    Hall C

    11/7/2002 1100-1900
    Experiment #: G0-Beamline
    Shift Leader: K. Grimm
    Shift Workers: J. Roche

    11001200130014001500160017001800Total Time
    Acceptable Beam
    in Use
    1.0 0.141388888889 0.0116666666667 0.0 0.0 1.0 1.0 0.9 4.05
    Beam Available
    but Not in Use
    0.0 0.0 0.0 0.866388888889 0.502222222222 0.0 0.0 0.103888888889 1.47
    Beam Not Available
    or Unacceptable
    0.0 0.858333333333 0.988055555556 0.133333333333 0.4975 0.0 0.0 0.0 2.48
    Accelerator Con-
    figuration Chage
    0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00
    Experiment
    Ready
    1.0 1.0 0.5 0.0 0.683333333333 1.0 1.0 0.9 6.08
    Planned Config-
    uration Change
    0.0 0.0 0.5 1.0 0.316666666667 0.0 0.0 0.1 1.92
    Unplanned
    Experiment Down
    0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00.00
    Hall not
    ready reasons
    G0 Magnet 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00
    Detectors 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00
    DAQ 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00
    Target 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00
    Other 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00

    Comments: false alarm on magnet IOC SE20 alarm

    Data Entry by: Klaus Grimm