Jefferson Lab Hall C Logbook for September 04 - runstarts omitted
Main INDEX
Thursday
89244 09/30/04 23:43 Tvaskis Shift Summary
89243 09/30/04 23:41 mbukhari target shift checklist screen
89241 09/30/04 23:40 mbukhari Target changed Aluminium Dummy -> 3% C
89240 09/30/04 23:38 mb
89239 09/30/04 23:33 segbefia
89236 09/30/04 22:45 mbukhari Target changed He3-> Aluminium Dummy
89233 09/30/04 21:42 mbukhari Target changed He4->He3
89231 09/30/04 21:27 mbukhari Target changed He4->He3
89226 09/30/04 18:54 mbukhari Target changed He3->He4
89223 09/30/04 18:04 mbukhari Target movement: 3He -> C 3%
89219 09/30/04 16:12 X. Zheng day shift summary
89217 09/30/04 14:19 Holt Helium-4 target pressure was increased during the beam studies
89216 09/30/04 14:10 gaskell access work
89215 09/30/04 10:52 Holt Helium targets are parked because of beam studies
89214 09/30/04 10:51 Holt
89212 09/30/04 09:10 horn Owl Shift Summary
89210 09/30/04 08:58 Holt Al dummy target is in the beam
89206 09/30/04 07:25 trojer Target changed
89200 09/30/04 02:14 trojer target checklist
89197 09/30/04 00:47 trojer Target changed He4->He3
Wednesday
89194 09/29/04 23:51 Tvaskis Shift Summary
89191 09/29/04 23:08 simona BCM and BPM Screens
89190 09/29/04 22:51 Tvaskis target changed
89188 09/29/04 22:20 Tvaskis data on dummy
89185 09/29/04 21:40 gaskell ready for beam after dummy test
89184 09/29/04 21:08 cseely yields before and after high current on dummy target
89181 09/29/04 19:48 gaskell Dummy damage test run
89179 09/29/04 19:08 Tvaskis target changed
89177 09/29/04 18:31 Tvaskis target changed
89170 09/29/04 16:01 X. Zheng day shift summary
89167 09/29/04 14:26 fomin bcm and bpm screens
89166 09/29/04 13:44 fomin HMS dipole ramp up error
89163 09/29/04 13:31 X. Zheng configuration change to setting VI
89162 09/29/04 13:14 Holt 3He target moved into beam
89158 09/29/04 11:59 Holt 3(2)% carbon target moved into beam
89157 09/29/04 11:52 fomin BCM1 seems to be the bad bcm
89154 09/29/04 09:46 Holt target checklist
89153 09/29/04 09:15 Holt 3He target moved into beam
89147 09/29/04 07:00 cseely ending run failed 50464. killed CODA and restarted
89143 09/29/04 06:07 trojer Target changed
89140 09/29/04 05:01 cseely run 50461 is He4, not He3
89137 09/29/04 03:48 trojer target checklist
89136 09/29/04 03:47 trojer Target changed
89127 09/29/04 00:17 Tvaskis shift summary
89126 09/29/04 00:11 segbefia
89124 09/29/04 00:07 simona
Tuesday
89123 09/28/04 23:55 segbefia high power heater
89121 09/28/04 23:12 Tvaskis target changed
89118 09/28/04 22:41 Tvaskis target changed
89114 09/28/04 21:39 Tvaskis beam info
89113 09/28/04 21:34 gaskell harp scan results
89110 09/28/04 20:32 gaskell no beam
89109 09/28/04 16:07 X. Zheng day shift summary
89107 09/28/04 16:05 segbefia target_checklist
89106 09/28/04 13:22 Holt Coolant flow to loop2 reduced since beam is off.
89105 09/28/04 10:36 gaskell "good" BCM run 50442
89104 09/28/04 10:14 Holt Empty target moved in for beam studies
89103 09/28/04 09:46 Holt 3He target moved into beam
89101 09/28/04 08:48 gaskell too many trips - BCM cal run no good
89100 09/28/04 08:30 cseely owl shift summary
89097 09/28/04 08:16 Holt empty target in for BCM calibration.
89093 09/28/04 07:52 Holt target checklist
89092 09/28/04 07:51 Holt target checklist
89089 09/28/04 06:54 cseely equipment checklist scans
89087 09/28/04 06:43 trojer target checklist
89086 09/28/04 06:42 trojer
89085 09/28/04 06:42 trojer Target changed He4->He3
89084 09/28/04 06:37 cseely HMS alcohol bubbler level looks low
89083 09/28/04 06:36 cseely bpm and bcm screenshots
89081 09/28/04 06:07 tro
89076 09/28/04 03:07 trojer Target changed He3->empty->He4
89074 09/28/04 03:04 trojer
89069 09/28/04 00:47 cseely new He(e,e'p)H missing mass plots
89066 09/28/04 00:09 trojer target checklist
89064 09/28/04 00:05 Bosted Shift Summary
Monday
89058 09/27/04 19:10 Segbefia He4 pressure
89056 09/27/04 17:49 gaskell SOS pipre disabled for part of run 50417
89055 09/27/04 17:20 gaskell Put sos pipre back to original configuration
89053 09/27/04 17:09 fomin He3 target unparked and moved into the beam position
89051 09/27/04 16:39 gaskell swapped gate generators for SOS pipre
89049 09/27/04 15:57 Keppel Shift Summary
89046 09/27/04 13:44 M Jones Hall C Beam Energy Measurement
89045 09/27/04 11:57 Tvaskis Dead fan in loop 1
89044 09/27/04 11:56 Keppel target change
89043 09/27/04 11:52 Tvaskis Changed from He3 to Dummy
89041 09/27/04 11:18 gaskell HMS dipole setting procedure - use USER Mode
89035 09/27/04 07:55 cseely owl shift summary
89031 09/27/04 04:42 mbukhari BCM and BPM Screens
89026 09/27/04 01:24 trojer target checklist
89025 09/27/04 01:02 cseely Y bpm plots look funny
89023 09/27/04 00:14 trojer Target changed
89021 09/27/04 00:00 fomin Swing shift summary
Sunday
89010 09/26/04 16:04 tajima day shift summary
89007 09/26/04 15:45 tajima the dipole control computer rebooted
89006 09/26/04 15:03 tajima configuration change done
89003 09/26/04 12:39 tajima note on run 50387
89001 09/26/04 12:02 mack crate voltages okay at the moment
89000 09/26/04 11:07 Tvaskis Change Target
88998 09/26/04 10:18 gaskell SOS pipre
88997 09/26/04 09:52 tajima Testing SOS trigger
88994 09/26/04 09:21 gaskell Target: Loop 1 fan died and came back
88992 09/26/04 08:23 cseely shift summary
88990 09/26/04 08:15 gaskell HMS drift chambers tripped at end of run 50381
88988 09/26/04 08:07 cseely shift summary
88985 09/26/04 06:24 mbukhari BCM and BPM Screens
88982 09/26/04 04:45 cseely changed to He3 from dummy target
88980 09/26/04 04:04 cseely SCAL channel counting low
88979 09/26/04 04:00 mbukhari target checklist after move
88977 09/26/04 03:36 mbukhari Target movement: 3He -> Al Dummy
88976 09/26/04 03:16 cseely He(e,e'p)H "elastics" followup
88974 09/26/04 01:57 cseely modified target masses in gtarg.param file
88971 09/26/04 00:15 Vipuli target checklist
Saturday
88968 09/25/04 23:57 Bosted Shift Summary
88966 09/25/04 22:42 Vipuli Taget GUI after changing target
88964 09/25/04 22:39 Bosted Q2 trip: end of run 50369 bad
88962 09/25/04 21:50 Vipuli Target changed
88960 09/25/04 21:32 mack offsets are rock solid, must be a gain shift; I'll be in Sunday morning
88959 09/25/04 21:26 Bosted Momentum changed both spectrometers. Run 50364 good fro HMS only
88958 09/25/04 20:44 mack offsets are rock solid, must be a gain shift
88955 09/25/04 19:03 gaskell BCMs not stable
88954 09/25/04 18:38 Vipuli target checklist
88950 09/25/04 17:06 Vipuli Target reboot
88947 09/25/04 16:08 tajima shift summary
88945 09/25/04 15:45 adaniel shift check list
88942 09/25/04 14:31 Hill Moved to He4 from He3
88941 09/25/04 13:09 tajima Runs 50356 and 50357
88939 09/25/04 12:45 tajima Run #50356 -- Short run
88933 09/25/04 09:12 Donal Format the entry
88931 09/25/04 08:17 Hill Moved to He3 from Dummy
88930 09/25/04 08:11 mbukhari shift summary
88927 09/25/04 07:18 mbukhari SOS Momentunm change
88926 09/25/04 07:18 mbukhari SOS Momentunm change
88923 09/25/04 06:42 slifer target motion
88920 09/25/04 05:22 mbukhari Run Replays: Histograms Different for Run 50344
88919 09/25/04 05:08 slifer target screen
88918 09/25/04 04:59 slifer target screen
88917 09/25/04 04:52 mbukhari BCM and BPM Screens
88913 09/25/04 01:36 mbukhari Run #50342 is JUNK
88912 09/25/04 01:36 mbukhari Drift Chambers G1 & G2 Tripped
88909 09/25/04 01:18 mbukhari HMS Q1 MPS Overtemp Interlock
88908 09/25/04 00:45 slifer correction
88907 09/25/04 00:39 slifer target motion
88905 09/25/04 00:16 cseely Shift Summary
Friday
88902 09/24/04 22:35 cseely bpms and bcms
88901 09/24/04 22:34 cseely
88893 09/24/04 19:00 hill HMS Dipole interlock while setting
88892 09/24/04 18:56 fomin target moved from C3% to He4
88891 09/24/04 18:33 hill HMS Dipole interlock while setting
88890 09/24/04 18:27 cseely HMS Dipole interlock while setting
88887 09/24/04 17:51 fomin target moved from He4 to C3%
88885 09/24/04 17:12 fomin target moved from Al Dummy to He4
88884 09/24/04 16:53 fomin He3 target parked, He4 unparked
88882 09/24/04 16:41 fomin Target moved from He3 to Al Dummy
88880 09/24/04 16:03 Keppel target change
88878 09/24/04 16:00 Potterveld Day shift summary
88875 09/24/04 15:29 Keppel target checklist
88870 09/24/04 12:53 Keppel target change
88867 09/24/04 11:58 Potterveld SOS magnet excitation data
88861 09/24/04 08:46 mbukhari Shift Summary
88857 09/24/04 07:11 mbukhari 4He runs complete for the shift
88856 09/24/04 07:10 McKee Betabrite restarted
88855 09/24/04 07:10 mbukhari shift checklist scans
88854 09/24/04 07:10 mbukhari shift checklist scans
88853 09/24/04 06:39 mbukhari bcm and bpm screens
88852 09/24/04 06:00 McKee target: move to he3 target
88849 09/24/04 05:19 McKee target checklist
88847 09/24/04 04:23 McKee target: jeffylab rebooted
88844 09/24/04 01:06 McKee beam on he4 target
88842 09/24/04 00:35 fomin HMS dipole field control errors
Thursday
88839 09/23/04 23:49 cseely some missing mass plots
88838 09/23/04 23:48 fomin Swing shift summary
88836 09/23/04 23:41 cseely moved to He4 from dummy
88834 09/23/04 23:01 gaskell Dipole set
88833 09/23/04 22:45 gaskell Usable BCM calibration run
88832 09/23/04 22:38 fomin MPS error, NMR error on the HMS dipole
88831 09/23/04 22:29 gaskell HMS dipole again
88830 09/23/04 22:14 gaskell more HMS dipole
88829 09/23/04 22:01 gaskell HMS dipole troubles
88826 09/23/04 20:01 fomin bcm and bpm screens
88824 09/23/04 19:25 cseely moved to dummy from He4
88821 09/23/04 17:52 gaskell C luminosity scan results
88820 09/23/04 17:46 gaskell He3 Luminosity Scan Results
88818 09/23/04 17:40 gaskell axis labels wrong
88817 09/23/04 17:37 gaskell He4 luminosity scan (preliminary) results
88816 09/23/04 17:23 Potterveld Day shift summary
88815 09/23/04 17:18 cseely restarted target gui
88814 09/23/04 17:01 fomin HMS dipole field control error
88813 09/23/04 16:58 cseely target checklist
88811 09/23/04 16:36 fomin HMS dipole field control error
88810 09/23/04 16:30 fomin GAS system interlock low psi alarm
88809 09/23/04 16:27 cseely Loop2 temperature alarm (
88808 09/23/04 16:24 fomin HMS dipole field control error
88806 09/23/04 15:54 okayasu Target changed
88804 09/23/04 15:15 fomin shift checklist ending on 9/22
88801 09/23/04 13:53 okayasu Target changed.
88799 09/23/04 10:28 saw Updated echmsq3i_set_s
88798 09/23/04 10:11 okayasu `Target temporaly moved
88797 09/23/04 10:07 gaskell One more HMS dipole field control error
88795 09/23/04 09:23 gaskell another HMS dipole field control error
88792 09/23/04 09:04 gaskell HMS dipole field control error
88789 09/23/04 07:57 jroche owl shift summary : no beam
88788 09/23/04 07:25 trojer target checklist
88787 09/23/04 07:06 jroche beam finally
88785 09/23/04 06:32 mbukhari Helium supply replenished
88784 09/23/04 00:29 trojer Rebooted target GUI
88783 09/23/04 00:07 Donal Shift report
Wednesday
88781 09/22/04 23:26 cseely moved to He3 from empty
88778 09/22/04 22:55 fomin bcm calibration update (attn: Dave Mack)
88777 09/22/04 22:51 fomin bcm and bpm screens
88774 09/22/04 22:15 cseely vesda alarm in zone 4 - reset
88773 09/22/04 22:09 fomin scanner doesn't work
88769 09/22/04 21:26 fomin SOS angle snapshot and cdaql1 boot problem
88767 09/22/04 20:36 fomin HMS dipole ramp up errors
88766 09/22/04 20:14 cseely empty target in. BCM calibration has commenced.
88763 09/22/04 19:51 target screen at 94uA (during He3 Lumi. scan)
88762 09/22/04 19:51 target screen at 94uA (during He3 Lumi. scan)
88760 09/22/04 19:40 cseely target screen at 81uA (during He3 Lumi. scan)
88755 09/22/04 19:21 cseely moved to C(3%) from He3
88754 09/22/04 19:15 cseely target screen at 67uA (during He3 Lumi. scan)
88753 09/22/04 19:14 cseely target screen at 50uA (during He3 Lumi. scan)
88751 09/22/04 19:08 cseely target screen at 31uA (during He3 Lumi. scan)
88747 09/22/04 18:42 cseely moved to C(3%) from He3
88746 09/22/04 18:34 cseely target screen at 31uA (during He3 Lumi. scan)
88744 09/22/04 18:28 cseely target screen at 16uA (during He3 Lumi. scan)
88742 09/22/04 18:26 cseely Loop1 parked, Loop2 unparked. Moved from C(3%) to He3(Loop2)
88740 09/22/04 18:12 cseely target change TO: C(3%) from He4(Loop1)
88736 09/22/04 17:52 cseely target screenshot at 91 uA (lumi. scan)
88735 09/22/04 17:48 cseely target screenshot at 82 uA (lumi. scan)
88733 09/22/04 17:40 cseely target screenshot at 62 uA (lumi. scan)
88731 09/22/04 17:34 cseely target screenshot at 47 uA (lumi. scan)
88729 09/22/04 17:29 cseely target screenshot at 32 uA (lumi. scan)
88724 09/22/04 17:04 cseely target screen at 15uA (during He4 Lumi. scan)
88723 09/22/04 16:39 Potterveld Day shift summary
88722 09/22/04 16:28 cseely HMS dipole crash #2
88720 09/22/04 16:17 Potterveld setting up for luminosity scan
88719 09/22/04 16:02 cseely target checklist
88718 09/22/04 16:00 okayasu Target changed to empty for harp run
88717 09/22/04 15:28 okayasu Screenshot
88712 09/22/04 11:21 okayasu Target changed
88710 09/22/04 10:04 smithg Loop1 target fan story
88709 09/22/04 09:51 okayasu Coolant flow meter alart
88707 09/22/04 09:36 okayasu Temprature limit was changed.
88705 09/22/04 09:21 okayasu IOC Cryotarget rebooted
88704 09/22/04 08:47 horn Owl Shift Summary
88702 09/22/04 07:58 trojer target checklist
88697 09/22/04 05:44 mbukhari BPM and BCM log checklist item
88684 09/22/04 01:21 horn Run 50237 junk
88681 09/22/04 00:26 trojer moved to He3 target (Loop 2)
88680 09/22/04 00:06 Donal Shift Report
Tuesday
88677 09/21/04 23:38 cseely Rebooted target IOC - Loop1 fan did not come back
88676 09/21/04 23:08 cseely cleared another fan speed alarm (lo 0) and vent pressure (hihi) alarms
88674 09/21/04 22:51 cseely moved to dummy target
88673 09/21/04 22:41 tajima bpm and bcm screens
88670 09/21/04 20:29 cseely Loop 1 fan control screen shot
88669 09/21/04 20:26 cseely Loop1 fan tachometer reading 0
88667 09/21/04 18:37 cseely parked Loop1 and unparked Loop2, moved to Loop2
88662 09/21/04 17:42 Donal HNS dipole
88661 09/21/04 17:23 smithg new 4He target PID params & current limit
88660 09/21/04 17:12 cseely target checklist
88659 09/21/04 17:00 Potterveld Day shift summary
88658 09/21/04 16:46 gaskell HMS dipole field control errors
88657 09/21/04 16:44 gaskell run 50227 is junk
88655 09/21/04 16:12 fomin target moved from He3 to He4
88653 09/21/04 16:10 fomin target parking/unparking
88649 09/21/04 14:32 fomin target alarm loop1
88648 09/21/04 14:29 smithg Improved 3He PID parameters
88642 09/21/04 11:51 fomin target checklist
88641 09/21/04 11:32 smithg 4He target leak isolated
88639 09/21/04 10:59 Lassiter Q2 trim coil
88638 09/21/04 10:57 beaufait target supervisor
88637 09/21/04 10:38 saw, ckeith Variables added to target logger
88636 09/21/04 09:49 adaniel trim coil quench hms q2
88635 09/21/04 08:33 horn Owl Shift Summary
88620 09/21/04 04:40 trojer He4 pressure fallup, reached LOLO Limit
88619 09/21/04 04:38 horn Frequent TS power cycling
88612 09/21/04 03:00 trojer He4 pressure fallup
88611 09/21/04 02:29 horn TS dead again at end of run 50196
88610 09/21/04 02:18 trojer target checklist
88607 09/21/04 00:17 horn Rebooted trigger supervisor
Monday
88605 09/20/04 23:59 Bosted Shift summary
88604 09/20/04 23:50 Donal He4 pressure fallup
88603 09/20/04 23:21 Donal Target motion - Al Dummy to He3
88602 09/20/04 22:41 Donal He4 pressure
88600 09/20/04 20:49 Donal He4 pressure
88598 09/20/04 20:26 gaskell Revenge of the trigger supervisor
88597 09/20/04 19:27 gaskell Q2 fix
88596 09/20/04 19:17 Donal Cell pressure Loop 1
88595 09/20/04 19:06 Donal target checklist
88594 09/20/04 18:57 Donal He4 target
88593 09/20/04 17:57 smithg both 4he and 3he available now
88592 09/20/04 17:36 gaskell target PID
88591 09/20/04 16:22 Lung day shift summary
88589 09/20/04 14:48 lassiter HMS Quads ramprate to 1.00 A/s
88587 09/20/04 14:03 smithg target leaking after all
88585 09/20/04 12:54 smithg loop1 (4He) update
88584 09/20/04 11:38 Lung Restricted Access
88583 09/20/04 11:34 gaskell Electronics room air conditioning
88582 09/20/04 11:31 gaskell new sos angle vernier adjustment
88581 09/20/04 11:28 gaskell SOS cer 3
88580 09/20/04 10:28 mack BCM calibration
88579 09/20/04 08:48 horn Owl Shift Summary
88577 09/20/04 06:47 mb Shift checklist scan
88573 09/20/04 03:02 trojer target checklist
88571 09/20/04 00:02 Donal Shift summary
Sunday
88566 09/19/04 20:55 cseely bpm and bcm screens
88565 09/19/04 20:51 cseely target checklist
88564 09/19/04 20:51 gaskell He3 target response to beam trips
88562 09/19/04 19:22 gaskell BCM calibration run
88560 09/19/04 19:18 gaskell added Helium target info to epics dictionary
88555 09/19/04 16:01 ioana Shift summary
88551 09/19/04 13:04 horn Q3 reboot
88550 09/19/04 12:48 gabriel Q3 trip
88548 09/19/04 12:19 johna SOS Trigger timing change!
88544 09/19/04 11:50 ioana bpm position screen grab
88543 09/19/04 11:38 horn Target motion - Al Dummy to He3
88541 09/19/04 11:25 gaskell SOS trigger timing
88538 09/19/04 11:00 gaskell changed sos trigger to ELREAL.or.PIPRE
88537 09/19/04 10:29 gaskell Pictures for entry 88536
88536 09/19/04 10:23 gaskell SOS scin tdc timing
88534 09/19/04 10:05 horn Target Motion
88533 09/19/04 09:58 gaskell strange computer dead time
88527 09/19/04 08:08 horn Shift checklist scan
88525 09/19/04 07:28 bradf shift summary
88522 09/19/04 05:24 bradf
88521 09/19/04 04:25 bradf beam off
88517 09/19/04 02:29 Trojer target checklist
88515 09/19/04 00:39 bradf beam loss
88513 09/19/04 00:02 Donal shift report
Saturday
88511 09/18/04 22:05 Donal BPM and BCM
88509 09/18/04 21:42 johna Preliminary target boiling tests for 3He (correct figures this time)
88508 09/18/04 21:41 johna Preliminary target boiling tests for 3He
88503 09/18/04 19:50 Bosted target checklist
88500 09/18/04 19:34 bosted Current scan on 3He
88499 09/18/04 19:29 johna End of run failed - several runs in a row
88492 09/18/04 18:17 Bosted First look at 3He target with beam
88491 09/18/04 17:58 gaskell q2 recovered
88490 09/18/04 17:42 johna Engine tweaks
88489 09/18/04 17:11 gaskell Q2 crash
88487 09/18/04 16:37 johna Updated threshold files
88485 09/18/04 15:56 gaskell Summary of SOS sive slit runs at P=1.2 Gev
88484 09/18/04 15:51 johna Removed root trees from online engine.
88483 09/18/04 15:49 gaskell Q2 ramp rate lowered to 0.5 amp/s
88482 09/18/04 15:46 gaskell put nominal beam positions in error checking code
88480 09/18/04 15:33 fomin repeated ESR alarms
88479 09/18/04 15:30 ioana shift summary
88478 09/18/04 15:26 gaskell Nominal Beam Position
88476 09/18/04 15:18 fomin sos angle camera grab
88468 09/18/04 13:26 gabriel Q2 finally up
88466 09/18/04 13:05 fomin target moved from C3 to carbon optics
88465 09/18/04 12:55 gabriel
88463 09/18/04 12:28 gabriel
88462 09/18/04 12:18 gabriel
88461 09/18/04 12:09 gabriel Q2 crash
88460 09/18/04 12:08
88458 09/18/04 11:47 gabriel Results of test for Peter
88454 09/18/04 10:47 gaskell Do not use 10% carbon target
88453 09/18/04 10:44 fomin Target moved to C3 from C10
88452 09/18/04 10:39 fomin Cryo target Lifter
88451 09/18/04 10:32 fomin IOC reboot, loop2 problem
88448 09/18/04 08:20 fomin target ESR alarm
88445 09/18/04 08:09 fomin target checklist
88444 09/18/04 07:50 slifer target: screen capture
88443 09/18/04 07:47 bradf setting up for J/psi test
88441 09/18/04 07:39 b filippone HMS problems
88440 09/18/04 07:32 b filippone
88439 09/18/04 07:31 b
88432 09/18/04 03:40 johna Electronics checkout, PID thresholds, Cerenkov ADC gates
88425 09/18/04 02:45 gaskell new sos angle vernier crooked
88420 09/18/04 01:22 slifer target motion
88419 09/18/04 01:04 B filippone ethane alarm
Friday
88418 09/17/04 21:17 johna Pion prescaling circut setup for HMS and SOS
88417 09/17/04 19:10 horn HMS Door problem
88416 09/17/04 18:52 horn Target Alarm Handler GUI
88415 09/17/04 18:41 horn HMS Q2 Dump switch
88414 09/17/04 18:13 horn Target: GUI Screenshot
88413 09/17/04 17:42 smithg target situation and repair plan
88412 09/17/04 14:56 smithg target cooldown finished- but there is a leak
88411 09/17/04 11:32 gaskell He3 and He4 Density Plots
88410 09/17/04 09:52 smithg target cooldown started
Thursday
88408 09/16/04 20:24 gaskell Hall status
88407 09/16/04 17:40 smithg target cooldown status
88406 09/16/04 16:41 nakahara TLD readings
88403 09/16/04 11:33 gaskell HMS calorimeter
88402 09/16/04 10:42 fomin Cherenkov calibration
88401 09/16/04 07:44 gaskell Can'r ramp HMS dipole to 5.25 GeV
88400 09/16/04 07:18 gaskell HMS dipole trip and polarity switch
88399 09/16/04 07:13 gaskell SOS BM02
88398 09/16/04 07:05 gaskell Magnet status
Wednesday
88397 09/15/04 15:20 gaskell updated BCM calibrations in epics
88395 09/15/04 14:49 fomin Q3 max current
88393 09/15/04 14:38 beaufait trigger supervisor repair
88392 09/15/04 07:55 gaskell sos magnets on
88391 09/15/04 07:52 gaskell trigger supervisor dead again
Tuesday
88378 09/14/04 09:21 gaskell trigger supervisor - dead again
Monday
88354 09/13/04 12:08 fomin hms sos angle marks
88353 09/13/04 11:11 HMS aerogel removed
Saturday
88351 09/11/04 18:33 gaskell HMS scintillator ADC ribbon cables
88348 09/11/04 18:16 gaskell strange replay error
88342 09/11/04 17:57 gaskell trigger supervisor crate dies again
Friday
88331 09/10/04 17:24 gaskell HMS cer correction
88326 09/10/04 13:44 gaskell HMS cer HV
88325 09/10/04 13:40 gaskell scer hv
Thursday
88322 09/09/04 17:37 gaskell changed scer1 hv
Wednesday
Tuesday
88288 09/07/04 16:27 gaskell Moved HV channel
88287 09/07/04 16:08 gaskell BCM1 and BCM2 gain to setting 2
88285 09/07/04 09:20 gaskell do not turn on drift chamber HV
Friday
88280 09/03/04 18:12 gaskell All HV off
88279 09/03/04 18:09 gaskell trigger supervisor crate croaked again
88276 09/03/04 14:52 saw Trigger fixed
Thursday
88272 09/02/04 16:01 gaskell no trigger
88267 09/02/04 12:23 razmilk hms cosmic test
88264 09/02/04 11:31 gaskell HMS and SOS HV on
Wednesday
88257 09/01/04 11:11 gaskell Drift chamber gas flows