Monday
93580 12/27/04 15:31 test test
Thursday
93578 12/23/04 11:55 hamlet HMS momentum was -2.7 GeV/c for runs 52492-52495
93577 12/23/04 11:22 hcf where the premix is REALLY valved off
93576 12/23/04 10:56 hcf Drift Chamber gas is now Pure Argon
93575 12/23/04 10:40 hamlet Main power for HMS Q1-Q3 and D is off
93574 12/23/04 10:35 hamlet Turned off power in SOS/HMS hut
93573 12/23/04 09:30 hickson secured
Wednesday
93572 12/22/04 20:43 horn Turned off equipment for holiday shutdown
93571 12/22/04 20:34 cdaq Beam Time Accounting
93570 12/22/04 20:13 cdaq Run 52495: Test Run thHMS=10.8,pHMS=+2.7, thSOS=28.0,pSOS=-0.90 Target LH2.
93569 12/22/04 19:51 cdaq Run 52494: Test Run thHMS=10.8,pHMS=+2.7, thSOS=28.0,pSOS=-0.90 Target LD2.
93568 12/22/04 19:49 cdaq Run 52493: Test Run thHMS=10.8,pHMS=+2.7, thSOS=28.0,pSOS=-0.90 Target LD2.
93567 12/22/04 19:32 cdaq Run 52492: Test Run thHMS=10.8,pHMS=+2.7, thSOS=28.0,pSOS=-0.90 Target LH2.
93566 12/22/04 18:58 cdaq Run 52491: Test Run thHMS=10.8,pHMS=+2.7, thSOS=28.0,pSOS=+0.90 Target 1.6% C.
93565 12/22/04 18:31 cdaq Run 52490: Test Run thHMS=10.8,pHMS=+2.7, thSOS=28.0,pSOS=-1.70 Target LD2.
93564 12/22/04 18:19 cdaq Run 52489: Test Run thHMS=10.8,pHMS=+2.7, thSOS=28.0,pSOS=-1.70 Target LH2.
93563 12/22/04 17:53 cdaq Run 52488: Test Run thHMS=10.8,pHMS=+2.7, thSOS=28.0,pSOS=-1.70 Target Al Dummy.
93562 12/22/04 17:53 horn Target: move to Al Dummy
93561 12/22/04 17:39 cdaq Run 52487: Test Run thHMS=10.8,pHMS=+2.7, thSOS=28.0,pSOS=-1.70 Target 2%Be.
93560 12/22/04 17:15 cdaq Run 52486: Test Run thHMS=10.8,pHMS=+2.7, thSOS=28.0,pSOS=-1.70 Target 1.6% C
93559 12/22/04 16:51 cdaq Run 52485: Test Run thHMS=10.8,pHMS=+2.7, thSOS=28.0,pSOS=-1.23 Target 1.6% C
93558 12/22/04 16:48 horn Target: move to 3% C
93557 12/22/04 16:39 cdaq Beam Time Accounting
93556 12/22/04 16:38 cdaq Beam Time Accounting
93555 12/22/04 16:38 cdaq Beam Time Accounting
93554 12/22/04 16:37 cdaq Beam Time Accounting
93553 12/22/04 16:37 cdaq Beam Time Accounting
93552 12/22/04 16:36 cdaq Beam Time Accounting
93551 12/22/04 16:36 cdaq Beam Time Accounting
93550 12/22/04 16:35 cdaq Beam Time Accounting
93549 12/22/04 16:35 cdaq Beam Time Accounting
93548 12/22/04 16:34 cdaq Beam Time Accounting
93547 12/22/04 16:33 cdaq Run 52484: Test Run thHMS=10.8,pHMS=+2.7, thSOS=28.0,pSOS=-1.23 Target Be.
93546 12/22/04 16:30 cdaq Beam Time Accounting
93545 12/22/04 16:23 cdaq Run 52483: Test Run thHMS=10.8,pHMS=+2.7, thSOS=28.0,pSOS=-1.23 Target Be.
93544 12/22/04 16:15 cdaq Run 52482: Test Run thHMS=10.8,pHMS=+2.7, thSOS=28.0,pSOS=-1.23 Target Be.
93543 12/22/04 16:04 cdaq Run 52481: Test Run thHMS=10.8,pHMS=+2.7, thSOS=28.0,pSOS=-1.23 Target Be.
93542 12/22/04 16:02 horn Target: move to Be
93541 12/22/04 16:02 Hall C Colla Day Shift Summary
93540 12/22/04 15:51 cdaq Run 52480: Test Run thHMS=10.8,pHMS=+2.7, thSOS=28.0,pSOS=-1.23 Target Al Dummy.
93530 12/22/04 15:37 hamlet HMS quad Q3 trip
93516 12/22/04 15:19 cdaq Run 52479: Test Run thHMS=10.8,pHMS=+2.7, thSOS=28.0,pSOS=-1.23 Target Al Dummy.
93514 12/22/04 15:14 clasie Target: move to Dummy
93506 12/22/04 15:03 cdaq Run 52478: Test Run thHMS=10.8,pHMS=+2.7, thSOS=28.0,pSOS=-1.23 Target LH2.
93503 12/22/04 14:59 clasie Target: move th LH2
93492 12/22/04 14:46 cdaq Run 52477: Test Run thHMS=10.8,pHMS=+2.7, thSOS=28.0,pSOS=-1.23 Target LD2.
93486 12/22/04 14:29 clasie BPM & BCM screen
93481 12/22/04 14:20 cdaq Run 52476: Test Run thHMS=10.8,pHMS=+2.7, thSOS=28.0,pSOS=-0.9 Target LD2.
93480 12/22/04 14:05 cdaq Run 52475: Test Run thHMS=10.8,pHMS=+2.7, thSOS=28.0,pSOS=-0.9 Target LH2.
93478 12/22/04 13:59 clasie Target: move th LH2
93471 12/22/04 13:48 cdaq Run 52474: Test Run thHMS=10.8,pHMS=+2.7, thSOS=28.0,pSOS=-0.9 Target Al.
93470 12/22/04 13:44 clasie Target: change to Al Dummy
93465 12/22/04 13:38 cdaq Run 52473: Test Run thHMS=10.8,pHMS=+2.7, thSOS=28.0,pSOS=-0.9 Target 2% Be
93460 12/22/04 13:30 cdaq Run 52472: Test Run thHMS=10.8,pHMS=+2.7, thSOS=28.0,pSOS=-0.9 Target 2% Be
93457 12/22/04 13:27 cdaq Run 52471: Junk
93452 12/22/04 13:17 cdaq Run 52470: Test Run thHMS=10.8,pHMS=+2.7, thSOS=28.0,pSOS=-0.9 Target 2% Be
93451 12/22/04 13:14 clasie target: move to Be
93447 12/22/04 13:00 cdaq Run 52469: Test Run
93441 12/22/04 12:49 cdaq Run 52468: Test Run
93428 12/22/04 12:12 cdaq Run 52467: Radiative Corrections Run,thHMS=10.63,pHMS=+0.555,6%Cu
93423 12/22/04 12:07 cdaq Run 52466: Radiative Corrections Run,thHMS=10.63,pHMS=+0.555,6%Au
93420 12/22/04 12:00 cdaq Run 52465: Radiative Corrections Run,thHMS=10.63,pHMS=+0.555,3%C
93415 12/22/04 11:47 cdaq Run 52464: Radiative Corrections Run,thHMS=10.63,pHMS=+0.555,6%C
93413 12/22/04 11:41 cdaq Run 52463: junk, beam dropped out at the start
93405 12/22/04 11:24 cdaq Run 52462: Radiative Corrections Run,thHMS=10.63,pHMS=+0.813,6%C
93401 12/22/04 11:12 cdaq Run 52461: Radiative Corrections Run,thHMS=10.63,pHMS=+0.813,3%C
93397 12/22/04 11:04 cdaq Run 52460: Radiative Corrections Run,thHMS=10.63,pHMS=+0.813,6%Au
93394 12/22/04 10:55 cdaq Run 52459: Radiative Corrections Run,thHMS=10.63,pHMS=+0.813,6%Cu
93386 12/22/04 10:18 clasie HMS diple LHe went to zero
93379 12/22/04 08:48 cdaq Run 52458: Radiative Corrections Run,thHMS=10.63,pHMS=+1.190,6%Cu
93378 12/22/04 08:37 cdaq Run 52457: Radiative Corrections Run,thHMS=10.63,pHMS=+1.190,6%Au
93377 12/22/04 08:33 horn Owl Shift Summary
93376 12/22/04 08:30 cdaq Run 52456: Radiative Corrections Run,thHMS=10.63,pHMS=+1.190,3%C
93375 12/22/04 08:18 cdaq Run 52455: Radiative Corrections Run,thHMS=10.63,pHMS=+1.190,6%C
93374 12/22/04 08:05 Xin Target snapshot
93373 12/22/04 08:03 cdaq Run 52454: Radiative Corrections Run,thHMS=10.63,pHMS=+1.743,6%C
93372 12/22/04 08:02 Xin target 6% Carbon
93371 12/22/04 07:54 cdaq Run 52453: Radiative Corrections Run,thHMS=10.63,pHMS=+1.743,3%C
93370 12/22/04 07:45 cdaq Run 52452: Radiative Corrections Run,thHMS=10.63,pHMS=+1.743,6%Au
93369 12/22/04 07:33 cdaq Run 52451: Radiative Corrections Run,thHMS=10.63,pHMS=+1.743,6%Cu
93368 12/22/04 06:41 cdaq Run 52449: Radiative Corrections Run,thHMS=10.63,pHMS=0.813,6%Cu
93367 12/22/04 06:25 cdaq Run 52448: Radiative Corrections Run,thHMS=10.63,pHMS=0.813,6%Au
93366 12/22/04 06:16 cdaq Run 52447: Radiative Corrections Run,thHMS=10.63,pHMS=0.813,3%C
93365 12/22/04 06:05 cdaq Run 52446: Radiative Corrections Run,thHMS=10.63,pHMS=0.813,6%C
93364 12/22/04 05:50 cdaq Run 52445: Radiative Corrections Run,thHMS=10.63,pHMS=1.190,6%C
93363 12/22/04 05:38 cdaq Run 52444: Radiative Corrections Run,thHMS=10.63,pHMS=1.190,3%C
93362 12/22/04 05:29 cdaq Run 52443: Radiative Corrections Run,thHMS=10.63,pHMS=1.190,6%Au
93361 12/22/04 05:20 cdaq Run 52442: Radiative Corrections Run,thHMS=10.63,pHMS=1.190,6%Cu
93360 12/22/04 05:04 cdaq Run 52441: Radiative Corrections Run,thHMS=10.63,pHMS=1.743,6%Cu
93359 12/22/04 04:56 cdaq Run 52440: Radiative Corrections Run,thHMS=10.63,pHMS=1.743,6%Au
93358 12/22/04 04:45 cdaq Run 52439: Radiative Corrections Run,thHMS=10.63,pHMS=1.743,3%C
93357 12/22/04 04:34 cdaq Run 52438: Radiative Corrections Run,thHMS=10.63,pHMS=1.743,6%C
93356 12/22/04 04:16 cdaq Run 52437: Radiative Corrections Run,thHMS=10.63,pHMS=2.552,6%C
93355 12/22/04 03:58 cdaq Run 52436: Radiative Corrections Run,thHMS=10.63,pHMS=2.552,3%C
93354 12/22/04 03:52 YaLi Target: 6% Carbon
93353 12/22/04 03:42 cdaq Run 52435: Radiative Corrections Run,thHMS=10.63,pHMS=2.552,6%Au
93352 12/22/04 03:42 YaLi Target: snapshot
93351 12/22/04 03:33 cdaq Run 52434: Radiative Corrections Run,thHMS=10.63,pHMS=2.552,6%Cu
93350 12/22/04 03:15 cdaq Run 52433: Radiative Corrections Run
93349 12/22/04 02:58 cdaq Run 52432: Radiative Corrections Run,thHMS=10.63,pHMS=3.736,6%Au
93348 12/22/04 02:47 cdaq Run 52431: Radiative Corrections Run,thHMS=10.63,pHMS=3.736,3%C
93347 12/22/04 02:34 cdaq Run 52430: Radiative Corrections Run,thHMS=10.63,pHMS=3.736,6%C
93346 12/22/04 02:03 cdaq Run 52429: Radiative Corrections Run,thHMS=10.63,pHMS=0.555,6%C
93345 12/22/04 01:53 horn target in header for run 52428 is 3%C
93344 12/22/04 01:41 cdaq Run 52428: Radiative Corrections Run,thHMS=10.63,pHMS=0.555,3%Cu
93343 12/22/04 01:32 cdaq Run 52427: Radiative Corrections Run,thHMS=10.63,pHMS=0.555,Au
93342 12/22/04 01:30 YaLi Target: from 6% Copper to 6% Gold
93341 12/22/04 01:23 cdaq Run 52426: Radiative Corrections Run
93340 12/22/04 01:11 cdaq Run 52425: Test Run
93339 12/22/04 01:09 cdaq Run 52424: Test Run
93338 12/22/04 01:07 cdaq Run 52423: Test Run
93337 12/22/04 01:06 cdaq Run 52422: Test Run
93336 12/22/04 01:03 cdaq Run 52421: Test Run
93335 12/22/04 00:56 cdaq Run 52420: Test Run
93334 12/22/04 00:47 clasie new premix bottle
93333 12/22/04 00:39 horn Radiative Corrections setup
93332 12/22/04 00:33 happy holidays from hall c
93331 12/22/04 00:15 clasie Swing shift summary
Tuesday
93330 12/21/04 23:40 Xin
93329 12/21/04 23:14 gaskell Moller done
93328 12/21/04 23:01 cdaq Moller Run 48782: Moller run - kicker off
93327 12/21/04 22:51 cdaq Moller Run 48781: Moller run - kicker off
93326 12/21/04 22:41 cdaq Moller Run 48780: Moller run - kicker on
93325 12/21/04 22:30 cdaq Moller Run 48779: Moller run - kicker on
93324 12/21/04 22:24 gaskell trouble delivering beam at 2uA
93323 12/21/04 22:19 cdaq Moller Run 48778: Moller run - kicker off
93322 12/21/04 22:16 gaskell 60 uA is no go
93321 12/21/04 19:50 cdaq Moller Run 48777: Moller run - kicker on
93320 12/21/04 19:42 cdaq Moller Run 48776: Moller run - kicker on
93319 12/21/04 18:48 cdaq Moller Run 48775: Moller run - kicker on
93318 12/21/04 18:34 cdaq Moller Run 48774: Moller run - kicker on
93317 12/21/04 18:25 cdaq Moller Run 48773: Moller run - kicker on
93316 12/21/04 18:16 cdaq Moller Run 48772: Moller run - kicker on
93315 12/21/04 18:06 cdaq Moller Run 48771: Moller run - kicker on
93314 12/21/04 17:49 cdaq Moller Run 48770: Moller run - kicker on
93313 12/21/04 17:40 cdaq Moller Run 48769: Moller run - kicker on
93312 12/21/04 17:28 cdaq Moller Run 48768: Moller run - kicker on
93309 12/21/04 16:33 cdaq Moller Run 48767: Moller run - kicker on
93308 12/21/04 16:03 gaskell raster fixed
93307 12/21/04 16:02 Xin target screenshot
93306 12/21/04 15:55 Miyoshi Target snapshot
93305 12/21/04 15:39 gaskell beam position scan
93300 12/21/04 14:31 gaskell power cycled raster - didn't help
93299 12/21/04 13:56 gaskell raster (vertical) tripped off
93298 12/21/04 13:24 cdaq Moller Run 48766: Moller run - kicker on
93297 12/21/04 13:12 cdaq Moller Run 48765: Moller run - kicker on
93296 12/21/04 12:53 cdaq Moller Run 48764: Moller run - kicker on
93295 12/21/04 12:23 gaskell Charge asymmetries are huge
93294 12/21/04 11:57 cdaq Moller Run 48763: Moller run
93293 12/21/04 11:53 gaskell Moller calo HV changed
93292 12/21/04 11:50 cdaq Moller Run 48762: Moller run
93291 12/21/04 11:15 gaskell Moller solenoid at field, quads on
93290 12/21/04 09:13 gaskell power supply switched to Moller
93289 12/21/04 08:05 M Jones Owl shift summary
93288 12/21/04 07:55 cdaq Run 52419: Production Run
93287 12/21/04 07:51 YaLi Target: snapshot
93286 12/21/04 07:49 cdaq Run 52418: Production Run
93285 12/21/04 07:37 simona beam position
93284 12/21/04 07:33 YaLi BCM and BPM Screens
93283 12/21/04 07:29 cdaq Run 52417: Production Run
93282 12/21/04 07:11 M Jones Harp scan for 3h00
93281 12/21/04 07:11 M Jones Harp scan for 3h00
93280 12/21/04 06:57 M Jones HMS angle set to 18, SOS angle to 30.
93279 12/21/04 06:55 M Jones Set HMS and SOS slits to sieve
93278 12/21/04 06:53 M Jones Change HMS pretrig from SCIN to ELREAL
93277 12/21/04 06:52 YaLi Target: LH2 to Carbon
93276 12/21/04 05:01 cdaq Run 52416: Production Run
93275 12/21/04 04:59 simona BCM and BPM Screens
93274 12/21/04 04:30 cdaq Run 52415: Production Run
93273 12/21/04 03:28 cdaq Run 52414: Production Run
93272 12/21/04 02:29 cdaq Run 52413: Production Run
93271 12/21/04 00:02 claie Swing shift summary
Monday
93270 12/20/04 23:47 Segbefia Target Screen Shot
93269 12/20/04 23:28 clasie beam soon
93268 12/20/04 21:56 clasie another update from mcc
93267 12/20/04 21:12 clasie update from mcc
93266 12/20/04 18:52 clasie no beam for another hour
93265 12/20/04 16:53 hcf drift chambers now running on pre-mixed gas
93264 12/20/04 16:52 clasie beam will be down for a vacuum problem
93260 12/20/04 16:32 cdaq Run 52412: Production Run
93249 12/20/04 16:03 cdaq Run 52411: Production Run
93246 12/20/04 15:57 Keppel Shift Summary
93242 12/20/04 15:35 cdaq Run 52410: Production Run
93241 12/20/04 15:29 clasie Target: move to hydrogen
93240 12/20/04 13:41 clasie Target: hcD2_P_Fill_Target_R low alarm set back to 21.5
93239 12/20/04 11:05 clasie `Target: move to empty for beam studies
93238 12/20/04 10:55 cdaq Beam Time Accounting
93237 12/20/04 09:37 cdaq Run 52409: Production Run
93236 12/20/04 09:34 Keppel moved target
93235 12/20/04 09:34 clasie target: move to LH2
93234 12/20/04 09:21 M Jones Beam Energy Measurement
93233 12/20/04 09:18 clasie target: screen snapshot
93232 12/20/04 09:01 clasie Target: hcD2_P_Fill_Target_R low alarm set to 20.0
93231 12/20/04 08:54 hcf gas shed too cold for mfc's
93230 12/20/04 08:20 clasie HMS Q2 trip
93229 12/20/04 08:17 M Jones Owl shift summary
93228 12/20/04 08:14 clasie Target: move to empty
93227 12/20/04 07:56 YaLi Target: yellow alarm for hcD2_p_Fill_Target_R
93226 12/20/04 07:49 simona BPM & BCM screens
93225 12/20/04 07:47 YaLi Target: snapshot
93224 12/20/04 07:41 cdaq Run 52408: Production Run
93223 12/20/04 07:40 simona run 52407 is junk
93222 12/20/04 07:31 simona run 52406 is junk
93221 12/20/04 06:19 simona SOS flow Eth CH2
93220 12/20/04 05:45 beaufait bm02 fuse failure
93219 12/20/04 04:32 M. Jones Radiation survey
93218 12/20/04 03:56 M Jones SOS BM02 crash
93217 12/20/04 02:43 cdaq Run 52407: Production Run
93216 12/20/04 02:32 cdaq Run 52406: Production Run
93215 12/20/04 01:27 cdaq Run 52405: Production Run
93214 12/20/04 00:23 YaLi Target: LH2 to Al dummy
93213 12/20/04 00:14 cdaq Run 52404: Production Run
93212 12/20/04 00:06 bruell shift summary
93211 12/20/04 00:01 cdaq Run 52403: Production Run
Sunday
93210 12/19/04 23:46 Segbefia Target Screen Shot
93209 12/19/04 23:05 cdaq Run 52402: Production Run
93208 12/19/04 22:40 grayc BCM and BPM Screens
93207 12/19/04 22:14 grayc changed ps values
93206 12/19/04 22:05 cdaq Run 52401: Production Run
93205 12/19/04 22:01 cdaq Run 52400: Production Run
93204 12/19/04 21:01 cdaq Run 52399: Production Run
93203 12/19/04 20:00 cdaq Run 52398: Production Run
93202 12/19/04 19:06 cdaq Run 52397: Production Run
93201 12/19/04 18:02 cdaq Run 52396: Production Run
93200 12/19/04 17:33 clasie hms thresholds
93199 12/19/04 17:01 cdaq Run 52395: Production Run
93198 12/19/04 16:35 cdaq Run 52394: Production Run
93197 12/19/04 16:06 clasie day shift summary
93196 12/19/04 15:44 Xin Qian Target status
93195 12/19/04 15:40 Xin Qian Change target to LH2
93194 12/19/04 15:39 Xin Qian Change target back to gold
93193 12/19/04 15:39 Xin Qian Target changed to empty
93192 12/19/04 15:08 cdaq Run 52393: Production Run
93191 12/19/04 13:21 tigran BCM and BPM Screens
93190 12/19/04 13:03 cdaq Run 52392: Production Run
93189 12/19/04 12:04 cdaq Run 52391: Production Run
93188 12/19/04 11:09 clasie RF zone dropped out
93187 12/19/04 11:05 cdaq Run 52390: Production Run
93186 12/19/04 10:09 cdaq Run 52389: Production Run
93185 12/19/04 09:50 clasie recent fid efficiency
93184 12/19/04 09:45 clasie SOS Quad
93183 12/19/04 09:09 cdaq Run 52388: Production Run
93182 12/19/04 09:02 cdaq Run 52387: junk adjusting PS factors
93181 12/19/04 08:31 beaufait sos powersupply
93180 12/19/04 08:14 Xin Qian Target screen shot
93179 12/19/04 07:47 ent owl shift summary
93178 12/19/04 06:43 ent Power Supply problem
93177 12/19/04 06:16 ent configuration change - SOS problem
93176 12/19/04 05:36 dalton target change LH2 to Gold
93175 12/19/04 05:00 cdaq Run 52386: Production Run
93174 12/19/04 04:30 cdaq Run 52385: Production Run
93173 12/19/04 03:55 cdaq Run 52384: Production Run
93172 12/19/04 03:20 cdaq Run 52383: Production Run
93171 12/19/04 03:19 cdaq Run 52382: Production Run
93170 12/19/04 03:14 ent move to LD2
93169 12/19/04 02:35 cdaq Run 52381: Production Run
93168 12/19/04 02:25 cdaq Run 52380: Production Run
93167 12/19/04 02:16 dalton Target changed to Dummy at 02h00
93166 12/19/04 02:00 cdaq Run 52379: Production Run
93165 12/19/04 01:03 cdaq Run 52378: Production Run
93164 12/19/04 00:01 hamlet Shift summary
Saturday
93163 12/18/04 23:56 cdaq Run 52377: Production Run
93162 12/18/04 23:35 Segbefia Target Screen shot
93161 12/18/04 23:15 clasie Shift checklist
93160 12/18/04 22:59 Segbefia Reboot Target IOC
93159 12/18/04 22:55 cdaq Run 52376: Production Run
93158 12/18/04 22:51 clasie fid efficiency
93157 12/18/04 22:40 gray BCM and BPM Screens
93156 12/18/04 22:16 cdaq Run 52375: Production Run
93155 12/18/04 21:22 Segbefia Changed Target
93154 12/18/04 21:21 hamlet Configuration changed before run 52374
93153 12/18/04 21:16 cdaq Run 52374: Production Run
93152 12/18/04 19:47 cdaq Run 52373: Production Run
93151 12/18/04 18:40 cdaq Run 52372: Production Run
93150 12/18/04 17:40 cdaq Run 52371: Production Run
93149 12/18/04 16:40 cdaq Run 52370: Production Run
93148 12/18/04 16:03 rohe day shift summary
93147 12/18/04 15:49 rohe BCM calibration
93146 12/18/04 15:39 cdaq Run 52369: Production Run
93145 12/18/04 15:34 markowitz target moved back to gold
93144 12/18/04 15:34 markowitz target moved back to gold
93143 12/18/04 14:12 cdaq Run 52368: Calibration BCM
93142 12/18/04 14:11 markowitz target to empty
93141 12/18/04 14:11 markowitz target to empty
93140 12/18/04 14:10 markowitz target move
93139 12/18/04 13:40 mertens BCM and BPM Screens 121804 day
93138 12/18/04 13:00 cdaq Run 52367: Production Run
93137 12/18/04 11:51 cdaq Run 52366: Production Run
93136 12/18/04 10:44 cdaq Run 52365: Production Run
93135 12/18/04 09:45 cdaq Run 52364: Production Run
93134 12/18/04 08:43 cdaq Run 52363: Production Run
93133 12/18/04 07:57 ent owl shift summary
93132 12/18/04 07:44 dalton Target change
93131 12/18/04 07:41 cdaq Run 52362: Production Run
93130 12/18/04 06:40 cdaq Run 52361: Production Run
93129 12/18/04 06:01 simona BPM & BCM screen
93128 12/18/04 05:33 cdaq Run 52360: Production Run
93127 12/18/04 04:46 cdaq Run 52359: Production Run
93126 12/18/04 04:24 cdaq Run 52358: Production Run
93125 12/18/04 03:25 cdaq Run 52357: Production Run
93124 12/18/04 02:31 dalton Glitches in target communication
93123 12/18/04 02:23 cdaq Run 52356: Production Run
93122 12/18/04 01:23 cdaq Run 52355: Production Run
93121 12/18/04 00:57 dalton Tagret abnormalities
93120 12/18/04 00:48 cdaq Run 52354: Production Run
93119 12/18/04 00:10 markowitz shift summary
Friday
93118 12/17/04 23:47 cdaq Run 52353: Production Run
93117 12/17/04 23:02 Segbefia Target Screen
93116 12/17/04 22:45 cdaq Run 52352: Production Run
93115 12/17/04 22:27 grayc BPM & BCM screens
93114 12/17/04 22:26 segbefia Target change to Copper
93113 12/17/04 22:19 cdaq Run 52351: Production Run
93112 12/17/04 20:54 R.Asaturyan BTA information lost
93111 12/17/04 20:42 cdaq Run 52350: Production Run
93110 12/17/04 19:48 cdaq Run 52349: Production Run
93109 12/17/04 18:27 cdaq Run 52348: Production Run
93108 12/17/04 17:39 Segbefia Changed Target
93107 12/17/04 17:34 cdaq Run 52347: Production Run
93106 12/17/04 17:30 cdaq Run 52346: Production Run
93105 12/17/04 17:15 hcf & dg DO NOT TRUST THE O'SCOPE IN THE COUNTING ROOM!!!
93104 12/17/04 16:08 M Jones Day shift summary
93103 12/17/04 15:45 cdaq Run 52345: Production Run
93102 12/17/04 15:39 mertens scan checklist 12/17/014
93101 12/17/04 15:38 mertens scan checklist 12/17/014
93100 12/17/04 15:15 M JOnes SOS gas Cerenkov
93099 12/17/04 15:02 M Jones BCM and BPM Screens
93098 12/17/04 14:46 cdaq Run 52344: Production Run
93097 12/17/04 14:38 erb Beam Time Accounting
93096 12/17/04 14:14 cdaq Run 52343: Production Run
93095 12/17/04 13:08 cdaq Run 52342: Production Run
93094 12/17/04 12:28 Miyoshi Target IOC reboot and screen shots
93093 12/17/04 11:47 cdaq Run 52341: Production Run
93075 12/17/04 10:35 cdaq Run 52340: Production Run
93059 12/17/04 09:43 cdaq Run 52339: Production Run
93058 12/17/04 08:36 cdaq Run 52338: Production Run
93057 12/17/04 07:54 R.Asaturyan Shift Summary
93056 12/17/04 07:52 dalton Target IOC reboot and screenshot
93055 12/17/04 07:14 cdaq Run 52337: Production Run
93054 12/17/04 06:44 simona BCM and BPM Screens
93053 12/17/04 06:01 cdaq Run 52336: Production Run
93052 12/17/04 04:50 cdaq Run 52335: Production Run
93051 12/17/04 03:51 cdaq Run 52334: Production Run
93050 12/17/04 02:51 cdaq Run 52333: Production Run
93049 12/17/04 01:14 cdaq Run 52332: Production Run
93048 12/17/04 00:39 cdaq Run 52331: Production Run
Thursday
93047 12/16/04 23:14 cdaq Run 52330: Production Run
93045 12/16/04 22:47 gaskell Moller summary and end
93044 12/16/04 21:12 cdaq Moller Run 48761: Moller run kicker amp. 1mm, 5 kHz
93043 12/16/04 20:17 cdaq Moller Run 48760: Moller run kicker amp. 1mm, 9 kHz
93042 12/16/04 20:07 cdaq Moller Run 48759: Moller run - kicker amp ~ 1mm
93041 12/16/04 19:52 gaskell target search
93040 12/16/04 19:18 cdaq Moller Run 48758: Moller run - no kicker
93039 12/16/04 19:02 gaskell/clas harp scan results
93037 12/16/04 18:28 cdaq Moller Run 48757: Moller run - no kicker
93036 12/16/04 18:12 cdaq Moller Run 48756: Moller run - no kicker
93035 12/16/04 17:03 gaskell Moller supply
93034 12/16/04 16:06 cdaq Beam Time Accounting
93033 12/16/04 16:06 ak opper day shift summary
93032 12/16/04 15:27 gaskell Moller power supply troubles
93031 12/16/04 15:02 Donal Target screen grab
93030 12/16/04 11:34 cdaq Moller Run 48755: moller daq test
93029 12/16/04 10:47 ak opper cosmic run
93028 12/16/04 10:41 cdaq Run 52329: Cosmic Run
93027 12/16/04 10:34 ak opper Change to Beam Studies
93026 12/16/04 10:01 Donal Target Motion
93016 12/16/04 09:32 cdaq Run 52328: Production Run
93006 12/16/04 08:43 cdaq Run 52327: Production Run
93005 12/16/04 08:21 cdaq Run 52326: Production Run
93004 12/16/04 08:01 cdaq Beam Time Accounting
93003 12/16/04 08:00 R.Asaturyan shift summary
93002 12/16/04 07:16 cdaq Run 52325: Production Run
93001 12/16/04 06:57 simona BCM and BPM Screens
93000 12/16/04 06:14 cdaq Run 52324: Production Run
92999 12/16/04 04:29 cdaq Run 52323: Production Run
92998 12/16/04 03:29 cdaq Run 52322: Production Run
92997 12/16/04 03:27 dalton Target Screenshot
92996 12/16/04 03:26 dalton hcD2_P_Fill_Target_R minor low alarm
92995 12/16/04 02:32 cdaq Run 52321: Production Run
92994 12/16/04 02:26 cdaq Run 52320: Production Run
92993 12/16/04 00:25 cdaq Beam Time Accounting
92992 12/16/04 00:17 cdaq Run 52319: Production Run
Wednesday
92991 12/15/04 23:56 ioana shift summary
92990 12/15/04 23:03 cdaq Run 52318: SOS Delta Scan elastics
92989 12/15/04 23:01 Keppel moved target again
92988 12/15/04 22:18 cdaq Run 52317: SOS Delta Scan elastics
92987 12/15/04 21:40 cdaq Run 52316: SOS Delta Scan elastics
92986 12/15/04 21:37 Keppel target change
92985 12/15/04 21:26 rohe lock to gas shed
92984 12/15/04 20:07 cdaq Run 52315: SOS Delta Scan elastics
92983 12/15/04 18:59 ioana target for run 52313
92982 12/15/04 18:59 cdaq Run 52314: SOS Delta Scan elastics
92981 12/15/04 18:11 clasie changes to the analyzer
92980 12/15/04 17:40 cdaq Run 52313: Production Run
92979 12/15/04 17:26 gaskell Moller results
92978 12/15/04 17:15 gaskell Moller tune plot
92977 12/15/04 16:33 gaskell loose communication cable
92976 12/15/04 16:11 ak opper day shift summary
92975 12/15/04 16:08 Mertens BCM and BPM Screens 121504 day
92974 12/15/04 16:04 Donal Open JT
92973 12/15/04 16:03 cdaq Beam Time Accounting
92972 12/15/04 15:57 gaskell BM01 tripped
92971 12/15/04 15:47 gaskell Moller backout
92970 12/15/04 15:44 Donal Move to LH2
92969 12/15/04 15:18 gaskell Moller done
92968 12/15/04 14:57 cdaq Moller Run 48754: moller tuneup run
92967 12/15/04 14:54 cdaq Moller Run 48753: moller tuneup run
92966 12/15/04 14:53 gaskell Moller pretty much tuned
92965 12/15/04 14:52 gaskell/hcf moller controls
92964 12/15/04 14:50 cdaq Moller Run 48752: moller tuneup run
92963 12/15/04 14:40 cdaq Moller Run 48751: moller tuneup run
92962 12/15/04 14:39 cdaq Moller Run 48750: moller tuneup run
92961 12/15/04 14:31 cdaq Moller Run 48749: moller tuneup run
92960 12/15/04 14:27 hcf note for moller collimator
92959 12/15/04 13:59 cdaq Moller Run 48748: moller tuneup run
92958 12/15/04 13:54 cdaq Moller Run 48747: moller tuneup run
92957 12/15/04 12:46 cdaq Moller Run 48746: moller tuneup run
92956 12/15/04 12:41 cdaq Moller Run 48745: moller tuneup run
92955 12/15/04 12:36 cdaq Moller Run 48744: moller tuneup run
92954 12/15/04 12:26 cdaq Moller Run 48742: moller tuneup run
92953 12/15/04 12:10 cdaq Moller Run 48741: moller tuneup run
92952 12/15/04 12:06 cdaq Moller Run 48740: moller tuneup run
92951 12/15/04 09:55 cdaq Moller Run 48739: moller LED test
92950 12/15/04 09:06 Donal Target screen grab
92949 12/15/04 09:02 ak opper pause production data taking for Moller calibrations
92948 12/15/04 08:56 Donal Move target
92947 12/15/04 08:42 cdaq Moller Run 48736: moller LED test
92946 12/15/04 08:02 cdaq Beam Time Accounting
92945 12/15/04 07:59 R.Asaturyan Shift summary
92944 12/15/04 07:43 cdaq Run 52312: Production Run
92943 12/15/04 07:33 cdaq Run 52311: Production Run
92942 12/15/04 06:32 cdaq Run 52310: Production Run
92941 12/15/04 05:30 cdaq Run 52309: Production Run
92940 12/15/04 04:25 cdaq Run 52308: Production Run
92939 12/15/04 03:17 cdaq Run 52307: Production Run
92938 12/15/04 02:09 cdaq Run 52306: Production Run
92937 12/15/04 01:14 cdaq Run 52305: Production Run
92936 12/15/04 01:02 dalton Target Changed to LH2 + Screenshot
92935 12/15/04 00:11 cdaq Run 52304: Production Run
92934 12/15/04 00:01 cdaq Beam Time Accounting
Tuesday
92933 12/14/04 22:59 cdaq Run 52303: Production Run
92932 12/14/04 21:45 Keppel target ioc again
92931 12/14/04 21:29 cdaq Run 52302: Production Run
92930 12/14/04 20:28 rohe BCM&BPM screen
92929 12/14/04 20:28 rohe BCM&BPM screen
92928 12/14/04 19:57 cdaq Run 52301: Production Run
92927 12/14/04 19:48 Keppel Q2 trip
92926 12/14/04 19:47 Keppel target ioc reboot
92925 12/14/04 18:19 cdaq Run 52300: Production Run
92924 12/14/04 16:56 Keppel trigger change and complaint
92923 12/14/04 16:50 cdaq Run 52299: Production Run
92922 12/14/04 16:34 cdaq Beam Time Accounting
92921 12/14/04 16:32 cdaq Run 52298: Production Run
92920 12/14/04 16:29 Keppel BETABRITE restart
92919 12/14/04 16:28 cdaq Run 52297: Production Run
92918 12/14/04 16:21 cdaq Run 52296: Production Run
92917 12/14/04 16:07 Donal Target motion
92912 12/14/04 11:03 ak opper partial day shift summary
92911 12/14/04 10:39 tajima Taking cosmic data
92910 12/14/04 10:31 cdaq Run 52295: Cosmic Run
92909 12/14/04 10:29 mertens BCM and BPM Screens 1214 day
92908 12/14/04 10:10 tajima Moved target to Empty, and beam studies just began
92907 12/14/04 09:56 cdaq Run 52294: Production Run
92906 12/14/04 09:51 tajima Q1 trip
92905 12/14/04 08:54 cdaq Run 52293: Production Run
92904 12/14/04 08:53 Donal Jeffylab hangs
92903 12/14/04 08:35 Donal Target GUI goes white
92902 12/14/04 08:01 cdaq Beam Time Accounting
92901 12/14/04 08:01 vardan shift summary
92900 12/14/04 07:58 cdaq Run 52292: Production Run
92899 12/14/04 06:51 cdaq Run 52291: Production Run
92898 12/14/04 05:40 cdaq Run 52290: Production Run
92897 12/14/04 05:31 simona BPM & BCM screen
92896 12/14/04 04:30 cdaq Run 52289: Production Run
92895 12/14/04 03:13 cdaq Run 52288: Production Run
92894 12/14/04 02:26 cdaq Run 52287: Production Run
92893 12/14/04 01:16 cdaq Run 52286: Production Run
92892 12/14/04 00:11 cdaq Run 52285: Production Run
92891 12/14/04 00:01 Bosted target screen
92890 12/14/04 00:01 cdaq Beam Time Accounting
Monday
92889 12/13/04 23:46 ioana shift summary
92888 12/13/04 22:47 cdaq Run 52284: Production Run
92887 12/13/04 20:49 cdaq Run 52283: Production Run
92886 12/13/04 19:55 rohe BCM & BCM screen
92885 12/13/04 19:34 cdaq Run 52282: Production Run
92884 12/13/04 18:08 smithg Scattering chamber pressure transducer
92883 12/13/04 18:00 cdaq Run 52281: Production Run
92882 12/13/04 17:02 Donal
92881 12/13/04 16:42 Donal Target IV
92880 12/13/04 16:36 cdaq Run 52280: Production Run
92879 12/13/04 16:11 cdaq Beam Time Accounting
92878 12/13/04 16:05 ak opper day shift summary
92877 12/13/04 16:00 Donal Channel map for hodoscopes
92876 12/13/04 15:36 cdaq Run 52279: Production Run
92875 12/13/04 15:29 Donal Target moved
92874 12/13/04 15:14 Donal Move target to empty
92873 12/13/04 14:55 Donal target ioc reboot
92871 12/13/04 14:50 ak opper HV trip
92868 12/13/04 14:33 cdaq Run 52278: Production Run
92867 12/13/04 14:23 ak opper problems with HV
92863 12/13/04 13:51 cdaq Run 52277: Production Run
92861 12/13/04 13:48 cdaq Run 52276: Production Run
92860 12/13/04 13:25 cdaq Run 52275: Production Run
92859 12/13/04 12:59 cdaq Run 52274: Production Run
92858 12/13/04 12:13 cdaq Run 52273: Production Run
92857 12/13/04 12:07 cdaq Run 52272: Production Run
92855 12/13/04 11:48 cseely g_examin_epics_event.f modified
92850 12/13/04 10:11 donal Target screen
92849 12/13/04 09:46 cdaq Run 52270: Production Run
92848 12/13/04 09:40 ak opper beam off for pzt test
92847 12/13/04 09:13 ak opper HMS drift chamber trip
92846 12/13/04 09:10 cdaq Run 52269: Production Run
92845 12/13/04 09:10 ak opper HMS Q2 trip
92844 12/13/04 09:03 cdaq Run 52268: Production Run
92843 12/13/04 08:23 ak opper Dipole PC reboot
92842 12/13/04 08:08 cdaq Run 52267: Production Run
92841 12/13/04 08:04 vardan shift summary
92840 12/13/04 08:03 cdaq Beam Time Accounting
92839 12/13/04 07:07 cdaq Run 52266: Production Run
92838 12/13/04 05:57 cdaq Run 52265: Production Run
92837 12/13/04 05:36 vardan HMS Q3 trip
92836 12/13/04 05:13 simona BPM & BCM screen
92835 12/13/04 05:12 clasie HMS Q1 trip
92834 12/13/04 04:21 cdaq Run 52264: Production Run
92833 12/13/04 03:35 vardan messages on HMS Dipole PC screen
92832 12/13/04 03:21 clasie target: alarm handler
92831 12/13/04 03:20 clasie target: change to gold
92830 12/13/04 03:20 cdaq Run 52263: Production Run
92829 12/13/04 03:20 clasie Target: ioc reboot
92828 12/13/04 02:01 cdaq Run 52262: Production Run
92827 12/13/04 00:59 cdaq Run 52261: Production Run
92826 12/13/04 00:23 cdaq Run 52260: Production Run
92825 12/13/04 00:16 bruell shift summary
92824 12/13/04 00:15 clasie Target:screen grab
92823 12/13/04 00:15 cdaq Beam Time Accounting
Sunday
92822 12/12/04 23:25 cdaq Run 52259: Production Run
92821 12/12/04 22:11 cdaq Run 52258: Production Run
92820 12/12/04 21:01 cdaq Run 52257: Production Run
92819 12/12/04 20:19 rohe BPM & BCM screen
92818 12/12/04 20:08 cdaq Run 52256: Production Run
92817 12/12/04 19:49 cdaq Run 52255: Production Run
92816 12/12/04 19:47 cdaq Run 52254: Production Run
92815 12/12/04 19:30 cdaq Run 52253: Production Run
92814 12/12/04 18:27 cdaq Run 52252: Production Run
92813 12/12/04 17:48 cdaq Run 52251: Production Run
92812 12/12/04 16:49 cdaq Run 52250: Production Run
92811 12/12/04 16:06 cdaq Beam Time Accounting
92810 12/12/04 16:05 Boeglin Shift Summary
92809 12/12/04 15:49 cdaq Run 52249: Production Run
92808 12/12/04 15:16 cdaq Run 52248: Production Run
92807 12/12/04 14:10 cdaq Run 52247: Production Run
92806 12/12/04 13:58 adaniel BPM and BCM screen
92805 12/12/04 13:12 cdaq Run 52246: Production Run
92804 12/12/04 12:03 cdaq Run 52245: Production Run
92803 12/12/04 11:30 YaLi Target: IOC reboot and target vacuum
92802 12/12/04 11:22 YaLi Target: screen_snapshot
92801 12/12/04 10:50 cdaq Run 52244: Production Run
92800 12/12/04 10:39 cdaq Run 52243: Production Run
92799 12/12/04 09:38 cdaq Run 52242: Production Run
92798 12/12/04 08:38 cdaq Run 52241: Production Run
92797 12/12/04 08:07 clasie shift summary
92796 12/12/04 08:05 cdaq Beam Time Accounting
92795 12/12/04 07:35 cdaq Run 52240: Production Run
92794 12/12/04 07:29 clasie BPM & BCM screen
92793 12/12/04 07:07 clasie SOS calorimeter
92792 12/12/04 06:50 clasie scan of shift shecklist (previous shift)
92791 12/12/04 06:34 cdaq Run 52239: Production Run
92790 12/12/04 06:02 cdaq Run 52238: Production Run
92789 12/12/04 05:54 dalton target screenshot
92788 12/12/04 05:45 dalton SOS HV trips
92787 12/12/04 05:43 cdaq Run 52237: Production Run
92786 12/12/04 05:06 cdaq Run 52236: Production Run
92785 12/12/04 03:55 cdaq Run 52235: Production Run
92784 12/12/04 02:50 cdaq Run 52234: Production Run
92783 12/12/04 02:37 clasie Pivot ion chamber thresholds
92782 12/12/04 01:58 cdaq Run 52233: Production Run
92781 12/12/04 00:19 bruell shift summary
92780 12/12/04 00:16 cdaq Beam Time Accounting
Saturday
92779 12/11/04 23:33 cdaq Run 52232: Production Run
92778 12/11/04 22:28 cdaq Run 52231: Production Run
92777 12/11/04 22:23 grayc target moved
92776 12/11/04 22:04 grayc target screenshot
92775 12/11/04 21:51 cdaq Run 52230: Production Run
92774 12/11/04 20:51 cdaq Run 52229: Production Run
92773 12/11/04 19:56 grayc target ioc fun
92772 12/11/04 19:49 cdaq Run 52228: Production Run
92771 12/11/04 19:22 cdaq Run 52227: Production Run
92770 12/11/04 18:41 cdaq Run 52226: Production Run
92769 12/11/04 18:09 grayc loop 2 heater alarm
92768 12/11/04 17:41 cdaq Run 52225: Production Run
92767 12/11/04 16:43 grayc hms hv alarm
92766 12/11/04 16:41 cdaq Run 52224: Production Run
92765 12/11/04 16:03 Boeglin Shift Summary
92764 12/11/04 16:01 Boeglin Shift Summary
92763 12/11/04 16:01 cdaq Beam Time Accounting
92762 12/11/04 15:54 nkalantarian target rebooted
92761 12/11/04 15:54 cdaq Run 52223: Production Run
92760 12/11/04 15:24 cdaq Run 52222: Production Run
92759 12/11/04 14:45 mertens BCM and BPM Screens 121104 day
92758 12/11/04 14:16 cdaq Run 52221: Production Run
92757 12/11/04 13:04 cdaq Run 52220: Production Run
92756 12/11/04 12:32 cdaq Run 52219: Production Run
92755 12/11/04 11:37 cdaq Run 52218: Production Run
92754 12/11/04 11:35 nkalantarian target moved
92753 12/11/04 10:43 cdaq Run 52217: Production Run
92752 12/11/04 09:43 cdaq Run 52216: Production Run
92751 12/11/04 09:39 cdaq Beam Time Accounting
92750 12/11/04 09:39 cdaq Beam Time Accounting
92749 12/11/04 09:35 nkalantarian target screenshot
92748 12/11/04 09:29 cdaq Beam Time Accounting
92747 12/11/04 09:26 cdaq Run 52215: Production Run
92746 12/11/04 08:20 cdaq Run 52214: Production Run
92745 12/11/04 08:04 cdaq Beam Time Accounting
92744 12/11/04 08:02 El Fassi Shift Summary
92743 12/11/04 07:14 clasie Target: ioc reboot
92742 12/11/04 07:14 cdaq Run 52213: Production Run
92741 12/11/04 06:55 cdaq Run 52212: Production Run
92740 12/11/04 06:50 El Fassi Checklist scan
92739 12/11/04 06:24 El Fassi BPM & BCM screen
92738 12/11/04 06:22 El Fassi BPM & BCM screen
92737 12/11/04 06:21 El Fassi BPM & BCM screen
92736 12/11/04 05:51 cdaq Run 52211: Production Run
92735 12/11/04 04:50 cdaq Run 52210: Production Run
92734 12/11/04 04:44 clasie Target: switch to LD2
92733 12/11/04 04:39 Elfassi Target switched
92732 12/11/04 03:45 cdaq Run 52209: Production Run
92731 12/11/04 02:37 cdaq Run 52208: Production Run
92730 12/11/04 02:22 clasie HMS dipole trip
92729 12/11/04 01:25 cdaq Run 52207: Production Run
92728 12/11/04 00:21 cdaq Run 52206: Production Run
Friday
92727 12/10/04 23:58 clasie Target: screen grab
92726 12/10/04 23:57 cdaq Beam Time Accounting
92725 12/10/04 23:47 clasie h1x11- under voltage
92724 12/10/04 23:43 Boeglin Shift Summary
92723 12/10/04 23:24 clasie changes to the analyzer
92722 12/10/04 23:18 cdaq Run 52205: Production Run
92721 12/10/04 22:29 boeglin bpm/bcm screen shots
92720 12/10/04 22:11 cdaq Run 52204: Production Run
92719 12/10/04 22:07 cdaq Run 52203: junk
92718 12/10/04 21:59 cdaq Run 52202: Production Run
92717 12/10/04 20:50 cdaq Run 52201: Production Run
92716 12/10/04 20:32 cdaq Run 52200: Production Run
92715 12/10/04 19:18 clasie magnet problems
92714 12/10/04 16:49 Boeglin Beam Time Accounting
92713 12/10/04 16:11 Fatiha Shift Summary
92712 12/10/04 16:05 Fatiha Fatiha
92711 12/10/04 15:32 Fatiha Q2
92710 12/10/04 15:07 Fatiha Q2 again
92709 12/10/04 14:50 Fatiha Q2 repaired
92708 12/10/04 13:30 nkalantarian progress on fixing hms
92707 12/10/04 11:21 nkalantarian checklist scan
92706 12/10/04 10:12 nkalantarian sos rotated
92705 12/10/04 10:01 nkalantarian target moved
92704 12/10/04 09:59 X. Zheng run #52193 was a carbon target run
92703 12/10/04 09:59 Fatiha Going to
92702 12/10/04 09:27 nkalantarian target gui
92701 12/10/04 09:15 cdaq Run 52199: SOS delta scan
92700 12/10/04 09:12 nkalantarian target moved
92699 12/10/04 08:29 Dutta Shift Summary
92698 12/10/04 08:24 cdaq Beam Time Accounting
92697 12/10/04 08:00 cdaq Run 52198: SOS delta scan
92696 12/10/04 07:42 ddutta sanity screen
92695 12/10/04 07:38 cdaq Run 52197: Cosmic test for Aerogel
92694 12/10/04 07:10 cdaq Run 52196: Cosmic test for Aerogel
92693 12/10/04 06:56 El Fassi BPM & BCM screen
92692 12/10/04 06:40 gaskell Accelerating Moeller cooldown
92691 12/10/04 06:01 cdaq Run 52195: Cosmic test for Aerogel
92690 12/10/04 04:59 cdaq Run 52194: Cosmic test for Aerogel
92689 12/10/04 04:46 ddutta Q2 problem
92688 12/10/04 00:42 clasie thresholds file were updated
92687 12/10/04 00:34 El Fassi Checklist scan copy
92686 12/10/04 00:09 cdaq Beam Time Accounting
92685 12/10/04 00:08 X. Zheng swing shift summary
92684 12/10/04 00:05 X, Zheng Reboot beam current IOC
92683 12/10/04 00:05 clasie target: screen grab
Thursday
92682 12/09/04 23:50 X. Zheng More on the HMS Q2 power supply
92681 12/09/04 23:12 X. Zheng Reboot HMS Q2 controls
92680 12/09/04 22:25 clasie increase HV on the SOS Cer PMT
92679 12/09/04 21:32 ak opper target change to 4 cm LH2
92678 12/09/04 21:19 X. Zheng new beam positions
92677 12/09/04 21:09 saw Rebooted vmec2 and vmec19 to restore runinfo menu
92676 12/09/04 21:02 gaskell/clas SOS cerenkov hardware threshold
92674 12/09/04 20:56 hamlet HMS field/current mode
92673 12/09/04 20:54 X. Zheng "sanity check" missing
92671 12/09/04 20:51 gaskell/clas lowered sos cerenkov threshold
92670 12/09/04 20:46 cdaq Run 52193: Cosmic test for Aerogel
92669 12/09/04 20:35 cdaq Run 52192: Cosmic test for Aerogel
92668 12/09/04 20:14 cdaq Run 52191: Cosmic test for Aerogel
92667 12/09/04 20:06 X. Zheng harp broken
92666 12/09/04 20:01 ak opper target change to 3% C
92665 12/09/04 19:51 X. Zheng 52188-52190 are not cosmic runs
92664 12/09/04 19:30 cdaq Run 52190: Cosmic test for Aerogel
92663 12/09/04 19:14 cdaq Run 52189: Cosmic test for Aerogel
92662 12/09/04 19:05 cdaq Run 52188: Cosmic test for Aerogel
92661 12/09/04 18:32 X. Zheng HMS dipole trip
92660 12/09/04 18:29 gaskell HMS dipole and Moeller
92659 12/09/04 16:54 cdaq Beam Time Accounting
92658 12/09/04 16:50 rohe day shift summary
92657 12/09/04 16:23 gaskell moeller cooldown
92656 12/09/04 16:22 hickson cerenkovs
92655 12/09/04 16:21 cdaq Run 52187: Cosmic test for Aerogel
92654 12/09/04 16:07 ak opper target gui
92653 12/09/04 13:35 rohe HMS field/current mode
92652 12/09/04 13:10 rohe restricted access
92651 12/09/04 12:27 cdaq Run 52186: Cosmic test for Aerogel
92650 12/09/04 12:25 hamlet,razmi hms aerogel back in
92649 12/09/04 11:42 cdaq Run 52185: Cosmic test for Aerogel
92648 12/09/04 11:38 cdaq Run 52184: Cosmic test for Aerogel
92647 12/09/04 11:35 Fowler HMS, SOS Rotation
92646 12/09/04 11:20 vulcan SOS supplies
92645 12/09/04 09:18 rohe full radiation survey done
92644 12/09/04 09:00 rohe controlled access at 8:30
92643 12/09/04 08:29 rohe Beam accounting
92642 12/09/04 08:16 cdaq Moller Run 48735: moller daq test
92641 12/09/04 08:13 El Fassi BCM and BPM screen
92640 12/09/04 08:07 cdaq Run 52183: HMS 4x4 trigger test (hs1xhs2)
92639 12/09/04 08:03 clasie Target: change to 3% carbon
92638 12/09/04 07:56 cdaq Run 52182: HMS 4x4 trigger test (hs1xhs2)
92637 12/09/04 07:50 cdaq Run 52181: HMS 2x4 trigger test (hs1)
92636 12/09/04 07:49 cdaq Run 52180: HMS 2x4 trigger test (hs1)
92635 12/09/04 07:37 cdaq Run 52179: HMS 3x4 trigger test (S0xhs1)
92634 12/09/04 07:31 cdaq Run 52177: HMS 1x4 trigger test (S0 vertical only)
92633 12/09/04 07:26 cdaq Run 52176: HMS 1x4 trigger test (S0 vertical only)
92632 12/09/04 05:55 cdaq Run 52175: HMS 3x4 trigger test (hs1 & S0)
92631 12/09/04 05:50 cdaq Run 52174: HMS 3x4 trigger test (hs1 & S0)
92630 12/09/04 05:27 cdaq Run 52173: HMS 4x4 trigger test (hs1 & hs2 rate)
92629 12/09/04 05:23 cdaq Run 52172: HMS 2x4 trigger test (hs1 rate)
92628 12/09/04 05:21 cdaq Run 52171: HMS 2x4 trigger test (hs1 rate)
92627 12/09/04 05:16 cdaq Run 52170: HMS 2x4 trigger test (hs1 rate)
92626 12/09/04 05:06 cdaq Run 52169: HMS 3x4 trigger test
92625 12/09/04 05:00 cdaq Run 52168: HMS 4x4 trigger test
92624 12/09/04 04:43 cdaq Run 52167: HMS 4x4 trigger test
92623 12/09/04 04:36 cdaq Run 52166: HMS 4x4 trigger test
92622 12/09/04 04:30 cdaq Run 52165: TEST 2a
92621 12/09/04 04:26 cdaq Run 52164: TEST 2
92620 12/09/04 04:22 cdaq Run 52163: TEST 1d
92619 12/09/04 04:18 cdaq Run 52162: TEST 1c
92618 12/09/04 04:14 cdaq Run 52161: TEST 1b
92617 12/09/04 03:53 cdaq Run 52160: TEST 1a
92616 12/09/04 03:49 cdaq Run 52159: TEST 1
92615 12/09/04 03:42 cdaq Run 52158: TEST
92614 12/09/04 03:29 cdaq Run 52157: TEST
92613 12/09/04 03:28 cdaq Run 52156: TEST
92612 12/09/04 03:26 cdaq Run 52155: TEST
92611 12/09/04 01:48 cdaq Beam Time Accounting
Wednesday
92610 12/08/04 23:54 clasie target: gui picture
92609 12/08/04 22:11 nkalantarian target moved
92608 12/08/04 22:00 ak opper partial swing shift summary
92607 12/08/04 21:24 cdaq Run 52153: Production data (P_HMS=1.95, theta_hms=10.99, P_SOS=-0.9, theta_sos=24.99)
92606 12/08/04 20:56 cdaq Run 52152: Production data (P_HMS=1.95, theta_hms=10.99, P_SOS=-0.9, theta_sos=24.99)
92605 12/08/04 20:40 hcf check of SOS argon flow zero
92604 12/08/04 20:24 cdaq Run 52151: Production data (P_HMS=1.95, theta_hms=10.99, P_SOS=-0.9, theta_sos=24.99)
92603 12/08/04 19:51 cdaq Run 52150: Production data (P_HMS=1.95, theta_hms=10.99, P_SOS=-0.9, theta_sos=24.99)
92602 12/08/04 19:19 cdaq Run 52149: Production data (P_HMS=1.95, theta_hms=10.99, P_SOS=-0.9, theta_sos=24.99)
92601 12/08/04 19:02 ak opper configuration change
92600 12/08/04 19:01 cdaq Run 52148: Production data (P_HMS=1.95, theta_hms=10.99, P_SOS=-0.9, theta_sos=24.99)
92599 12/08/04 18:54 nkalantarian target moved back
92598 12/08/04 18:41 nkalantarian target moved
92597 12/08/04 18:03 cdaq Run 52147: Production data (P_HMS=2.2, theta_hms=13.00, P_SOS=-1.0, theta_sos=27.83)
92596 12/08/04 18:00 nkalantarian bpm and bcm screens
92595 12/08/04 17:27 hcf high multiplicity (2) in drift chambers
92594 12/08/04 17:23 ak opper continuing story on # hits/detector
92593 12/08/04 17:19 cdaq Run 52146: Production data (P_HMS=2.2, theta_hms=13.00, P_SOS=-1.0, theta_sos=27.83)
92592 12/08/04 16:54 ak opper high # of hits per detector in hms
92591 12/08/04 16:46 ak opper large # of hits/detector
92590 12/08/04 16:25 nkalantarian target gui
92589 12/08/04 16:22 cdaq Run 52145: Production data (P_HMS=2.2, theta_hms=13.00, P_SOS=-1.0, theta_sos=27.83)
92588 12/08/04 16:01 cdaq Beam Time Accounting
92587 12/08/04 15:59 X. Zheng shift summary
92586 12/08/04 15:37 X. Zheng Changed SOS to elclean
92585 12/08/04 15:36 X. Zheng Ion chamber trip, will run 30uA
92584 12/08/04 15:33 cdaq Run 52144: Production data (P_HMS=2.2, theta_hms=13.00, P_SOS=-1.0, theta_sos=27.83)
92583 12/08/04 15:26 cdaq Run 52143: Production data (P_HMS=2.2, theta_hms=13.00, P_SOS=-1.0, theta_sos=27.83)
92582 12/08/04 15:24 okayasu Target changed
92581 12/08/04 15:20 X. Zheng fileserver reboot 14:40-14:50
92580 12/08/04 14:55 cdaq Run 52142: Production data (P_HMS=2.2, theta_hms=13.00, P_SOS=-1.0, theta_sos=27.83)
92579 12/08/04 14:22 cdaq Run 52141: Production data (P_HMS=2.2, theta_hms=13.00, P_SOS=-1.0, theta_sos=27.83)
92578 12/08/04 13:49 cdaq Run 52140: Production data (P_HMS=2.2, theta_hms=13.00, P_SOS=-1.0, theta_sos=27.83)
92577 12/08/04 13:36 rohe BCM screen
92576 12/08/04 13:35 rohe BPM screen
92575 12/08/04 13:18 cdaq Run 52139: Production data (P_HMS=2.2, theta_hms=13.00, P_SOS=-1.0, theta_sos=27.83)
92574 12/08/04 12:58 gaskell added H2 and D2 target pressure to epics
92573 12/08/04 12:29 X. Zheng Change HMS momentum to +2.2 GeV/c
92572 12/08/04 12:09 cdaq Run 52138: Production data (P_HMS=2.5, theta_hms=13.00, P_SOS=-1.0, theta_sos=27.83)
92571 12/08/04 11:49 X. Zheng Change trigger to el_real for HMS and SOS
92570 12/08/04 11:32 cdaq Run 52137: Production data (P_HMS=2.5, theta_hms=13.00, P_SOS=-1.0, theta_sos=27.83)
92569 12/08/04 10:52 cdaq Run 52136: Production data (P_HMS=2.5, theta_hms=13.00, P_SOS=-1.0, theta_sos=27.83)
92568 12/08/04 10:18 smithg cvxwrks home directory accidental erasure
92567 12/08/04 10:14 cdaq Run 52135: Production data (P_HMS=2.5, theta_hms=13.00, P_SOS=-1.0, theta_sos=27.83)
92566 12/08/04 10:00 cdaq Run 52134: Production data (P_HMS=2.5, theta_hms=13.00, P_SOS=-1.0, theta_sos=27.83)
92565 12/08/04 09:52 X. Zheng HMS P=+2.5 GeV/c starting run #52125
92564 12/08/04 09:47 cdaq Run 52133: Production data (P_HMS=2.5, theta_hms=13.00, P_SOS=-1.0, theta_sos=27.83)
92563 12/08/04 09:40 cdaq Run 52132: Production data (P_HMS=2.5, theta_hms=13.00, P_SOS=-1.0, theta_sos=27.83)
92562 12/08/04 09:27 okayasu Target IOC rebooted
92561 12/08/04 08:23 X. Zheng HMS Q3 LN2 overfilling
92560 12/08/04 08:02 cdaq Beam Time Accounting
92559 12/08/04 07:56 cdaq Run 52131: Production data (P_HMS=3.5, theta_hms=13.00, P_SOS=-1.7, theta_sos=27.83)
92558 12/08/04 07:48 ddutta Owl Shift summary
92557 12/08/04 07:19 Dutta BPM screen
92556 12/08/04 07:18 cdaq Run 52130: Production data (P_HMS=3.5, theta_hms=13.00, P_SOS=-1.7, theta_sos=27.83)
92555 12/08/04 06:17 cdaq Run 52129: Production data (P_HMS=3.5, theta_hms=13.00, P_SOS=-1.7, theta_sos=27.83)
92554 12/08/04 06:12 cdaq Run 52128: Production data (P_HMS=3.5, theta_hms=13.00, P_SOS=-1.7, theta_sos=27.83)
92553 12/08/04 06:10 cdaq Run 52127: Production data (P_HMS=3.5, theta_hms=13.00, P_SOS=-1.7, theta_sos=27.83)
92552 12/08/04 06:08 cdaq Run 52126: Production data (P_HMS=3.5, theta_hms=13.00, P_SOS=-1.7, theta_sos=27.83)
92551 12/08/04 06:05 cdaq Run 52125: Production data (P_HMS=3.5, theta_hms=13.00, P_SOS=-1.7, theta_sos=27.83)
92550 12/08/04 04:40 Dunne Changed SOS angle to 27.83 just after 52104
92549 12/08/04 04:36 cdaq Run 52124: Production data (P_HMS=3.5, theta_hms=13.00, P_SOS=-1.7, theta_sos=27.83)
92548 12/08/04 04:35 cdaq Run 52123: Production data (P_HMS=3.5, theta_hms=13.00, P_SOS=-1.7, theta_sos=27.83)
92547 12/08/04 04:29 cdaq Run 52122: Production data (P_HMS=3.5, theta_hms=13.00, P_SOS=-1.7, theta_sos=27.83)
92546 12/08/04 04:26 cdaq Run 52121: Production data (P_HMS=3.5, theta_hms=13.00, P_SOS=-1.7, theta_sos=27.83)
92545 12/08/04 04:18 cdaq Run 52120: Production data (P_HMS=3.5, theta_hms=13.00, P_SOS=-1.7, theta_sos=27.83)
92544 12/08/04 04:08 cdaq Run 52119: Production data (P_HMS=3.5, theta_hms=13.00, P_SOS=-1.7, theta_sos=27.83)
92543 12/08/04 03:54 cdaq Run 52118: Production data (P_HMS=3.5, theta_hms=13.00, P_SOS=-1.7, theta_sos=27.83)
92542 12/08/04 03:41 cdaq Run 52117: Production data (P_HMS=3.5, theta_hms=13.00, P_SOS=-1.7, theta_sos=27.83)
92541 12/08/04 03:33 cdaq Run 52116: Production data (P_HMS=3.5, theta_hms=13.00, P_SOS=-1.7, theta_sos=27.83)
92540 12/08/04 03:28 cdaq Run 52115: Production data (P_HMS=3.5, theta_hms=13.00, P_SOS=-1.7, theta_sos=27.83)
92539 12/08/04 03:27 cdaq Run 52114: Production data (P_HMS=3.5, theta_hms=13.00, P_SOS=-1.7, theta_sos=27.83)
92538 12/08/04 03:23 cdaq Run 52113: Production data (P_HMS=3.5, theta_hms=13.00, P_SOS=-1.7, theta_sos=27.83)
92537 12/08/04 03:22 cdaq Run 52112: Production data (P_HMS=3.5, theta_hms=13.00, P_SOS=-1.7, theta_sos=27.83)
92536 12/08/04 03:19 cdaq Run 52111: Production data (P_HMS=3.5, theta_hms=13.00, P_SOS=-1.7, theta_sos=27.83)
92535 12/08/04 03:18 cdaq Run 52110: Production data (P_HMS=3.5, theta_hms=13.00, P_SOS=-1.7, theta_sos=27.83)
92534 12/08/04 03:16 cdaq Run 52109: Production data (P_HMS=3.5, theta_hms=13.00, P_SOS=-1.7, theta_sos=27.83)
92533 12/08/04 03:14 cdaq Run 52108: Production data (P_HMS=3.5, theta_hms=13.00, P_SOS=-1.7, theta_sos=27.83)
92532 12/08/04 03:11 cdaq Run 52107: Production data (P_HMS=3.5, theta_hms=13.00, P_SOS=-1.7, theta_sos=27.83)
92531 12/08/04 03:10 cdaq Run 52106: Production data (P_HMS=3.5, theta_hms=13.00, P_SOS=-1.7, theta_sos=27.83)
92530 12/08/04 03:06 cdaq Run 52105: Production data (P_HMS=3.5, theta_hms=13.00, P_SOS=-1.7, theta_sos=27.83)
92529 12/08/04 02:31 cdaq Run 52104: Production data (P_HMS=3.5, theta_hms=13.00, P_SOS=-1.7, theta_sos=40.18)
92528 12/08/04 01:39 cdaq Run 52103: Production data (P_HMS=3.5, theta_hms=13.00, P_SOS=-1.7, theta_sos=40.18)
92527 12/08/04 01:31 cdaq Run 52102: Production data (P_HMS=3.5, theta_hms=13.00, P_SOS=-1.7, theta_sos=40.18)
92526 12/08/04 00:46 dunne Changed SOS angle to 40
92525 12/08/04 00:44 cdaq Run 52101: Production data (P_HMS=3.5, theta_hms=13.00, P_SOS=-1.7, theta_sos=40.18)
92524 12/08/04 00:43 cdaq Run 52100: Production data (P_HMS=3.5, theta_hms=13.00, P_SOS=-1.7, theta_sos=40.18)
92523 12/08/04 00:40 cdaq Run 52099: Production data (P_HMS=3.5, theta_hms=13.00, P_SOS=-1.7, theta_sos=52.995)
92522 12/08/04 00:06 cdaq Beam Time Accounting
92521 12/08/04 00:03 ak opper Swing shift summary
Tuesday
92520 12/07/04 23:29 cdaq Run 52098: Production data (P_HMS=3.5, theta_hms=13.00, P_SOS=-1.7, theta_sos=52.995)
92519 12/07/04 23:16 clasie checklist copy
92518 12/07/04 23:01 clasie BPM & BCM screen
92517 12/07/04 22:58 cdaq Run 52097: Production data (P_HMS=3.5, theta_hms=13.00, P_SOS=-1.7, theta_sos=52.995)
92516 12/07/04 21:48 cdaq Run 52096: Production data (P_HMS=3.5, theta_hms=13.00, P_SOS=-1.7, theta_sos=52.995)
92515 12/07/04 21:14 vipuli New HMS and SOS angle limits
92514 12/07/04 20:44 cdaq Run 52095: Production data (P_HMS=3.5, theta_hms=13.00, P_SOS=-1.7, theta_sos=52.995)
92513 12/07/04 20:16 saw cdaqfs errors
92512 12/07/04 19:55 cdaq Run 52094: Production data (P_HMS=3.5, theta_hms=13.00, P_SOS=-1.7, theta_sos=52.995)
92511 12/07/04 19:23 cdaq Run 52093: Production data (P_HMS=3.5, theta_hms=13.00, P_SOS=-1.7, theta_sos=52.995)
92510 12/07/04 19:19 cdaq Run 52092: Production data (P_HMS=3.5, theta_hms=13.00, P_SOS=-1.7, theta_sos=52.995)
92509 12/07/04 18:28 cdaq Run 52091: Production data (P_HMS=3.5, theta_hms=13.00, P_SOS=-1.7, theta_sos=52.995)
92508 12/07/04 18:08 cdaq Run 52090: Production data (P_HMS=3.5, theta_hms=13.01, P_SOS=-1.7, theta_sos=53.00)
92507 12/07/04 17:58 clasie Target: change to LH2
92506 12/07/04 17:30 gaskell BM01 (Moeller) polarity switch not working
92505 12/07/04 17:02 gaskell SOS BM02
92504 12/07/04 16:47 clasie Target yellow alarm while increasing the fan speed
92503 12/07/04 16:46 target: screen snapshot
92502 12/07/04 16:22 cdaq Run 52089: cosmic
92501 12/07/04 16:17 cdaq Run 52088: cosmic
92500 12/07/04 16:13 cdaq Run 52087: cosmic
92499 12/07/04 16:02 cdaq Beam Time Accounting
92498 12/07/04 16:02 X. Zheng day shift summary
92497 12/07/04 15:47 fowler HMS, SOS Rotation
92496 12/07/04 12:14 smithg Target cooldown completed
Monday
92495 12/06/04 08:28 vipuli We are going to restricted access
Sunday
92494 12/05/04 16:29 vipuli HV and Magnets were turned off
92493 12/05/04 12:30 rohe day summary
92492 12/05/04 12:28 mseely target warm up
92491 12/05/04 12:28 cdaq Beam Time Accounting
92490 12/05/04 12:01 mseely scattering chamber leak
92489 12/05/04 11:19 smithg Scattering chamber vacuum problem
92488 12/05/04 09:01 cdaq Run 52086: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92487 12/05/04 08:42 rohe HMS dipole PC reboot
92486 12/05/04 08:24 cdaq Run 52085: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92485 12/05/04 08:02 cdaq Beam Time Accounting
92484 12/05/04 07:49 dunne Shift Summary
92483 12/05/04 07:27 cdaq Run 52084: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92482 12/05/04 06:58 El Fassi Beam monitor snap shot
92481 12/05/04 06:58 El Fassi Beam monitor snap shot
92480 12/05/04 06:54 El Fassi beam monitor snap shot
92479 12/05/04 05:53 cdaq Run 52083: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92478 12/05/04 05:19 testa GUI of hms dipole not responding - NMR is fine
92477 12/05/04 04:52 cdaq Run 52082: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92476 12/05/04 04:52 testa hms drift chamber HV tripped.
92475 12/05/04 04:03 cdaq Run 52081: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92474 12/05/04 03:04 testa reboot of target ioc
92473 12/05/04 03:01 cdaq Run 52080: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92472 12/05/04 01:57 cdaq Run 52079: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92471 12/05/04 01:11 testa Q3 tripped
92470 12/05/04 00:35 cdaq Run 52078: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92469 12/05/04 00:02 cdaq Beam Time Accounting
Saturday
92468 12/04/04 23:50 ak opper swing shift summary
92467 12/04/04 23:33 cdaq Run 52077: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92466 12/04/04 23:26 cdaq Run 52076: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92465 12/04/04 23:02 clasie target ioc reboot
92464 12/04/04 22:59 ak opper roc3 and runcontrol problems
92463 12/04/04 22:42 cdaq Run 52075: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92462 12/04/04 22:38 cdaq Run 52074: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92461 12/04/04 22:29 cdaq Run 52073: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92460 12/04/04 21:33 clasie BPM & BCM screen
92459 12/04/04 21:12 cdaq Run 52071: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92458 12/04/04 20:34 clasie target ioc reboot
92457 12/04/04 19:59 clasie hms hodoscope h1x11- tripped
92456 12/04/04 19:58 cdaq Run 52070: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92455 12/04/04 19:49 cdaq Run 52069: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92454 12/04/04 19:19 clasie target ioc reboot
92453 12/04/04 18:38 cdaq Run 52068: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92452 12/04/04 18:37 clasie HMS q1 trip
92451 12/04/04 17:20 cdaq Run 52067: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92450 12/04/04 17:13 vipuli New rster size
92449 12/04/04 16:55 rohe day shift summary
92448 12/04/04 16:30 vipuli Raster problem.......
92447 12/04/04 16:09 cdaq Run 52066: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92446 12/04/04 16:00 cdaq Beam Time Accounting
92445 12/04/04 15:20 cdaq Run 52065: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92444 12/04/04 15:00 mertens EQuipment Checklist 1203_1204
92443 12/04/04 14:41 rohe raster size changes !!
92442 12/04/04 14:26 mertens hcbpm and bcm snapshots
92441 12/04/04 14:24 rohe raster puzzle
92440 12/04/04 14:20 cdaq Run 52064: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92439 12/04/04 13:53 cdaq Run 52063: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92438 12/04/04 12:41 cdaq Run 52062: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92437 12/04/04 11:41 cdaq Run 52061: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92436 12/04/04 10:40 cdaq Run 52060: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92435 12/04/04 10:29 grayc electron/muC jump from ~0.7 to ~0.9
92434 12/04/04 09:37 cdaq Run 52059: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92433 12/04/04 09:02 Bosted Filling in Beam Accounting Form, Beam Off for Trips
92432 12/04/04 08:58 rohe hmsdipole alarm tcl script not working
92431 12/04/04 08:30 cdaq Run 52057: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92430 12/04/04 08:02 cdaq Beam Time Accounting
92429 12/04/04 07:50 dunne Shift Summary
92428 12/04/04 07:25 cdaq Run 52056: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92427 12/04/04 06:37 dunne Target Reboot again
92426 12/04/04 06:23 cdaq Run 52055: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92425 12/04/04 05:40 dunne Target Reboot
92424 12/04/04 05:20 cdaq Run 52054: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92423 12/04/04 04:58 testa hcbpm and bcm snapshots
92422 12/04/04 04:18 cdaq Run 52053: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92421 12/04/04 03:10 cdaq Run 52052: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92420 12/04/04 03:01 cdaq Run 52051: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92419 12/04/04 01:50 cdaq Run 52050: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92418 12/04/04 00:46 cdaq Run 52049: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92417 12/04/04 00:12 cdaq Beam Time Accounting
Friday
92416 12/03/04 23:45 ak opper Swing Shift Summary
92415 12/03/04 23:29 cdaq Run 52048: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92414 12/03/04 23:06 E.Chudakov HMS Q3 tripped again
92413 12/03/04 22:55 E.Chudakov HMS Q3 tripped
92412 12/03/04 22:22 cdaq Run 52047: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92411 12/03/04 22:05 E.Chudakov HMS Q1 tripped
92410 12/03/04 21:56 cdaq Run 52046: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92409 12/03/04 20:55 cdaq Run 52045: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92408 12/03/04 19:54 cdaq Run 52044: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92407 12/03/04 19:32 E.Chudakov HMS Q3 tripped
92406 12/03/04 18:36 cdaq Run 52043: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92405 12/03/04 17:35 cdaq Run 52042: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92404 12/03/04 17:05 Fowler HMS & SOS Rotation
92403 12/03/04 16:58 hcf sos ar zero flow now reads -0.006 slpm. OK!
92402 12/03/04 16:35 cdaq Run 52041: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92401 12/03/04 16:23 beam position
92400 12/03/04 16:22
92399 12/03/04 16:19 Beam position
92398 12/03/04 16:18
92397 12/03/04 16:06 cdaq Beam Time Accounting
92396 12/03/04 16:04 jroche day shift summary
92395 12/03/04 15:33 cdaq Run 52040: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92394 12/03/04 14:49 cdaq Run 52039: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92393 12/03/04 14:10 jroche the raster size story (late entry)
92392 12/03/04 13:32 jroche raster gui
92391 12/03/04 13:28 jroche beam status between 10:40 and now
92390 12/03/04 13:27 cdaq Run 52038: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92389 12/03/04 13:15 jroche q3 trip
92388 12/03/04 12:31 cdaq Run 52037: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92387 12/03/04 12:05 jroche beam status
92386 12/03/04 11:28 grayc bcm problems
92385 12/03/04 11:23 cdaq Run 52036: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92384 12/03/04 10:39 jroche beam stoped for 15 mn for spot move
92383 12/03/04 10:16 cdaq Run 52035: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92382 12/03/04 09:51 cdaq Run 52034: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92381 12/03/04 09:06 hcf SOS chamber flows back to normal
92380 12/03/04 08:14 cdaq Run 52033: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92379 12/03/04 08:07 saw Shift Summary
92378 12/03/04 08:04 cdaq Beam Time Accounting
92377 12/03/04 07:38 saw Restored EPICS Hall Probe reading of HMS quad fields
92376 12/03/04 07:25 testa scan of the checklist
92375 12/03/04 07:13 testa hcbpm and bcm snapshots
92374 12/03/04 06:47 cdaq Run 52032: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92373 12/03/04 06:27 saw Q2 trip
92372 12/03/04 05:37 cdaq Run 52031: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92371 12/03/04 03:45 cdaq Run 52030: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92370 12/03/04 02:56 cdaq Beam Time Accounting
92369 12/03/04 02:21 cdaq Run 52029: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92368 12/03/04 01:51 saw Q3 trip
92367 12/03/04 01:50 cdaq Run 52028: Production data C3% (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92366 12/03/04 01:07 cdaq Run 52027: Production data C3% (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
Thursday
92365 12/02/04 23:57 ak opper Swing shift summary
92364 12/02/04 23:57 cdaq Run 52026: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92363 12/02/04 23:56 hcf corrected scale factor for SOS argon flow controller
92362 12/02/04 23:26 cdaq Run 52025: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92361 12/02/04 23:00 cdaq Run 52024: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92360 12/02/04 22:45 cdaq Run 52023: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92359 12/02/04 22:31 hcf corrected scale factor for SOS argon flow controller
92358 12/02/04 21:43 cdaq Run 52022: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92357 12/02/04 20:48 cdaq Run 52021: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92356 12/02/04 19:36 cdaq Run 52020: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92355 12/02/04 19:32 Claire Gray Target Change
92354 12/02/04 18:45 cdaq Run 52019: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92353 12/02/04 18:22 cdaq Run 52018: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92352 12/02/04 18:01 ak opper HMS dipole resurrection
92351 12/02/04 16:39 jroche day shift summary
92350 12/02/04 16:07 cdaq Run 52017: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92349 12/02/04 16:02 cdaq Beam Time Accounting
92348 12/02/04 15:46 jroche hms and sos fidutial efficency for j/psi exp
92347 12/02/04 13:27 hcf replacement sos argon flow controller zeroed
92346 12/02/04 12:00 jroche HV off
92345 12/02/04 11:26 hickson mass flow controller
92344 12/02/04 11:17 jroche single electron rates versus hroizontal beam position
92343 12/02/04 10:33 jroche hall in controlled access
92342 12/02/04 10:24 smithg Target alarm limit memory loss fixed
92341 12/02/04 10:23 jroche looking for the target position using the beam
92340 12/02/04 09:56 cdaq Run 52016: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92339 12/02/04 09:51 cdaq Run 52015: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92338 12/02/04 09:47 cdaq Run 52014: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92337 12/02/04 09:44 cdaq Run 52013: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92336 12/02/04 09:40 cdaq Run 52012: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92335 12/02/04 09:36 cdaq Run 52011: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92334 12/02/04 09:32 cdaq Run 52010: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92333 12/02/04 09:29 cdaq Run 52009: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92332 12/02/04 09:22 cdaq Beam Time Accounting
92331 12/02/04 09:08 cdaq Run 52008: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92330 12/02/04 08:51 hcf SOS argon flow controller zero drifted again
92329 12/02/04 07:52 saw Shift summary
92328 12/02/04 07:48 saw SOS fiducial efficiency has dropped
92327 12/02/04 07:34 testa hcbpm and bcm snapshots
92325 12/02/04 07:11 cdaq Run 52007: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92324 12/02/04 05:15 cdaq Run 52006: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92323 12/02/04 03:15 saw Q1 crashed
92322 12/02/04 03:14 cdaq Run 52005: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92321 12/02/04 02:51 cdaq Run 52004: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92320 12/02/04 02:49 saw Q3 recovery
92319 12/02/04 02:06 saw Q3 crash
92318 12/02/04 01:32 cdaq Run 52003: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92317 12/02/04 01:17 saw Q2 crash
92316 12/02/04 01:07 cdaq Run 52002: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92315 12/02/04 00:01 cdaq Beam Time Accounting
Wednesday
92314 12/01/04 23:59 hamlet Shift summary
92313 12/01/04 23:42 Razmik BPM & BCM screen
92312 12/01/04 23:41 cdaq Run 52001: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92311 12/01/04 23:19 hamlet HMS quad Q2 trip
92310 12/01/04 22:43 cdaq Run 52000: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92309 12/01/04 21:31 cdaq Run 51999: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92308 12/01/04 20:20 cdaq Run 51998: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92307 12/01/04 20:01 hamlet HMS quad Q2 trip
92306 12/01/04 19:43 cdaq Run 51997: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92305 12/01/04 18:29 cdaq Run 51996: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92304 12/01/04 17:11 cdaq Run 51995: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92303 12/01/04 16:30 Fowler HMS & SOS Rotation
92302 12/01/04 16:01 cdaq Beam Time Accounting
92301 12/01/04 15:57 gaskell shift summary
92300 12/01/04 15:47 cdaq Run 51994: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92299 12/01/04 15:42 gaskell checklist scan
92298 12/01/04 15:33 gaskell BPM and BCM screens
92297 12/01/04 14:38 gaskell Raster changed to 1 x 1 mm
92296 12/01/04 14:38 cdaq Run 51993: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92295 12/01/04 14:26 hcf Replaced TDC in HMS
92294 12/01/04 14:21 Donal Drift chamber problems
92293 12/01/04 13:33 cdaq Run 51992: cosmic 3/4
92292 12/01/04 13:30 cdaq Run 51991: cosmic 2/4
92291 12/01/04 13:23 cdaq Run 51990: cosmic 2/4 dc1
92290 12/01/04 12:01 cdaq Run 51989: cosmic 2/4 dc1
92289 12/01/04 11:52 cdaq Run 51988: cosmic 2/4 dc1
92288 12/01/04 11:42 cdaq Run 51987: cosmic 2/4 dc1
92287 12/01/04 11:13 cdaq Run 51986: cosmic 2/4 dc1 thresh 10 v
92286 12/01/04 10:55 cdaq Run 51985: cosmic 2/4 dc1 thresh 10 v
92285 12/01/04 10:49 cdaq Run 51984: cosmic 2/4
92284 12/01/04 10:45 cdaq Run 51983: cosmic 2/4
92283 12/01/04 10:41 gaskell HMS drift chamber 1
92282 12/01/04 10:38 gaskell HMS dipole crashed
92281 12/01/04 10:31 cdaq Run 51982: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92280 12/01/04 10:16 gaskell rebooted vmec18
92279 12/01/04 10:14 cdaq Run 51980: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92278 12/01/04 10:03 gaskell SOS BM02 "drifting"
92277 12/01/04 09:51 cdaq Run 51979: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92276 12/01/04 08:46 donal target heartbeat gone
92275 12/01/04 08:40 gaskell target ioc reboot
92274 12/01/04 08:11 cdaq Run 51978: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92273 12/01/04 08:09 saw Shift Summary
92272 12/01/04 08:02 cdaq Beam Time Accounting
92271 12/01/04 07:38 fowler HMS Dipole Nitrogen Level
92270 12/01/04 07:10 saw HMS Dipole Nitrogen Level < 15%
92269 12/01/04 06:17 saw HMS drift chambers tripped
92268 12/01/04 06:15 cdaq Run 51977: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92267 12/01/04 05:51 fomin bpm and bcm screens
92266 12/01/04 05:33 cdaq Run 51976: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92265 12/01/04 05:20 saw HMS H1X11- temporarily undervoltage
92264 12/01/04 03:29 cdaq Run 51975: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92263 12/01/04 02:40 fomin target ioc reboot (and correct alarm limits)
92262 12/01/04 01:29 cdaq Run 51974: Production data (P_HMS=3.5, theta_hms=23.97, P_SOS=-1.7, theta_sos=52.995)
92261 12/01/04 00:01 cdaq Beam Time Accounting
92260 12/01/04 00:01 hamlet Shift summary