10/24/04 0000-0800
Experiment #: E02-019
Shift Leader: H. Mkrtchyan
Shift Workers: A. Daniel, M. Kotulla

00000100020003000400050006000700Total Time
Acceptable Beam
in Use
0.400.460.460.280.230.710.220.483.24
Beam Available
but Not in Use
0.140.040.040.000.000.100.620.000.94
Beam Not Available
or Unacceptable
0.470.500.500.720.770.180.150.523.80
Accelerator Con-
figuration Change
0.000.000.000.000.000.000.000.000.00
Experiment
Ready
0.860.950.961.001.000.880.321.006.97
Planned Config-
uration Change
0.140.040.000.000.000.100.000.000.27
Unplanned
Experiment Down
0.000.000.030.000.000.000.680.000.72
Hall not
ready reasons
Target0.000.000.000.000.000.000.680.000.68
DAQ0.000.000.030.000.000.000.000.000.03
HMS0.000.000.000.000.000.000.000.000.00
SOS0.000.000.000.000.000.000.000.000.00
Detectors0.000.000.000.000.000.000.000.000.00
Other0.000.000.000.000.000.000.000.000.00

Comments: Finished data taking at P_hms=-1.33 GeV, thet_hms=40 deg. Changed HMS settings for momentum P_hms=-1.14. Take data on Au, Cu and C targets. Have problem to change target from Cu to C . Lost about 40 min. Beam was very unstable during all shift.

Data Entry by: hamlet