    User name gaskell

    Log entry time 09:42:35 on September 15,2003

    Entry number 67502

    keyword=Moeller target work

    Last week, Dave Meekins, Tanja Horn and I (well, ok, Tanja and I mostly watched Dave) installed some new targets in the Moeller target ladder. Currently the new configuration is:


    Target 1: 25 um wire target (new).
    3 wires suspended on a copper frame for use with
    Chen Yan's new kicker system.

    Target 2: 1 um foil target (new) for high current tests.

    Target 3: 4 um foil target (old).


    The first two targets are for "experts only" and should never be used for normal Moller running. I will update the Moller instructions to reflect this.