Log entry time 09:01:20 on December 11,2002
Entry number 53883
keyword=schedule for today
I attended the 8:00 AM meeting, representing Steve, who was working
on magnet recovery.
Here is the plan for the day:
- 10AM - noon: Beam will be off for South Linac gradient work (originally
was scheduled for tomorrow morning, moved to today since we are offline
while magnet recovers).
- noon-14:00: Tests of adiabatic damping in the machine. They would
find it useful to send beam to the hall, but they could do it with sending
beam elsewhere if needed. If we don't still need to be in controlled access,
we should have them send beam to the hall, and we should run both the
injector DAQ and our regular DAQ to look at BPM position differences.
- 14:00- 16:00: a continuation of the emmittance matching/optimization work.
- 16:00: Hall C/arc energy measurement. The MCC expert will be on shift.
aside: do we have an expert who should be here for this as well,
and if so, who is that?
Longer term plan: Thursday Swing shift: 8 hours of 40 µA G0 beam.
We should endeavour to check as many of the table of required beam properties
as we can....
Friday: two hour general beam check (12:00-14:00) - may be cancelled
if things look good. 20:00 - midnight, beam off for switch of Hall B to