Last week, Dave Meekins, Tanja Horn and I (well, ok, Tanja and I mostly watched Dave) installed some new targets in the Moeller target ladder. Currently the new configuration is:
Target 1: 25 um wire target (new).
3 wires suspended on a copper frame for use with
Chen Yan's new kicker system.
Target 2: 1 um foil target (new) for high current tests.
Target 3: 4 um foil target (old).
The first two targets are for "experts only" and should never be used for normal Moller running. I will update the Moller instructions to reflect this.