Jefferson Lab Hall C Logbook for September 04 - runstarts omitted

  • Main INDEX

    Thursday

  • 89244 09/30/04 23:43 Tvaskis Shift Summary
  • 89243 09/30/04 23:41 mbukhari target shift checklist screen
  • 89241 09/30/04 23:40 mbukhari Target changed Aluminium Dummy -> 3% C
  • 89240 09/30/04 23:38 mb
  • 89239 09/30/04 23:33 segbefia
  • 89236 09/30/04 22:45 mbukhari Target changed He3-> Aluminium Dummy
  • 89233 09/30/04 21:42 mbukhari Target changed He4->He3
  • 89231 09/30/04 21:27 mbukhari Target changed He4->He3
  • 89226 09/30/04 18:54 mbukhari Target changed He3->He4
  • 89223 09/30/04 18:04 mbukhari Target movement: 3He -> C 3%
  • 89219 09/30/04 16:12 X. Zheng day shift summary
  • 89217 09/30/04 14:19 Holt Helium-4 target pressure was increased during the beam studies
  • 89216 09/30/04 14:10 gaskell access work
  • 89215 09/30/04 10:52 Holt Helium targets are parked because of beam studies
  • 89214 09/30/04 10:51 Holt
  • 89212 09/30/04 09:10 horn Owl Shift Summary
  • 89210 09/30/04 08:58 Holt Al dummy target is in the beam
  • 89206 09/30/04 07:25 trojer Target changed
  • 89200 09/30/04 02:14 trojer target checklist
  • 89197 09/30/04 00:47 trojer Target changed He4->He3
  • Wednesday

  • 89194 09/29/04 23:51 Tvaskis Shift Summary
  • 89191 09/29/04 23:08 simona BCM and BPM Screens
  • 89190 09/29/04 22:51 Tvaskis target changed
  • 89188 09/29/04 22:20 Tvaskis data on dummy
  • 89185 09/29/04 21:40 gaskell ready for beam after dummy test
  • 89184 09/29/04 21:08 cseely yields before and after high current on dummy target
  • 89181 09/29/04 19:48 gaskell Dummy damage test run
  • 89179 09/29/04 19:08 Tvaskis target changed
  • 89177 09/29/04 18:31 Tvaskis target changed
  • 89170 09/29/04 16:01 X. Zheng day shift summary
  • 89167 09/29/04 14:26 fomin bcm and bpm screens
  • 89166 09/29/04 13:44 fomin HMS dipole ramp up error
  • 89163 09/29/04 13:31 X. Zheng configuration change to setting VI
  • 89162 09/29/04 13:14 Holt 3He target moved into beam
  • 89158 09/29/04 11:59 Holt 3(2)% carbon target moved into beam
  • 89157 09/29/04 11:52 fomin BCM1 seems to be the bad bcm
  • 89154 09/29/04 09:46 Holt target checklist
  • 89153 09/29/04 09:15 Holt 3He target moved into beam
  • 89147 09/29/04 07:00 cseely ending run failed 50464. killed CODA and restarted
  • 89143 09/29/04 06:07 trojer Target changed
  • 89140 09/29/04 05:01 cseely run 50461 is He4, not He3
  • 89137 09/29/04 03:48 trojer target checklist
  • 89136 09/29/04 03:47 trojer Target changed
  • 89127 09/29/04 00:17 Tvaskis shift summary
  • 89126 09/29/04 00:11 segbefia
  • 89124 09/29/04 00:07 simona
  • Tuesday

  • 89123 09/28/04 23:55 segbefia high power heater
  • 89121 09/28/04 23:12 Tvaskis target changed
  • 89118 09/28/04 22:41 Tvaskis target changed
  • 89114 09/28/04 21:39 Tvaskis beam info
  • 89113 09/28/04 21:34 gaskell harp scan results
  • 89110 09/28/04 20:32 gaskell no beam
  • 89109 09/28/04 16:07 X. Zheng day shift summary
  • 89107 09/28/04 16:05 segbefia target_checklist
  • 89106 09/28/04 13:22 Holt Coolant flow to loop2 reduced since beam is off.
  • 89105 09/28/04 10:36 gaskell "good" BCM run 50442
  • 89104 09/28/04 10:14 Holt Empty target moved in for beam studies
  • 89103 09/28/04 09:46 Holt 3He target moved into beam
  • 89101 09/28/04 08:48 gaskell too many trips - BCM cal run no good
  • 89100 09/28/04 08:30 cseely owl shift summary
  • 89097 09/28/04 08:16 Holt empty target in for BCM calibration.
  • 89093 09/28/04 07:52 Holt target checklist
  • 89092 09/28/04 07:51 Holt target checklist
  • 89089 09/28/04 06:54 cseely equipment checklist scans
  • 89087 09/28/04 06:43 trojer target checklist
  • 89086 09/28/04 06:42 trojer
  • 89085 09/28/04 06:42 trojer Target changed He4->He3
  • 89084 09/28/04 06:37 cseely HMS alcohol bubbler level looks low
  • 89083 09/28/04 06:36 cseely bpm and bcm screenshots
  • 89081 09/28/04 06:07 tro
  • 89076 09/28/04 03:07 trojer Target changed He3->empty->He4
  • 89074 09/28/04 03:04 trojer
  • 89069 09/28/04 00:47 cseely new He(e,e'p)H missing mass plots
  • 89066 09/28/04 00:09 trojer target checklist
  • 89064 09/28/04 00:05 Bosted Shift Summary
  • Monday

  • 89058 09/27/04 19:10 Segbefia He4 pressure
  • 89056 09/27/04 17:49 gaskell SOS pipre disabled for part of run 50417
  • 89055 09/27/04 17:20 gaskell Put sos pipre back to original configuration
  • 89053 09/27/04 17:09 fomin He3 target unparked and moved into the beam position
  • 89051 09/27/04 16:39 gaskell swapped gate generators for SOS pipre
  • 89049 09/27/04 15:57 Keppel Shift Summary
  • 89046 09/27/04 13:44 M Jones Hall C Beam Energy Measurement
  • 89045 09/27/04 11:57 Tvaskis Dead fan in loop 1
  • 89044 09/27/04 11:56 Keppel target change
  • 89043 09/27/04 11:52 Tvaskis Changed from He3 to Dummy
  • 89041 09/27/04 11:18 gaskell HMS dipole setting procedure - use USER Mode
  • 89035 09/27/04 07:55 cseely owl shift summary
  • 89031 09/27/04 04:42 mbukhari BCM and BPM Screens
  • 89026 09/27/04 01:24 trojer target checklist
  • 89025 09/27/04 01:02 cseely Y bpm plots look funny
  • 89023 09/27/04 00:14 trojer Target changed
  • 89021 09/27/04 00:00 fomin Swing shift summary
  • Sunday

  • 89010 09/26/04 16:04 tajima day shift summary
  • 89007 09/26/04 15:45 tajima the dipole control computer rebooted
  • 89006 09/26/04 15:03 tajima configuration change done
  • 89003 09/26/04 12:39 tajima note on run 50387
  • 89001 09/26/04 12:02 mack crate voltages okay at the moment
  • 89000 09/26/04 11:07 Tvaskis Change Target
  • 88998 09/26/04 10:18 gaskell SOS pipre
  • 88997 09/26/04 09:52 tajima Testing SOS trigger
  • 88994 09/26/04 09:21 gaskell Target: Loop 1 fan died and came back
  • 88992 09/26/04 08:23 cseely shift summary
  • 88990 09/26/04 08:15 gaskell HMS drift chambers tripped at end of run 50381
  • 88988 09/26/04 08:07 cseely shift summary
  • 88985 09/26/04 06:24 mbukhari BCM and BPM Screens
  • 88982 09/26/04 04:45 cseely changed to He3 from dummy target
  • 88980 09/26/04 04:04 cseely SCAL channel counting low
  • 88979 09/26/04 04:00 mbukhari target checklist after move
  • 88977 09/26/04 03:36 mbukhari Target movement: 3He -> Al Dummy
  • 88976 09/26/04 03:16 cseely He(e,e'p)H "elastics" followup
  • 88974 09/26/04 01:57 cseely modified target masses in gtarg.param file
  • 88971 09/26/04 00:15 Vipuli target checklist
  • Saturday

  • 88968 09/25/04 23:57 Bosted Shift Summary
  • 88966 09/25/04 22:42 Vipuli Taget GUI after changing target
  • 88964 09/25/04 22:39 Bosted Q2 trip: end of run 50369 bad
  • 88962 09/25/04 21:50 Vipuli Target changed
  • 88960 09/25/04 21:32 mack offsets are rock solid, must be a gain shift; I'll be in Sunday morning
  • 88959 09/25/04 21:26 Bosted Momentum changed both spectrometers. Run 50364 good fro HMS only
  • 88958 09/25/04 20:44 mack offsets are rock solid, must be a gain shift
  • 88955 09/25/04 19:03 gaskell BCMs not stable
  • 88954 09/25/04 18:38 Vipuli target checklist
  • 88950 09/25/04 17:06 Vipuli Target reboot
  • 88947 09/25/04 16:08 tajima shift summary
  • 88945 09/25/04 15:45 adaniel shift check list
  • 88942 09/25/04 14:31 Hill Moved to He4 from He3
  • 88941 09/25/04 13:09 tajima Runs 50356 and 50357
  • 88939 09/25/04 12:45 tajima Run #50356 -- Short run
  • 88933 09/25/04 09:12 Donal Format the entry
  • 88931 09/25/04 08:17 Hill Moved to He3 from Dummy
  • 88930 09/25/04 08:11 mbukhari shift summary
  • 88927 09/25/04 07:18 mbukhari SOS Momentunm change
  • 88926 09/25/04 07:18 mbukhari SOS Momentunm change
  • 88923 09/25/04 06:42 slifer target motion
  • 88920 09/25/04 05:22 mbukhari Run Replays: Histograms Different for Run 50344
  • 88919 09/25/04 05:08 slifer target screen
  • 88918 09/25/04 04:59 slifer target screen
  • 88917 09/25/04 04:52 mbukhari BCM and BPM Screens
  • 88913 09/25/04 01:36 mbukhari Run #50342 is JUNK
  • 88912 09/25/04 01:36 mbukhari Drift Chambers G1 & G2 Tripped
  • 88909 09/25/04 01:18 mbukhari HMS Q1 MPS Overtemp Interlock
  • 88908 09/25/04 00:45 slifer correction
  • 88907 09/25/04 00:39 slifer target motion
  • 88905 09/25/04 00:16 cseely Shift Summary
  • Friday

  • 88902 09/24/04 22:35 cseely bpms and bcms
  • 88901 09/24/04 22:34 cseely
  • 88893 09/24/04 19:00 hill HMS Dipole interlock while setting
  • 88892 09/24/04 18:56 fomin target moved from C3% to He4
  • 88891 09/24/04 18:33 hill HMS Dipole interlock while setting
  • 88890 09/24/04 18:27 cseely HMS Dipole interlock while setting
  • 88887 09/24/04 17:51 fomin target moved from He4 to C3%
  • 88885 09/24/04 17:12 fomin target moved from Al Dummy to He4
  • 88884 09/24/04 16:53 fomin He3 target parked, He4 unparked
  • 88882 09/24/04 16:41 fomin Target moved from He3 to Al Dummy
  • 88880 09/24/04 16:03 Keppel target change
  • 88878 09/24/04 16:00 Potterveld Day shift summary
  • 88875 09/24/04 15:29 Keppel target checklist
  • 88870 09/24/04 12:53 Keppel target change
  • 88867 09/24/04 11:58 Potterveld SOS magnet excitation data
  • 88861 09/24/04 08:46 mbukhari Shift Summary
  • 88857 09/24/04 07:11 mbukhari 4He runs complete for the shift
  • 88856 09/24/04 07:10 McKee Betabrite restarted
  • 88855 09/24/04 07:10 mbukhari shift checklist scans
  • 88854 09/24/04 07:10 mbukhari shift checklist scans
  • 88853 09/24/04 06:39 mbukhari bcm and bpm screens
  • 88852 09/24/04 06:00 McKee target: move to he3 target
  • 88849 09/24/04 05:19 McKee target checklist
  • 88847 09/24/04 04:23 McKee target: jeffylab rebooted
  • 88844 09/24/04 01:06 McKee beam on he4 target
  • 88842 09/24/04 00:35 fomin HMS dipole field control errors
  • Thursday

  • 88839 09/23/04 23:49 cseely some missing mass plots
  • 88838 09/23/04 23:48 fomin Swing shift summary
  • 88836 09/23/04 23:41 cseely moved to He4 from dummy
  • 88834 09/23/04 23:01 gaskell Dipole set
  • 88833 09/23/04 22:45 gaskell Usable BCM calibration run
  • 88832 09/23/04 22:38 fomin MPS error, NMR error on the HMS dipole
  • 88831 09/23/04 22:29 gaskell HMS dipole again
  • 88830 09/23/04 22:14 gaskell more HMS dipole
  • 88829 09/23/04 22:01 gaskell HMS dipole troubles
  • 88826 09/23/04 20:01 fomin bcm and bpm screens
  • 88824 09/23/04 19:25 cseely moved to dummy from He4
  • 88821 09/23/04 17:52 gaskell C luminosity scan results
  • 88820 09/23/04 17:46 gaskell He3 Luminosity Scan Results
  • 88818 09/23/04 17:40 gaskell axis labels wrong
  • 88817 09/23/04 17:37 gaskell He4 luminosity scan (preliminary) results
  • 88816 09/23/04 17:23 Potterveld Day shift summary
  • 88815 09/23/04 17:18 cseely restarted target gui
  • 88814 09/23/04 17:01 fomin HMS dipole field control error
  • 88813 09/23/04 16:58 cseely target checklist
  • 88811 09/23/04 16:36 fomin HMS dipole field control error
  • 88810 09/23/04 16:30 fomin GAS system interlock low psi alarm
  • 88809 09/23/04 16:27 cseely Loop2 temperature alarm (
  • 88808 09/23/04 16:24 fomin HMS dipole field control error
  • 88806 09/23/04 15:54 okayasu Target changed
  • 88804 09/23/04 15:15 fomin shift checklist ending on 9/22
  • 88801 09/23/04 13:53 okayasu Target changed.
  • 88799 09/23/04 10:28 saw Updated echmsq3i_set_s
  • 88798 09/23/04 10:11 okayasu `Target temporaly moved
  • 88797 09/23/04 10:07 gaskell One more HMS dipole field control error
  • 88795 09/23/04 09:23 gaskell another HMS dipole field control error
  • 88792 09/23/04 09:04 gaskell HMS dipole field control error
  • 88789 09/23/04 07:57 jroche owl shift summary : no beam
  • 88788 09/23/04 07:25 trojer target checklist
  • 88787 09/23/04 07:06 jroche beam finally
  • 88785 09/23/04 06:32 mbukhari Helium supply replenished
  • 88784 09/23/04 00:29 trojer Rebooted target GUI
  • 88783 09/23/04 00:07 Donal Shift report
  • Wednesday

  • 88781 09/22/04 23:26 cseely moved to He3 from empty
  • 88778 09/22/04 22:55 fomin bcm calibration update (attn: Dave Mack)
  • 88777 09/22/04 22:51 fomin bcm and bpm screens
  • 88774 09/22/04 22:15 cseely vesda alarm in zone 4 - reset
  • 88773 09/22/04 22:09 fomin scanner doesn't work
  • 88769 09/22/04 21:26 fomin SOS angle snapshot and cdaql1 boot problem
  • 88767 09/22/04 20:36 fomin HMS dipole ramp up errors
  • 88766 09/22/04 20:14 cseely empty target in. BCM calibration has commenced.
  • 88763 09/22/04 19:51 target screen at 94uA (during He3 Lumi. scan)
  • 88762 09/22/04 19:51 target screen at 94uA (during He3 Lumi. scan)
  • 88760 09/22/04 19:40 cseely target screen at 81uA (during He3 Lumi. scan)
  • 88755 09/22/04 19:21 cseely moved to C(3%) from He3
  • 88754 09/22/04 19:15 cseely target screen at 67uA (during He3 Lumi. scan)
  • 88753 09/22/04 19:14 cseely target screen at 50uA (during He3 Lumi. scan)
  • 88751 09/22/04 19:08 cseely target screen at 31uA (during He3 Lumi. scan)
  • 88747 09/22/04 18:42 cseely moved to C(3%) from He3
  • 88746 09/22/04 18:34 cseely target screen at 31uA (during He3 Lumi. scan)
  • 88744 09/22/04 18:28 cseely target screen at 16uA (during He3 Lumi. scan)
  • 88742 09/22/04 18:26 cseely Loop1 parked, Loop2 unparked. Moved from C(3%) to He3(Loop2)
  • 88740 09/22/04 18:12 cseely target change TO: C(3%) from He4(Loop1)
  • 88736 09/22/04 17:52 cseely target screenshot at 91 uA (lumi. scan)
  • 88735 09/22/04 17:48 cseely target screenshot at 82 uA (lumi. scan)
  • 88733 09/22/04 17:40 cseely target screenshot at 62 uA (lumi. scan)
  • 88731 09/22/04 17:34 cseely target screenshot at 47 uA (lumi. scan)
  • 88729 09/22/04 17:29 cseely target screenshot at 32 uA (lumi. scan)
  • 88724 09/22/04 17:04 cseely target screen at 15uA (during He4 Lumi. scan)
  • 88723 09/22/04 16:39 Potterveld Day shift summary
  • 88722 09/22/04 16:28 cseely HMS dipole crash #2
  • 88720 09/22/04 16:17 Potterveld setting up for luminosity scan
  • 88719 09/22/04 16:02 cseely target checklist
  • 88718 09/22/04 16:00 okayasu Target changed to empty for harp run
  • 88717 09/22/04 15:28 okayasu Screenshot
  • 88712 09/22/04 11:21 okayasu Target changed
  • 88710 09/22/04 10:04 smithg Loop1 target fan story
  • 88709 09/22/04 09:51 okayasu Coolant flow meter alart
  • 88707 09/22/04 09:36 okayasu Temprature limit was changed.
  • 88705 09/22/04 09:21 okayasu IOC Cryotarget rebooted
  • 88704 09/22/04 08:47 horn Owl Shift Summary
  • 88702 09/22/04 07:58 trojer target checklist
  • 88697 09/22/04 05:44 mbukhari BPM and BCM log checklist item
  • 88684 09/22/04 01:21 horn Run 50237 junk
  • 88681 09/22/04 00:26 trojer moved to He3 target (Loop 2)
  • 88680 09/22/04 00:06 Donal Shift Report
  • Tuesday

  • 88677 09/21/04 23:38 cseely Rebooted target IOC - Loop1 fan did not come back
  • 88676 09/21/04 23:08 cseely cleared another fan speed alarm (lo 0) and vent pressure (hihi) alarms
  • 88674 09/21/04 22:51 cseely moved to dummy target
  • 88673 09/21/04 22:41 tajima bpm and bcm screens
  • 88670 09/21/04 20:29 cseely Loop 1 fan control screen shot
  • 88669 09/21/04 20:26 cseely Loop1 fan tachometer reading 0
  • 88667 09/21/04 18:37 cseely parked Loop1 and unparked Loop2, moved to Loop2
  • 88662 09/21/04 17:42 Donal HNS dipole
  • 88661 09/21/04 17:23 smithg new 4He target PID params & current limit
  • 88660 09/21/04 17:12 cseely target checklist
  • 88659 09/21/04 17:00 Potterveld Day shift summary
  • 88658 09/21/04 16:46 gaskell HMS dipole field control errors
  • 88657 09/21/04 16:44 gaskell run 50227 is junk
  • 88655 09/21/04 16:12 fomin target moved from He3 to He4
  • 88653 09/21/04 16:10 fomin target parking/unparking
  • 88649 09/21/04 14:32 fomin target alarm loop1
  • 88648 09/21/04 14:29 smithg Improved 3He PID parameters
  • 88642 09/21/04 11:51 fomin target checklist
  • 88641 09/21/04 11:32 smithg 4He target leak isolated
  • 88639 09/21/04 10:59 Lassiter Q2 trim coil
  • 88638 09/21/04 10:57 beaufait target supervisor
  • 88637 09/21/04 10:38 saw, ckeith Variables added to target logger
  • 88636 09/21/04 09:49 adaniel trim coil quench hms q2
  • 88635 09/21/04 08:33 horn Owl Shift Summary
  • 88620 09/21/04 04:40 trojer He4 pressure fallup, reached LOLO Limit
  • 88619 09/21/04 04:38 horn Frequent TS power cycling
  • 88612 09/21/04 03:00 trojer He4 pressure fallup
  • 88611 09/21/04 02:29 horn TS dead again at end of run 50196
  • 88610 09/21/04 02:18 trojer target checklist
  • 88607 09/21/04 00:17 horn Rebooted trigger supervisor
  • Monday

  • 88605 09/20/04 23:59 Bosted Shift summary
  • 88604 09/20/04 23:50 Donal He4 pressure fallup
  • 88603 09/20/04 23:21 Donal Target motion - Al Dummy to He3
  • 88602 09/20/04 22:41 Donal He4 pressure
  • 88600 09/20/04 20:49 Donal He4 pressure
  • 88598 09/20/04 20:26 gaskell Revenge of the trigger supervisor
  • 88597 09/20/04 19:27 gaskell Q2 fix
  • 88596 09/20/04 19:17 Donal Cell pressure Loop 1
  • 88595 09/20/04 19:06 Donal target checklist
  • 88594 09/20/04 18:57 Donal He4 target
  • 88593 09/20/04 17:57 smithg both 4he and 3he available now
  • 88592 09/20/04 17:36 gaskell target PID
  • 88591 09/20/04 16:22 Lung day shift summary
  • 88589 09/20/04 14:48 lassiter HMS Quads ramprate to 1.00 A/s
  • 88587 09/20/04 14:03 smithg target leaking after all
  • 88585 09/20/04 12:54 smithg loop1 (4He) update
  • 88584 09/20/04 11:38 Lung Restricted Access
  • 88583 09/20/04 11:34 gaskell Electronics room air conditioning
  • 88582 09/20/04 11:31 gaskell new sos angle vernier adjustment
  • 88581 09/20/04 11:28 gaskell SOS cer 3
  • 88580 09/20/04 10:28 mack BCM calibration
  • 88579 09/20/04 08:48 horn Owl Shift Summary
  • 88577 09/20/04 06:47 mb Shift checklist scan
  • 88573 09/20/04 03:02 trojer target checklist
  • 88571 09/20/04 00:02 Donal Shift summary
  • Sunday

  • 88566 09/19/04 20:55 cseely bpm and bcm screens
  • 88565 09/19/04 20:51 cseely target checklist
  • 88564 09/19/04 20:51 gaskell He3 target response to beam trips
  • 88562 09/19/04 19:22 gaskell BCM calibration run
  • 88560 09/19/04 19:18 gaskell added Helium target info to epics dictionary
  • 88555 09/19/04 16:01 ioana Shift summary
  • 88551 09/19/04 13:04 horn Q3 reboot
  • 88550 09/19/04 12:48 gabriel Q3 trip
  • 88548 09/19/04 12:19 johna SOS Trigger timing change!
  • 88544 09/19/04 11:50 ioana bpm position screen grab
  • 88543 09/19/04 11:38 horn Target motion - Al Dummy to He3
  • 88541 09/19/04 11:25 gaskell SOS trigger timing
  • 88538 09/19/04 11:00 gaskell changed sos trigger to ELREAL.or.PIPRE
  • 88537 09/19/04 10:29 gaskell Pictures for entry 88536
  • 88536 09/19/04 10:23 gaskell SOS scin tdc timing
  • 88534 09/19/04 10:05 horn Target Motion
  • 88533 09/19/04 09:58 gaskell strange computer dead time
  • 88527 09/19/04 08:08 horn Shift checklist scan
  • 88525 09/19/04 07:28 bradf shift summary
  • 88522 09/19/04 05:24 bradf
  • 88521 09/19/04 04:25 bradf beam off
  • 88517 09/19/04 02:29 Trojer target checklist
  • 88515 09/19/04 00:39 bradf beam loss
  • 88513 09/19/04 00:02 Donal shift report
  • Saturday

  • 88511 09/18/04 22:05 Donal BPM and BCM
  • 88509 09/18/04 21:42 johna Preliminary target boiling tests for 3He (correct figures this time)
  • 88508 09/18/04 21:41 johna Preliminary target boiling tests for 3He
  • 88503 09/18/04 19:50 Bosted target checklist
  • 88500 09/18/04 19:34 bosted Current scan on 3He
  • 88499 09/18/04 19:29 johna End of run failed - several runs in a row
  • 88492 09/18/04 18:17 Bosted First look at 3He target with beam
  • 88491 09/18/04 17:58 gaskell q2 recovered
  • 88490 09/18/04 17:42 johna Engine tweaks
  • 88489 09/18/04 17:11 gaskell Q2 crash
  • 88487 09/18/04 16:37 johna Updated threshold files
  • 88485 09/18/04 15:56 gaskell Summary of SOS sive slit runs at P=1.2 Gev
  • 88484 09/18/04 15:51 johna Removed root trees from online engine.
  • 88483 09/18/04 15:49 gaskell Q2 ramp rate lowered to 0.5 amp/s
  • 88482 09/18/04 15:46 gaskell put nominal beam positions in error checking code
  • 88480 09/18/04 15:33 fomin repeated ESR alarms
  • 88479 09/18/04 15:30 ioana shift summary
  • 88478 09/18/04 15:26 gaskell Nominal Beam Position
  • 88476 09/18/04 15:18 fomin sos angle camera grab
  • 88468 09/18/04 13:26 gabriel Q2 finally up
  • 88466 09/18/04 13:05 fomin target moved from C3 to carbon optics
  • 88465 09/18/04 12:55 gabriel
  • 88463 09/18/04 12:28 gabriel
  • 88462 09/18/04 12:18 gabriel
  • 88461 09/18/04 12:09 gabriel Q2 crash
  • 88460 09/18/04 12:08
  • 88458 09/18/04 11:47 gabriel Results of test for Peter
  • 88454 09/18/04 10:47 gaskell Do not use 10% carbon target
  • 88453 09/18/04 10:44 fomin Target moved to C3 from C10
  • 88452 09/18/04 10:39 fomin Cryo target Lifter
  • 88451 09/18/04 10:32 fomin IOC reboot, loop2 problem
  • 88448 09/18/04 08:20 fomin target ESR alarm
  • 88445 09/18/04 08:09 fomin target checklist
  • 88444 09/18/04 07:50 slifer target: screen capture
  • 88443 09/18/04 07:47 bradf setting up for J/psi test
  • 88441 09/18/04 07:39 b filippone HMS problems
  • 88440 09/18/04 07:32 b filippone
  • 88439 09/18/04 07:31 b
  • 88432 09/18/04 03:40 johna Electronics checkout, PID thresholds, Cerenkov ADC gates
  • 88425 09/18/04 02:45 gaskell new sos angle vernier crooked
  • 88420 09/18/04 01:22 slifer target motion
  • 88419 09/18/04 01:04 B filippone ethane alarm
  • Friday

  • 88418 09/17/04 21:17 johna Pion prescaling circut setup for HMS and SOS
  • 88417 09/17/04 19:10 horn HMS Door problem
  • 88416 09/17/04 18:52 horn Target Alarm Handler GUI
  • 88415 09/17/04 18:41 horn HMS Q2 Dump switch
  • 88414 09/17/04 18:13 horn Target: GUI Screenshot
  • 88413 09/17/04 17:42 smithg target situation and repair plan
  • 88412 09/17/04 14:56 smithg target cooldown finished- but there is a leak
  • 88411 09/17/04 11:32 gaskell He3 and He4 Density Plots
  • 88410 09/17/04 09:52 smithg target cooldown started
  • Thursday

  • 88408 09/16/04 20:24 gaskell Hall status
  • 88407 09/16/04 17:40 smithg target cooldown status
  • 88406 09/16/04 16:41 nakahara TLD readings
  • 88403 09/16/04 11:33 gaskell HMS calorimeter
  • 88402 09/16/04 10:42 fomin Cherenkov calibration
  • 88401 09/16/04 07:44 gaskell Can'r ramp HMS dipole to 5.25 GeV
  • 88400 09/16/04 07:18 gaskell HMS dipole trip and polarity switch
  • 88399 09/16/04 07:13 gaskell SOS BM02
  • 88398 09/16/04 07:05 gaskell Magnet status
  • Wednesday

  • 88397 09/15/04 15:20 gaskell updated BCM calibrations in epics
  • 88395 09/15/04 14:49 fomin Q3 max current
  • 88393 09/15/04 14:38 beaufait trigger supervisor repair
  • 88392 09/15/04 07:55 gaskell sos magnets on
  • 88391 09/15/04 07:52 gaskell trigger supervisor dead again
  • Tuesday

  • 88378 09/14/04 09:21 gaskell trigger supervisor - dead again
  • Monday

  • 88354 09/13/04 12:08 fomin hms sos angle marks
  • 88353 09/13/04 11:11 HMS aerogel removed
  • Saturday

  • 88351 09/11/04 18:33 gaskell HMS scintillator ADC ribbon cables
  • 88348 09/11/04 18:16 gaskell strange replay error
  • 88342 09/11/04 17:57 gaskell trigger supervisor crate dies again
  • Friday

  • 88331 09/10/04 17:24 gaskell HMS cer correction
  • 88326 09/10/04 13:44 gaskell HMS cer HV
  • 88325 09/10/04 13:40 gaskell scer hv
  • Thursday

  • 88322 09/09/04 17:37 gaskell changed scer1 hv
  • Wednesday

    
    

    Tuesday

  • 88288 09/07/04 16:27 gaskell Moved HV channel
  • 88287 09/07/04 16:08 gaskell BCM1 and BCM2 gain to setting 2
  • 88285 09/07/04 09:20 gaskell do not turn on drift chamber HV
  • Friday

  • 88280 09/03/04 18:12 gaskell All HV off
  • 88279 09/03/04 18:09 gaskell trigger supervisor crate croaked again
  • 88276 09/03/04 14:52 saw Trigger fixed
  • Thursday

  • 88272 09/02/04 16:01 gaskell no trigger
  • 88267 09/02/04 12:23 razmilk hms cosmic test
  • 88264 09/02/04 11:31 gaskell HMS and SOS HV on
  • Wednesday

  • 88257 09/01/04 11:11 gaskell Drift chamber gas flows