Monday
93580 12/27/04 15:31 test test
Thursday
93578 12/23/04 11:55 hamlet HMS momentum was -2.7 GeV/c for runs 52492-52495
93577 12/23/04 11:22 hcf where the premix is REALLY valved off
93576 12/23/04 10:56 hcf Drift Chamber gas is now Pure Argon
93575 12/23/04 10:40 hamlet Main power for HMS Q1-Q3 and D is off
93574 12/23/04 10:35 hamlet Turned off power in SOS/HMS hut
93573 12/23/04 09:30 hickson secured
Wednesday
93572 12/22/04 20:43 horn Turned off equipment for holiday shutdown
93562 12/22/04 17:53 horn Target: move to Al Dummy
93558 12/22/04 16:48 horn Target: move to 3% C
93542 12/22/04 16:02 horn Target: move to Be
93541 12/22/04 16:02 Hall C Colla Day Shift Summary
93530 12/22/04 15:37 hamlet HMS quad Q3 trip
93514 12/22/04 15:14 clasie Target: move to Dummy
93503 12/22/04 14:59 clasie Target: move th LH2
93486 12/22/04 14:29 clasie BPM & BCM screen
93478 12/22/04 13:59 clasie Target: move th LH2
93470 12/22/04 13:44 clasie Target: change to Al Dummy
93451 12/22/04 13:14 clasie target: move to Be
93386 12/22/04 10:18 clasie HMS diple LHe went to zero
93377 12/22/04 08:33 horn Owl Shift Summary
93374 12/22/04 08:05 Xin Target snapshot
93372 12/22/04 08:02 Xin target 6% Carbon
93354 12/22/04 03:52 YaLi Target: 6% Carbon
93352 12/22/04 03:42 YaLi Target: snapshot
93345 12/22/04 01:53 horn target in header for run 52428 is 3%C
93342 12/22/04 01:30 YaLi Target: from 6% Copper to 6% Gold
93334 12/22/04 00:47 clasie new premix bottle
93333 12/22/04 00:39 horn Radiative Corrections setup
93332 12/22/04 00:33 happy holidays from hall c
93331 12/22/04 00:15 clasie Swing shift summary
Tuesday
93330 12/21/04 23:40 Xin
93329 12/21/04 23:14 gaskell Moller done
93324 12/21/04 22:24 gaskell trouble delivering beam at 2uA
93322 12/21/04 22:16 gaskell 60 uA is no go
93308 12/21/04 16:03 gaskell raster fixed
93307 12/21/04 16:02 Xin target screenshot
93306 12/21/04 15:55 Miyoshi Target snapshot
93305 12/21/04 15:39 gaskell beam position scan
93300 12/21/04 14:31 gaskell power cycled raster - didn't help
93299 12/21/04 13:56 gaskell raster (vertical) tripped off
93295 12/21/04 12:23 gaskell Charge asymmetries are huge
93293 12/21/04 11:53 gaskell Moller calo HV changed
93291 12/21/04 11:15 gaskell Moller solenoid at field, quads on
93290 12/21/04 09:13 gaskell power supply switched to Moller
93289 12/21/04 08:05 M Jones Owl shift summary
93287 12/21/04 07:51 YaLi Target: snapshot
93285 12/21/04 07:37 simona beam position
93284 12/21/04 07:33 YaLi BCM and BPM Screens
93282 12/21/04 07:11 M Jones Harp scan for 3h00
93281 12/21/04 07:11 M Jones Harp scan for 3h00
93280 12/21/04 06:57 M Jones HMS angle set to 18, SOS angle to 30.
93279 12/21/04 06:55 M Jones Set HMS and SOS slits to sieve
93278 12/21/04 06:53 M Jones Change HMS pretrig from SCIN to ELREAL
93277 12/21/04 06:52 YaLi Target: LH2 to Carbon
93275 12/21/04 04:59 simona BCM and BPM Screens
93271 12/21/04 00:02 claie Swing shift summary
Monday
93270 12/20/04 23:47 Segbefia Target Screen Shot
93269 12/20/04 23:28 clasie beam soon
93268 12/20/04 21:56 clasie another update from mcc
93267 12/20/04 21:12 clasie update from mcc
93266 12/20/04 18:52 clasie no beam for another hour
93265 12/20/04 16:53 hcf drift chambers now running on pre-mixed gas
93264 12/20/04 16:52 clasie beam will be down for a vacuum problem
93246 12/20/04 15:57 Keppel Shift Summary
93241 12/20/04 15:29 clasie Target: move to hydrogen
93240 12/20/04 13:41 clasie Target: hcD2_P_Fill_Target_R low alarm set back to 21.5
93239 12/20/04 11:05 clasie `Target: move to empty for beam studies
93236 12/20/04 09:34 Keppel moved target
93235 12/20/04 09:34 clasie target: move to LH2
93234 12/20/04 09:21 M Jones Beam Energy Measurement
93233 12/20/04 09:18 clasie target: screen snapshot
93232 12/20/04 09:01 clasie Target: hcD2_P_Fill_Target_R low alarm set to 20.0
93231 12/20/04 08:54 hcf gas shed too cold for mfc's
93230 12/20/04 08:20 clasie HMS Q2 trip
93229 12/20/04 08:17 M Jones Owl shift summary
93228 12/20/04 08:14 clasie Target: move to empty
93227 12/20/04 07:56 YaLi Target: yellow alarm for hcD2_p_Fill_Target_R
93226 12/20/04 07:49 simona BPM & BCM screens
93225 12/20/04 07:47 YaLi Target: snapshot
93223 12/20/04 07:40 simona run 52407 is junk
93222 12/20/04 07:31 simona run 52406 is junk
93221 12/20/04 06:19 simona SOS flow Eth CH2
93220 12/20/04 05:45 beaufait bm02 fuse failure
93219 12/20/04 04:32 M. Jones Radiation survey
93218 12/20/04 03:56 M Jones SOS BM02 crash
93214 12/20/04 00:23 YaLi Target: LH2 to Al dummy
93212 12/20/04 00:06 bruell shift summary
Sunday
93210 12/19/04 23:46 Segbefia Target Screen Shot
93208 12/19/04 22:40 grayc BCM and BPM Screens
93207 12/19/04 22:14 grayc changed ps values
93200 12/19/04 17:33 clasie hms thresholds
93197 12/19/04 16:06 clasie day shift summary
93196 12/19/04 15:44 Xin Qian Target status
93195 12/19/04 15:40 Xin Qian Change target to LH2
93194 12/19/04 15:39 Xin Qian Change target back to gold
93193 12/19/04 15:39 Xin Qian Target changed to empty
93191 12/19/04 13:21 tigran BCM and BPM Screens
93188 12/19/04 11:09 clasie RF zone dropped out
93185 12/19/04 09:50 clasie recent fid efficiency
93184 12/19/04 09:45 clasie SOS Quad
93181 12/19/04 08:31 beaufait sos powersupply
93180 12/19/04 08:14 Xin Qian Target screen shot
93179 12/19/04 07:47 ent owl shift summary
93178 12/19/04 06:43 ent Power Supply problem
93177 12/19/04 06:16 ent configuration change - SOS problem
93176 12/19/04 05:36 dalton target change LH2 to Gold
93170 12/19/04 03:14 ent move to LD2
93167 12/19/04 02:16 dalton Target changed to Dummy at 02h00
93164 12/19/04 00:01 hamlet Shift summary
Saturday
93162 12/18/04 23:35 Segbefia Target Screen shot
93161 12/18/04 23:15 clasie Shift checklist
93160 12/18/04 22:59 Segbefia Reboot Target IOC
93158 12/18/04 22:51 clasie fid efficiency
93157 12/18/04 22:40 gray BCM and BPM Screens
93155 12/18/04 21:22 Segbefia Changed Target
93154 12/18/04 21:21 hamlet Configuration changed before run 52374
93148 12/18/04 16:03 rohe day shift summary
93147 12/18/04 15:49 rohe BCM calibration
93145 12/18/04 15:34 markowitz target moved back to gold
93144 12/18/04 15:34 markowitz target moved back to gold
93142 12/18/04 14:11 markowitz target to empty
93141 12/18/04 14:11 markowitz target to empty
93140 12/18/04 14:10 markowitz target move
93139 12/18/04 13:40 mertens BCM and BPM Screens 121804 day
93133 12/18/04 07:57 ent owl shift summary
93132 12/18/04 07:44 dalton Target change
93129 12/18/04 06:01 simona BPM & BCM screen
93124 12/18/04 02:31 dalton Glitches in target communication
93121 12/18/04 00:57 dalton Tagret abnormalities
93119 12/18/04 00:10 markowitz shift summary
Friday
93117 12/17/04 23:02 Segbefia Target Screen
93115 12/17/04 22:27 grayc BPM & BCM screens
93114 12/17/04 22:26 segbefia Target change to Copper
93112 12/17/04 20:54 R.Asaturyan BTA information lost
93108 12/17/04 17:39 Segbefia Changed Target
93105 12/17/04 17:15 hcf & dg DO NOT TRUST THE O'SCOPE IN THE COUNTING ROOM!!!
93104 12/17/04 16:08 M Jones Day shift summary
93102 12/17/04 15:39 mertens scan checklist 12/17/014
93101 12/17/04 15:38 mertens scan checklist 12/17/014
93100 12/17/04 15:15 M JOnes SOS gas Cerenkov
93099 12/17/04 15:02 M Jones BCM and BPM Screens
93094 12/17/04 12:28 Miyoshi Target IOC reboot and screen shots
93057 12/17/04 07:54 R.Asaturyan Shift Summary
93056 12/17/04 07:52 dalton Target IOC reboot and screenshot
93054 12/17/04 06:44 simona BCM and BPM Screens
Thursday
93045 12/16/04 22:47 gaskell Moller summary and end
93041 12/16/04 19:52 gaskell target search
93039 12/16/04 19:02 gaskell/clas harp scan results
93035 12/16/04 17:03 gaskell Moller supply
93033 12/16/04 16:06 ak opper day shift summary
93032 12/16/04 15:27 gaskell Moller power supply troubles
93031 12/16/04 15:02 Donal Target screen grab
93029 12/16/04 10:47 ak opper cosmic run
93027 12/16/04 10:34 ak opper Change to Beam Studies
93026 12/16/04 10:01 Donal Target Motion
93003 12/16/04 08:00 R.Asaturyan shift summary
93001 12/16/04 06:57 simona BCM and BPM Screens
92997 12/16/04 03:27 dalton Target Screenshot
92996 12/16/04 03:26 dalton hcD2_P_Fill_Target_R minor low alarm
Wednesday
92991 12/15/04 23:56 ioana shift summary
92989 12/15/04 23:01 Keppel moved target again
92986 12/15/04 21:37 Keppel target change
92985 12/15/04 21:26 rohe lock to gas shed
92983 12/15/04 18:59 ioana target for run 52313
92981 12/15/04 18:11 clasie changes to the analyzer
92979 12/15/04 17:26 gaskell Moller results
92978 12/15/04 17:15 gaskell Moller tune plot
92977 12/15/04 16:33 gaskell loose communication cable
92976 12/15/04 16:11 ak opper day shift summary
92975 12/15/04 16:08 Mertens BCM and BPM Screens 121504 day
92974 12/15/04 16:04 Donal Open JT
92972 12/15/04 15:57 gaskell BM01 tripped
92971 12/15/04 15:47 gaskell Moller backout
92970 12/15/04 15:44 Donal Move to LH2
92969 12/15/04 15:18 gaskell Moller done
92966 12/15/04 14:53 gaskell Moller pretty much tuned
92965 12/15/04 14:52 gaskell/hcf moller controls
92960 12/15/04 14:27 hcf note for moller collimator
92950 12/15/04 09:06 Donal Target screen grab
92949 12/15/04 09:02 ak opper pause production data taking for Moller calibrations
92948 12/15/04 08:56 Donal Move target
92945 12/15/04 07:59 R.Asaturyan Shift summary
92936 12/15/04 01:02 dalton Target Changed to LH2 + Screenshot
Tuesday
92932 12/14/04 21:45 Keppel target ioc again
92930 12/14/04 20:28 rohe BCM&BPM screen
92929 12/14/04 20:28 rohe BCM&BPM screen
92927 12/14/04 19:48 Keppel Q2 trip
92926 12/14/04 19:47 Keppel target ioc reboot
92924 12/14/04 16:56 Keppel trigger change and complaint
92920 12/14/04 16:29 Keppel BETABRITE restart
92917 12/14/04 16:07 Donal Target motion
92912 12/14/04 11:03 ak opper partial day shift summary
92911 12/14/04 10:39 tajima Taking cosmic data
92909 12/14/04 10:29 mertens BCM and BPM Screens 1214 day
92908 12/14/04 10:10 tajima Moved target to Empty, and beam studies just began
92906 12/14/04 09:51 tajima Q1 trip
92904 12/14/04 08:53 Donal Jeffylab hangs
92903 12/14/04 08:35 Donal Target GUI goes white
92901 12/14/04 08:01 vardan shift summary
92897 12/14/04 05:31 simona BPM & BCM screen
92891 12/14/04 00:01 Bosted target screen
Monday
92889 12/13/04 23:46 ioana shift summary
92886 12/13/04 19:55 rohe BCM & BCM screen
92884 12/13/04 18:08 smithg Scattering chamber pressure transducer
92882 12/13/04 17:02 Donal
92881 12/13/04 16:42 Donal Target IV
92878 12/13/04 16:05 ak opper day shift summary
92877 12/13/04 16:00 Donal Channel map for hodoscopes
92875 12/13/04 15:29 Donal Target moved
92874 12/13/04 15:14 Donal Move target to empty
92873 12/13/04 14:55 Donal target ioc reboot
92871 12/13/04 14:50 ak opper HV trip
92867 12/13/04 14:23 ak opper problems with HV
92855 12/13/04 11:48 cseely g_examin_epics_event.f modified
92850 12/13/04 10:11 donal Target screen
92848 12/13/04 09:40 ak opper beam off for pzt test
92847 12/13/04 09:13 ak opper HMS drift chamber trip
92845 12/13/04 09:10 ak opper HMS Q2 trip
92843 12/13/04 08:23 ak opper Dipole PC reboot
92841 12/13/04 08:04 vardan shift summary
92837 12/13/04 05:36 vardan HMS Q3 trip
92836 12/13/04 05:13 simona BPM & BCM screen
92835 12/13/04 05:12 clasie HMS Q1 trip
92833 12/13/04 03:35 vardan messages on HMS Dipole PC screen
92832 12/13/04 03:21 clasie target: alarm handler
92831 12/13/04 03:20 clasie target: change to gold
92829 12/13/04 03:20 clasie Target: ioc reboot
92825 12/13/04 00:16 bruell shift summary
92824 12/13/04 00:15 clasie Target:screen grab
Sunday
92819 12/12/04 20:19 rohe BPM & BCM screen
92810 12/12/04 16:05 Boeglin Shift Summary
92806 12/12/04 13:58 adaniel BPM and BCM screen
92803 12/12/04 11:30 YaLi Target: IOC reboot and target vacuum
92802 12/12/04 11:22 YaLi Target: screen_snapshot
92797 12/12/04 08:07 clasie shift summary
92794 12/12/04 07:29 clasie BPM & BCM screen
92793 12/12/04 07:07 clasie SOS calorimeter
92792 12/12/04 06:50 clasie scan of shift shecklist (previous shift)
92789 12/12/04 05:54 dalton target screenshot
92788 12/12/04 05:45 dalton SOS HV trips
92783 12/12/04 02:37 clasie Pivot ion chamber thresholds
92781 12/12/04 00:19 bruell shift summary
Saturday
92777 12/11/04 22:23 grayc target moved
92776 12/11/04 22:04 grayc target screenshot
92773 12/11/04 19:56 grayc target ioc fun
92769 12/11/04 18:09 grayc loop 2 heater alarm
92767 12/11/04 16:43 grayc hms hv alarm
92765 12/11/04 16:03 Boeglin Shift Summary
92764 12/11/04 16:01 Boeglin Shift Summary
92762 12/11/04 15:54 nkalantarian target rebooted
92759 12/11/04 14:45 mertens BCM and BPM Screens 121104 day
92754 12/11/04 11:35 nkalantarian target moved
92749 12/11/04 09:35 nkalantarian target screenshot
92744 12/11/04 08:02 El Fassi Shift Summary
92743 12/11/04 07:14 clasie Target: ioc reboot
92740 12/11/04 06:50 El Fassi Checklist scan
92739 12/11/04 06:24 El Fassi BPM & BCM screen
92738 12/11/04 06:22 El Fassi BPM & BCM screen
92737 12/11/04 06:21 El Fassi BPM & BCM screen
92734 12/11/04 04:44 clasie Target: switch to LD2
92733 12/11/04 04:39 Elfassi Target switched
92730 12/11/04 02:22 clasie HMS dipole trip
Friday
92727 12/10/04 23:58 clasie Target: screen grab
92725 12/10/04 23:47 clasie h1x11- under voltage
92724 12/10/04 23:43 Boeglin Shift Summary
92723 12/10/04 23:24 clasie changes to the analyzer
92721 12/10/04 22:29 boeglin bpm/bcm screen shots
92715 12/10/04 19:18 clasie magnet problems
92713 12/10/04 16:11 Fatiha Shift Summary
92712 12/10/04 16:05 Fatiha Fatiha
92711 12/10/04 15:32 Fatiha Q2
92710 12/10/04 15:07 Fatiha Q2 again
92709 12/10/04 14:50 Fatiha Q2 repaired
92708 12/10/04 13:30 nkalantarian progress on fixing hms
92707 12/10/04 11:21 nkalantarian checklist scan
92706 12/10/04 10:12 nkalantarian sos rotated
92705 12/10/04 10:01 nkalantarian target moved
92704 12/10/04 09:59 X. Zheng run #52193 was a carbon target run
92703 12/10/04 09:59 Fatiha Going to
92702 12/10/04 09:27 nkalantarian target gui
92700 12/10/04 09:12 nkalantarian target moved
92699 12/10/04 08:29 Dutta Shift Summary
92696 12/10/04 07:42 ddutta sanity screen
92693 12/10/04 06:56 El Fassi BPM & BCM screen
92692 12/10/04 06:40 gaskell Accelerating Moeller cooldown
92689 12/10/04 04:46 ddutta Q2 problem
92688 12/10/04 00:42 clasie thresholds file were updated
92687 12/10/04 00:34 El Fassi Checklist scan copy
92685 12/10/04 00:08 X. Zheng swing shift summary
92684 12/10/04 00:05 X, Zheng Reboot beam current IOC
92683 12/10/04 00:05 clasie target: screen grab
Thursday
92682 12/09/04 23:50 X. Zheng More on the HMS Q2 power supply
92681 12/09/04 23:12 X. Zheng Reboot HMS Q2 controls
92680 12/09/04 22:25 clasie increase HV on the SOS Cer PMT
92679 12/09/04 21:32 ak opper target change to 4 cm LH2
92678 12/09/04 21:19 X. Zheng new beam positions
92677 12/09/04 21:09 saw Rebooted vmec2 and vmec19 to restore runinfo menu
92676 12/09/04 21:02 gaskell/clas SOS cerenkov hardware threshold
92674 12/09/04 20:56 hamlet HMS field/current mode
92673 12/09/04 20:54 X. Zheng "sanity check" missing
92671 12/09/04 20:51 gaskell/clas lowered sos cerenkov threshold
92667 12/09/04 20:06 X. Zheng harp broken
92666 12/09/04 20:01 ak opper target change to 3% C
92665 12/09/04 19:51 X. Zheng 52188-52190 are not cosmic runs
92661 12/09/04 18:32 X. Zheng HMS dipole trip
92660 12/09/04 18:29 gaskell HMS dipole and Moeller
92658 12/09/04 16:50 rohe day shift summary
92657 12/09/04 16:23 gaskell moeller cooldown
92656 12/09/04 16:22 hickson cerenkovs
92654 12/09/04 16:07 ak opper target gui
92653 12/09/04 13:35 rohe HMS field/current mode
92652 12/09/04 13:10 rohe restricted access
92650 12/09/04 12:25 hamlet,razmi hms aerogel back in
92647 12/09/04 11:35 Fowler HMS, SOS Rotation
92646 12/09/04 11:20 vulcan SOS supplies
92645 12/09/04 09:18 rohe full radiation survey done
92644 12/09/04 09:00 rohe controlled access at 8:30
92643 12/09/04 08:29 rohe Beam accounting
92641 12/09/04 08:13 El Fassi BCM and BPM screen
92639 12/09/04 08:03 clasie Target: change to 3% carbon
Wednesday
92610 12/08/04 23:54 clasie target: gui picture
92609 12/08/04 22:11 nkalantarian target moved
92608 12/08/04 22:00 ak opper partial swing shift summary
92605 12/08/04 20:40 hcf check of SOS argon flow zero
92601 12/08/04 19:02 ak opper configuration change
92599 12/08/04 18:54 nkalantarian target moved back
92598 12/08/04 18:41 nkalantarian target moved
92596 12/08/04 18:00 nkalantarian bpm and bcm screens
92595 12/08/04 17:27 hcf high multiplicity (2) in drift chambers
92594 12/08/04 17:23 ak opper continuing story on # hits/detector
92592 12/08/04 16:54 ak opper high # of hits per detector in hms
92591 12/08/04 16:46 ak opper large # of hits/detector
92590 12/08/04 16:25 nkalantarian target gui
92587 12/08/04 15:59 X. Zheng shift summary
92586 12/08/04 15:37 X. Zheng Changed SOS to elclean
92585 12/08/04 15:36 X. Zheng Ion chamber trip, will run 30uA
92582 12/08/04 15:24 okayasu Target changed
92581 12/08/04 15:20 X. Zheng fileserver reboot 14:40-14:50
92577 12/08/04 13:36 rohe BCM screen
92576 12/08/04 13:35 rohe BPM screen
92574 12/08/04 12:58 gaskell added H2 and D2 target pressure to epics
92573 12/08/04 12:29 X. Zheng Change HMS momentum to +2.2 GeV/c
92571 12/08/04 11:49 X. Zheng Change trigger to el_real for HMS and SOS
92568 12/08/04 10:18 smithg cvxwrks home directory accidental erasure
92565 12/08/04 09:52 X. Zheng HMS P=+2.5 GeV/c starting run #52125
92562 12/08/04 09:27 okayasu Target IOC rebooted
92561 12/08/04 08:23 X. Zheng HMS Q3 LN2 overfilling
92558 12/08/04 07:48 ddutta Owl Shift summary
92557 12/08/04 07:19 Dutta BPM screen
92550 12/08/04 04:40 Dunne Changed SOS angle to 27.83 just after 52104
92526 12/08/04 00:46 dunne Changed SOS angle to 40
92521 12/08/04 00:03 ak opper Swing shift summary
Tuesday
92519 12/07/04 23:16 clasie checklist copy
92518 12/07/04 23:01 clasie BPM & BCM screen
92515 12/07/04 21:14 vipuli New HMS and SOS angle limits
92513 12/07/04 20:16 saw cdaqfs errors
92507 12/07/04 17:58 clasie Target: change to LH2
92506 12/07/04 17:30 gaskell BM01 (Moeller) polarity switch not working
92505 12/07/04 17:02 gaskell SOS BM02
92504 12/07/04 16:47 clasie Target yellow alarm while increasing the fan speed
92503 12/07/04 16:46 target: screen snapshot
92498 12/07/04 16:02 X. Zheng day shift summary
92497 12/07/04 15:47 fowler HMS, SOS Rotation
92496 12/07/04 12:14 smithg Target cooldown completed
Monday
92495 12/06/04 08:28 vipuli We are going to restricted access
Sunday
92494 12/05/04 16:29 vipuli HV and Magnets were turned off
92493 12/05/04 12:30 rohe day summary
92492 12/05/04 12:28 mseely target warm up
92490 12/05/04 12:01 mseely scattering chamber leak
92489 12/05/04 11:19 smithg Scattering chamber vacuum problem
92487 12/05/04 08:42 rohe HMS dipole PC reboot
92484 12/05/04 07:49 dunne Shift Summary
92482 12/05/04 06:58 El Fassi Beam monitor snap shot
92481 12/05/04 06:58 El Fassi Beam monitor snap shot
92480 12/05/04 06:54 El Fassi beam monitor snap shot
92478 12/05/04 05:19 testa GUI of hms dipole not responding - NMR is fine
92476 12/05/04 04:52 testa hms drift chamber HV tripped.
92474 12/05/04 03:04 testa reboot of target ioc
92471 12/05/04 01:11 testa Q3 tripped
Saturday
92468 12/04/04 23:50 ak opper swing shift summary
92465 12/04/04 23:02 clasie target ioc reboot
92464 12/04/04 22:59 ak opper roc3 and runcontrol problems
92460 12/04/04 21:33 clasie BPM & BCM screen
92458 12/04/04 20:34 clasie target ioc reboot
92457 12/04/04 19:59 clasie hms hodoscope h1x11- tripped
92454 12/04/04 19:19 clasie target ioc reboot
92452 12/04/04 18:37 clasie HMS q1 trip
92450 12/04/04 17:13 vipuli New rster size
92449 12/04/04 16:55 rohe day shift summary
92448 12/04/04 16:30 vipuli Raster problem.......
92444 12/04/04 15:00 mertens EQuipment Checklist 1203_1204
92443 12/04/04 14:41 rohe raster size changes !!
92442 12/04/04 14:26 mertens hcbpm and bcm snapshots
92441 12/04/04 14:24 rohe raster puzzle
92435 12/04/04 10:29 grayc electron/muC jump from ~0.7 to ~0.9
92433 12/04/04 09:02 Bosted Filling in Beam Accounting Form, Beam Off for Trips
92432 12/04/04 08:58 rohe hmsdipole alarm tcl script not working
92429 12/04/04 07:50 dunne Shift Summary
92427 12/04/04 06:37 dunne Target Reboot again
92425 12/04/04 05:40 dunne Target Reboot
92423 12/04/04 04:58 testa hcbpm and bcm snapshots
Friday
92416 12/03/04 23:45 ak opper Swing Shift Summary
92414 12/03/04 23:06 E.Chudakov HMS Q3 tripped again
92413 12/03/04 22:55 E.Chudakov HMS Q3 tripped
92411 12/03/04 22:05 E.Chudakov HMS Q1 tripped
92407 12/03/04 19:32 E.Chudakov HMS Q3 tripped
92404 12/03/04 17:05 Fowler HMS & SOS Rotation
92403 12/03/04 16:58 hcf sos ar zero flow now reads -0.006 slpm. OK!
92401 12/03/04 16:23 beam position
92400 12/03/04 16:22
92399 12/03/04 16:19 Beam position
92398 12/03/04 16:18
92396 12/03/04 16:04 jroche day shift summary
92393 12/03/04 14:10 jroche the raster size story (late entry)
92392 12/03/04 13:32 jroche raster gui
92391 12/03/04 13:28 jroche beam status between 10:40 and now
92389 12/03/04 13:15 jroche q3 trip
92387 12/03/04 12:05 jroche beam status
92386 12/03/04 11:28 grayc bcm problems
92384 12/03/04 10:39 jroche beam stoped for 15 mn for spot move
92381 12/03/04 09:06 hcf SOS chamber flows back to normal
92379 12/03/04 08:07 saw Shift Summary
92377 12/03/04 07:38 saw Restored EPICS Hall Probe reading of HMS quad fields
92376 12/03/04 07:25 testa scan of the checklist
92375 12/03/04 07:13 testa hcbpm and bcm snapshots
92373 12/03/04 06:27 saw Q2 trip
92368 12/03/04 01:51 saw Q3 trip
Thursday
92365 12/02/04 23:57 ak opper Swing shift summary
92363 12/02/04 23:56 hcf corrected scale factor for SOS argon flow controller
92359 12/02/04 22:31 hcf corrected scale factor for SOS argon flow controller
92355 12/02/04 19:32 Claire Gray Target Change
92352 12/02/04 18:01 ak opper HMS dipole resurrection
92351 12/02/04 16:39 jroche day shift summary
92348 12/02/04 15:46 jroche hms and sos fidutial efficency for j/psi exp
92347 12/02/04 13:27 hcf replacement sos argon flow controller zeroed
92346 12/02/04 12:00 jroche HV off
92345 12/02/04 11:26 hickson mass flow controller
92344 12/02/04 11:17 jroche single electron rates versus hroizontal beam position
92343 12/02/04 10:33 jroche hall in controlled access
92342 12/02/04 10:24 smithg Target alarm limit memory loss fixed
92341 12/02/04 10:23 jroche looking for the target position using the beam
92330 12/02/04 08:51 hcf SOS argon flow controller zero drifted again
92329 12/02/04 07:52 saw Shift summary
92328 12/02/04 07:48 saw SOS fiducial efficiency has dropped
92327 12/02/04 07:34 testa hcbpm and bcm snapshots
92323 12/02/04 03:15 saw Q1 crashed
92320 12/02/04 02:49 saw Q3 recovery
92319 12/02/04 02:06 saw Q3 crash
92317 12/02/04 01:17 saw Q2 crash
Wednesday
92314 12/01/04 23:59 hamlet Shift summary
92313 12/01/04 23:42 Razmik BPM & BCM screen
92311 12/01/04 23:19 hamlet HMS quad Q2 trip
92307 12/01/04 20:01 hamlet HMS quad Q2 trip
92303 12/01/04 16:30 Fowler HMS & SOS Rotation
92301 12/01/04 15:57 gaskell shift summary
92299 12/01/04 15:42 gaskell checklist scan
92298 12/01/04 15:33 gaskell BPM and BCM screens
92297 12/01/04 14:38 gaskell Raster changed to 1 x 1 mm
92295 12/01/04 14:26 hcf Replaced TDC in HMS
92294 12/01/04 14:21 Donal Drift chamber problems
92283 12/01/04 10:41 gaskell HMS drift chamber 1
92282 12/01/04 10:38 gaskell HMS dipole crashed
92280 12/01/04 10:16 gaskell rebooted vmec18
92278 12/01/04 10:03 gaskell SOS BM02 "drifting"
92276 12/01/04 08:46 donal target heartbeat gone
92275 12/01/04 08:40 gaskell target ioc reboot
92273 12/01/04 08:09 saw Shift Summary
92271 12/01/04 07:38 fowler HMS Dipole Nitrogen Level
92270 12/01/04 07:10 saw HMS Dipole Nitrogen Level < 15%
92269 12/01/04 06:17 saw HMS drift chambers tripped
92267 12/01/04 05:51 fomin bpm and bcm screens
92265 12/01/04 05:20 saw HMS H1X11- temporarily undervoltage
92263 12/01/04 02:40 fomin target ioc reboot (and correct alarm limits)
92260 12/01/04 00:01 hamlet Shift summary