Jefferson Lab Hall C Logbook for January 05 - runstarts omitted

  • Main INDEX

    Thursday

  • 96150 01/27/05 14:35 beaufait sos quad
  • Wednesday

  • 96149 01/26/05 09:13 smithg Target warmed up.
  • 96148 01/26/05 07:43 vipuli HMS detectors : HV off
  • 96146 01/26/05 06:29 vardan shift summary
  • 96145 01/26/05 06:28 vardan HMS Dipole won't rump-up
  • 96144 01/26/05 04:44 vipuli HMS rotated to 60
  • 96143 01/26/05 04:14 vipuli target change: LH2 to LD2
  • 96140 01/26/05 03:58 vipuli HMS rotated to 21.5
  • 96138 01/26/05 03:38 vipuli target changed to dummy
  • 96137 01/26/05 03:00 vardan HMS Q3 trip
  • 96135 01/26/05 02:21 vardan HMS to 30 deg., 2.09 GeV/c
  • 96133 01/26/05 02:11 vipuli rotate HMS to 30 deg.
  • 96131 01/26/05 01:54 vardan Run Control restarted
  • 96126 01/26/05 00:41 vipuli target moved to LD2
  • 96124 01/26/05 00:08 hamlet Shift summary
  • Tuesday

  • 96121 01/25/05 23:56 gaskell target motion: LH2-> Al dummy
  • 96119 01/25/05 23:42 gaskell HMS kinematics change
  • 96117 01/25/05 23:27 gaskell target motion: dummy -> LH2
  • 96115 01/25/05 23:17 gaskell rotate HMS: 24.0 -> 17.0 degrees
  • 96114 01/25/05 23:16 gaskell bpm/bcm screens
  • 96112 01/25/05 23:02 gaskell target motion: LD2-> dummy
  • 96110 01/25/05 22:33 gaskell target shift checklist
  • 96107 01/25/05 22:07 gaskell HMS kinematics change
  • 96103 01/25/05 21:03 gaskell Target change: dummy -> LD2
  • 96101 01/25/05 20:41 gaskell HMS rotation: 15.005 -> 21.50 degrees
  • 96099 01/25/05 20:24 gaskell Target change: LH2 -> Al dummy
  • 96097 01/25/05 20:04 gaskell HMS momnetum change: -2.28 -> -2.24 GeV/c
  • 96096 01/25/05 20:04 gaskell HMS rotation: 13.005 -> 15.005 degrees
  • 96093 01/25/05 19:39 gaskell HMS rotation: 19.00 -> 13.005 degrees
  • 96091 01/25/05 19:21 gaskell Target motion: LD2->Dummy
  • 96087 01/25/05 16:27 Bosted Changed gas bottle
  • 96086 01/25/05 16:15 smithg day shift summary
  • 96084 01/25/05 11:59 smithg Replaced lumi near beam dump. Inserted C target.
  • 96079 01/25/05 08:44 smithg Put in Fe target
  • 96077 01/25/05 08:18 Segbefia Target Screenshot
  • 96076 01/25/05 08:13 Segbefia Target Change
  • 96073 01/25/05 08:01 Segbefia Target Change
  • 96072 01/25/05 07:54 Segbefia Target Change
  • 96069 01/25/05 07:28 Segbefia Target Change
  • 96065 01/25/05 06:38 Segbefia Target Change
  • 96063 01/25/05 06:04 Segbefia Target Change
  • 96060 01/25/05 05:40 tigran BPM and BCM screens
  • 96056 01/25/05 04:40 Segbefia HMS Drift chamber HV trip
  • 96054 01/25/05 04:32 Segbefia Target Change
  • 96052 01/25/05 04:14 Segbefia Target Change
  • 96049 01/25/05 03:39 Segbefia Target Change
  • 96045 01/25/05 02:55 Segbefia Angle Change
  • 96042 01/25/05 02:32 Segbefia Target Change
  • 96041 01/25/05 02:23 Segbefia Target Change
  • 96038 01/25/05 02:03 Segbefia Target Change
  • 96037 01/25/05 02:02 Segbefia Target Change
  • 96035 01/25/05 01:35 Segbefia Target Change
  • 96028 01/25/05 00:12 gaskell swing shift summary
  • Monday

  • 96026 01/24/05 23:44 gaskell changed trigger to ELCLEAN before run 53349
  • 96021 01/24/05 22:40 gaskell HMS rotation: 60 deg. -> 45 deg.
  • 96019 01/24/05 22:25 slifer target ioc reboot
  • 96013 01/24/05 20:29 gaskell changed HMS momentum to -0.443 GeV
  • 96010 01/24/05 19:48 gaskell dipole trip from spontaneous RS232 reboot?
  • 96009 01/24/05 19:41 slifer HMS dipole trip during 53337
  • 96007 01/24/05 19:28 slifer target screenshot
  • 96006 01/24/05 19:27 slifer target screenshot
  • 96004 01/24/05 18:48 Rondon run 53335 angle=60 degr. target Fe %
  • 96003 01/24/05 18:44 gaskell high currents on Fe for a while
  • 96000 01/24/05 18:37 gaskell correction to runstarts
  • 95997 01/24/05 18:16 slifer HMS angle: from 45 to 60.
  • 95995 01/24/05 17:48 gaskell deleted coin files
  • 95994 01/24/05 17:36 slifer BCM/BPM screenshot
  • 95988 01/24/05 16:53 Bosted Day shift summary
  • 95986 01/24/05 16:36 slifer HMS angle: from 30 to 45.
  • 95985 01/24/05 16:32 gaskell rotating HMS to 45 degrees
  • 95972 01/24/05 13:48 Tvaskis Reboot IOC
  • 95955 01/24/05 10:50 saw Target error. Run 53304 was actually H2
  • 95946 01/24/05 08:39 Keppel shift summary
  • 95941 01/24/05 07:31 jayalath BPM and BCM screens
  • 95938 01/24/05 06:34 Keppel rotated spectrometer, and changed targets a few more times
  • 95932 01/24/05 05:14 Keppel more Q1 trips
  • 95928 01/24/05 04:53 Keppel Q1 tripped
  • 95926 01/24/05 04:29 Keppel target and angle changes
  • 95924 01/24/05 03:49 Keppel wire chamber trip
  • 95912 01/24/05 01:13 christy 1/23/05 evening shift summary
  • Sunday

  • 95905 01/23/05 22:54 Bodek Target-screen-evening shift 1-23-05
  • 95903 01/23/05 22:50 christy dipole keyboard control restored
  • 95901 01/23/05 22:01 S. Manly 21:57 Magnet control computer troubles
  • 95887 01/23/05 16:05 vipuli shift summary
  • 95885 01/23/05 16:00 reinhold moved target to 1% Fe iron
  • 95884 01/23/05 15:52 adaniel HMS cerenkov camera
  • 95883 01/23/05 15:50 reinhold VESDA faults/alarms
  • 95880 01/23/05 15:22 reinhold moved target to 4cm Al dummy
  • 95879 01/23/05 15:07 adaniel Bpm and bcm screens
  • 95877 01/23/05 15:05 reinhold rotated HMS to 20 deg
  • 95874 01/23/05 14:05 reinhold moved target to 4cm D2 deuterium
  • 95871 01/23/05 13:19 reinhold moved target to 4cm H2 hydrogen
  • 95869 01/23/05 12:52 reinhold moved target to 1% carbon
  • 95867 01/23/05 12:19 reinhold move target to 4cm aluminum dummy
  • 95866 01/23/05 11:59 reinhold before run 53242 moved target to 1% carbon
  • 95865 01/23/05 11:57 reinhold target status
  • 95863 01/23/05 11:36 beaufait sos quad trouble shoot
  • 95862 01/23/05 11:19 vipuli SOS problem
  • 95861 01/23/05 09:59 vipuli Water in the hall
  • 95860 01/23/05 09:39 Vipuli/Hamle SOS Q1
  • 95859 01/23/05 08:04 hamlet Shift summary
  • 95857 01/23/05 07:48 hamlet Beam off due to problem in west arc
  • 95854 01/23/05 06:12 hamlet Change HMS angle to thet_hms=60.0
  • 95852 01/23/05 05:32 T.Iwashita Target change : C -> Fe
  • 95850 01/23/05 05:09 T.Iwashita Target change : dummy -> C
  • 95848 01/23/05 04:28 T.Iwashita Target change : D2 -> dummy
  • 95846 01/23/05 04:06 hamlet Change HMS angle to thet_hms=45.0
  • 95844 01/23/05 03:46 T.Iwashita Target change : H2 -> D2
  • 95842 01/23/05 03:25 T.Iwashita Target change : dummy -> H2
  • 95840 01/23/05 03:06 T.Iwashita Target change : C -> dummy
  • 95838 01/23/05 02:47 T.Iwashita Target change : Fe -> C
  • 95837 01/23/05 02:40 hamlet VESEDA Alarm
  • 95835 01/23/05 02:25 hamlet Change HMS angle thet_hms=30.0
  • 95833 01/23/05 02:06 T.Iwashita Target change : C -> Fe
  • 95831 01/23/05 01:46 T.Iwashita Target change : dummy -> C
  • 95829 01/23/05 01:29 hamlet Will contiune data taking without SOS
  • 95828 01/23/05 01:26 T.Iwashita Target change : D2 -> dummy
  • 95827 01/23/05 01:21 hamlet Problem to reset SOS QUAD
  • 95825 01/23/05 00:21 hamlet Change P_hms=-0.941, thet_hms=20.0 and P_sos=0.647,thet_sos=70.0
  • Saturday

  • 95823 01/22/05 23:56 tajima swing shift summary
  • 95821 01/22/05 23:08 Bodek Target problem- message to Ckeith to fix
  • 95820 01/22/05 22:10 tajima no beam
  • 95819 01/22/05 20:58 Bodek target-summary-eve-1-22-05
  • 95815 01/22/05 18:55 tajima HMS angle to 60.0 deg
  • 95809 01/22/05 17:00 tajima Both HMS and SOS angles to 45.0 deg
  • 95808 01/22/05 16:55 Tajima BCM Calibration
  • 95807 01/22/05 16:17 tajima Run 53218 is BCM calibration run
  • 95806 01/22/05 16:06 vipuli Shift summary
  • 95804 01/22/05 13:40 reinhold adjust target JT valve for loop3 D2
  • 95801 01/22/05 13:10 reinhold move target to D2 deuterium
  • 95799 01/22/05 12:45 reinhold moved target to H2 hydrogen
  • 95797 01/22/05 12:23 reinhold moved target to 4cm Al dummy (aka "the not so bright target")
  • 95795 01/22/05 11:55 reinhold moved target to 1% carbon
  • 95794 01/22/05 11:49 vipuli BPM and BCM screens
  • 95792 01/22/05 11:38 reinhold moved HMS to 30 deg
  • 95789 01/22/05 10:46 reinhold moved target to 1% carbon
  • 95787 01/22/05 10:36 reinhold HMS DC 1&2 HV trip
  • 95785 01/22/05 10:24 reinhold moved target to 4cm Al dummy
  • 95783 01/22/05 10:03 reinhold moved target from D2 to H2 hydrogen
  • 95780 01/22/05 09:43 reinhold rotated spectrometers HMS=20 deg SOS=60 deg
  • 95779 01/22/05 09:31 reinhold HMS DC 1& 2 HV trip
  • 95777 01/22/05 09:09 reinhold target status
  • 95775 01/22/05 09:02 reinhold moved target from H2 to D2 deuterium
  • 95772 01/22/05 08:29 reinhold moved target from 4cm Al to H2 hydrogen
  • 95770 01/22/05 08:01 hamlet Shift summary
  • 95767 01/22/05 07:30 T.Iwashita Target change : D2 -> C
  • 95764 01/22/05 06:32 T.Iwashita H2 and D2 target over heat
  • 95763 01/22/05 06:27 hamlet Change thet_hms=45.0
  • 95761 01/22/05 06:00 T.Iwashita Target change : C -> Fe
  • 95759 01/22/05 05:37 T.Iwashita Target change : dummy -> C
  • 95757 01/22/05 05:17 T.Iwashita Target change : H2 -> dummy
  • 95755 01/22/05 04:59 T.Iwashita Change target : D2 -> H2
  • 95753 01/22/05 04:37 hamlet Change thet_hms=30.0, thet_sos=70.0 and P_sos=0.557
  • 95751 01/22/05 04:10 T.Iwashita Target change : H2 -> D2
  • 95749 01/22/05 03:48 T.Iwashita Target change : dummy -> H2
  • 95747 01/22/05 03:30 T.Iwashita Target change : C -> dummy
  • 95745 01/22/05 03:09 T.Iwashita Target changed : Fe -> C
  • 95743 01/22/05 02:48 hamlet Change P_hms=-1.272 and thet_hms=20.0
  • 95740 01/22/05 01:36 T.Iwashita Target change : C -> Fe
  • 95738 01/22/05 00:56 T.Iwashita Target changed : dummy -> C
  • 95737 01/22/05 00:25 T.Iwashita Target changed : D2 -> dummy
  • Friday

  • 95734 01/21/05 23:59 tajima swing shift summary
  • 95731 01/21/05 23:30 tajima Both HMS and SOS angles to 45 deg
  • 95730 01/21/05 23:22 tajima He bottle changed
  • 95729 01/21/05 23:09 Bodek Eve Shift Target Summary
  • 95723 01/21/05 21:33 tajima CORRECTION: Run 53175 is JUNK, 53174 is good
  • 95722 01/21/05 21:30 tajima Run 53174 is junk
  • 95719 01/21/05 21:27 tajima hms angle to 30.00 deg
  • 95714 01/21/05 19:58 gabriel beam trips 4 last hour
  • 95713 01/21/05 19:55 gabriel beam trips 4 last hour
  • 95710 01/21/05 19:19 tajima kinematics change
  • 95706 01/21/05 17:50 tajima missing sos data (#53159-53164)
  • 95700 01/21/05 17:30 tajima 53158 junk
  • 95694 01/21/05 16:59 tajima hms momentum to -1.72
  • 95690 01/21/05 16:05 Bosted/Reinh Changed Ar/Ethane bottle
  • 95688 01/21/05 15:52 Bosted Day shift Summary
  • 95685 01/21/05 15:26 gaskell missing HMS tdcs
  • 95681 01/21/05 15:06 M Jones Beam Energy measurement
  • 95679 01/21/05 14:45 reinhold move target from empty (after Ebeam meas.) to 4cm dummy
  • 95677 01/21/05 14:14 gaskell swapp com start for HMS s1x and s2x
  • 95676 01/21/05 14:10 gaskell swapped HMS s1x s2x both top ribbons
  • 95673 01/21/05 13:55 reinhold move target from D2 to empty for beam energy meas.
  • 95670 01/21/05 13:11 reinhold HMS S2X and S2Y TDC missing
  • 95668 01/21/05 12:47 Bosted HMS S2x,y TDC's missing
  • 95662 01/21/05 11:02 reinhold rotated HMS from 20 to 30 deg
  • 95661 01/21/05 10:59 reinhold moved to HMS pion and SOS large collimator
  • 95660 01/21/05 10:38 reinhold moved to D2 deuterium target
  • 95658 01/21/05 10:22 reinhold moved to 1% carbon target
  • 95657 01/21/05 09:50 bruell swing shift summary
  • 95655 01/21/05 09:16 reinhold moved 1% Copper target in
  • 95654 01/21/05 08:32 reinhold target status
  • 95653 01/21/05 08:23 reinhold moved SOS & HMS sieve slits in & HMS to 20.0 deg
  • 95652 01/21/05 08:11 vipuli Shift summary
  • Thursday

  • 95499 01/20/05 22:49 gabriel new discriminator for s1x+
  • 95481 01/20/05 18:34 christy hs1x hot scintillator checks
  • 95476 01/20/05 17:16 christy HMS trigger changed to cosmics
  • 95474 01/20/05 16:08 Bosted Day shift summary
  • 95472 01/20/05 16:03 saw Logbook repaired
  • 95471 01/20/05 16:02 Bosted Access to reset HMS magnet computer switch
  • 95470 01/20/05 15:59 Bosted Access for SANE Cherenkov work
  • 95469 01/20/05 15:58 Bosted Access for SANE Cherenkov work
  • 95468 01/20/05 15:03 reinhold History of target event
  • 95467 01/20/05 14:27 reinhold set HMS magnets to -2.000 GeV
  • 95466 01/20/05 12:51 reinhold Target alarm: fan off
  • 95445 01/20/05 09:43 Bosted Controlled Access 9:45 to 12:30
  • 95444 01/20/05 09:13 reinhold target status
  • 95443 01/20/05 08:57 reinhold moved target to empty
  • 95441 01/20/05 08:41 reinhold moved target 4cm Al dummy --> 4cm D2
  • 95438 01/20/05 08:19 reinhold moved target to 4cm Aluminum dummy
  • 95437 01/20/05 08:09 vardan shift summary
  • 95434 01/20/05 07:51 vardan bcm, bpm snapshots
  • 95431 01/20/05 07:22 vardan HMS to 38.5 deg.
  • 95430 01/20/05 07:21 T.Iwashita Target changed : dummy -> D2
  • 95428 01/20/05 06:57 T.Iwashtia Target changed : H2 -> dummy
  • 95426 01/20/05 06:33 vardan HMS at 25 deg.
  • 95424 01/20/05 06:12 T.Iwashita Target changed : dummy -> H2
  • 95423 01/20/05 06:00 vardan beam displacement during runs 53100, 53101
  • 95419 01/20/05 05:21 T.Iwashita Target change : H2 -> dummy
  • 95416 01/20/05 04:47 vardan spectrometers' changes
  • 95415 01/20/05 04:28 T.Iwashita Target changed : Carbon -> H2
  • 95414 01/20/05 03:54 vardan HMS rotated to 10.8 degrees
  • 95410 01/20/05 03:19 T.Iwashita Target changed : dummy -> Carbon
  • 95409 01/20/05 03:00 T.Iwashita Target changed : H2 -> dummy
  • 95406 01/20/05 02:40 T.Iwashita Target changed : D2 -> H2
  • 95404 01/20/05 02:13 T.Iwashita Target changed : Carbon -> D2
  • 95403 01/20/05 02:06 vardan HMS rotated to 13 degrees
  • 95402 01/20/05 01:51 T.Iwashita Target changed : Fe -> Carbon
  • 95400 01/20/05 01:32 vardan DAQ failed, reset
  • 95399 01/20/05 01:25 T.Iwashita Target changed : dummy -> Fe
  • 95397 01/20/05 01:12 vardan intermittent beam
  • 95396 01/20/05 01:10 vardan HMS DC HV trip
  • 95392 01/20/05 00:43 T.Iwashita Target change : H2 -> dummy
  • 95390 01/20/05 00:03 bruell shift summary
  • 95389 01/20/05 00:02 T.Iwashita Target changed : D2 -> H2 for run#53086
  • Wednesday

  • 95385 01/19/05 23:37 G Mills moved SOS and HMS to 45 degree settings
  • 95384 01/19/05 23:25 slifer BCM/BPMs
  • 95383 01/19/05 23:07 G Mills switched to LD2 target for run 53084
  • 95380 01/19/05 22:56 slifer 53082: End of run failed
  • 95379 01/19/05 22:39 G Mills Switched to LH2 target for run 53082
  • 95376 01/19/05 22:08 slifer spectrometer angles in sanity checklist
  • 95374 01/19/05 21:29 slifer hms magnet control screen restored
  • 95373 01/19/05 21:03 Mills access to Hall C made to fix HMS magnet control computer
  • 95370 01/19/05 19:49 slifer hms HDC deadwires
  • 95367 01/19/05 19:18 G Mills target moved to LH2 postion for run 53076
  • 95365 01/19/05 18:31 Mills/Bodek Snapshot of Target Control Panel (once a shift) attached filed
  • 95364 01/19/05 18:23 saw Unrecoverable logbook entries
  • 95363 01/19/05 18:16 slifer HMS control screen lost
  • 95362 01/19/05 18:14 slifer run 53073 target is dummy.
  • 95359 01/19/05 17:42 Mills/Bodek false alarm in loop 2 (H2)
  • 95357 01/19/05 17:07 G Mills SOS angle is not quite 70 degrees, really 69.9 degrees
  • 95354 01/19/05 16:39 G Mills target move to Carbon 1% for run 53070
  • 95353 01/19/05 16:30 saw Logbook all messed up
  • 95351 01/19/05 16:13 G Mills Move to dummy target for run 53069
  • 95349 01/19/05 15:57 Bosted Day shift summary
  • 95347 01/19/05 15:49 Bosted Q3 trip
  • 95346 01/19/05 15:33 S. Likhoded Target changes
  • 95344 01/19/05 15:09 S. Likhoded Target and configuration changes
  • 95343 01/19/05 14:59 S. Likhoded Target changes
  • 95342 01/19/05 14:57 Bosted BPM and BCM Scrren shots
  • 95339 01/19/05 13:49 Bosted Changed Ar/Ethane bottle
  • 95337 01/19/05 13:44 S. Likhoded Target changes
  • 95336 01/19/05 13:39 S. Likhoded Target changes
  • 95332 01/19/05 12:04 S. Likhoded Target changes
  • 95330 01/19/05 11:27 S. Likhoded Target and configuration changed
  • 95329 01/19/05 11:10 S. Likhoded Target changes
  • 95326 01/19/05 10:44 S. Likhoded Target changes
  • 95324 01/19/05 10:16 S. Likhoded Target and configuration changed
  • 95322 01/19/05 09:57 Bosted End Run failed run 55055
  • 95321 01/19/05 09:52 S. Likhoded Target changes
  • 95319 01/19/05 09:34 S. Likhoded Target changes
  • 95318 01/19/05 09:18 S. Likhoded Target changes
  • 95316 01/19/05 09:15 S. Likhoded Target change
  • 95313 01/19/05 07:55 vardan shift summary
  • 95312 01/19/05 06:47 vardan mcc update
  • 95311 01/19/05 06:40 vardan bpm, bcm snapshots
  • 95310 01/19/05 04:10 vardan no beam
  • 95309 01/19/05 03:39 vardan wrong minimum acceptable currnet in BTAA
  • 95308 01/19/05 03:34 T.Iwashita Target was changed: C -> Fe
  • 95306 01/19/05 03:23 gueye HMS dipole setting for low fields & data analysis Ctnd
  • 95305 01/19/05 03:22 gueye HMS dipole setting for low fields & data analysis
  • 95303 01/19/05 02:51 vardan no beam
  • 95302 01/19/05 01:34 bruell shift summary
  • Tuesday

  • 95300 01/18/05 23:56 Rik Gran More bad scintillator on HMS s1x+
  • 95298 01/18/05 23:33 T.Iwashita Target changed: 4cm Al to 1% C for run#53049
  • 95295 01/18/05 23:12 T.Iwashita Change target to 4cm Al dummy
  • 95294 01/18/05 22:58 G Mills target moved to LH2 for run 53047
  • 95291 01/18/05 22:21 G Mills target moved to LD2
  • 95286 01/18/05 21:05 G Mills target changes
  • 95282 01/18/05 19:55 G Mills target alarm
  • 95268 01/18/05 15:55 Bosted Day shift summary
  • 95266 01/18/05 15:48 smithg Moved target: 1% C to 1% Fe
  • 95263 01/18/05 15:07 smithg Moved target: From 1% Fe to 1% C
  • 95262 01/18/05 14:37 smithg Moved target: From Al dummy to 1% Fe
  • 95261 01/18/05 14:36 smithg target IOC: lost network connection
  • 95258 01/18/05 14:12 smithg Moved target: LH2 to dummy
  • 95256 01/18/05 13:54 smithg Moved target: LD2 to LH2
  • 95255 01/18/05 13:38 M Jones Beam energy measurement
  • 95254 01/18/05 13:32 Bosted ed elastic peaks
  • 95252 01/18/05 13:18 smithg Moved target: empty=no tgt to LD2 at new kinematics
  • 95251 01/18/05 12:33 smithg Moved target: C to empty=no tgt.
  • 95248 01/18/05 11:43 smithg Moved target: Al dummy to C
  • 95246 01/18/05 11:19 smithg Moved target: LH2 to Al dummy
  • 95244 01/18/05 11:00 smithg Moved target: LD2 to LH2
  • 95242 01/18/05 10:15 smithg Moved target: Al dummy to LD2
  • 95238 01/18/05 09:26 smithg Moved target: C to Al dummy
  • 95236 01/18/05 08:37 fomin updated hms and sos thresholds
  • 95235 01/18/05 08:18 smithg Target log, and lower pressure alarm limits
  • 95234 01/18/05 08:08 vardan shift summary
  • 95231 01/18/05 07:38 vardan HMS moved to 19 degrees
  • 95229 01/18/05 07:08 vardan HMS Dipole trip
  • 95227 01/18/05 06:30 Tigran Target Change: 1% Carbon.
  • 95226 01/18/05 06:20 tigran Equipment checklist scan.
  • 95225 01/18/05 06:15 tigran BPM and BCM Screens.
  • 95223 01/18/05 06:04 tigran Target Change: Al Dummy.
  • 95222 01/18/05 06:02 tigran Target Change: LH2.
  • 95220 01/18/05 05:22 vardan moved HMS to 22 degrees, SOS to 25 degrees
  • 95218 01/18/05 05:07 tigran Target Change: LD2.
  • 95217 01/18/05 04:32 vardan moved HMS to 28 degrees
  • 95215 01/18/05 04:23 tigran LH Loop temperature.
  • 95214 01/18/05 03:56 vardan HMS DC HV trip
  • 95212 01/18/05 03:36 vardan down for at least 15 min.
  • 95210 01/18/05 03:06 tigran Target Change: 1% Carbon.
  • 95208 01/18/05 02:36 tigran Target Change: 1% Iron.
  • 95206 01/18/05 02:01 tigran Target Change: Al Dummy.
  • 95204 01/18/05 01:30 tigran Target Change: LH2.
  • 95203 01/18/05 01:24 vardan HMS to 45deg
  • 95202 01/18/05 01:10 Tigran. Target alarm.
  • 95199 01/18/05 00:24 vardan HMS DC HV trip
  • 95198 01/18/05 00:21 tigran Target Change: LD2.
  • 95197 01/18/05 00:07 tigran Target Screen.
  • 95195 01/18/05 00:03 jroche swing shift summary
  • Monday

  • 95193 01/17/05 23:53 jroche vesda alarm : network fault
  • 95192 01/17/05 23:39 Rik Gran Out of date entries in the log book.
  • 95191 01/17/05 23:34 Rik Gran HV trip in Drift chamber
  • 95190 01/17/05 23:31 G Mills Target changed to Al dummy
  • 95189 01/17/05 23:30 G Mills Target changed to Fe 1%
  • 95188 01/17/05 23:30 Rik Gran More HMS Scintillator problems
  • 95186 01/17/05 23:26 G Mills HMS to 55 degrees for run 52992
  • 95182 01/17/05 22:04 hamlet Bad hs1x14+ and hs1x16+
  • 95179 01/17/05 19:46 G Mills target to Al dummy for 52989
  • 95177 01/17/05 19:45 G Mills target to LH2 for 52987
  • 95175 01/17/05 19:17 jroche Q2 trip
  • 95173 01/17/05 18:42 Rik Gran Bad HMS Scintillator recovers?
  • 95172 01/17/05 18:28 Rik Gran Plot of Bad HMS scintillator
  • 95171 01/17/05 18:25 Unknown Lost logbook entry
  • 95167 01/17/05 18:15 Unknown Lost logbook entry
  • 95166 01/17/05 18:15 ioana The BCM calibration constants
  • 95165 01/17/05 18:15 ioana The BCM calibration constants
  • 95163 01/17/05 18:07 ioana BCM calibration results for run 52933
  • 95162 01/17/05 18:07 ioana BCM calibration results for run 52933
  • 95160 01/17/05 18:03 Unknown Lost logbook entry
  • 95155 01/17/05 16:46 G Mills HMS moved to 70 degrees
  • 95154 01/17/05 16:39 jroche changing the hms momentum to 0.682 GeV
  • 95153 01/17/05 16:39 G Mills Target Change to LD2
  • 95152 01/17/05 16:38 Rik Gran Extra bump at zero in SOS pedestal
  • 95151 01/17/05 16:11 Bosted Day shift summary
  • 95146 01/17/05 15:11 Willis Target change: 1% carbon
  • 95145 01/17/05 15:05 Bosted DAQ problem run 59273
  • 95141 01/17/05 14:34 Unknown Lost logbook entry
  • 95139 01/17/05 14:08 Unknown Lost logbook entry
  • 95136 01/17/05 13:32 Bosted BPM and BCM
  • 95134 01/17/05 13:21 Willis Target change: LD2
  • 95132 01/17/05 12:52 Willis Target change: 4cm Al dummy
  • 95129 01/17/05 11:37 Willis Target change: 1% carbon
  • 95127 01/17/05 11:15 bosted/gaske changed pre-mix bottles
  • 95126 01/17/05 11:15 Willis Beam position unstable
  • 95124 01/17/05 10:59 Willis Target change: LD2
  • 95123 01/17/05 10:53 Howard Budd reason for the small size of the rastor size
  • 95122 01/17/05 10:52 gaskell raster position shift from bad peds
  • 95120 01/17/05 10:36 Willis Target change: LH2
  • 95118 01/17/05 10:10 Unknown Lost logbook entry
  • 95116 01/17/05 09:36 howard budd Rastor size for run 52960
  • 95113 01/17/05 08:16 gaskell raster pattern should have nothing to do with beam position
  • 95111 01/17/05 08:08 Unknown Lost logbook entry
  • 95110 01/17/05 08:05 Willis Target status at start of day shift
  • 95109 01/17/05 08:01 vardan shift summary
  • 95108 01/17/05 07:53 vardan bpm, bcm screens
  • 95106 01/17/05 07:35 tigran Target Change: Al Dummy.
  • 95105 01/17/05 07:03 Unknown Lost logbook entry
  • 95104 01/17/05 06:42 tigran Target Change: LH2.
  • 95101 01/17/05 05:58 tigran Target Change: LD2.
  • 95100 01/17/05 05:36 tigran Target IOC Reboot.
  • 95098 01/17/05 05:14 tigran Target Change: 1% Carbon.
  • 95096 01/17/05 04:40 tigran Target computer crashed.
  • 95095 01/17/05 04:36 Target Change: 1% Iron
  • 95093 01/17/05 03:51 tigran Target IOC Reboot.
  • 95090 01/17/05 03:24 Unknown Lost logbook entry
  • 95088 01/17/05 02:29 vardan HMS changed to 55deg., -0.811 GeV/c
  • 95086 01/17/05 01:49 tigran Target Change: LD2
  • 95084 01/17/05 00:38 Unknown Lost logbook entry
  • 95082 01/17/05 00:24 Unknown Lost logbook entry
  • 95081 01/17/05 00:14 tigran Target Screen
  • 95079 01/17/05 00:05 tajima swing shift summary
  • 95077 01/17/05 00:01 Geoff Mills Target Change: 4cm Al dummy
  • 95076 01/17/05 00:00
  • Sunday

  • 95074 01/16/05 23:25 Rik Gran Raster issue
  • 95072 01/16/05 22:44 geoff Mills Target Change: 4cm Al dummy
  • 95071 01/16/05 22:42 Geoff Mills Target Change: 1% Carbon
  • 95066 01/16/05 20:45 Rik Gran Noisy Scintillator
  • 95061 01/16/05 20:29 Geoff Mills Target Change: LD2
  • 95058 01/16/05 20:28 Geoff Mills Target Change: LH2
  • 95056 01/16/05 20:27 Geoff Millst Target Change: 4cm Al dummy
  • 95055 01/16/05 20:25 Geoff Mills Target Change: 1% Carbon
  • 94988 01/16/05 18:23 tajima BCM calibration
  • 94987 01/16/05 16:32 Geoff Mills Target status: start of swing shift
  • 94985 01/16/05 16:13 horn Day Shift Summary
  • 94979 01/16/05 15:31 Willis Target Change: LH2
  • 94960 01/16/05 15:05 Willis Target Change: 1% Carbon
  • 94943 01/16/05 14:39 Willis Target Change: 1% iron
  • 94927 01/16/05 14:16 Wiillis Target Change: 4cm Al dummy
  • 94926 01/16/05 14:15 Wiillis Target Change: LH2
  • 94925 01/16/05 14:15 horn ROC2 crashed at end of run 52929
  • 94921 01/16/05 13:38 horn Target for run 52928 is LD2
  • 94920 01/16/05 13:31 horn Q2 tripped during kinematics change
  • 94918 01/16/05 13:14 Willis Target Change: LD2
  • 94915 01/16/05 12:13 Willis Target Change: 1% Carbon
  • 94913 01/16/05 11:53 Willis Target: beam current change for 4cm Al dummy
  • 94911 01/16/05 11:47 Willis Target Change: 4cm Al dummy
  • 94909 01/16/05 11:24 Willis Target Change: LH2
  • 94907 01/16/05 11:01 Willis Target: beam current change for LD2
  • 94905 01/16/05 10:38 Willis: Target: beam current change for LD2
  • 94902 01/16/05 10:28 Willis Target Change: LD2
  • 94901 01/16/05 10:18 horn Target for run 52918 is LH2
  • 94899 01/16/05 10:00 Willis Target Change: LH2
  • 94898 01/16/05 09:51 horn Q3 crashed at end of run 52916
  • 94896 01/16/05 09:29 horn Runinfomenu screen restored
  • 94894 01/16/05 09:23 Willis Target Change: 4cm Al dummy
  • 94893 01/16/05 09:03 horn Changed HMS angle to 16 degrees
  • 94890 01/16/05 08:36 Willis Target Change: 1% Carbon
  • 94888 01/16/05 08:11 Willis Target Change: 4cm Al dummy
  • 94887 01/16/05 08:05 vardan shift summary
  • 94885 01/16/05 08:03 Willis Target status at start of day shift
  • 94882 01/16/05 06:54 Segbefia bcm screenshot
  • 94881 01/16/05 06:46 gueye runinfo window still not OK
  • 94880 01/16/05 06:44 Segbefia Target Change: LH2
  • 94878 01/16/05 06:16 poul, vardan runinfo window problem in runs 52908, 52909
  • 94877 01/16/05 06:12 vardan beam position
  • 94875 01/16/05 06:09 Segbefia Target Change: 4cm Al dummy
  • 94874 01/16/05 06:07 vardan beam position
  • 94871 01/16/05 05:37 gueye comment on entry 94870
  • 94870 01/16/05 05:35 gueye beam offset from beam_offset.kumac
  • 94867 01/16/05 02:33 vardan mcc update
  • 94866 01/16/05 01:16 gueye BPM/raster calibration
  • 94865 01/16/05 01:16 vardan no beam
  • 94844 01/16/05 00:27 saw Shift summary
  • 94842 01/16/05 00:07 Segbefia target screenshot: owl shift
  • 94837 01/16/05 00:01 Rik Gran Raster pattern shifts in replay
  • 94836 01/16/05 00:01 slifer Swing Shift Summary
  • Saturday

  • 94835 01/15/05 23:56 Rik Gran End run failed
  • 94820 01/15/05 23:29 KS McFarland Target Change: 1% Carbon
  • 94807 01/15/05 23:06 KS McFarland Target Change: 4cm Al dummy
  • 94798 01/15/05 22:50 slifer BPM/BCM screenshot
  • 94794 01/15/05 22:40 KS McFarland Target Change: LH2
  • 94793 01/15/05 22:29 KS McFarland Target Change: Empty target
  • 94785 01/15/05 21:58 KS McFarland Target status, evening shift after pass change
  • 94784 01/15/05 21:50 KS McFarland SOS angle to 70 deg
  • 94783 01/15/05 21:46 KS McFarland Target Change: LH2
  • 94782 01/15/05 21:14 slifer HMS dipole
  • 94781 01/15/05 21:13 slifer LH2 levels ok
  • 94780 01/15/05 21:07 slifer Update
  • 94779 01/15/05 19:22 KS McFarland HMS Angle change, 28deg
  • 94778 01/15/05 18:38 ioana SOS magnets
  • 94777 01/15/05 17:51 Rik Gran Sanity check entries 52886 and 52891
  • 94776 01/15/05 17:48 Rik Gran SOS momentum setpoints zero
  • 94775 01/15/05 17:44 Rik Gran Lost SOS data in run 52885 and 52886
  • 94774 01/15/05 17:40 KS McFarland Target Change: Empty target
  • 94772 01/15/05 17:20 KS McFarland Target Change: LD2
  • 94758 01/15/05 17:00 KS McFarland Target Change: 4cm Al dummy
  • 94741 01/15/05 16:42 KS McFarland Target Change: 1% Carbon
  • 94740 01/15/05 16:42 tajima Day shift summary
  • 94724 01/15/05 16:23 tajima Dipole LN level increasing
  • 94722 01/15/05 16:21 KS McFarland Target Change: 1% iron
  • 94709 01/15/05 16:09 tajima Q1 problem and p_hms value changed
  • 94707 01/15/05 16:07 Willis Target Change: 4cm Al dummy
  • 94703 01/15/05 15:51 christy Fiducial Tracking Efficiencies are OK!
  • 94701 01/15/05 14:25 tajima Argone/Ethane mixed bottle
  • 94699 01/15/05 13:59 Willis Target Change: LD2
  • 94697 01/15/05 13:38 Willis Target Change: 4cm Al dummy
  • 94695 01/15/05 13:20 tajima Dipole LN level dropped
  • 94694 01/15/05 13:19 Willis Target Change: 1% iron
  • 94691 01/15/05 12:32 Willis Target Change: 1% Carbon
  • 94690 01/15/05 12:16 ioana DC gas
  • 94688 01/15/05 12:13 Willis Target Change: 1% iron
  • 94686 01/15/05 11:59 Willis Target Change: 4cm Al dummy
  • 94685 01/15/05 11:48 tajima kinematics change
  • 94682 01/15/05 10:58 Willis Target Change: LD2
  • 94681 01/15/05 10:52 tajima VESDA alarms
  • 94680 01/15/05 10:43 Willis Target Change: 4cm Al dummy
  • 94676 01/15/05 10:17 Willis Target Change: 1% iron
  • 94674 01/15/05 09:59 tajima HMS angle to 28.0 deg
  • 94673 01/15/05 09:41 ioana ABUs for our hall (for shift leaders)!
  • 94671 01/15/05 09:37 Willis Target Change: 1% Carbon
  • 94669 01/15/05 09:17 Willis Target Change: 1% iron
  • 94667 01/15/05 08:58 Willis Target Change: 4cm Al dummy
  • 94666 01/15/05 08:55 hamlet Shift summary
  • 94665 01/15/05 08:51 tajima HMS Angle to 36 deg
  • 94664 01/15/05 08:47 tajima end of run failed
  • 94662 01/15/05 08:09 Willis Target status: start of day shift
  • 94661 01/15/05 08:09 Willis Target status: start of day shift
  • 94660 01/15/05 08:08 hamlet ABU's
  • 94658 01/15/05 07:57 Segbefia Target Change: LD2
  • 94657 01/15/05 07:44 hamlet Need to control DC fid.efficiencies
  • 94653 01/15/05 07:03 Segbefia Target Change: dummy target
  • 94652 01/15/05 07:02 tigran Fiducial efficiency.
  • 94650 01/15/05 06:39 hamlet Beam very unstable since 06:20
  • 94647 01/15/05 05:52 Segbefia Target Change: 1% iron
  • 94646 01/15/05 05:28 hamlet Change HMS/SOS angle, SOS degaussing
  • 94644 01/15/05 05:20 tigran BPM and BCM Screens
  • 94642 01/15/05 04:44 Segbefia Target Change: 1% Carbon
  • 94640 01/15/05 04:06 Segbefia Target Change: 1% iron
  • 94638 01/15/05 03:26 hamlet HMS Dipole trip
  • 94636 01/15/05 03:00 Segbefia Target Change: dummy target
  • 94633 01/15/05 02:33 hamlet Change HMS momentum and angle
  • 94632 01/15/05 02:15 Segbefia Target Change: LD2
  • 94628 01/15/05 01:30 Segbefia Target Change: LH2
  • 94627 01/15/05 01:03 Segbefia Target Change: dummy target
  • 94624 01/15/05 00:10 Segbefia Target Screen
  • 94623 01/15/05 00:01 R. Bradford Shift Summary
  • Friday

  • 94620 01/14/05 23:48 KS McFarland Target Change: 1% iron
  • 94619 01/14/05 23:32 Rik Gran Beam position okay
  • 94618 01/14/05 23:29 Rik Gran End Run Failed, Killed Master run control
  • 94614 01/14/05 23:05 Rik Gran BPM and BCM screens
  • 94609 01/14/05 21:51 KS McFarland Target Change: 1% Carbon
  • 94576 01/14/05 20:36 christy 3.489 GeV elastic peak position
  • 94560 01/14/05 20:01 KS McFarland Target Change: 1% iron
  • 94557 01/14/05 19:56 Rik Gran Increased entries in SOS TDC overflow bin
  • 94545 01/14/05 19:22 Keppel beam excursions
  • 94543 01/14/05 19:15 KS McFarland Target Change: dummy target; CORRECTION TO PREVIOUS ENTRY
  • 94542 01/14/05 19:13 KS McFarland Target Change: dummy target
  • 94529 01/14/05 18:25 M Jones Correction to Linac energy calculation
  • 94528 01/14/05 18:23 KS McFarland target: status, evening shift
  • 94523 01/14/05 18:17 KS McFarland Target Change: Loop 3 (D2)
  • 94504 01/14/05 17:41 KS McFarland Target Change: dummy target
  • 94487 01/14/05 17:14 KS McFarland Target Change: 1% iron
  • 94472 01/14/05 16:47 benesch Accelerator beam energy monitor agrees quite well with hall C measurement
  • 94468 01/14/05 16:37 M JOnes Beam Energy Measurement
  • 94465 01/14/05 16:30 Rik Gran Restarted Run Control
  • 94463 01/14/05 16:29 jroche day shift summary
  • 94454 01/14/05 16:15 jroche day shift summary
  • 94449 01/14/05 16:04 howard budd new angle positions
  • 94447 01/14/05 16:00 Willis Target Change: 1% Carbon
  • 94446 01/14/05 14:59 Keppel Argon, Ethane
  • 94445 01/14/05 14:56 Keppel harp scan
  • 94442 01/14/05 14:17 Willis Target Change: Empty target
  • 94422 01/14/05 13:43 Willis Target Change: 1% Carbon
  • 94418 01/14/05 13:40 Willis Target Change: 1% iron
  • 94405 01/14/05 12:30 howard budd New angle for HMS
  • 94404 01/14/05 12:16 WillisT Target controls problems - update
  • 94403 01/14/05 12:13 Willis Target controls problems
  • 94401 01/14/05 11:54 Willis Target Change
  • 94399 01/14/05 11:30 Willis Target Change
  • 94398 01/14/05 10:45 ioana Phone numbers for tonight (during phone outage)
  • 94397 01/14/05 10:29 jroche beam off since 8:45 and off for 1/2 h more
  • 94396 01/14/05 09:22 jroche sos degaussed for proton
  • 94394 01/14/05 08:17 Willis Target Change
  • 94393 01/14/05 08:09 Willis Target status at start of day shift
  • 94391 01/14/05 08:05 hamlet Shift Summary
  • 94386 01/14/05 06:07 tigran Equipment Shecklist Scan
  • 94384 01/14/05 05:51 tigran BPM and BCM Screens.
  • 94374 01/14/05 02:03 Segbefia Target Change
  • 94369 01/14/05 01:11 cdaq Computer reboots for 2005-01-13
  • 94367 01/14/05 00:53 Segbefia Target Change
  • 94365 01/14/05 00:32 Segbefia Target Change
  • 94363 01/14/05 00:27 Segbefia Target status at start of evening shift
  • 94361 01/14/05 00:02 R. Bradford Shift Summary
  • 94360 01/14/05 00:02 R. Bradford BPM and BCM screens
  • Thursday

  • 94357 01/13/05 23:12 KS McFarland go from 1% carbon to Fe target
  • 94356 01/13/05 23:06 slifer Runs 52792-96 : SOS polarity wrong
  • 94352 01/13/05 21:27 KS McFarland inserting 1% carbon target in preparation for beam
  • 94351 01/13/05 16:31 KS McFarland Target status at start of evening shift
  • 94349 01/13/05 15:57 jroche day shift summary : no beam
  • 94348 01/13/05 14:49 Howard Budd changing He gas gas bottle
  • 94347 01/13/05 14:35 jroche beam studies extended. No beamstudies tomorrow ??
  • 94346 01/13/05 14:32 Howard Budd changing He gas gas bottle
  • 94345 01/13/05 13:08 jroche beam studies extended. No beamstudies tomorrow ??
  • 94344 01/13/05 08:55 adaniel target moved to empty
  • 94343 01/13/05 08:51 adaniel target checklist
  • 94342 01/13/05 08:06 hamlet Shift summary
  • 94340 01/13/05 07:54 hamlet We spend 40% of time on Fe
  • 94339 01/13/05 07:13 hamlet Beam Gone for Beam Studies
  • 94337 01/13/05 05:48 tigran BPM and BCM Screens
  • 94329 01/13/05 02:00 adaniel target moved from dummy to Fe
  • 94327 01/13/05 00:39 hamlet ABUs for 12 Jan swing shift
  • 94324 01/13/05 00:29 adaniel target moved from LH2 to dummy
  • Wednesday

  • 94323 01/12/05 23:59 R. Bradford Shift Summary
  • 94322 01/12/05 23:57 R. Bradford Shift Checklist
  • 94321 01/12/05 23:53 R. Bradford Shift Checklist
  • 94320 01/12/05 23:47 R. Bradford BPM and BCM screens
  • 94319 01/12/05 23:40 smithg Target "log"
  • 94317 01/12/05 23:26 smithg Changed tgt: LD2 to LH2
  • 94310 01/12/05 21:27 smithg Changed tgt: Al dummy to LD2
  • 94309 01/12/05 20:52 smithg Changed tgt: Fe to Al dummy
  • 94306 01/12/05 20:24 smithg Changed tgt: C to Fe
  • 94301 01/12/05 17:14 gaskell Analyzer re-make
  • 94299 01/12/05 15:58 vulcan Day shift Summary
  • 94294 01/12/05 13:33 fomin bpm and bcm screens
  • 94292 01/12/05 12:46 fomin 52760 correction
  • 94286 01/12/05 10:44 vulcan down
  • 94284 01/12/05 09:51 saw Target IOC reboot
  • 94283 01/12/05 09:49 saw Rebooted Fileserver
  • 94279 01/12/05 08:04 Shift summary
  • 94277 01/12/05 07:41 dunne Moving to Dummy Target
  • 94275 01/12/05 07:15 dunne Moving to LH2 Target
  • 94272 01/12/05 06:26 dunne Moving to LD2 Target
  • 94270 01/12/05 06:05 dunne Moving to Dummy Target
  • 94268 01/12/05 05:45 dunne Moving to Fe Target
  • 94264 01/12/05 04:52 dunne Moving to C Target
  • 94262 01/12/05 04:30 dunne Moving to Fe Target
  • 94261 01/12/05 04:20 Sakuda BCM and BPM Screens 12-Jan-05 Owl
  • 94259 01/12/05 04:05 dunne Moving to Dummy Target
  • 94257 01/12/05 03:40 dunne Moving to LH2 Target
  • 94254 01/12/05 02:49 dunne Moving to LD2 Target
  • 94252 01/12/05 02:27 dunne Moving to LH2 Target
  • 94250 01/12/05 02:06 dunne Moving to Dummy Target
  • 94249 01/12/05 01:54 dunne Moving to Fe Target
  • 94245 01/12/05 01:00 dunne Moving from Fe to C Target
  • 94242 01/12/05 00:14 dunne Dummy Target
  • Tuesday

  • 94239 01/11/05 23:51 R. Bradford LH2 target
  • 94238 01/11/05 23:47 slifer swing shift summary
  • 94232 01/11/05 22:31 R. Bradford LD2 target
  • 94228 01/11/05 21:53 R. Bradford LH2 target
  • 94227 01/11/05 21:53 R. Bradford Target IOC reboot
  • 94225 01/11/05 21:25 R. Bradford Al dummy target
  • 94223 01/11/05 20:59 R. Bradford 1% Fe target
  • 94217 01/11/05 20:02 slifer BPM/BCM screenshot
  • 94216 01/11/05 19:57 slifer BPM/BCM screenshot
  • 94213 01/11/05 19:13 R. Bradford 1% Fe target
  • 94209 01/11/05 18:35 R. Bradford Al dummy target
  • 94207 01/11/05 18:08 R. Bradford LH2 target
  • 94202 01/11/05 16:26 Keppel SOS breaker trip
  • 94200 01/11/05 15:57 vulcan Day shift summary
  • 94199 01/11/05 13:08 saw NMR lock
  • 94197 01/11/05 12:38 saw Target lifter stuck - Target IOC reboot
  • 94196 01/11/05 12:17 vulcan nmr for dipole
  • 94191 01/11/05 10:27 vulcan run 52701
  • 94189 01/11/05 10:11 saw LD2 target number change in analyzer
  • 94183 01/11/05 08:01 Sakuda Correction to a run comment (Run52691)
  • 94177 01/11/05 07:16 M Jones Owl Shift Summary
  • 94176 01/11/05 06:33 M Jones Beam down for ARC6 BOX/shunt problem.
  • 94175 01/11/05 06:27 M Jones 3rd Fe lumi scan
  • 94173 01/11/05 05:12 dunne LD2 target
  • 94169 01/11/05 04:49 dunne Fe target
  • 94166 01/11/05 04:09 dunne LD2 target
  • 94164 01/11/05 03:47 dunne Dummy target
  • 94162 01/11/05 03:28 dunne Fe target
  • 94161 01/11/05 03:22 dunne HMS DC trip
  • 94156 01/11/05 02:07 dunne Fe target
  • 94154 01/11/05 01:42 dunne Dummy target
  • 94153 01/11/05 01:24 Sakuda 52677 Beam Position Hist
  • 94150 01/11/05 00:49 dunne LD2 target
  • 94148 01/11/05 00:28 dunne Dummy target
  • 94146 01/11/05 00:07 dunne 1% Fe target
  • 94144 01/11/05 00:01 gaskell swing shift summary
  • Monday

  • 94143 01/10/05 23:57 gaskell sos degaussed - zeroed quad hall probe
  • 94141 01/10/05 23:50 gaskell Kinematics change
  • 94139 01/10/05 23:18 R. Bradford 1% Carbon target
  • 94137 01/10/05 22:48 R. Bradford 1% Fe target
  • 94135 01/10/05 22:14 R. Bradford 4cm dummy target
  • 94134 01/10/05 21:51 gaskell Rotated HMS to 25.00 degrees
  • 94131 01/10/05 21:32 gaskell Incoming call from MCC
  • 94129 01/10/05 21:09 gaskell LD2 target
  • 94128 01/10/05 21:06 R. Bradford Target screen
  • 94127 01/10/05 21:00 R. Bradford BPM & BCM screen
  • 94125 01/10/05 20:31 R. Bradford 4cm dummy target
  • 94124 01/10/05 20:09 gaskell Q1 back
  • 94122 01/10/05 19:54 gaskell No cryo info for Q1
  • 94120 01/10/05 19:49 gaskell 1% Iron
  • 94119 01/10/05 19:23 gaskell rotated HMS to 20.00
  • 94115 01/10/05 18:31 gaskell sos cerenkov
  • 94114 01/10/05 18:28 R. Bradford 1% carbon target
  • 94112 01/10/05 17:59 R. Bradford 1% Fe Target
  • 94109 01/10/05 17:14 R. Bradford Al dummy target
  • 94102 01/10/05 16:56 gaskell SOS quad not regulating correctly
  • 94082 01/10/05 16:34 gaskell SOS cerenkov cabling
  • 94076 01/10/05 16:27 gaskell HMS dipole trip
  • 94066 01/10/05 16:14 gaskell configuration change
  • 94054 01/10/05 16:01 vulcan Day shift summary
  • 94050 01/10/05 15:44 hamlet SOS Cerenkov signal cables
  • 94042 01/10/05 15:30 jayalath BCM and BPM Screens
  • 94027 01/10/05 14:09 vulcan beam
  • 94024 01/10/05 12:12 vulcan cerenkov
  • 94022 01/10/05 10:57 smithg 1% C target current limit with raster off
  • 94021 01/10/05 10:52 vulcan HMS hot wire
  • 94020 01/10/05 10:49 vulcan HMS door
  • 94015 01/10/05 07:51 M Jones Owl shift summary
  • 94014 01/10/05 07:04 Sakuda Checklist Jan-10-05 Owl Scan
  • 94012 01/10/05 06:36 dunne LD2 Target
  • 94010 01/10/05 06:15 dunne Dummy Target
  • 94008 01/10/05 05:53 dunne Fe Target
  • 94005 01/10/05 04:57 dunne Target IOC reboot
  • 94004 01/10/05 04:52 Sakuda BCM and BPM Screens
  • 94002 01/10/05 04:30 dunne C target
  • 94000 01/10/05 04:09 dunne Fe target
  • 93998 01/10/05 03:44 dunne Dummy target
  • 93995 01/10/05 02:58 dunne LD2 target
  • 93993 01/10/05 02:34 dunne Dummy target
  • 93991 01/10/05 02:07 dunne Fe target
  • 93987 01/10/05 01:27 dunne C target
  • 93986 01/10/05 00:56 dunne Fe target
  • 93982 01/10/05 00:36 dunne Dummy target
  • 93980 01/10/05 00:01 gaskell swing shift summary
  • Sunday

  • 93978 01/09/05 23:56 R. Bradford LD2 target
  • 93970 01/09/05 23:36 christy Elastic peak positions and preliminary cross sections
  • 93946 01/09/05 22:51 R. Bradford LH2 target
  • 93944 01/09/05 22:44 R. Bradford Target screen
  • 93942 01/09/05 22:43 simona BCM calibration for E02-109
  • 93941 01/09/05 22:39 R. Bradford BPM & BCM screen
  • 93939 01/09/05 22:18 christy Preliminary cross section overlap plots
  • 93937 01/09/05 22:18 christy Preliminary cross section overlap plots
  • 93923 01/09/05 21:34 R. Bradford 1% Carbon target
  • 93907 01/09/05 21:05 gaskell Q2 trppped
  • 93877 01/09/05 18:49 R. Bradford Al dummy target
  • 93875 01/09/05 18:25 R. Bradford Fe target
  • 93871 01/09/05 17:45 R. Bradford 1% Carbon target
  • 93869 01/09/05 17:27 R. Bradford LD2 Target
  • 93868 01/09/05 17:17 gaskell SOS HV? - Hamlet please read
  • 93865 01/09/05 16:42 gaskell HMS door is closed
  • 93864 01/09/05 16:15 christy Day Shift Summary
  • 93862 01/09/05 15:38 horn HMS door opened
  • 93861 01/09/05 15:29 horn Runs from 52600-52607 are at thetaHMS=16.00
  • 93860 01/09/05 15:23 jayalath BCM and BPM Screens
  • 93857 01/09/05 14:30 horn 60uA on Fe target for run 52603
  • 93849 01/09/05 13:00 horn Target: change to C 1%
  • 93846 01/09/05 12:18 horn Target to 1% Fe
  • 93844 01/09/05 11:42 horn cdaqfs reboot
  • 93843 01/09/05 11:37 horn beam gone for injector work
  • 93840 01/09/05 10:31 horn Change to LH2 target.
  • 93835 01/09/05 09:36 horn Q2 crash at end of run 52588
  • 93832 01/09/05 09:01 horn Target change to LD2
  • 93830 01/09/05 08:37 horn Change to LH2 target.
  • 93829 01/09/05 08:20 horn Change target to Al
  • 93826 01/09/05 07:48 sakuda BPM Screens
  • 93824 01/09/05 07:38 dunne Target change: to Fe
  • 93823 01/09/05 07:20 M Jones Owl shift summary
  • 93821 01/09/05 07:05 dunne Target change: to Carbon 1%
  • 93818 01/09/05 06:19 dunne Target change: from Dummy to Fe
  • 93815 01/09/05 05:29 dunne Target change: from LD2 to LH2
  • 93810 01/09/05 03:52 dunne Target change: to Dummy
  • 93808 01/09/05 03:29 dunne Target change: to Fe
  • 93805 01/09/05 01:56 dunne Target change: to Carbon 1%
  • 93803 01/09/05 01:26 dunne Target change: to Fe
  • 93801 01/09/05 01:02 dunne Target change: to Dummy
  • 93800 01/09/05 00:46 dunne Target change: to LH2
  • Saturday

  • 93772 01/08/05 23:58 R. Bradford LD2 target
  • 93771 01/08/05 23:58 gaskell swing shift summary
  • 93752 01/08/05 23:20 R. Bradford Target screen
  • 93741 01/08/05 23:03 R. Bradford Fe target
  • 93727 01/08/05 22:25 gaskell dummy and runplan
  • 93726 01/08/05 22:20 gaskell Target: change to C 1%
  • 93723 01/08/05 21:49 R. Bradford BPM & BCM screen
  • 93722 01/08/05 20:50 gaskell operational restrctions won't allow unrastered beam on C z=0
  • 93714 01/08/05 18:28 R. Bradford Target change
  • 93712 01/08/05 18:11 gaskell Cryo target fan speeds too low during lumi scan runs?
  • 93711 01/08/05 18:09 gaskell unparked targets
  • 93709 01/08/05 17:56 christy day shift summary
  • 93708 01/08/05 17:39 gaskell target trouble
  • 93705 01/08/05 16:38 R. Bradford Target change
  • 93702 01/08/05 16:14 jayalath BCM and BPM Screens
  • 93695 01/08/05 15:19 horn New Beam Size
  • 93694 01/08/05 15:18 christy Beam returns - new spot size
  • 93693 01/08/05 15:15 horn Target Checklist
  • 93692 01/08/05 14:57 horn Carbon 1% target in
  • 93690 01/08/05 14:15 smithg Added aluminum optics targets to MCC's list
  • 93688 01/08/05 13:45 christy intrinsic beam size change - beam off for ~1 hr
  • 93687 01/08/05 13:27 horn Target Changes
  • 93659 01/08/05 10:48 horn Cryo problems in south linac
  • 93658 01/08/05 10:43 horn Raster Setting
  • 93657 01/08/05 10:32 horn Raster Size
  • 93656 01/08/05 10:22 horn Change target to LD2
  • 93650 01/08/05 08:16 M Jones Owl Shift summary
  • 93647 01/08/05 07:43 M Jones Reboot DAQFS upstairs
  • 93643 01/08/05 07:15 Segbefia Target Checklist
  • 93640 01/08/05 06:55 M Jones Beam Energy Measurement
  • 93639 01/08/05 06:50 Sakuda BPM screens
  • 93638 01/08/05 06:41 Segbefia Change Target
  • 93636 01/08/05 06:30 M Jones Beam position centering
  • 93634 01/08/05 05:41 Segbefia Change Target
  • 93628 01/08/05 04:59 Segbefia Target Reboot
  • 93625 01/08/05 03:48 M Jones Intrinsic beam size
  • 93624 01/08/05 03:32 Segbefia Target Change
  • 93623 01/08/05 03:24 Segbefia Target Change
  • 93621 01/08/05 03:16 M JOnes Cannot run "4 foil al optics"
  • 93620 01/08/05 03:14 M JOnes Cannot run "4 foil al optics"
  • 93617 01/08/05 01:44 Sakuda Hot wire
  • 93616 01/08/05 01:17 Keppel scintillator HV channel
  • 93614 01/08/05 00:40 Keppel target change
  • 93612 01/08/05 00:20 Keppel target in
  • Friday

  • 93611 01/07/05 19:32 Keppel Power Permit - ready
  • 93610 01/07/05 19:30 Keppel HMS Hall probes zeroed
  • 93609 01/07/05 19:23 Keppel HMS hut door
  • 93608 01/07/05 15:29 smithg Beginning HMS quad degauss cycle
  • 93605 01/07/05 12:56 smithg Target cooldown complete
  • 93603 01/07/05 08:29 hcf drift chamber gas now normal
  • Thursday

  • 93602 01/06/05 18:46 hamlet Run 52515 to check SOS/HMS detectors
  • 93597 01/06/05 15:41 hcf alcohol cooling down
  • Wednesday

  • 93588 01/05/05 15:44 gunnar BPM cable change
  • 93587 01/05/05 15:43 beaufait hms q2 power supply
  • 93586 01/05/05 15:29 hcf defrost cycle not complete yet
  • 93585 01/05/05 15:20 gaskell Moller motion controls locked out
  • 93584 01/05/05 14:54 gaskell certified HMS and SOS collimator motion
  • Tuesday

  • 93583 01/04/05 17:20 hcf Drift Gas on again, but alcohol is bypassed
  • 93582 01/04/05 15:36 vulcan Water leak under Q2 supply
  • 93581 01/04/05 08:25 Lassiter Optical Isolator Chips