Jefferson Lab Hall C Logbook for December 03 - runstarts omitted
Main INDEX
Wednesday
72572 12/31/03 19:35
Tuesday
72570 12/30/03 14:02 nakahara SMS: Coils warming up
Monday
72568 12/29/03 20:48 gaskell Moller is (kind of) warm
72567 12/29/03 20:46 nakahara SMS: LHe reservoir empty
Sunday
72565 12/28/03 19:02 nakahara ESR Trip Part3
72564 12/28/03 17:12 nakahara ESR Trip Part2B
72563 12/28/03 17:11 nakahara ESR Trip Part2
72562 12/28/03 13:23 nakahara ESR Trip Part1
72560 12/28/03 01:09
Wednesday
72556 12/24/03 13:42 gaskell counting house walk-through
72555 12/24/03 13:33 gaskell Moller off
72554 12/24/03 12:03 gaskell target and kicker
72553 12/24/03 10:41 M Jones Hall C beam energy measurement
72552 12/24/03 10:18 silviu target: warming up
72551 12/24/03 09:26 grimm Run Coordinator's report - 23+24 December 2003
72550 12/24/03 09:11 nakahara SMS: Pumps
72549 12/24/03 09:03 horn Hall in Restricted Access
72548 12/24/03 08:50 nakahara SMS: SMS ramped down
72547 12/24/03 08:41 arvieux ROC3 and HV PS switched off
72546 12/24/03 08:05 horn Shift Summary
72545 12/24/03 08:05 nakahara SMS: SMS ramping down
72544 12/24/03 08:05 horn beam off
72532 12/24/03 05:41 nakahara Target: Target moved, but position undefined
72531 12/24/03 05:30 horn HV: Proton Reduced Gain
72530 12/24/03 04:41 horn Target IOC crash
72529 12/24/03 04:08 gaskell kicker checkout (brief) summary
72527 12/24/03 04:01 gaskell backing out of moller
72526 12/24/03 04:00 gaskell moller runlist from kicker studies
72515 12/24/03 01:11 gaskell bleedthrough at 5 uA
72514 12/24/03 00:43 horn harpscan
72512 12/24/03 00:20 gaskell bleedthrough from Hall B at 2uA
Tuesday
72506 12/23/03 23:45 gaskell run 48335 has larger bleedthrough
72504 12/23/03 22:28 gaskell kicker seems to kick down
72502 12/23/03 22:24 gaskell kicker parameters at 5 uA
72499 12/23/03 21:15 gaskell changed moller prescale
72497 12/23/03 19:09 horn Moller BPM screen
72496 12/23/03 19:05 gaskell finding wire target
72495 12/23/03 19:03 gaskell iron wire target edges
72494 12/23/03 17:36 Sarah Target: Moved the target to out of beam position
72492 12/23/03 17:30 gaskell setting up for kicker commissioning
72491 12/23/03 17:28 gaskell swing shift summary I
72486 12/23/03 16:04 breuer shift summary, part 2: 14:00-
72482 12/23/03 15:34 jianglai x position off by 1 mm during run 18772
72479 12/23/03 14:02 breuer hv trip
72478 12/23/03 13:10 breuer shift summary, part 1: 8AM-1 PM
72475 12/23/03 12:12 silviu target: boiloff and ioc reboot
72463 12/23/03 10:49 grimm Run Coordinator Report for 22 December 2003
72454 12/23/03 08:49 jianglai French threshold setting for 5 uA running
72453 12/23/03 08:44 arvieux NA detect 14/15 in DMCH
72446 12/23/03 08:05 horn Shift Summary
72444 12/23/03 07:21 horn reboot g0iocsms
72442 12/23/03 05:58 horn HV: Proton Full Gain
72439 12/23/03 04:32 horn No signal in det10/oct5 for part of run 18755
72438 12/23/03 04:17 horn TSO problems during runs 18753 and 18754
72437 12/23/03 04:09 horn TS0 and ROC reset
72431 12/23/03 02:14 horn IOCse20 reboot
72430 12/23/03 02:06 horn run 18752 is TED run
72429 12/23/03 02:04 silviu magnet: rebooted g0smsioc
72426 12/23/03 00:54 horn Scan of shift check list
Monday
72422 12/22/03 23:54 gaskell shift summary
72421 12/22/03 23:42 arvieux verification of run 18749
72418 12/22/03 22:53 arvieux s-dmch alerts
72417 12/22/03 22:53 grimm Remaining run plan for tuesday and wednesday
72416 12/22/03 22:47 gaskell runs 18747 and 18748
72411 12/22/03 22:20 grimm restoring FR DMCH#8 cabling
72404 12/22/03 21:52 arvieux raised FR thresholds to 75 mV
72403 12/22/03 21:50 nakahara Beam: Hall PZTY scan
72400 12/22/03 21:44 nakahara Beam: Hall PZTX scan
72393 12/22/03 21:26 nakahara Beam: Hall IA scan
72390 12/22/03 21:18 nakahara Beam: Hall RHWP scan
72376 12/22/03 20:27 gaskell dead time fastbus runs
72370 12/22/03 19:03
72368 12/22/03 18:58 gaskell run 18729 is junk
72367 12/22/03 18:46 gaskell wrong run headers for 18728 and 18727
72363 12/22/03 18:00 gaskell more BPM
72361 12/22/03 17:56 gaskell end of run 18726
72360 12/22/03 17:12 jianglai gas shed key found
72358 12/22/03 17:09 gaskell BPM weirdness
72355 12/22/03 16:39 gaskell beam polarization sign change on Dec. 9
72354 12/22/03 16:10 lung Shift Summary
72351 12/22/03 15:52 gaskell loaded half-gain high voltages
72350 12/22/03 15:47 lung List of Magnetic Field Studies
72349 12/22/03 15:41 jianglai Gas shed key gone?
72348 12/22/03 15:40 jianglai BPM/BCM screen shot
72344 12/22/03 15:22 biselli NA deadtime - some good results
72337 12/22/03 14:39 jianglai/gri ToF check before the B field scan
72332 12/22/03 14:20 nakahara Beam: IHWP IN feedback runs
72331 12/22/03 14:17 nakahara Beam: IHWP OUT feedback runs
72322 12/22/03 13:25 silviu target: put the pump speed to nominal
72320 12/22/03 13:22 grimm Restored NA electronics (MT,Scalers)
72319 12/22/03 13:17 grimm HV proton fullgain loaded
72318 12/22/03 13:17 jianglai powercycled HV crate 32
72317 12/22/03 12:54 lung List of Target Boiling Runs
72315 12/22/03 12:39 arvieux spikes vs sdmch alerts
72314 12/22/03 12:39 jianglai Beam: charge asymmetry width gone out of the spec
72304 12/22/03 10:55 jianglai Beam: beam feedback off
72302 12/22/03 10:41 lung Beam steering
72301 12/22/03 10:35 arvieux/jian no more spikes in FR DMCHs???
72294 12/22/03 09:35 nakahara Beam: Injector PZTY scan
72292 12/22/03 09:35 nakahara Beam: Injector PZTX scan
72291 12/22/03 09:33 nakahara Beam: Injector IA scan
72289 12/22/03 09:32 nakahara Beam: Injector RHWP scan
72286 12/22/03 08:30 horn List of target boiling studies runs
72285 12/22/03 08:22 horn Shift Summary
72281 12/22/03 08:00 silviu target: pump speed at 42 Hz
72268 12/22/03 06:04 horn beam back
72264 12/22/03 04:42 horn RF problems
72255 12/22/03 03:20 Run plan Run plan for the remaining days
72254 12/22/03 03:17 horn max beam current and raster
72252 12/22/03 02:57 horn 1x1 raster at 40 uA
72249 12/22/03 02:37 horn Runs 18689 and 18690 are Target Boiling Studies
72244 12/22/03 01:57 jianglai Optimize lumi HVs for the target boiling studies
72240 12/22/03 01:34 horn HV on
72239 12/22/03 01:15 nakahara Beam: Magnet ramped up
72238 12/22/03 00:43 horn beam permit
72237 12/22/03 00:38 nakahara/Spa SMS: Magnet fastdump
72236 12/22/03 00:36 silviu target: set the FSD
72235 12/22/03 00:16 grimm MT 1,2,5,6 plugged into scalers (target density studies)
Sunday
72233 12/21/03 23:49 jyun controlled access tgt FSD reset
72232 12/21/03 23:37 jyun swing shift summary
72231 12/21/03 23:11 Armstrong some of "spikes" problem just DNL
72230 12/21/03 23:09 Armstrong some of "spikes" problem just DNL
72229 12/21/03 22:29 Armstrong more on spikes in French TOF spectra
72228 12/21/03 22:15 jyun magnet quench
72227 12/21/03 22:15 Sarah/Nakaha SMS: Magnet Fastdump
72224 12/21/03 21:54 arvieux TS0 and ROC3 rebooted
72222 12/21/03 21:37 Spayde Run Coordinator's Report for 21 December 2003
72219 12/21/03 20:40 Spayde Rebooted g0ana
72216 12/21/03 20:08 Spayde Sunday Swing/Monday Owl Run Plan
72215 12/21/03 20:05 Vassili Spikes in French ToF spectra still there
72195 12/21/03 19:23 nakahara Beam: Hall RHWP scan
72211 12/21/03 19:10 nakahara Beam: PZTX scan again...
72210 12/21/03 19:09 nakahara Beam: Hall PZTY scans
72208 12/21/03 19:04 nakahara Beam: Hall PZTX scan
72202 12/21/03 18:47 nakahara Beam: Hall IA scan
72175 12/21/03 16:39 Spayde Rebooting iocse20 and iocg0a
72174 12/21/03 15:56 M Jones Day Shift Summary
72172 12/21/03 14:05 Vassili Spikes in the French ToF spectra (Run 18651)
72168 12/21/03 13:03 arvieux sdmch alerts and thresholds
72161 12/21/03 12:07 nakahara Beam: Injector RHWP scans and damping summary
72159 12/21/03 11:40 nakahara Beam: PZTY scan
72158 12/21/03 11:34 nakahara Beam: PZTX (small stepsize)
72162 12/21/03 11:09 M JOnes MCC improves y beam position
72156 12/21/03 09:37 M Jones Finished Coil Pulsing, Start Wells plot.
72153 12/21/03 08:50 M Jones Reboot TS2
72147 12/21/03 07:33 Beise beam off cavity issue
72146 12/21/03 07:32 tforest SMS: reboot gosmsioc
72141 12/21/03 06:37 Beise HV 2-16-FR alarm during last run
72137 12/21/03 05:59 silviu NA electronics: flashing lights on LTDs
72136 12/21/03 05:58 Beise can't recenter beam
72135 12/21/03 05:55 silviu Analysis: tof vs. beam pos
72134 12/21/03 05:50 Beise ask to recenter beam
72131 12/21/03 05:00 Beise Beam steering done, QE measurement next
72126 12/21/03 04:06 Armstrong Shift Checklists
72112 12/21/03 02:42 Beise beam moved during 18632
72109 12/21/03 02:27 Beise Runs18630-18631 positions incorrect
72107 12/21/03 02:24 Armstrong High rates and backgrounds when beam at (+2,0)
72105 12/21/03 02:14 Beise TS0 hung up in run 18630
72103 12/21/03 02:09 Armstrong some files stuck in "Copying to Stage"
72100 12/21/03 02:00 Beise Internal DMCH Gen off
72097 12/21/03 01:42 Beise high rates at (+2,0)
72096 12/21/03 01:39 Beise No end for 18627
Saturday
72084 12/20/03 23:50 jyun swing shift summary
72083 12/20/03 23:43 secrest DMCH Internal generator
72067 12/20/03 23:41 Armstrong reduce beam with slits not attenuator
72082 12/20/03 23:33 secrest FPDs HV are at fullgain
72081 12/20/03 23:29 secrest HV readback and settings for magnetic study
72059 12/20/03 23:07 nakahara RIP scans
72057 12/20/03 22:58 Armstrong more on SDMCH alerts
72065 12/20/03 22:37 secrest HV: Pion full gain
72039 12/20/03 22:03 Armstrong Software or French alert problem?
72020 12/20/03 21:02 nakahara Beam: Hall IA scan
72036 12/20/03 20:57 jianglai Shall we retake TED runs of the B field scan (with the leakage current)?
72012 12/20/03 20:45 nakahara Beam: Hall RHWP scan
72024 12/20/03 20:18 Rutledge Saturday Day/Swing Sunday Owl/Day Run Plan: addendum Coil Modulation.
72013 12/20/03 19:46 Franklin Beam: Y0 signal resynch for low intensity
72009 12/20/03 19:39 Vassili CW beam leakage into Hall C?
72005 12/20/03 19:28 Franklin Beam: Y0 signal synch shift for low intensity runs
72000 12/20/03 18:43 secrest Magnet set values vs. readout values
71965 12/20/03 15:46 M Jones Day shift summary
71964 12/20/03 14:57 M Jones Problem with run 18572 end of run
71963 12/20/03 14:48 arvieux SMS ramped down to 4750 A
71961 12/20/03 14:39 arvieux set HV on proton fullgain
71956 12/20/03 13:22 arvieux SMS ramped down to 4800A
71954 12/20/03 13:19 Spayde Saturday Day/Swing Sunday Owl/Day Run Plan
71946 12/20/03 11:53 nakahara Beam: Injector orthogonality
71950 12/20/03 11:52 arvieux real current read in SMS
71945 12/20/03 11:52 nakahara Beam: Injector PZTY scan
71944 12/20/03 11:51 nakahara Beam: Injector PZTX scan
71942 12/20/03 11:47 nakahara Beam: Injector IA scan
71949 12/20/03 11:46 arvieux SMS at 4900 A
71941 12/20/03 11:46 nakahara Beam: Injector RHWP scan
71943 12/20/03 10:49 M Jones Set PS4 = 1000 for B-field study
71939 12/20/03 08:51 arvieux HV trips
71938 12/20/03 08:41 Beise DAQ problems earlier
71937 12/20/03 08:35 Beise Owl shift summary
71933 12/20/03 06:20 Beise ps4 should be low for fastbus?
71930 12/20/03 05:54 Beise Unclear about configuration
71927 12/20/03 05:22 Beise SOS VESDA alarm
71925 12/20/03 04:47 Beise TED Magnet study completed
71900 12/20/03 03:56 Armstrong asymmetries no longer correlated with y-differences
71899 12/20/03 03:53 nakahara Beam: Hall PZTY scan with 23uA
71895 12/20/03 03:41 nakahara Hall PZTX scan with 23uA (bad charge asymmetry)
71907 12/20/03 03:29 Beise reset crate 32 again
71904 12/20/03 03:17 Beise LED beam current not right at 0.5 uA
71903 12/20/03 03:15 beise HV crate 32 power-cycled
71890 12/20/03 03:07 nakahara Beam: Hall IA scan @ 23uA
71885 12/20/03 02:42 nakahara Beam: Hall 23uA RHWP scan
71879 12/20/03 01:20 jianglai Reanalyzing the "production" runs with the new default na deadtime routine
71874 12/20/03 00:43 pking Problems with ts_full2 run type; revert to ts_full.
Friday
71855 12/19/03 23:20 jyun swing shift summary
71850 12/19/03 22:55 Spayde Revised Friday Swing/Saturday Owl Run Plan
71843 12/19/03 22:10 Spayde High Voltages On
71841 12/19/03 22:09 Spayde/Beck SMS: Magnet at 5000 A
71840 12/19/03 22:07 Spayde/Beck SMS: JT4 Actuator Relay Failure
71834 12/19/03 20:56 grimm Target: Moving to lH2
71827 12/19/03 20:10 jroche Beam: width of charge asymmetry increased since december 15th
71826 12/19/03 20:08 Vassili Asymmetries correlated with y differences?
71823 12/19/03 19:09 jyun access for magnet
71822 12/19/03 18:57 grimm Shutting down HV (SMS slow dump)
71820 12/19/03 18:53 Franklin Beam: Y0 signal and LTD light error
71819 12/19/03 18:32 jyun Beam: channel access for RHWP, IA, PZTX been closed
71816 12/19/03 18:05 grimm Target: moved to ALU frame
71812 12/19/03 17:27 jyun 30uA beam max for now.
71810 12/19/03 16:38 jianglai Late entry: HV alarm problem solved
71809 12/19/03 16:30 pking/grimm Checking ASCS errors and other silo data transfer problems.
71806 12/19/03 16:08 jianglai Target: moved target to LH2
71805 12/19/03 15:55 Spayde Run Plan for Friday Swing/Saturday Owl
71803 12/19/03 15:28 Carlini Beam: Negligable usable beam this shift
71801 12/19/03 13:07 jianglai beam status
71800 12/19/03 12:15 silviu SMS IOC rebooted
71798 12/19/03 09:39 nakahara Beam: Injector orthogonality
71797 12/19/03 09:38 nakahara Beam: Injector PZTY scan
71796 12/19/03 09:38 nakahara Beam: Injector PZTX scan
71795 12/19/03 09:36 nakahara Beam: Injector IA scan
71794 12/19/03 09:35 nakahara Beam: Injector RHWP scan from last night
71799 12/19/03 09:32 Spayde Friday Day/Swing Run Plan
71792 12/19/03 08:09 Beise HV alarm
71791 12/19/03 08:02 Beise MCC takes beam for injector tuneup
71790 12/19/03 07:54 Beise shift summary
71789 12/19/03 07:51 Beise adjust beam location a bit
71787 12/19/03 07:37 Beise Feedback OK, lumis maybe not
71786 12/19/03 06:56 Beise iocg0a rebooted+ beam feedback
71783 12/19/03 05:45 tforest Target: iocg01 crashes
71780 12/19/03 05:28 tforest Target: Insert Aluminum frame, 15 uA dumps 100 W into target
71778 12/19/03 05:06 beise iocg0a tripped
71777 12/19/03 04:44 beise CFD threshold program complete
71764 12/19/03 03:41 beise change HV to "pion full"
71751 12/19/03 02:54 Beise switch to full proton
71744 12/19/03 02:18 secrest BPM screenshot
71737 12/19/03 01:42 beise begin CFD threshold tests
71736 12/19/03 01:41 tforest SMS: SMS ramped to 5000A
71734 12/19/03 01:29 beise feedback off, magnet to 5000 A
71733 12/19/03 01:27 Beise iocg0a recovered, on to CFD threshold tests
71731 12/19/03 01:22 beise iocg0a needs rebooting
71730 12/19/03 00:53 secrest proton asymmetry widths seem large for Fr rings 7 and 8
71729 12/19/03 00:19 Beise G0Realtime OK
Thursday
71725 12/18/03 23:52 jyun swing shift summary
71724 12/18/03 23:44 jyun g0realtime monitor not updating
71717 12/18/03 23:41 nakahara Beam: Hall PZTY scan
71713 12/18/03 23:26 nakahara Beam: Hall PZTX scan...with the picture
71712 12/18/03 23:26 nakahara Beam: Hall PZTX scan
71722 12/18/03 23:10 jyun g0ana clock is off by an hour. don't make a log entry from g0ana
71707 12/18/03 23:08 nakahara Beam: Hall IA scan
71721 12/18/03 23:02 secrest Parity device calibration
71720 12/18/03 23:01 jyun iocg0a down
71700 12/18/03 22:45 nakahara Beam: Hall RHWP scan
71690 12/18/03 21:20 Spayde Run Coordinator Report for 18 December 2003
71687 12/18/03 20:32 Spayde Thursday Swing/Friday Owl Run Plan
71686 12/18/03 20:14 nakahara
71685 12/18/03 20:07 nakahara Vacuum event in the injector with just HallC beam
71676 12/18/03 20:06 nakahara Beam: Injector orthogonality
71675 12/18/03 20:05 nakahara Beam: Injector PZTY scan
71674 12/18/03 20:04 nakahara Beam: Injector PZTX scan
71673 12/18/03 20:03 nakahara Beam: Injector IA scan
71683 12/18/03 19:46 nakahara HallA/HallC beam not available yet
71672 12/18/03 19:12 nakahara Beam: Hall PZT scans
71670 12/18/03 19:07 nakahara Beam: Hall IA scan from this morning
71677 12/18/03 19:07 Spayde SMS: Ramping Magnet to 4500 A
71667 12/18/03 17:53 nakahara Stable G0 beam at ~7pm
71666 12/18/03 17:20
71665 12/18/03 17:05 jyun beam energy mesurement
71663 12/18/03 17:01 Vassili CAEN HV module for octant 6 reset
71660 12/18/03 16:40 Vassili PMT 6-16-FR keeps tripping
71656 12/18/03 15:57 Lung Shift Summary
71655 12/18/03 15:25 Spayde/Lung DAQ & HV Changes
71653 12/18/03 14:55 Lung Cycle crate for Octant 2
71652 12/18/03 14:42 Lung Unexpected Beam in Hall C
71651 12/18/03 12:59 benesch deadtime vs current
71647 12/18/03 09:51 Lung No Beam Expected
71646 12/18/03 09:49 pking Recompiled G0Analysis on g0ana.
71645 12/18/03 09:22 jianglai Target: rebooted SMS ioc
71644 12/18/03 09:21 pking Owl shift summary.
71618 12/18/03 05:01 pking HV for 8-16-BL was overvoltage; power cycled crate 38.
71611 12/18/03 03:38 secrest HV 8-16-FR tripped
71610 12/18/03 03:37 secrest coil modulation histograms not filled in offline hist
71607 12/18/03 03:01 tforest Target: IOC crash
71603 12/18/03 02:22 pking Recompiled G0Analysis.
71595 12/18/03 00:37 secrest BPM screen shot
Wednesday
71593 12/17/03 23:47 jyun swing shift summary
71591 12/17/03 23:38 Spayde Run Coordinator's Report for 17 December 2003
71586 12/17/03 21:58 nakahara beam: injector PZT scans
71585 12/17/03 21:56 nakahara beam: injector IA scan
71582 12/17/03 21:35 jyun/secrest mt tdc empty spots
71577 12/17/03 21:08 nakahara beam: injector RHWP scan
71575 12/17/03 20:57 jroche I made the plot in entry 71574
71574 12/17/03 20:55 Tungsten contribution to Flyswatter+Tungsten ToF spectra
71569 12/17/03 19:44 nakahara beam: late entry: PZT scans
71568 12/17/03 19:41 nakahara beam: late entry: RHWP and IA scans
71565 12/17/03 19:03 Vassili Outside He bottle nearly empty
71563 12/17/03 18:58 averett HV turned on
71560 12/17/03 17:29 jyun how to start halo mon gui
71558 12/17/03 16:51 Spayde Run Plan for Wednesday Swing/Thursday Owl
71557 12/17/03 16:34 nakahara corrections to run titles
71550 12/17/03 15:10 Carlini. Comments Day shift 12/17/03
71549 12/17/03 14:17 gaskell more moller LN2
71546 12/17/03 13:17 nakahara IA/PZT/RHWP scans
71544 12/17/03 13:05 jroche accounting for asymmetry data taken so far
71521 12/17/03 11:07 gaskell Moller LN2 level may be bogus
71520 12/17/03 11:03 nakahara IHWP IN
71519 12/17/03 10:13 Spayde SMS: Ramping Up Magnet
71518 12/17/03 10:09 McKeown, Sil reset target vacuum interlock
71517 12/17/03 09:22 Spayde SMS: Magnet on Cold Return
71516 12/17/03 08:54 Spayde SMS: Fast Dump Followup
71515 12/17/03 08:35 Spayde SMS: Magnet Fast Dump
71513 12/17/03 08:02 pking Owl shift summary.
71512 12/17/03 07:38 pking Status from the cryo group.
71511 12/17/03 07:27 pking SMS fast dump.
71506 12/17/03 06:30 tforest Target: False Target Motion Alarm
71503 12/17/03 05:25 pking no beam for a few minutes
71502 12/17/03 05:16 pking Mistake in run start screen; run 18430 is a long feedback run.
71498 12/17/03 04:55 pking Beam delivery is resuming.
71497 12/17/03 04:53 pking MCC does a QE measurement
71494 12/17/03 04:32 pking iocSE20 has been rebooted.
71493 12/17/03 04:27 pking G0 and G0B BPM readout frozen; reboot iocSE20.
71481 12/17/03 01:40 pking Power cycled caen crate
71475 12/17/03 00:39 secrest BPM screen shot
Tuesday
71473 12/16/03 23:58 grimm/pitt Swing shift summary
71472 12/16/03 23:55 quinn Another attempt at optimizing Y0 timing
71471 12/16/03 23:44 PItt Summary of feedback parameters
71469 12/16/03 23:40 secrest automatic data clean up script--not working?
71465 12/16/03 23:18 quinn Changed Y0 timing for NA electronics (undoing this morning's change???)
71464 12/16/03 23:16 PItt Summary of feedback parameter
71460 12/16/03 22:50 Pitt PZTx,PZTy scans
71458 12/16/03 22:44 Pitt IA scan
71457 12/16/03 22:42 Pitt RHWP scan
71456 12/16/03 22:22 Spayde Run Coordinator Report for 16 December 2003
71453 12/16/03 21:40 grimm Beam: IHWP was taken out on monday afternoon
71446 12/16/03 21:00 grimm/jroche Status of MT FastBus rates (oct4,8)
71438 12/16/03 20:40 Vassili Scanning with the EPSON scanner
71435 12/16/03 20:28 Vassili Logbook scans
71422 12/16/03 20:00 grimm Target: Channel Access Exception (network)
71419 12/16/03 19:53 Vassili Failed to make BPM screen shot
71417 12/16/03 19:51 Spayde Tuesday Swing Wedneday Owl/Day Run Plan
71413 12/16/03 19:16 nakahara beam: injector orthogonality
71412 12/16/03 19:14 nakahara beam: injector PZTY scan
71411 12/16/03 19:13 nakahara beam: injector PZTX scan from last night
71399 12/16/03 16:15 grimm MCC: reboot IOC G0A
71390 12/16/03 14:10 Carlini Beam: Observations
71384 12/16/03 13:08 nakahara/jia beam: 3x3 feedback results so far
71387 12/16/03 12:56 pking g0ana's clock was off by an hour; corrected it now.
71379 12/16/03 08:58 Spayde Halo Target GUI Is Available from Monticello
71377 12/16/03 08:36 Spayde Beam Gone due to iocg0a
71375 12/16/03 08:21 jianglai owl shift summary
71373 12/16/03 07:53 spwellls Target: Tungsten radiator out, LH2 target in
71365 12/16/03 07:43 jianglai YO timing shift
71370 12/16/03 07:37 jianglai MT fastbus
71369 12/16/03 07:09 jianglai beam HC noise
71368 12/16/03 07:00 quinn New Y0 timing (to go back to old Y0 timing)
71355 12/16/03 04:39 spwellls Target: Tungsten radiator out, LH2 target in
71350 12/16/03 03:43 nakahara PZT scans
71336 12/16/03 02:28 nakahara Injector IA scans
71349 12/16/03 02:23 quinn Beam: New Musson box program and timing
71332 12/16/03 02:11 nakahara IA/RHWP scans
71335 12/16/03 01:28 jianglai TS failed, rebooted
71317 12/16/03 00:29 pking Rebooted g0ana.
71319 12/16/03 00:00 Pitt Swing shift summary
Monday
71316 12/15/03 22:47 Pitt Beam status
71314 12/15/03 22:35 pking Recopied one data file to tape; one datafile couldn't be recopied yet.
71313 12/15/03 22:21 Spayde Run Coordinator Report for 15 December 2003
71312 12/15/03 22:17 pking Cleanup of old junk data files on gzerol3.
71310 12/15/03 21:55 jroche Beam: sensitivities of beam properties to IA and PZTs over time (just better legends)
71308 12/15/03 20:20 grimm Lumis: HV turned on
71307 12/15/03 19:29 grimm MCC: still tuning the beam, may take longer ...
71306 12/15/03 19:02 grimm container for TLD 13 is empty
71305 12/15/03 18:44 grimm Detector HV turned on (all octants)
71303 12/15/03 15:51 jyun no halo target gui on monticello
71302 12/15/03 15:24 Domi FR electronic pager disabled until Jacques Arvieux arrival thursday 12/18
71301 12/15/03 14:42 Spayde Magnet at 5000 A (late entry)
71299 12/15/03 13:16 Spayde Hall C Chopper Slit Restored
71298 12/15/03 13:06 Rutledge Target: Tungston Radiator Target - FSD settings
71297 12/15/03 12:59 Spayde Halo Target GUI Available from Monticello
71296 12/15/03 12:56 Spayde Revised Monday Swing/Tuesday Owl Run Schedule
71295 12/15/03 12:21 jyun Beam: halo 7 and 8 OUT
71294 12/15/03 12:13 Serge/Klaus TLDs removal from Hall C
71290 12/15/03 11:00 Spayde SMS: Ramping Magnet Up
71284 12/15/03 10:27 Carlini Fly Swatter Status
71283 12/15/03 09:33 Domi Reference files for FR electronics have been updated
71282 12/15/03 09:27 Spayde Hall in Controlled Access
71281 12/15/03 09:05 Domi FR TDC Diff. Linearity optomization - Memo
71280 12/15/03 08:36 jianglai/wel Beam: halo calibration
71279 12/15/03 08:22 jianglai owl shift summary
71256 12/15/03 05:32 Lars Target: killed all MEDM processes
71255 12/15/03 05:08 jianglai halo target control?
71254 12/15/03 04:49 jianglai tune beam in hall, steering
71253 12/15/03 04:34 Lars Target: when MEDM won't let you change the alarm limits
71251 12/15/03 03:23 jianglai beam status
71250 12/15/03 03:06 jianglai status update
71249 12/15/03 03:03 A. Kolarkar graphs for the "Slopes from IA and PZT Scans"
71248 12/15/03 01:53 Domi/SPwells More on high rates from MT (TDC) of octants 4 and 8
71246 12/15/03 00:31 quinn More on Musson box monitor signals
Sunday
71244 12/14/03 23:51 J. Secrest Swing Shit Summary
71241 12/14/03 22:48 jroche Target: the total heat alarm fooled me
71238 12/14/03 22:41 nakahara LN2 reservoir level alarm
71236 12/14/03 22:38 jroche Target: target position off beam
71235 12/14/03 21:37 Nakahara/Phi SMS: Rebooted the magnet computer
71234 12/14/03 21:34 jroche Target: vent line alarm (transient)
71229 12/14/03 19:45 Spayde Monday Day/Monday Swing/Tuesday Owl Run Plan
71227 12/14/03 19:37 pking Reconnected cavity monitor signals and Gary's batteries to V/F channels.
71226 12/14/03 19:33 nakahara/phi Magnet ramping down
71225 12/14/03 19:25 Benoit Dilution factor - comparison with last year
71224 12/14/03 19:17 Spayde Run Coordinator Report for 14 December 2003
71223 12/14/03 19:13 pking Test of cavity monitor V/F
71222 12/14/03 18:56 secrest IHWP--"in"
71219 12/14/03 18:44 dmckee RWHP scan
71216 12/14/03 18:34 Quinn & King Musson box monitor signals
71210 12/14/03 18:15 jroche Target: open jt valve by on click
71205 12/14/03 17:25 jroche Target: lh2 target in beam
71199 12/14/03 16:33 Spayde Sunday Swing/Monday Owl Run Plan
71194 12/14/03 15:59 dmckee Run #18335
71191 12/14/03 15:48 Domi Run type is back to ts_full
71190 12/14/03 15:46 Domi DMCH 9 unplugged => 8 DMCH boards
71187 12/14/03 15:24 gaskell bpm gains back to normal
71184 12/14/03 15:10 Domi ROC3 terminal downstairs and downloaded
71183 12/14/03 15:00 Domi 9 DMCH boards plugged intp the VXI crate
71180 12/14/03 14:22 pking Changed run type to ts_scaler!!!!!
71179 12/14/03 14:09 pking Reconnected YO TDC input cables
71178 12/14/03 14:09 pking Reconnected YO TDC input cables
71177 12/14/03 13:51 dmckee RHWP scan from Friday
71176 12/14/03 13:49 dmckee PZT scans from Friday
71175 12/14/03 13:48 gaskell controlled access
71174 12/14/03 13:46 gaskell Moller systematics - current dependence
71173 12/14/03 13:44 dmckee IA scan from Friday
71171 12/14/03 13:29 Domi ROC3 terminal upstairs
71170 12/14/03 13:28 gaskell Moller systematics - laser phase dependence
71169 12/14/03 13:20 gaskell Moller systematics - overview
71168 12/14/03 13:12 dmckee RHWP scan again.
71164 12/14/03 10:44 gaskell correct moller raster picture
71162 12/14/03 10:38 gaskell changed bpms to forced gain mode
71160 12/14/03 10:31 nakahara qrtntuples not filled?
71159 12/14/03 10:26 Spayde ABU Issue Resolved
71154 12/14/03 08:42 gaskell changed helium bottle
71153 12/14/03 08:20 C.Davis RHWP scan (local)
71152 12/14/03 08:17
71151 12/14/03 08:13 spwells owl shift summary
71145 12/14/03 08:01 C.Davis PzTy scan
71142 12/14/03 07:51 C.Davis PzTx scan
71137 12/14/03 07:40 C.Davis IA scan
71103 12/14/03 03:14 quinn Beam: Change in Y0 timing
71102 12/14/03 02:58 jianglai Beam: implemented revised 3x3 feedback algorithm in g0beamfeedback33
71101 12/14/03 02:39 spwells more ABU software problems
71098 12/14/03 02:25 spwells Octants 4 and 8 MT TDC's
71097 12/14/03 02:22 spwells Rate monitor not working
71096 12/14/03 02:20 spwells prestart and runinfomenu
71078 12/14/03 00:45 spwells radiation monitor trip
71074 12/14/03 00:23 secrest Swing Shift Summary
Saturday
71070 12/13/03 23:34 secrest ABU software doesn't seem to calc ABUs correctly
71062 12/13/03 21:35 Spayde Run Coordinator Report for 13 December 2003
71061 12/13/03 21:01 Gzero Target: changed g0bcm_alarm setting
71059 12/13/03 20:40 grimm Used pins of the YO TDC
71055 12/13/03 19:55 Spayde Sunday Owl Run Plan
71054 12/13/03 19:54 dmckee pzt scan
71053 12/13/03 19:52 pking More details on the YO TDC
71052 12/13/03 19:43 dmckee RHWP scan
71051 12/13/03 19:41 dmckee IA scan results
71032 12/13/03 18:18 pking Modifed the DMCH configuration screen in g0daq_config.pl
71027 12/13/03 18:08 secrest Yo TDC inputs not connected
71018 12/13/03 16:47 gaskell rebooted moller ioc
71017 12/13/03 16:41 Domi FR TDC Diff. Linearity optimization
71016 12/13/03 16:35 gaskell summary of Moller running
71015 12/13/03 16:28 gaskell Moller raster is off
71012 12/13/03 16:21 horn ramping down solenoid
71011 12/13/03 16:19 horn bcm2 gain setting
71010 12/13/03 16:15 gaskell Moller run list
71007 12/13/03 15:56 Spayde Saturday Swing Run Plan
71005 12/13/03 15:39 jianglai Beam: feedback configuration run logs last night
71003 12/13/03 15:35 gaskell more 2 mm moller raster pictures
71002 12/13/03 15:32 gaskell pics of moller raster at 2mm
71000 12/13/03 15:18
70997 12/13/03 15:03 gaskell ROC 3 is upstairs
70987 12/13/03 13:34 dmckee SMS IOC appears to be down
70984 12/13/03 13:18 gaskell tried the solenoid at higher field
70977 12/13/03 12:27 gaskell increased CAMAC prescale
70975 12/13/03 12:20 nakahara/jia beam: feedback results/summary
70966 12/13/03 11:23 gaskell run 48296 followup
70964 12/13/03 11:05 pking Updated and recompiled the analyzer on g0ana/cdaql1/cdaql2.
70963 12/13/03 11:03 horn Moller BPM
70962 12/13/03 10:53 nakahara beam: PZT scan before feedback
70960 12/13/03 10:49 nakahara beam: RHWP + IA scan before feedback
70958 12/13/03 10:16 horn/gaskell moller raster harp_y position
70956 12/13/03 10:09 gaskell ion chambers
70955 12/13/03 10:01 horn/gaskell Moller Raster
70952 12/13/03 09:43 gaskell beam steering for moller
70950 12/13/03 09:13 Serge/Julie HV pion file OK
70949 12/13/03 09:01 grimm run 18257: silo backup error
70948 12/13/03 08:46 C.Davis Scan of checklist, small
70947 12/13/03 08:28 C.Davis Scan of checklist
70944 12/13/03 08:10 gaskell getting ready for Moller
70943 12/13/03 08:05 spwells feedback off
70941 12/13/03 08:01 spwells owl shift summary
70940 12/13/03 08:01 spwells IA/PZT scan summary
70939 12/13/03 07:44 gaskell pre-moller injector epics stuff
70938 12/13/03 07:43 C.Davis RHWP scan
70937 12/13/03 07:27 C.Davis PzTy scan
70930 12/13/03 07:06 C.Davis PzTx scan
70927 12/13/03 06:58 C.Davis IA scan
70908 12/13/03 05:47 spwells Beam back
70906 12/13/03 05:45 spwells beam off for QE scan
70899 12/13/03 03:50 spwells G0 BPM info lost
70895 12/13/03 02:35 quinn dead time measurement
70889 12/13/03 00:18 jianglai Target: lumi widths with different target pump speed
Friday
70888 12/12/03 23:59 jroche octant 8, det 16 fr hv off since a while ...
70887 12/12/03 23:58 Secrest Swing Shift Summary
70884 12/12/03 23:36 jroche HV file for pion measurement
70883 12/12/03 23:29 jroche Target: target alarm handler dispearing
70882 12/12/03 23:29 Secrest current readout above target computer
70879 12/12/03 23:24 jroche HV change to align pion to a same amplitude
70876 12/12/03 23:07 jroche adjust valve setting after lowering pump speed
70873 12/12/03 22:48 jroche Target: target pump speed to 30 Hz
70870 12/12/03 21:55 Secrest The Jeffylab computer went down
70857 12/12/03 21:00 pking Recopied two files to the silo
70848 12/12/03 20:24 Spayde Run Coordinator Report for 12 December 2003
70843 12/12/03 19:50 Spayde Settings for Halo Monitor Calibration Test Plan
70839 12/12/03 19:39 jianglai/ben update PID cuts table
70834 12/12/03 19:25 nakahara beam: PZTY angle differences
70832 12/12/03 19:22 nakahara beam: PZTX angle differences
70831 12/12/03 19:22 Secrest Correction: Run 18231 deadtime studies : 30 uA CFD threshold 5
70830 12/12/03 19:16 nakahara beam: IA scan angle differences
70827 12/12/03 19:09 pking Standard DAQ settings for G0 runs.
70824 12/12/03 18:56 pking Restarted the automatic analysis processes.
70821 12/12/03 18:38 nakahara Beam: feedback results: correction
70814 12/12/03 18:13 Spayde Procedure for Requesting Beam Currents Other than 40 uA
70811 12/12/03 18:06 Spayde Hall B Beam Trip Test Plan
70804 12/12/03 17:33 grimm/pking New DAQ-Pager: 584-5560 (Klaus Grimm)
70799 12/12/03 17:16 Spayde Friday Swing, Saturday Owl and Day Run Plan
70797 12/12/03 16:57 benoit DNL Correction for french FPDs
70796 12/12/03 16:38 nakahara Axy Plot
70795 12/12/03 16:35 nakahara beam: feedback results
70792 12/12/03 16:05 gaskell shift summary and run list
70791 12/12/03 16:04 pking anadata2 will be offline to be remformatted.
70790 12/12/03 16:01 gaskell beam gone to make look-up table
70789 12/12/03 16:00 gaskell good beam position confusion
70787 12/12/03 15:10 jroche the change in gain we made up to now
70782 12/12/03 15:01 gaskell update
70781 12/12/03 14:43 nakahara beam: orthogonality injector and Hall
70777 12/12/03 14:11 gaskell beam is back
70776 12/12/03 13:09 jianglai My faults ...
70775 12/12/03 12:36 nakahara beam: IA = 9, PZTY scan
70774 12/12/03 10:53 nakahara beam: PZT scans
70773 12/12/03 10:50 nakahara beam: RHWP/IA scans from last night
70768 12/12/03 09:39 Spayde Problems with Hall C Chopper Slit
70767 12/12/03 09:30 Lars Target: Tungsten target
70766 12/12/03 09:05 gaskell beam going away for a bit
70764 12/12/03 09:03 gaskell runs 18210-18212 wrong run mode
70760 12/12/03 08:00 spwells owl shift summary
70759 12/12/03 07:37 biselli moved H2 target in
70758 12/12/03 07:35 Spayde Day Shift Run Plan
70754 12/12/03 06:52 biselli moving the target around
70752 12/12/03 06:30 biselli moved radiator in
70746 12/12/03 04:22 spwells He cell pressure alarm
70745 12/12/03 04:17 domi/pking FrAm test runs / TOF decoding
70714 12/12/03 01:09 spwells Hall C Access
70713 12/12/03 00:52 smithg flyswatter target out
70712 12/12/03 00:50 J Kuhn KGB to SDB cable replaced
70711 12/12/03 00:39 J Kuhn Musson box revisited
70708 12/12/03 00:18 Secrest Swing Shift Summary
Thursday
70706 12/11/03 23:26 Spayde Run Coordinator Report for 11 December 2003
70705 12/11/03 22:51 smithg old fix for stuck JT
70702 12/11/03 22:06 smithg Put LH2 target in
70700 12/11/03 21:13 Spayde Updated Swing/Owl Run Plan
70699 12/11/03 21:08 smithg W target temp vs I_beam
70681 12/11/03 19:30 smithg put in W target.
70680 12/11/03 19:28 pking Removed empty data files from gzerol3.
70679 12/11/03 18:39 dmckee BPM screen
70678 12/11/03 18:38 smithg total target heat load bug
70677 12/11/03 17:39 smithg Flyswatter knob reading
70676 12/11/03 17:26 smithg target out, flyswatter still in
70675 12/11/03 17:25 smithg Flyswatter knob reading
70674 12/11/03 17:09 J. Kuhn Musson-YO update
70673 12/11/03 17:05 jroche Beam: harps analysis
70672 12/11/03 16:28 Domi DMCH parameters for the 9th FrAm board
70671 12/11/03 16:13 lung Shift Summary
70669 12/11/03 15:59 Spayde Swing Shift Run Plan
70668 12/11/03 15:57 Razmik Target: Flyswatter position is "IN"
70667 12/11/03 15:56 dmckee HV set to 1/2 gain
70665 12/11/03 15:39 dmckee HV to full gain for GMS test
70661 12/11/03 15:35 smithg Changed ion chamber trip levels
70660 12/11/03 14:13 Lars Target: JT valve control may still be flaky
70659 12/11/03 13:23 Lars Target: fixed problem with target position id!
70658 12/11/03 13:12 lung CHL Crash - no beam.....
70657 12/11/03 13:08 nakahara injector PZT slopes
70655 12/11/03 13:00 saw g0iocsms remote reboot restored
70654 12/11/03 12:52 nakahara injector IA + RHWP scans
70653 12/11/03 12:48 Lars Target: LH2 target is in beam
70652 12/11/03 12:46 Lars Target: updated target positions and motion FSD settings
70651 12/11/03 12:37 Lars Target: pump speed increased to 40 Hz
70649 12/11/03 12:25 pking Updated G0Scripts directory.
70648 12/11/03 12:24 Spayde Day Shift Run Plan
70647 12/11/03 12:20 Sarah Beam: Halo rates during the lumi scans and spot size changes
70643 12/11/03 12:01 jianglai Beam: instructions to use the 3x3 feedback program
70642 12/11/03 11:58 Kuhn/Musson Divide-by-16 box power cycled
70641 12/11/03 11:49 Serge Load HV 1/2 gain file
70640 12/11/03 11:18 C. Davis Controlled Access begins
70638 12/11/03 10:47 lung Controlled Access
70637 12/11/03 10:24 nakahara Beam: IA scan from last night
70627 12/11/03 09:50 lung Beam off
70626 12/11/03 09:41 Serge FR FPDs Half Gain calibration
70625 12/11/03 09:38 Serge Third round of FR gain calibration
70622 12/11/03 07:53 Neven Owl Shift Summary
70620 12/11/03 06:59 C. Davis `x' should read `ia'
70619 12/11/03 06:58 C. Davis PzTy scan
70616 12/11/03 06:49 C. Davis PzTx scan
70612 12/11/03 06:42 C. Davis IA scan
70608 12/11/03 06:33 C. Davis RHWP scan
70600 12/11/03 05:55 C.Davis Run 18164 mislabelled as 6275; should be 5750
70583 12/11/03 03:02 biselli moved target in
70570 12/11/03 02:14 Serge Problems with CAEN supply
70568 12/11/03 01:47 silviu targets scan, BH and SH
70567 12/11/03 01:35 silviu Targets scan I, LH2 and W
70565 12/11/03 00:06 saw SMS: Call me if entry is made during day
70564 12/11/03 00:04 secrest shift summary
Wednesday
70563 12/10/03 23:53 saw Reboot vmec15 to add EPICS records
70561 12/10/03 20:31 nakahara correction
70560 12/10/03 20:21 pking Modified the automatic data cleanup script on gzerol3.
70559 12/10/03 19:48 nakahara DAQ/DATA: Raw data missing
70558 12/10/03 19:28 jroche, secr Beam: centering the beam on target
70557 12/10/03 19:27 jroche, secr Beam: centering the beam on target
70556 12/10/03 18:42 saw Target: gpt4 alarm limits changed
70555 12/10/03 17:56 nakahara Beam: IA scan in injector
70554 12/10/03 17:32 dmckee completed shift checklist sheet
70553 12/10/03 17:17 biselli dnl results for NA electronic for run 18142
70552 12/10/03 17:17 saw Target: Target alarm
70551 12/10/03 17:13 nakahara Beam: RHWP scan comparison in injector
70550 12/10/03 17:10 biselli dnl results for NA electronic for run 1814
70549 12/10/03 17:05 dmckee non-existant NA CFD threshold
70548 12/10/03 17:02 dmckee BPM screen
70530 12/10/03 13:50 Lars Target: SMS EPICS IOC stuck
70529 12/10/03 12:47 gaskell moller scin channel 9-left is dead
70520 12/10/03 11:01 Domi Fast-Bus Data taking Cont'ed
70519 12/10/03 10:51 Domi FR CFD Threshols while running Fast-Bus : reminder
70518 12/10/03 10:48 Razmik Target: Target position 'out of beam'
70517 12/10/03 10:27 nakahara Widths before/after beam spot size change
70516 12/10/03 10:19 vulcan. 18138
70515 12/10/03 10:00 Serge FPD 06-16-FL
70514 12/10/03 09:49 C. Davis Hasty conclusion re octant 6 element 16.
70513 12/10/03 09:32 C. Davis Octant 6 Element 16 Front Electronics problem
70512 12/10/03 09:11 Serge 2nd pass of FR FPDs calibration
70510 12/10/03 08:38 C. Davis DAQ data1 data2 cleaned out
70509 12/10/03 08:37 vulcan. full disk
70503 12/10/03 07:31 Neven Simice Owl Shift Summary
70497 12/10/03 05:56 chuck davis Ignore 70485
70496 12/10/03 05:45 chuck davis MCC measurements
70495 12/10/03 05:44 chuck davis Ignore 70485
70494 12/10/03 05:43 chuck davis PzTy scan
70492 12/10/03 05:30 chuck davis IA scan picture
70491 12/10/03 05:27 chuck davis Ignore 70485
70489 12/10/03 05:25 chuck davis PzTx scan
70487 12/10/03 05:19 chuck davis IA scan
70485 12/10/03 05:16 chuck davis PzTx scan
70476 12/10/03 04:50 kolarkar RHWP scans
70466 12/10/03 03:43 kolarkar Beam: PZTX, PZTY scan results
70465 12/10/03 03:37 kolarkar RHWP Scan - update
70457 12/10/03 03:14 kolarkar IA scans
70451 12/10/03 02:46 kolarkar Beam: RHWP scans (before spotsize reduction))
70430 12/10/03 01:45 Breuer HV interlock current thresholds set to 80 uA
70425 12/10/03 01:01 kolarkar run # 18105 does not exist
70423 12/10/03 00:49 kolarkar cdaqs1 hung; rebooted
70422 12/10/03 00:47 secrest Shift summary
Tuesday
70417 12/09/03 23:54 musson/domi/ YO update
70410 12/09/03 23:00 jianglai instructions to start the lumi and halo HVs
70403 12/09/03 22:18 Kolarkar Rotatable Half Wave Plate scan
70401 12/09/03 22:11 jroche Beam: beam position : from the elog
70397 12/09/03 21:47 pking Stopped analysis jobs for "anadata2"; the disk "anadata2" may be reformatted tomorrow.
70391 12/09/03 21:14 saw cdaqs3 replaced by cdaql3
70387 12/09/03 20:15 saw Target: Target moved out and back in
70386 12/09/03 19:45 pking Changed ROOT envirnment setting for g0ana/cdaql1/cdaql2.
70385 12/09/03 19:42 Serge/Julie French PMT gain calib.
70383 12/09/03 19:11 saw Target: Gzero target in
70382 12/09/03 18:49 gaskell moller target retracted
70381 12/09/03 18:40 horn ramping down solenoid
70380 12/09/03 18:40 gaskell bcm2 back to gain 3
70379 12/09/03 18:39 horn/gaskell Beam polarization
70376 12/09/03 18:08 dmckee HV files, no 4-05-BR
70373 12/09/03 17:45 Target: Cryotarget is off
70372 12/09/03 17:15 gaskell ramping up solenoid
70371 12/09/03 17:14 gaskell BCM2 to gain setting 4
70369 12/09/03 16:39 pking Changed path to ROOT on gzerol3.
70366 12/09/03 15:53 vulcan shift summary
70365 12/09/03 14:39 Spayde SMS: Fast Dump Post-Mortem
70364 12/09/03 13:37 Spayde SMS: Magnet at Full Current
70363 12/09/03 13:24 dmckee GMS progress report
70362 12/09/03 13:03 dmckee HV snipper restored
70361 12/09/03 12:52 Spayde SMS: Ramping the Magnet Up
70359 12/09/03 12:39 dmckee More snipper
70358 12/09/03 12:24 gzero YO signal (Musson) box
70357 12/09/03 12:11 Spayde SMS: Recovery from Fast Dump
70355 12/09/03 11:44 jyun Beam: feedback run, To Kaz
70354 12/09/03 11:41 Serke/Klaus/ TLD installation +_LV supply
70352 12/09/03 11:15 vulcan Y0 signal
70351 12/09/03 11:12 Breuer NA Amplifier changes
70350 12/09/03 11:11 vulcan Harp
70349 12/09/03 11:09 vulcan BPM
70348 12/09/03 11:07 vulcan survey
70345 12/09/03 10:41 dmckee/pking GMS gate timing
70342 12/09/03 09:57 beaufait lvdt readback noise
70340 12/09/03 09:45 Lars Target: new flyswatter and tungsten temperature alarms
70331 12/09/03 09:13 dmckee Sniper disabled
70330 12/09/03 08:39 gaskell modified run summary
70329 12/09/03 08:33 gaskell better moller tune pictures
70327 12/09/03 08:00 Neven Owl shift summary
70326 12/09/03 07:20 Breuer FR gain calibration: HV NOT set when hitting limit
70323 12/09/03 06:33 biselli Target: moved target in
70322 12/09/03 06:16 biselli Target: moved target out
70318 12/09/03 04:58 Breuer HV crate problem, did not load
70317 12/09/03 04:52 breuer DAQ instructions for change to Sarah's 30 Hz running
70314 12/09/03 04:42 Neven End of Run 18077 is actually end of Run 18076
70312 12/09/03 04:27 Neven Good calibration data start with Run # 18077
70305 12/09/03 03:30 nakahara PZT scans
70304 12/09/03 03:28 nakahara RHWP + IA scan
70303 12/09/03 03:22 nakahara Beam trips
70301 12/09/03 03:20 nakahara analysis: charge and position feedback
70300 12/09/03 03:19 biselli Target: lowered the Low alarm of gpt5
70299 12/09/03 03:08 nakahara Beam: Charge/position feedback test...and then some....
70297 12/09/03 02:08 Domi Cleaning up of old FR reference files
70294 12/09/03 01:10 pking/kuhnj Scope pictures of CFD refiring for 1-01-BL and 8-01-BL
70284 12/09/03 00:48 Kolarkar corrections in the Gain Analysis procedure
70280 12/09/03 00:40 Benoit-Serge Gain adjustement with scope
70267 12/09/03 00:01 secrest Swing shift summary
Monday
70260 12/08/03 23:48 Kolarkar, Br New High Voltage file: octant 2,4,6,8 first iteration high gain
70259 12/08/03 22:50 saw Target: BCM and Beam heat limits changed
70258 12/08/03 22:44 saw BCM calibrations loaded into EPICEs
70248 12/08/03 19:20 saw Target: Hydrogen target in beam
70247 12/08/03 18:41 pking Use "ts_full" to take Fastbus calibration data.
70246 12/08/03 18:38 gaskell moller run summary
70245 12/08/03 18:25 gaskell BCM2 back to gain setting 3
70244 12/08/03 17:53 horn/gaskell Moller tuned
70243 12/08/03 17:52 gaskell moller done
70237 12/08/03 16:57 horn/gaskell moller controls
70235 12/08/03 16:43 saw Target Vacuum readback.
70233 12/08/03 16:30 gaskell/horn moller collimator scan
70231 12/08/03 16:22 dmckee Gas shed helium bottle
70230 12/08/03 16:11 gaskell controlled access
70228 12/08/03 16:02 vulcan shift run summary
70227 12/08/03 15:51 Lars Target: JT valve set to 30%
70226 12/08/03 15:36 Lars Target: Pump speed set to 31 Hz
70224 12/08/03 14:54 Razmik Target Vaccum screen not updating
70223 12/08/03 12:34 Sarah Missing run 17991 mystery solved
70221 12/08/03 11:15 jianglai for Beam: new BCM calibration constants for EPICs
70220 12/08/03 09:35 gaskell G0 HV off
70219 12/08/03 09:34 horn/gaskell BCM2 gain setting
70218 12/08/03 09:34 gaskell moller start
70213 12/08/03 08:38 gaskell test
70211 12/08/03 08:26 Vulcan Oct 2
70208 12/08/03 07:52 Neven Owl shift run summary
70201 12/08/03 06:37 Louis Flyswatter+LH2 DMCH ToF
70198 12/08/03 05:49 Kuhn/Biselli CFD#1 changed back to 10ns
70195 12/08/03 04:12 Kuhn/Biselli last 2 CFD test runs are junk
70187 12/08/03 02:36 Williamson How do you start the Injector DAQ
70186 12/08/03 02:36 Kuhn/Biselli Delay changed for CFD#1
70182 12/08/03 02:08 Neven Back to the original gains and 40uA
70181 12/08/03 02:08 jianglai rate monitor, beam cuts
70177 12/08/03 01:00 Neven Increased gain and reduced current study
70176 12/08/03 00:57 Williamson On-line Rate Monitor doesn't work
70171 12/08/03 00:15 Neven Simice Gain change
70167 12/08/03 00:00 Chuck Davis Swing Shift Summary
Sunday
70165 12/07/03 23:48 pking Recompiled G0Analysis on g0ana/cdaql1/cdaql2.
70162 12/07/03 23:03 pking Modifed the data_deletion script on gzerol3.
70159 12/07/03 22:46 Williamson Charge feedback gain changed
70158 12/07/03 22:16 Williamson Charge feedback back on again
70156 12/07/03 22:01 Williamson More on charge feedback
70155 12/07/03 21:56 Williamson Charge feedback whipping back and forth
70151 12/07/03 21:19 smithg Fix for missing target alarm beep
70149 12/07/03 21:09 C.Davis/G.Sm Data disks full
70147 12/07/03 21:01 nakahara integrated charge asym and posdiff for charge feedback test
70141 12/07/03 19:30 Breuer/King HV max set on exchanged card
70136 12/07/03 18:00 gaskell kick start
70131 12/07/03 17:34 smithg Intrinsic beam size may be bigger than we want
70130 12/07/03 17:30 smithg OTR foil had been left in the beamline
70129 12/07/03 17:20 Breuer problem with octant 7 det 8-FR
70128 12/07/03 17:12 gaskell Moller HV
70123 12/07/03 16:54 smithg Target: Put LH2 target in
70120 12/07/03 16:01 J. W. Martin day shift summary
70119 12/07/03 15:48 C. Davis Target: TARGET OUT!!!!!!!!
70118 12/07/03 15:33 J. W. Martin Run 18015 junk (HV trip)
70116 12/07/03 15:30 J. Kuhn CFD cables unseated
70114 12/07/03 15:24 J. W. Martin injector studies
70113 12/07/03 15:21 Gzero Hv file to use for next Fr gain calibration
70112 12/07/03 15:19 J. W. Martin beam off for injector studies
70108 12/07/03 14:32 J. W. Martin Lars' simulation for comparison with recent TE data LH2+fly
70107 12/07/03 13:40 jroche software cut in gofar
70106 12/07/03 13:38 nakahara Beam: Injector slow feedback
70099 12/07/03 13:19 lenoble Wrong title for automatic entry
70094 12/07/03 13:11 J. W. Martin Run 18007 was actually 5 uA
70091 12/07/03 13:05 lenoble Comparison between NA TOFs with and without FlySwatter
70089 12/07/03 13:03 lenoble Comparison between French TOFs with and without Fly Swatter
70075 12/07/03 12:29 J. W. Martin restarted current scan for deadtime test with 3x3 raster
70074 12/07/03 12:28 J. W. Martin the mysterious ion chamber trips
70071 12/07/03 12:22 Rutledge Target: Lost control of J-T valve
70067 12/07/03 12:02 biselli/kuhn Setup for runs with CFD/MT plugged into scalers
70066 12/07/03 11:54 J. W. Martin detector ion chamber, halo rates, MCC communications
70065 12/07/03 11:34 Sarah Automatic analyzer killed on g0ana, cdaql1, and cdaql2
70064 12/07/03 11:34 J. W. Martin beam off for target access
70057 12/07/03 10:32 J. W. Martin large halo readings
70056 12/07/03 10:18 J. W. Martin shorts runs, break for brief injector PZT study.
70051 12/07/03 09:52 J. W. Martin electronics reconfig
70050 12/07/03 09:38 J. W. Martin 3x3 raster
70049 12/07/03 09:10 J. W. Martin IOC G0A rebooted.
70048 12/07/03 08:51 J. W. Martin IOC G0A saga continues
70045 12/07/03 08:27 grimm owl shift run summary
70044 12/07/03 08:20 J. W. Martin IOC G0A
70043 12/07/03 07:54 Jianglai lumi scan with solid target
70042 12/07/03 07:33 jianglai/gri Target: flyswatter out
70041 12/07/03 07:33 Gilles Target: magnet vacuum readout from target main screen
70040 12/07/03 07:03 Gilles Target: IOC rebooted by MCC once again!!!!!!!!!
70039 12/07/03 06:52 grimm MCC: Hall access for IOC hardware reboot
70038 12/07/03 06:36 grimm 06:12 target IOC crash
70035 12/07/03 05:19 grimm Moving H2 target in, flyswatter still in
70033 12/07/03 05:15 Gilles (in p CAEN card change
70028 12/07/03 04:42 Gilles Target: Information about flyswater temperature plateau
70019 12/07/03 03:45 grimm beserk charge feedback during the last lumi calib runs
70018 12/07/03 03:43 Williamson Results of IA scan
70017 12/07/03 03:32 grimm MCC is performing inj PZT scan
70005 12/07/03 02:34 grimm MCC will perform a injector pzt scan at 03:30
70004 12/07/03 02:30 grimm probs with charge feedback
70003 12/07/03 01:58 grimm turn off HV for octant2, det9-16
70002 12/07/03 01:41 Williamson Some results of the Flyswatter-only running
70001 12/07/03 01:25 pking/breuer Changed the ADC in slot 11 (second French ADC).
70000 12/07/03 01:09 Gilles Target: JT valve opening change to about 26% when flyswater in and LH2 out
69996 12/07/03 00:49 Breuer HV-change -> no gain change investigation/ ADC problem
69993 12/07/03 00:27 grimm G0IOCSMS reboot from rebootpanelGUI doesn't work
69992 12/07/03 00:18 Williamson G0 SMS EPICS IOC rebooted
69991 12/07/03 00:15 grimm beam off for ~20min, acc probs
69990 12/07/03 00:13 smithg more flyswatter target temperature data
69986 12/07/03 00:01 Chuck Davis Swing Shift Summary
Saturday
69985 12/06/03 23:54 smithg Changed target pump speed
69972 12/06/03 22:25 smithg Flyswatter target temperature vs beam current
69970 12/06/03 21:44 Williamson HV channel 2-16-FR Overvoltage
69969 12/06/03 21:28 smithg moved to (LH2) target out (with flyswatter in) position
69968 12/06/03 21:25 smithg flyswatter target position error
69967 12/06/03 21:22 jianglai lumi 6 recabled
69966 12/06/03 21:18 Williamson Fly-swatter target IN
69965 12/06/03 21:13 pking Recommended settings for the G0 DAQ prescales.
69963 12/06/03 20:44 Kaz Beam: BPM/BCM Calibration
69943 12/06/03 20:11 smithg G0 girder alignment problem
69931 12/06/03 19:53 lenoble 60Hz components in beam charge and positions
69923 12/06/03 19:43 Kaz Approximate gains for BPMs before switching to forced gain
69919 12/06/03 18:18 jianglai lumi pedestals revisit
69908 12/06/03 16:24 J. W. Martin day shift summary
69906 12/06/03 15:47 pking Run types to be used for 120 Hz running (and FrAm detector tests)
69905 12/06/03 15:22 Rutledge/Dav Target: Inserting of LH2 target back into position
69904 12/06/03 14:19 nakahara Changed IA slope
69902 12/06/03 13:35 nakahara injector feedback parameters
69897 12/06/03 12:37 lenoble Beam: IA scans
69878 12/06/03 11:31 Kuhn/Biselli FB spectra for run 17917 and 17919
69877 12/06/03 11:29 Kuhn/Biselli more on LTD data
69876 12/06/03 11:10 jroche for R injector health study : result for today (2nd try)
69875 12/06/03 11:08 jroche for R health injector studies for today : the ouput (try again)
69874 12/06/03 11:06 jroche for R health injector studies for today : the ouput
69873 12/06/03 10:57 J. W. Martin PZT test beginning
69872 12/06/03 10:53 J. W. Martin Fun in the Sun
69868 12/06/03 09:53 tigran RHWP scan
69866 12/06/03 09:27 J. W. Martin inj studies, oct 4,8 HV fastbus test
69858 12/06/03 08:57 J. W. Martin set of RHWP scans beginning
69853 12/06/03 08:28 grimm owl shift run summary
69852 12/06/03 08:24 Martin/Gille Beam: switched off beam feedback
69851 12/06/03 08:19 Louis French DMCH ToFs from January 2003
69850 12/06/03 08:06 Louis French Time encoding
69849 12/06/03 07:57 Gilles Beam: raster calibration - harp scans
69848 12/06/03 07:42 Tygram/Gille HV snipped off on Oct 1 FPD 14 FL
69843 12/06/03 07:00 grimm change to Raster calib (Harp scan) while DAQ is down
69842 12/06/03 06:43 grimm DAQ frozen/crashed
69833 12/06/03 04:52 grimm G0realtimemonitor: quality beam display working again
69832 12/06/03 04:45 grimm G0 Data Tracker: run 17913, still on "copying to analysis" status
69828 12/06/03 03:31 grimm G0realtimemonitor: empty parity beam display
69827 12/06/03 03:08 Kuhn/Biselli First look at LTD data
69825 12/06/03 02:46 grimm Loading HV.halfgain_2nd_engineeringrun_2nd_iter_alloct_a.hvc
69823 12/06/03 02:30 Kuhn/Biselli YO delayed by 2ns for NA electronics
69815 12/06/03 00:56 lenoble g0ana rebooted, follow up
69813 12/06/03 00:51 Louis RMT values for FiB coinc
69812 12/06/03 00:40 lenoble g0ana rebooted
69804 12/06/03 00:00 Chuck Davis Swing Shift Summary
Friday
69799 12/05/03 23:32 breuer direct FR + NA anode current measurements at 40 uA beam
69796 12/05/03 23:14 jianglai lumi linearity scan results
69789 12/05/03 22:31 Louis Bimbot FiB plateau
69776 12/05/03 21:58 saw Scanner from all counting house linux machines
69761 12/05/03 21:28 lenoble Runs 17891-3 : anode current tests
69759 12/05/03 21:27 jianglai Intermitent BCM and lumi calibrations loaded into the database
69758 12/05/03 21:25 Breuer anode currents at 40 uA beam
69756 12/05/03 21:19 lenoble Anodes currents with 40muA beam
69752 12/05/03 20:59 pking Started automatic raw data cleanup routine.
69751 12/05/03 20:53 pking Changed output ROOT file name for automatic analysis.
69746 12/05/03 20:00 nakahara Additional injector run
69744 12/05/03 19:27 nakahara RF fault...charge feedback test interrupted
69743 12/05/03 19:13 Breuer HV intelock threshold settings changed
69735 12/05/03 18:32 Breuer changed base current limit for French HV
69731 12/05/03 18:20 breuer det O1-11BR HV restored
69726 12/05/03 17:28 Williamson How to scan the shift checklist
69725 12/05/03 17:14 Williamson Shift Checklist
69724 12/05/03 17:11 saw Scanner
69723 12/05/03 16:55 smithg rebooted target ioc
69722 12/05/03 16:54 saw Beta Brite BCM display changed to display BCM1
69721 12/05/03 16:41 Breuer HV O1-11-BR problem
69715 12/05/03 16:30 smithg rebooted target ioc
69713 12/05/03 16:29 J. Kuhn KGB changed
69712 12/05/03 16:28 Louis, Bill Caen -HV channel 00 dead
69711 12/05/03 16:07 Breuer NA anode currents, direct measurement, acm recalibration
69709 12/05/03 16:02 J. W. Martin day shift summary
69705 12/05/03 15:48 lenoble changed file pedestals.in on g0ana
69704 12/05/03 15:44 J. W. Martin octant 2 off during 17878
69703 12/05/03 15:30 J. W. Martin results of harp scans and how to "analyze" harp scans
69701 12/05/03 15:27 lenoble channel 106fralooks weird on G0ACM
69699 12/05/03 14:54 lenoble 2 new HV files (half gain, 2nd iter, French "Is" at 700 and at 750)
69698 12/05/03 14:53 jroche RC daily report
69697 12/05/03 14:33 jroche rc meeting pushed at 4:30 pm
69693 12/05/03 13:25 J. W. Martin going to 1/2 gain, 10 uA
69689 12/05/03 12:51 Pking Reset the fast clear circuit to accept events from NA and French detectors.
69688 12/05/03 12:50 J. W. Martin HV file
69687 12/05/03 12:46 J. W. Martin HV actually full gain
69686 12/05/03 12:44 J. W. Martin Run 17873 junk
69685 12/05/03 12:42 J. W. Martin run 17873 junk
69680 12/05/03 11:49 Rutledge Target: Target IN Beam
69679 12/05/03 11:39 gzero Second Iteration HVs for octants.
69678 12/05/03 11:38 J. W. Martin harp scans
69677 12/05/03 11:04 J. W. Martin harp scans
69676 12/05/03 10:23 J. W. Martin access
69674 12/05/03 10:12 J. W. Martin BCM2 gain was wrong
69673 12/05/03 09:50 J. W. Martin run 17871 is junk
69671 12/05/03 09:36 Lars Target: reminder for target operators
69670 12/05/03 09:36 Rutledge Target: Target Move
69664 12/05/03 08:54 J. W. Martin realtime beam parity plots
69662 12/05/03 08:18 J. W. Martin FPD off, request 40 uA
69661 12/05/03 08:16 grimm fastbus TE of 03-12 MT front
69659 12/05/03 08:02 grimm owl shift run summary
69657 12/05/03 07:56 grimm 03-12-FR shows a high rate (~3x)
69654 12/05/03 06:55 grimm ADC gate: g0realtime Fastbus pictures, part 2
69651 12/05/03 06:39 grimm ADC gate: g0realtime FastBus pictures
69650 12/05/03 06:23 grimm FR FastBus: bad ADC gate timing ?
69639 12/05/03 02:36 grimm MCC probs, beam off
69637 12/05/03 02:07 grimm det 16 calib issue, overcurrent, modifying HV file
69634 12/05/03 01:30 grimm 02-16-BL overcurrent during warmup
69633 12/05/03 01:20 grimm rebooting cdaql1
69629 12/05/03 00:00 Chuck Davis Swing Shift Summary
Thursday
69628 12/04/03 23:58 Williamson First Iteration HVs for octants 1, 2, 3, 5, 6, and 7 Loaded
69625 12/04/03 23:34 Gzero New HV file
69622 12/04/03 23:02 jroche FPD gain changes after first iteration
69621 12/04/03 22:59 Louis DMCH Tof Spectra
69620 12/04/03 22:48 pking/bisell Modified the YO timing.
69617 12/04/03 22:40 lenoble Further FPD gain checks by hand
69616 12/04/03 22:40 jianglai Beam: IA feedback code bug fixing
69615 12/04/03 22:40 PaulK ,Louis Fastbus TDC 5 changed
69614 12/04/03 22:38 Kuhn, Bisell CAREFUL when moving WNFM!
69613 12/04/03 22:35 Kuhn, Bisell YO delay
69610 12/04/03 22:30 Louis French TED New YO
69607 12/04/03 22:13 Louis HV overcharge on Channel 16 of octant$
69600 12/04/03 21:32 Jianglai lumi checkout summary
69597 12/04/03 21:13
69592 12/04/03 20:26 jianglai BCM calibration summary
69583 12/04/03 19:52 jianglai BPM auto/forced-gains
69578 12/04/03 19:25 jianglai odd BPM readings
69567 12/04/03 18:33 jianglai Changed BCM2 to high gain
69566 12/04/03 18:31 jianglai Get ready for the BPM/BCM calibration
69564 12/04/03 18:12 J Kuhn NA monitor channels
69563 12/04/03 18:04 J Kuhn MT data for det5&13 in oct1&5
69559 12/04/03 17:29 jones Target: Changed Hi-alarm setting for ghptrue
69558 12/04/03 17:08 Spayde SMS: Ramping Magnet Current Up
69554 12/04/03 16:03 J. W. Martin day shift summary
69553 12/04/03 15:55 bimbot/lenob TE data check for French octants
69552 12/04/03 15:44 Spayde SMS: Ramping Magnet Current Down
69551 12/04/03 15:37 lenoble calibration constants octant 7
69545 12/04/03 14:58 J. W. Martin end run failures
69544 12/04/03 14:56 J. W. Martin run #17830 aborted
69538 12/04/03 14:31 lenoble Calibration constants octant 6
69536 12/04/03 14:01 lenoble Calibration constants octant 1
69535 12/04/03 13:57 J. W. Martin waveguide trip
69531 12/04/03 13:48 J. W. Martin codakill called for
69530 12/04/03 13:45 lenoble HV trip
69525 12/04/03 13:23 breuer/lenob Calibration constants octant 5
69524 12/04/03 13:00 breuer calibration constants octant 2
69520 12/04/03 12:40 pking Corrected the boot parameters for ROC5.
69519 12/04/03 12:37 lenoble temperature on the French crate
69517 12/04/03 11:49 jroche Target: target motion FSD : there is one piece missing
69516 12/04/03 11:32 jroche Beam: injector health check : the work done this morning
69514 12/04/03 11:30 Breuer cal. factors octant 3, first round
69513 12/04/03 11:14 jianglai IA feedback bebugging
69512 12/04/03 11:01 J. W. Martin injector tuning done
69508 12/04/03 10:24 Gzero something wrong in the front mt det 12 octant 3
69506 12/04/03 09:07 J. W. Martin run 17819 beam feedback was not on
69504 12/04/03 08:19 J. W. Martin retune delayed till 9 am
69503 12/04/03 08:15 J. W. Martin MCC gives us 35 uA
69499 12/04/03 08:07 grimm owl shift run summary
69497 12/04/03 07:41 grimm HV Crates disabled
69496 12/04/03 07:40 tigran Octant 5 and 7 anode current.
69495 12/04/03 07:28 grimm HV OFF, MCC takes over
69490 12/04/03 06:35 grimm 03-16-FL was turned off briefly
69489 12/04/03 06:32 Breuer anode currents oct 1,2, 3, 4; adc gate disconnected?
69480 12/04/03 04:44 grimm DAQ: ROC5 problems (FastBus)
69471 12/04/03 03:38 Williamson A smaller plot of the G0DET BLM versus BCM1 data
69470 12/04/03 03:38 grimm/Breuer HV on octanct 1 for det calibration
69469 12/04/03 03:33 Williamson Plot of 0-40uA BLM scan (G0DET) on H2-target
69461 12/04/03 02:22 grimm/willia 0-40uA BLM scan (G0DET) on H2-target
69460 12/04/03 02:21 grimm/willia 0-40uA BLM scan (G0DET) on H2-target
69459 12/04/03 01:35 grimm preparing for G0DET BLM trippoint scan
69458 12/04/03 01:21 Gilles target alarm handler not blinking
69457 12/04/03 00:48 jroche turn BCM2 gain back to 2
69456 12/04/03 00:01 nakahara/jia IA feedback exercises
69455 12/04/03 00:01 Chuck Davis Swing Shift Summary
Wednesday
69451 12/03/03 21:36 jroche daily RC report
69450 12/03/03 21:24 jianglai beam status
69449 12/03/03 19:52 jroche (for Beam: Hall C ion chamber
69442 12/03/03 17:33 pking Found two problems with recent NA Monitor and DNL runs.
69441 12/03/03 17:03 Williamson SMS: Temperature rise during target studies
69440 12/03/03 17:00 nakahara Beam feedback test1
69439 12/03/03 16:08 J. W. Martin Reset IA, PZTX, PZTY to 5 V.
69438 12/03/03 16:07 J. W. Martin day shift summary
69432 12/03/03 15:28 saw EPICS BCM calibrations changed
69426 12/03/03 14:26 pking High temperature in the electronics area this morning; current temperatures.
69416 12/03/03 13:42 nakahara RHWP scan results
69401 12/03/03 12:58 J. W. Martin beam trips, solved?
69399 12/03/03 12:31 J. W. Martin beam trips
69398 12/03/03 12:28 J. W. Martin result of RHWP scan = 26.44 deg = 1322 DAC.
69385 12/03/03 11:43 Louis Gilles Anomalies in some ToFs of French TED
69380 12/03/03 10:07 J. W. Martin attempt at BPM/BCM calib before access
69371 12/03/03 09:07 J. W. Martin beam positions pictures
69370 12/03/03 08:55 J. W. Martin new beam positions
69369 12/03/03 08:51 J. W. Martin plan for access around 10 am
69368 12/03/03 08:38 Rutledge Rutledge
69367 12/03/03 08:11 grimm owl shift summary
69365 12/03/03 07:50 Lars et al. Target: scan of LH2 target
69364 12/03/03 07:11 Lars/Gilles Target: change of the low limit of gpt5
69362 12/03/03 04:47 Williamson SMS: Temperature rise during target studies
69361 12/03/03 04:34 Lars/Gilles Target: Second low limit change on gpt5 alarm
69358 12/03/03 03:36 Lars/Gilles Target: Target gpt5 low limit change from 7 to 6.95
69357 12/03/03 01:46 grimm observed Go,G0B center beam position
69356 12/03/03 01:25 grimm MCC probs, beam trips, Hall B leakage
69355 12/03/03 00:17 grimm preparing for target scan, 20uA pulsed beam
69354 12/03/03 00:11 grimm loading HV-file: HV.fullgain_2nd_engineering_run_start.hvc, HV off
69353 12/03/03 00:01 Chuck Swing Shift Summary
Tuesday
69352 12/02/03 22:57 pking The Fastbus ADC in slot 11 was changed this morning.
69351 12/02/03 19:25 Louis Run plan for DMCH-thresholds studies
69350 12/02/03 19:03 jianglai deleted corrupted records in na_dnl tables, fixed the last_run_id
69349 12/02/03 18:45 J. Roche Daily RC report : December 2nd
69348 12/02/03 18:30 Spayde/Willi SMS: Magnet at Full Current
69347 12/02/03 18:22 Breuer HV interlock circuit ("sniper") active, parameter details
69346 12/02/03 18:16 nakahara Quick report of beam status
69345 12/02/03 17:26 Louis Study of Front Back coincidence in DMCH modules
69344 12/02/03 16:58 smithg G0 harp, bpm, etc. official survey results
69342 12/02/03 15:59 Lars Day shift summary 12/02/2003
69341 12/02/03 15:42 pking/lenobl Check on oscilloscope for signals 5-06-FL, 5-06-BL
69340 12/02/03 15:27 lenoble Check of TDC signals for octant 7 and ADC signals for octant 5
69337 12/02/03 15:13 jyun/jiangla new instructions to start the MEDM halo GUI
69334 12/02/03 14:27 jyun/jiangla new instructions to start the MEDM halo GUI
69332 12/02/03 13:48 lars, silviu g0 target cooldown
69331 12/02/03 13:32 jyun injector bpm display
69330 12/02/03 13:02 lenoble ADC channels check, problem with 5-06
69319 12/02/03 11:14 pking Modifed TSdmch_FrAm CRL file.
69305 12/02/03 08:27 grimm run summary owl shift
69300 12/02/03 06:09 grimm Erratum: Logentry 69299 refers to DNL run 17726
69299 12/02/03 05:42 grimm junk run, HV not connected
69298 12/02/03 04:46 grimm preparing for cosmic runs
69294 12/02/03 04:16 jianglai quick instructions on the usage of the feedback engine
69277 12/02/03 01:32 grimm reminder: detector HV is disabled
69271 12/02/03 00:47 grimm MCC: beam probs, take NA DNL runs meanwhile
69269 12/02/03 00:01 ChuckD Swing Shift Summary
Monday
69261 12/01/03 22:36 pking Activated the "online" replay for ts_full run type.
69260 12/01/03 22:29 jianglai Please page Jianglai before the feedback test.
69257 12/01/03 20:20 pking Updated the g0daq_config.pl script.
69254 12/01/03 19:30 nakahara Injector lasertable studies
69253 12/01/03 18:58 Louis, Gille French ADC channel swapping to check channels number 614 BL and FL
69248 12/01/03 17:45 Louis VXI crate status
69246 12/01/03 17:34 Gilles , Lou Checks of Detector signals at Patch Panel
69242 12/01/03 17:16 jroche hall to close after 6pm
69241 12/01/03 16:19 pking Disconnected NA CFD test input circuit
69239 12/01/03 16:02 Lars Day shift summary
69225 12/01/03 12:22 Louis/Gilles French detectors
69214 12/01/03 09:58 secrest Octant 3 det 16 yellowing test
69213 12/01/03 09:49 jianglai realtime display/ x resources
69212 12/01/03 09:37 beaufait rock 5
69211 12/01/03 09:03 grimm run summary owl shift
69205 12/01/03 07:26 grimm MCC: Hall C is in restricted access
69203 12/01/03 06:58 grimm ROC3: high room temp ?!
69202 12/01/03 06:37 grimm GO DAQ console on cdaqs3 now
69201 12/01/03 06:18 grimm Hall A+C are in controlled Access
69198 12/01/03 05:01 grimm cdaqs1 frozen (DAQ console)
69197 12/01/03 04:30 grimm G0 DAQ frozen, MCC takes over
69196 12/01/03 04:13 grimm Results from PZTy scans for runs 17719,17720,17721
69188 12/01/03 03:23 grimm PZTx scan results for runs 17716,17717,17718
69181 12/01/03 02:25 grimm IA scan of runs 17713,17714,17715
69174 12/01/03 01:31 nakahara Schedule for the rest of Owl.
69169 12/01/03 00:01 Sarah Swing Shift Summary