23:59 comanl top target annealing
  • 46896 02/04/02 23:58 cdaq Moller Run 43474: moller
  • 46895 02/04/02 23:41 cdaq Moller Run 43473: moller
  • 46894 02/04/02 23:37 khandaker Moller cryo screen
  • 46893 02/04/02 23:36 khandaker RealMoller screen shot
  • 46892 02/04/02 23:31 khandaker Moller GUI
  • 46891 02/04/02 23:25 khandaker Moller BPM snapshot
  • 46890 02/04/02 23:23 khandaker Injector parameters
  • 46889 02/04/02 22:58 cdaq End of Run 43472:
  • 46888 02/04/02 22:35 comanl target - hourly screen
  • 46887 02/04/02 22:20 cdaq Run 43472: top target ND3, pol=+12.6
  • 46886 02/04/02 22:19 cdaq End of Run 43471:
  • 46885 02/04/02 22:08 nsavvinv BPM screen
  • 46884 02/04/02 21:43 cdaq Run 43471: top target ND3, pol=+12.8
  • 46883 02/04/02 21:41 cdaq End of Run 43470:
  • 46882 02/04/02 21:37 comanl target screen
  • 46881 02/04/02 21:07 cdaq Run 43470: top target ND3, pol=+13.6
  • 46880 02/04/02 21:06 cdaq End of Run 43469:
  • 46879 02/04/02 20:32 comanl target screen
  • 46878 02/04/02 20:30 cdaq Run 43469: top target ND3, pol=+13.5 I=150 nA
  • 46877 02/04/02 20:29 cdaq End of Run 43468:
  • 46876 02/04/02 19:54 cdaq Run 43468: top target ND3, pol=+15.1 I=150 nA
  • 46875 02/04/02 19:52 cdaq End of Run 43467:
  • 46874 02/04/02 19:18 comanl separator alarm
  • 46873 02/04/02 19:14 comanl hourly screen
  • 46872 02/04/02 19:10 cdaq Run 43467: top target ND3, pol=+14.2 I=150 nA
  • 46871 02/04/02 19:08 cdaq End of Run 43466:
  • 46870 02/04/02 18:35 cdaq Run 43466: top target ND3, pol=+14.2 I=150 nA
  • 46869 02/04/02 18:34 cdaq End of Run 43465:
  • 46868 02/04/02 18:32 comanl target cryo computer crushed
  • 46867 02/04/02 18:08 khandaker Hall A leakage current
  • 46866 02/04/02 18:03 khandaker BCM, BPM snapshots
  • 46865 02/04/02 18:00 comanl target polarization
  • 46864 02/04/02 17:52 cdaq Run 43465: top target ND3, pol=+14.4 , beam current: 150nA.
  • 46863 02/04/02 17:50 cdaq End of Run 43464:
  • 46862 02/04/02 17:44 cdaq Run 43464: top target ND3, pol=+13.4, I=150 nA
  • 46861 02/04/02 17:02 comanl hourly screen
  • 46860 02/04/02 16:08 ioana shift summary
  • 46859 02/04/02 16:05 cdaq Beam Time Accounting
  • 46858 02/04/02 15:35 cdaq End of Run 43463:
  • 46857 02/04/02 15:01 donal target screen
  • 46856 02/04/02 14:20 cdaq Run 43463: bottom target ND3, pol=+18.3
  • 46855 02/04/02 14:19 cdaq End of Run 43462:
  • 46854 02/04/02 14:00 donal target screen
  • 46853 02/04/02 13:15 cdaq Run 43462: top target ND3, pol=+19.7
  • 46852 02/04/02 13:14 cdaq End of Run 43461:
  • 46851 02/04/02 13:03 Donal annealing
  • 46850 02/04/02 13:00 donal target screen
  • 46849 02/04/02 12:18 cdaq Run 43461: top target ND3, pol=+18.6
  • 46848 02/04/02 12:16 cdaq End of Run 43460:
  • 46847 02/04/02 12:00 donal Oveanneal
  • 46846 02/04/02 11:26 cdaq Run 43460: ND3 pol=+15.2
  • 46845 02/04/02 11:18 donal buildup continued
  • 46844 02/04/02 11:12 ioana Moller run
  • 46843 02/04/02 10:43 Frlez Moeller BPM
  • 46842 02/04/02 10:41 Frlez Mueller Cryo
  • 46841 02/04/02 10:38 ioana realmoller screen
  • 46840 02/04/02 10:37 cdaq Moller Run 43459: moller
  • 46839 02/04/02 10:36 Frlez Moeller GUI
  • 46838 02/04/02 10:26 donal polarization buildup -bottom
  • 46837 02/04/02 10:15 ioana Leakage test
  • 46836 02/04/02 10:11 ioana Injector setting before Moller
  • 46835 02/04/02 09:49 cdaq End of Run 43458:
  • 46834 02/04/02 09:19 cdaq Run 43458: Carbon
  • 46833 02/04/02 09:16 donal anneal
  • 46832 02/04/02 09:10 cdaq End of Run 43457:
  • 46831 02/04/02 08:42 cdaq Run 43457: MT target
  • 46830 02/04/02 08:21 cdaq End of Run 43456:
  • 46829 02/04/02 08:16 cdaq Run 43456: top target ND3, pol=+16.8
  • 46828 02/04/02 08:14 cdaq End of Run 43455:
  • 46827 02/04/02 08:01 donal target screen
  • 46826 02/04/02 07:59 cdaq Beam Time Accounting
  • 46825 02/04/02 07:55 K. Wang run log
  • 46824 02/04/02 07:53 bitao total charge deposit so far
  • 46823 02/04/02 07:20 cdaq Run 43455: top target ND3, pol=+15.9
  • 46822 02/04/02 07:19 cdaq End of Run 43454:
  • 46821 02/04/02 06:34 bitao charge deposit in the target
  • 46820 02/04/02 06:29 bitao HMS high voltage gui
  • 46819 02/04/02 06:25 bitao targer screen disapeared again
  • 46818 02/04/02 06:24 cdaq Run 43454: top target ND3, pol=+15.9
  • 46817 02/04/02 06:17 cdaq End of Run 43453:
  • 46816 02/04/02 05:51 cdaq Run 43453: top target ND3, pol=+15.9
  • 46815 02/04/02 05:48 cdaq End of Run 43452:
  • 46814 02/04/02 05:09 bitao reboot target computer
  • 46813 02/04/02 04:58 cdaq Run 43452: top target ND3, pol=+16.7
  • 46812 02/04/02 04:56 cdaq End of Run 43451:
  • 46811 02/04/02 04:08 bitao target screen
  • 46810 02/04/02 04:05 cdaq Run 43451: top target ND3, pol=+16.8
  • 46809 02/04/02 04:04 cdaq End of Run 43450:
  • 46808 02/04/02 03:07 cdaq Run 43450: top target ND3, pol=+17.3
  • 46807 02/04/02 03:06 bitao target screen
  • 46806 02/04/02 03:05 cdaq End of Run 43449:
  • 46805 02/04/02 02:31 bitao q3 trip
  • 46804 02/04/02 02:17 bitao target screen
  • 46803 02/04/02 02:09 cdaq Run 43449: top target ND3, pol=+16.8
  • 46802 02/04/02 01:26 cdaq End of Run 43448:
  • 46801 02/04/02 01:14 bitao target screen
  • 46800 02/04/02 01:08 cdaq Run 43448: top target ND3, pol=+11.5, 100 nA
  • 46799 02/04/02 00:47 cdaq End of Run 43447:
  • 46798 02/04/02 00:32 khandaker Swing Shift Summary
  • 46797 02/04/02 00:32 cdaq Beam Time Accounting
  • 46796 02/04/02 00:22 cdaq Run 43447: top target ND3, pol=-0.2
  • 46795 02/04/02 00:08 cdaq End of Run 43446:
  • 46794 02/04/02 00:05 cdaq Computer reboots for 2002-02-03
  • Sunday

  • 46793 02/03/02 23:59 donal target screen
  • 46792 02/03/02 23:57 cdaq Run 43446: bottom target ND3, pol=-15.4, I=100 nA
  • 46791 02/03/02 23:52 cdaq End of Run 43445:
  • 46790 02/03/02 23:31 cdaq Run 43445: bottom target ND3, pol=-12.6, I=200 nA
  • 46789 02/03/02 23:29 cdaq End of Run 43444:
  • 46788 02/03/02 23:03 donal target screen
  • 46787 02/03/02 22:54 khandaker Injector problem
  • 46786 02/03/02 22:31 cdaq Run 43444: bottom target ND3, pol=-16.9, I=200 nA
  • 46785 02/03/02 22:24 cdaq End of Run 43443:
  • 46784 02/03/02 22:03 donal target screen
  • 46783 02/03/02 21:30 cdaq Run 43443: bottom target ND3, pol=-18.4
  • 46782 02/03/02 21:28 cdaq End of Run 43442:
  • 46781 02/03/02 21:06 khandaker SEM x coordinate problem
  • 46780 02/03/02 21:02 donal target screen
  • 46779 02/03/02 20:38 cdaq Run 43442: bottom target ND3, pol=-18.8
  • 46778 02/03/02 20:37 cdaq End of Run 43441:
  • 46777 02/03/02 20:02 donal target screen
  • 46776 02/03/02 19:47 cdaq Run 43441: bottom target ND3, pol=-18.6
  • 46775 02/03/02 19:31 donal polarization
  • 46774 02/03/02 19:29 cdaq End of Run 43440:
  • 46773 02/03/02 19:16 cdaq Run 43440: bottom target ND3, pol=-13.1
  • 46772 02/03/02 19:14 cdaq End of Run 43439:
  • 46771 02/03/02 19:04 donal target screen
  • 46770 02/03/02 18:31 cdaq Run 43439: bottom target ND3, pol=-11.8
  • 46769 02/03/02 18:11 Donal build-up?
  • 46768 02/03/02 17:49 cdaq End of Run 43438:
  • 46767 02/03/02 17:04 cdaq Run 43438: bottom target ND3, pol=-7.6
  • 46766 02/03/02 17:02 cdaq End of Run 43437:
  • 46765 02/03/02 16:57 khandaker BCM, BPM snapshots
  • 46764 02/03/02 16:44 cdaq Run 43437: bottom target ND3, pol=0.0
  • 46763 02/03/02 16:09 Donal instrumentation
  • 46762 02/03/02 16:06 Donal LN2 and Stick storage
  • 46761 02/03/02 16:04 ioana shift summary
  • 46760 02/03/02 15:58 Donal Bottom TE results
  • 46759 02/03/02 15:50 donal stick instrumentation info
  • 46758 02/03/02 15:47 cdaq Beam Time Accounting
  • 46757 02/03/02 15:36 comanl TE measurements -set #3
  • 46756 02/03/02 14:54 comanl TE measurements # 2
  • 46755 02/03/02 14:53 comanl TE #1
  • 46754 02/03/02 09:35 ioana plans for today
  • 46753 02/03/02 09:35 comanl start TE measurement
  • 46752 02/03/02 09:29 comanl target screed after PDP restat
  • 46751 02/03/02 09:24 donal frequency counter stuck
  • 46750 02/03/02 09:08 comanl target screen for 24 hours
  • 46749 02/03/02 08:20 comanl target hourly screen
  • 46748 02/03/02 07:53 cdaq Beam Time Accounting
  • 46747 02/03/02 07:52 cdaq Beam Time Accounting
  • 46746 02/03/02 07:51 Wang injector problem
  • 46745 02/03/02 06:47 bitao target screen
  • 46744 02/03/02 05:32 cdaq End of Run 43436:
  • 46743 02/03/02 05:28 bitao target screen
  • 46742 02/03/02 04:32 bitao charge deposit on the target
  • 46741 02/03/02 04:25 cdaq Run 43436: bottom target ND3, pol=-15.9%
  • 46740 02/03/02 04:23 cdaq End of Run 43435:
  • 46739 02/03/02 03:46 bitao target screen
  • 46738 02/03/02 03:21 Wang beam
  • 46737 02/03/02 03:19 cdaq Run 43435: bottom target ND3, pol=-20.6%
  • 46736 02/03/02 02:26 bitao target
  • 46735 02/03/02 01:42 bitao target chart
  • 46734 02/03/02 00:23 bitao target chart
  • 46733 02/03/02 00:09 comanl Shift Summary
  • 46732 02/03/02 00:09 cdaq Beam Time Accounting
  • 46731 02/03/02 00:05 cdaq Computer reboots for 2002-02-02
  • 46730 02/03/02 00:00 cdaq cookie shortage
  • Saturday

  • 46729 02/02/02 23:59 donal target screen
  • 46728 02/02/02 23:02 donal target screen
  • 46727 02/02/02 22:41 cdaq End of Run 43434:
  • 46726 02/02/02 22:37 comanl beam off again -MCC tunning beam for Hall A
  • 46725 02/02/02 22:02 donal hourly screen
  • 46724 02/02/02 21:31 cdaq Run 43434: bottom target ND3, pol=-19.3%
  • 46723 02/02/02 21:28 comanl Beam polarization at Wien angle 71.4
  • 46722 02/02/02 21:21 comanl moller cryo
  • 46721 02/02/02 21:18 comanl BPM moller
  • 46720 02/02/02 21:15 comanl Beam polarization
  • 46719 02/02/02 21:15 donal target screen
  • 46718 02/02/02 21:09 comanl MOller GUI
  • 46717 02/02/02 21:02 comanl Injector Parameters
  • 46716 02/02/02 20:53 cdaq Moller Run 43433: moller
  • 46715 02/02/02 20:12 comanl beam off for Wien angle change
  • 46714 02/02/02 20:09 cdaq End of Run 43432:
  • 46713 02/02/02 20:07 comanl HV trip in HMS hodo 2y_38
  • 46712 02/02/02 20:02 Donal target screen
  • 46711 02/02/02 19:18 cdaq Run 43432: bottom target ND3, pol=-17.4%
  • 46710 02/02/02 19:17 cdaq End of Run 43431:
  • 46709 02/02/02 19:03 Donal target screen
  • 46708 02/02/02 19:03 cdaq Run 43431: bottom target ND3, pol=-17.4%
  • 46707 02/02/02 19:01 cdaq End of Run 43430:
  • 46706 02/02/02 18:08 cdaq Run 43430: bottom target ND3, pol=-17.8%
  • 46705 02/02/02 18:07 cdaq End of Run 43429:
  • 46704 02/02/02 17:59 Donal Target screen
  • 46703 02/02/02 17:21 Donal target response to beam
  • 46702 02/02/02 17:07 comanl Moller result for nominal fase angle (remeasured)
  • 46701 02/02/02 17:05 cdaq Run 43429: bottom target ND3, pol=-20.4%
  • 46700 02/02/02 17:01 donal target screen
  • 46699 02/02/02 16:44 comanl leakage test
  • 46698 02/02/02 16:02 cdaq Beam Time Accounting
  • 46697 02/02/02 16:02 ioana shift summary
  • 46696 02/02/02 16:00 ioana Moller runs
  • 46695 02/02/02 15:55 cdaq Moller Run 43428: moller
  • 46694 02/02/02 15:30 Rakhsha .
  • 46693 02/02/02 15:27 cdaq Moller Run 43427: moller
  • 46692 02/02/02 14:51 cdaq Moller Run 43426: moller
  • 46691 02/02/02 14:17 smithg pol screen since 11am
  • 46690 02/02/02 13:58 ioana Moller run
  • 46689 02/02/02 13:52 cdaq Moller Run 43425: moller
  • 46688 02/02/02 13:45 ioana leakage test
  • 46687 02/02/02 12:45 cdaq Moller Run 43424: moller
  • 46686 02/02/02 12:33 ioana DC2 high voltage problem
  • 46685 02/02/02 12:09 R. Nasseripo injector parameters.
  • 46684 02/02/02 12:03 cdaq End of Run 43423:
  • 46683 02/02/02 11:31 smithg tgt screen for polarizing bottom tgt
  • 46682 02/02/02 11:17 cdaq Run 43423: Top target ND3, pol=-17.4%
  • 46681 02/02/02 09:41 donal TC polarity
  • 46680 02/02/02 09:09 donal bottom buildup
  • 46679 02/02/02 08:42 donal target anneal
  • 46678 02/02/02 08:01 hamlet Shift summary
  • 46677 02/02/02 08:00 cdaq Beam Time Accounting
  • 46676 02/02/02 05:06 hamlet Probably will be no beam up to 9:00am
  • 46675 02/02/02 04:31 jyun tgt screen
  • 46674 02/02/02 00:33 Rondon Top target polarization by peak ratio
  • 46673 02/02/02 00:10 donal target screen
  • 46672 02/02/02 00:05 cdaq Computer reboots for 2002-02-01
  • 46671 02/02/02 00:01 cdaq Beam Time Accounting
  • 46670 02/02/02 00:00 comanl Shift Summary
  • Friday

  • 46669 02/01/02 22:59 donal target screen
  • 46668 02/01/02 22:44 comanl north linac in controlled acces
  • 46667 02/01/02 20:22 Donal target screen
  • 46666 02/01/02 19:28 donal insert storage LN2
  • 46665 02/01/02 18:04 comanl hall in controlled acces
  • 46664 02/01/02 18:02 donal target screen top deuteron
  • 46663 02/01/02 17:57 comanl beam off for hall A energy change
  • 46662 02/01/02 17:53 cdaq End of Run 43422:
  • 46661 02/01/02 17:25 cdaq Run 43422: Top target ND3, pol=-12.6%
  • 46660 02/01/02 17:23 cdaq End of Run 43421:
  • 46659 02/01/02 17:01 donal target screen
  • 46658 02/01/02 16:54 cdaq Run 43421: Top target ND3, pol=-10.6%
  • 46657 02/01/02 16:53 cdaq End of Run 43420:
  • 46656 02/01/02 16:35 donal target polarization top deuteron
  • 46655 02/01/02 16:27 cdaq Run 43420: Top target ND3, pol=-9%
  • 46654 02/01/02 16:25 cdaq End of Run 43419:
  • 46653 02/01/02 16:03 ioana shift summary
  • 46652 02/01/02 16:03 cdaq Beam Time Accounting
  • 46651 02/01/02 15:59 cdaq Run 43419: bottom target ND3, pol=-6.1%
  • 46650 02/01/02 15:58 cdaq End of Run 43418:
  • 46649 02/01/02 15:32 cdaq Run 43418: bottom target ND3, pol=-1.8%
  • 46648 02/01/02 15:13 cdaq End of Run 43417:
  • 46647 02/01/02 14:23 cdaq Run 43417: bottom target ND3, pol=13.3%
  • 46646 02/01/02 14:22 cdaq End of Run 43416:
  • 46645 02/01/02 13:32 cdaq Run 43416: bottom target ND3, pol=14.7%
  • 46644 02/01/02 13:31 cdaq End of Run 43415:
  • 46643 02/01/02 12:42 cdaq Run 43415: bottom target ND3, pol=15.8%
  • 46642 02/01/02 12:39 cdaq End of Run 43414:
  • 46641 02/01/02 12:23 hcf cryo history during moller --> cold return
  • 46640 02/01/02 11:45 cdaq Run 43414: bottom target ND3, pol=22.3%
  • 46639 02/01/02 11:15 smithg tgt pol screen past hour
  • 46638 02/01/02 11:08 cdaq Run 43413: bottom target ND3, pol=22.3%
  • 46637 02/01/02 11:06 smithg tgt pol from peak asymmetry
  • 46636 02/01/02 11:05 cdaq End of Run 43412:
  • 46635 02/01/02 11:04 cdaq Run 43412: bottom target ND3, pol=22.3%
  • 46634 02/01/02 10:25 cdaq End of Run 43411:
  • 46633 02/01/02 10:16 smithg tgt screen past 3 hours
  • 46632 02/01/02 09:57 ioana wrong dipole setting
  • 46631 02/01/02 09:51 cdaq Run 43411: bottom target ND3, pol=22.9%
  • 46630 02/01/02 09:24 cdaq End of Run 43410:
  • 46629 02/01/02 09:03 cdaq Run 43410: bottom target ND3, pol=23.4%
  • 46628 02/01/02 08:55 ioana beam tuning
  • 46627 02/01/02 08:44 cdaq End of Run 43409:
  • 46626 02/01/02 07:59 cdaq Run 43409: bottom target, pol=21.4%
  • 46625 02/01/02 07:57 Keppel Shift Summary
  • 46624 02/01/02 07:57 cdaq Beam Time Accounting
  • 46623 02/01/02 07:23 cdaq End of Run 43408:
  • 46622 02/01/02 06:48 cdaq Run 43408: Carbon target
  • 46621 02/01/02 06:46 cdaq End of Run 43407:
  • 46620 02/01/02 06:12 cdaq Run 43407: Carbon target
  • 46619 02/01/02 05:50 cdaq End of Run 43406:
  • 46618 02/01/02 05:27 cdaq Run 43406: Carbon target
  • 46617 02/01/02 05:26 cdaq End of Run 43405:
  • 46616 02/01/02 04:55 cdaq Run 43405: Carbon target
  • 46615 02/01/02 04:53 cdaq Moller Run 43404: moller
  • 46614 02/01/02 04:48 M Jones Moller Results
  • 46613 02/01/02 04:23 Keppel leakage tests
  • 46612 02/01/02 04:21 cdaq Moller Run 43403: moller
  • 46611 02/01/02 03:20 cdaq Moller Run 43402: moller
  • 46610 02/01/02 03:04 Keppel Moller GetEpics Screen
  • 46609 02/01/02 03:03 M Jones Moller bpm and GUI screens
  • 46608 02/01/02 02:59 cdaq Moller Run 43401: moller
  • 46607 02/01/02 02:44 cdaq End of Run 43400:
  • 46606 02/01/02 02:15 cdaq Run 43400: Carbon target
  • 46605 02/01/02 02:13 Keppel Empty target position results
  • 46604 02/01/02 02:08 cdaq End of Run 43399:
  • 46603 02/01/02 01:59 cdaq Run 43399: empty target position test, 10 mm slow raster + 1 mm Lissajous
  • 46602 02/01/02 01:51 cdaq End of Run 43398:
  • 46601 02/01/02 01:39 cdaq Run 43398: empty target position test, FR off
  • 46600 02/01/02 01:38 cdaq End of Run 43397:
  • 46599 02/01/02 01:26 cdaq Run 43397: empty target position test
  • 46598 02/01/02 00:59 mckee deuteron stick loaded
  • 46597 02/01/02 00:34 cdaq Beam Time Accounting
  • 46596 02/01/02 00:05 cdaq Computer reboots for 2002-01-31
    Search this logbook:

    This file generated by /group/hallc/www/hallcweb/apps/logbooks/hclog/src/hclogscript version HC1.81
    If you have any comments or problems, please contact:
    Stephen A. Wood
    saw@jlab.org
    (757) 269-7367