Log entry time 08:05:51 on April 25,2004
Entry number 83158
keyword=owl shift summary
L: B.Guillon
T: D.MacKee
W: I.Kanagawa / L.Bimbot
-----------------
00:00 waiting for beam
00:20 MCC call. they will try to send us low current beam.
00:45 MCC call. they still investigating the Hall C laser & will try to send 10 uA beam . but didn't succed
02:15 MCC call, They still have trouble with the Hall C laser . no estimate of how long it will take.
Then we decided to tabe DNL runs
03:30 MCC call. The hall C laser is now OK. We will have the beam soon
04:00 After we replace the Meantimer cable and restore the half gain HV-file
det 1 and 12 on octant 1 are missing. Louis and Dave looked at the electronic cables but find nothing. For both detector, all the cfd signals are here.
It certainly comes from the meantimer.
04:15 Call NA electronics expert : Joachim
04:20 We find the problem. It was the input cable of the meantimer 2 which was unplugged just before Joachim called us. Sorry Joachim to wake up you for nothing. Let's go to take production data.
06:10 A lot of NA errors happenned on run 21616 .
and we don't succed to stop this fury.
I paged again Joachim.
07:10 Joachim fixed the problem (instable cable). It should be OK now.
***** Runs taken :
run 21611 : junk run
run 21612 : Green blocks - DNL for french - NA meantimers 1-2-3-4
run 21613 : test run - beam tuning
run 21614 : test run - (det8-oct7 , det2-oct1, det12-oct1) are missing
run 21615 : production run - (det8-oct7) are missing
run 21616 : production run - (det8-oct7) are missing - a lot of NA errors
run 21617 : test run
run 21618 : production run - (det8-oct7) are missing - a lot of NA errors
run 21619 : production run - (det8-oct7) are missing - BPM IOC crashed at the end
run 21620 : production run - (det8-oct7) are missing