98990 06/30/05 18:28 Nue Picture of the stacking paper to the hole
98989 06/30/05 18:11 gaskell Hari and Rolf found the (a?) leak!
98988 06/30/05 17:36 Nue today swing, tomorrow owl shifts are cancelled.
98987 06/30/05 17:24 gaskell swing shift summary
98984 06/30/05 15:56 cdaq Beam Time Accounting
98983 06/30/05 15:53 PPamela Day Shift Summary
98982 06/30/05 15:11 PPamela Reset "Air Handler Unit ALERT" and "G0 Ferris Wheel ALERT"
98981 06/30/05 14:56 Nue ENGE water leak is fixed.
98980 06/30/05 14:33 Akihiko Turn off ENGE detectors
98979 06/30/05 14:25 saw, akihiko Additional scalers in DAQ
98978 06/30/05 14:20 okayasu He bug air flow status & I stopped it
98977 06/30/05 14:17 okayasu ENGE water leak(now fixing...)
98976 06/30/05 14:03 cdaq Run 55922: Scalar Test, No Beam
98975 06/30/05 14:00 PPamela Restricted Access
98974 06/30/05 13:33 yuan Faster Raster X is horizontal beam position
98973 06/30/05 12:27 Reinhold An old story: why the breaker trips (do not open on a full stomach)
98972 06/30/05 12:25 Nue Status of the vacuum problem
98971 06/30/05 10:34 Nue Time chart for SPL, Beam and Vacuum valve
98970 06/30/05 10:32 Akihiko Need to re-analyze run55328 - 555921
98969 06/30/05 10:27 Akihiko Known problem
98968 06/30/05 10:25 Akihiko MAP file updated.
98967 06/30/05 09:46 Reinhold Vacuum event
98966 06/30/05 09:44 Reinhold Vacuum event
98965 06/30/05 09:37 PPamela All magnets are off
98964 06/30/05 09:30 Nue Vacuum problem status
98963 06/30/05 08:39 reinhold AC3-6T/B are ok on discriminator
98962 06/30/05 08:33 Reinhold Need to check FRX and FRY assignment
98961 06/30/05 08:02 horn Shift Summary
98960 06/30/05 08:02 cdaq Beam Time Accounting
98959 06/30/05 07:41 horn hall going to controlled access
98958 06/30/05 07:38 Nue A plan for this week and during the long shutdown
98957 06/30/05 07:23 horn no beam - vacuum problems
98956 06/30/05 07:05 horn splitter magnet tripped
98955 06/30/05 06:51 Kawama The swapped channel of EHODO
98953 06/30/05 06:28 cdaq Run 55921: Carbon calibration (15uA)
98952 06/30/05 06:19 horn more vmec rebooting
98951 06/30/05 06:09 cdaq Run 55920: Carbon calibration (15uA)
98950 06/30/05 05:00 cdaq Run 55919: Carbon calibration (15uA)
98949 06/30/05 04:38 cdaq Run 55918: Carbon calibration (15uA)
98948 06/30/05 04:16 Nue CH2 rates summary
98947 06/30/05 04:13 cdaq Run 55917: Carbon calibration (15uA)
98946 06/30/05 04:02 Nue Carbon Rates for various current
98945 06/30/05 03:54 horn rebooted roc12
98944 06/30/05 03:52 cdaq Run 55916: Carbon calibration (15uA)
98943 06/30/05 03:37 cdaq Run 55915: Carbon calibration (15uA)
98942 06/30/05 03:26 Nue Rates for 2.02uA CH2, various currents for Carbon (kaon * e' trig)
98941 06/30/05 03:18 cdaq Run 55914: Carbon calibration (15uA)
98940 06/30/05 03:13 Akihiko Figure in log 98938 waring
98939 06/30/05 03:09 cdaq Run 55913: Carbon calibration (20uA)
98938 06/30/05 03:09 Akihiko EDC & HDC status w/ 30 uA, 12C target
98937 06/30/05 03:06 horn beam current for run 55911 was 10uA
98936 06/30/05 03:06 cdaq Run 55912: Carbon calibration (30uA)
98935 06/30/05 03:04 horn raster off starting with run 55911
98934 06/30/05 03:04 horn FR and CH2 target behaviour
98933 06/30/05 02:57 Akihiko EDC & HDC status w/ 10 uA, 12C target
98932 06/30/05 02:51 cdaq Run 55911: Carbon calibration
98931 06/30/05 02:46 horn carbon target in
98930 06/30/05 02:20 horn rebooted all VME crates and CODA
98929 06/30/05 02:14 cdaq Run 55910: CH2 calibration
98928 06/30/05 02:11 cdaq Run 55909: CH2 calibration
98927 06/30/05 02:07 cdaq Run 55908: CH2 calibration
98926 06/30/05 01:42 horn run 55906 is junk
98925 06/30/05 01:41 horn roc 14 rebooted
98924 06/30/05 01:40 cdaq Run 55907: CH2 calibration
98923 06/30/05 01:36 cdaq Run 55906: CH2 calibration
98922 06/30/05 01:11 horn roc 11 reset
98921 06/30/05 01:09 cdaq Run 55905: CH2 calibration
98920 06/30/05 01:05 cdaq Run 55904: CH2 calibration
98919 06/30/05 01:04 horn roc 13 reset
98918 06/30/05 00:43 Tang Singles rate w/ 1.96 uA , CH2 target
98917 06/30/05 00:37 cdaq Run 55903: CH2 calibration
98916 06/30/05 00:17 horn rebooted roc 13
98915 06/30/05 00:12 cdaq Run 55902: CH2 calibration
98914 06/30/05 00:02 cdaq Beam Time Accounting
Wednesday
98913 06/29/05 23:56 gaskell swing shift summary
98912 06/29/05 23:50 cdaq Run 55901: CH2 calibration
98911 06/29/05 23:24 cdaq Run 55900: CH2 calibration
98910 06/29/05 22:58 gaskell this run is also junk
98909 06/29/05 22:56 cdaq Run 55899: CH2 calibration
98908 06/29/05 22:49 cdaq Run 55898: CH2 calibration
98907 06/29/05 22:41 gaskell run 55897 is junk
98906 06/29/05 22:36 cdaq Run 55897: CH2 calibration
98905 06/29/05 22:15 gaskell HKS AC3-6
98904 06/29/05 22:10 cdaq Run 55896: CH2 calibration
98903 06/29/05 21:46 cdaq Run 55895: CH2 calibration
98902 06/29/05 21:22 cdaq Run 55894: CH2 calibration
98901 06/29/05 21:16 gaskell FR x information is present
98900 06/29/05 21:05 gaskell no beam for 15 minutes
98899 06/29/05 21:00 yuan HKS TOF beta resolution and Kaon extraction
98898 06/29/05 20:45 cdaq Run 55893: CH2 calibration
98897 06/29/05 20:41 cdaq Run 55892: CH2 calibration
98896 06/29/05 20:36 gaskell FR readout resolution
98895 06/29/05 20:14 cdaq Run 55891: FR readout test
98894 06/29/05 20:08 cdaq Run 55890: FR readout test
98893 06/29/05 20:01 cdaq Run 55889: FR readout test
98892 06/29/05 19:58 cdaq Run 55888: FR readout test
98891 06/29/05 19:20 cdaq Run 55887: FR readout test
98890 06/29/05 19:15 seva AC16B
98889 06/29/05 19:01 cdaq Run 55886: FR readout test
98888 06/29/05 18:16 gaskell fast raster woes
98887 06/29/05 18:09 cdaq Beam Time Accounting
98886 06/29/05 16:56 cdaq Run 55885: CH2 calibration 2 uA
98885 06/29/05 16:50 Nue Rates for CH2 target
98884 06/29/05 16:40 cdaq Run 55884: CH2 calibration 2 uA
98883 06/29/05 16:15 cdaq Run 55883: CH2 calibration 2 uA
98882 06/29/05 15:57 Nue Rate for 1.95uA CH2
98881 06/29/05 15:55 cdaq Run 55882: CH2 calibration 2 uA
98880 06/29/05 15:51 Nue Rate in #98876 is for tighter coincidense time
98879 06/29/05 15:45 cdaq Run 55881: CH2 calibration 2 uA
98878 06/29/05 15:38 cdaq Run 55880: CH2 calibration 2uA Trigger Changed
98877 06/29/05 15:38 Nue Rates for 1.95uA CH2
98876 06/29/05 15:37 Akihiko Singles rate w/ 1.96 uA , CH2 target
98875 06/29/05 15:35 Reinhold Change coincidence timing window
98874 06/29/05 15:24 PPamela Trigger changes
98873 06/29/05 15:10 cdaq Run 55878: CH2 calibration 2 uA
98872 06/29/05 14:59 cdaq Run 55877: CH2 calibration 2uA
98871 06/29/05 14:58 Nue Correct Rates for CH2, 2.56uA
98870 06/29/05 14:48 Nue Rates for 2.5uA CH2
98869 06/29/05 14:46 cdaq Run 55876: CH2 calibration 2.5 uA
98868 06/29/05 14:32 cdaq Run 55875: CH2 calibration
98867 06/29/05 14:16 New MCC cannot hold 2.0uA
98866 06/29/05 14:15 cdaq Run 55874: CH2 calibration
98865 06/29/05 14:04 Nue Rates for 2.07uA, CH2
98864 06/29/05 14:02 cdaq Run 55873: CH2 calibration
98863 06/29/05 13:43 cdaq Run 55872: CH2 calibration
98862 06/29/05 13:24 cdaq Run 55871: CH2 calibration
98861 06/29/05 13:02 cdaq Run 55870: CH2 calibration
98860 06/29/05 12:48 Kawama WC threshold study(high-momentum side, run#55838)
98859 06/29/05 12:40 cdaq Run 55869: CH2 calibration
98858 06/29/05 12:38 Nue Sorry, I missed a decimal point
98857 06/29/05 12:34 okayasu WC threshold updates
98856 06/29/05 12:31 saw Rebooted switch
98855 06/29/05 12:28 cdaq Run 55868: CH2 calibration
98854 06/29/05 12:18 Tang Was this rate right?
98853 06/29/05 12:17 cdaq Run 55867: CH2 calibration
98852 06/29/05 12:09 Nue Singles rate w/1.56uA CH2
98851 06/29/05 12:05 V. Tvaskis Problem with Rocs
98850 06/29/05 11:05 Kawama WC threshold study(low-momentum side, run#55838)
98849 06/29/05 10:36 Nue Helium bag gas
98848 06/29/05 10:13 Akihiko CODA and all crates rebooted
98847 06/29/05 10:02 Reinhold MCC calls to bring us down for access: fix MEZ ionchamber and hall probe FSD
98846 06/29/05 09:58 Akihiko Singles rate w/ 1.52 uA and CH2 target
98845 06/29/05 09:56 Reinhold Channel Archive
98844 06/29/05 09:54 Nue CH2 rates
98843 06/29/05 09:43 cdaq Run 55865: CH2 calibration
98842 06/29/05 09:21 cdaq Run 55864: CH2 calibration
98841 06/29/05 09:18 Akihiko Singles rate w/ 1.52 uA and CH2 target
98840 06/29/05 09:01 Akihiko VMEC14 rebooted
98839 06/29/05 09:01 cdaq Run 55863: CH2 calibration
98838 06/29/05 08:46 Akihiko Preliminary result of run55837 & 55838 for EDC and CVS updated
98837 06/29/05 08:41 Nue TDC calibration is nesessary
98836 06/29/05 08:39 cdaq Run 55860: CH2 calibration
98835 06/29/05 08:25 Nue Correlation between TOF between target-ENGE vs ENGE fp parameters (calc)
98834 06/29/05 08:20 cdaq Run 55859: CH2 calibration
98833 06/29/05 08:18 Akihiko HDC and some PMTs tripped
98832 06/29/05 08:14 cdaq Run 55858: CH2 calibration
98831 06/29/05 08:12 horn Shift Summary
98830 06/29/05 08:11 cdaq Beam Time Accounting
98829 06/29/05 07:26 horn splitter magnet tripped
98828 06/29/05 07:08 cdaq Run 55857: CH2 calibration
98827 06/29/05 06:54 horn run 55855 junk
98826 06/29/05 06:50 cdaq Run 55856: CH2 calibration
98825 06/29/05 06:48 cdaq Run 55855: CH2 calibration
98824 06/29/05 06:32 cdaq Run 55854: CH2 calibration
98823 06/29/05 06:14 cdaq Run 55853: CH2 calibration
98822 06/29/05 06:06 Akihiko Singles rate w/ 1.65 uA and CH2 target
98821 06/29/05 05:56 cdaq Run 55852: CH2 calibration
98820 06/29/05 05:40 horn reset roc 12
98819 06/29/05 05:37 cdaq Run 55851: CH2 calibration
98818 06/29/05 05:33 Kawama The effect of 75mV threshold
98817 06/29/05 05:24 horn rebooted roc 11
98816 06/29/05 05:21 Akihiko ingles rate w/ 1.63 uA and CH2 target
98815 06/29/05 05:20 cdaq Run 55850: CH2 calibration
98814 06/29/05 05:10 Kawama I found the First Clear Kaon in the HKS!!!!!
98813 06/29/05 05:01 cdaq Run 55849: CH2 calibration
98812 06/29/05 04:47 horn rebooted roc 11
98811 06/29/05 04:45 horn run 55846 junk - roc11 dead
98810 06/29/05 04:44 cdaq Run 55848: CH2 calibration
98809 06/29/05 04:43 Akihiko Singles rate w/ 1.56 uA and CH2 target
98808 06/29/05 04:32 cdaq Run 55846: CH2 calibration
98807 06/29/05 04:19 horn Run 55844 junk - beam position off in y
98806 06/29/05 04:09 cdaq Run 55845: CH2 calibration
98805 06/29/05 04:01 Akihiko EDC&HDC status w/ 1uA CW, CH2 target
98804 06/29/05 04:01 horn Beam Positions before run 55844
98803 06/29/05 04:00 cdaq Run 55844: CH2 calibration
98802 06/29/05 03:59 Akihiko All HV on
98801 06/29/05 03:56 Akihiko Singles rate w/ 1.22 uA and CH2 target
98800 06/29/05 03:50 Akihiko Turn EDC off
98799 06/29/05 03:44 Akihiko HDC and some HTOF tripped
98798 06/29/05 03:37 horn Rebooted roc 12
98797 06/29/05 03:35 horn Run 5583 is junk (not for analysis)
98796 06/29/05 03:24 cdaq Run 55843: CH2 calibration (beam pos 1mm off in y)
98795 06/29/05 01:48 yuan HKS Sieve Slit run status
98794 06/29/05 01:42 horn beam status update
98793 06/29/05 00:39 horn No beam - IOC lost
98792 06/29/05 00:03 gaskell shift summary
98791 06/29/05 00:01 cdaq Beam Time Accounting
Tuesday
98790 06/28/05 23:41 cdaq Run 55841: CH2 calibration
98789 06/28/05 23:39 gaskell rocs
98788 06/28/05 23:20 cdaq Run 55840: CH2 calibration
98787 06/28/05 23:05 Tang CH2 (5mm) light up
98786 06/28/05 23:03 cdaq Run 55839: CH2 calibration
98785 06/28/05 22:44 okayasu Status for Run#55835
98784 06/28/05 22:38 Tang Start to take CH2 (5mm) data - need to reset EZ ion chamber trip level
98783 06/28/05 22:30 okayasu Transfer matrix for ENGE target angle reconstruction
98782 06/28/05 22:29 seva AC gain check
98781 06/28/05 22:16 cdaq Run 55838: CH2 calibration
98780 06/28/05 22:05 gaskell setting up for CH2 running
98779 06/28/05 21:51 cdaq Run 55837: ENGE sieve slit
98778 06/28/05 21:39 cdaq Run 55836: ENGE sieve slit
98777 06/28/05 21:34 Tang Re-take some more Enge sieve slit data, good track rate
98776 06/28/05 21:32 Tang Re-take some more Enge sieve slit data
98775 06/28/05 21:30 cdaq Run 55835: ENGE sieve slit
98774 06/28/05 21:08 cdaq Run 55834: HKS sieve slit
98773 06/28/05 20:56 Tang ROC11 causing us about 83% computer dead time
98772 06/28/05 20:52 cdaq Run 55833: HKS sieve slit
98771 06/28/05 20:40 okayasu Status for Run55822-55825
98770 06/28/05 20:40 gaskell online engine broken
98769 06/28/05 20:35 cdaq Run 55832: HKS sieve slit
98768 06/28/05 20:26 cdaq Run 55831: HKS sieve slit
98767 06/28/05 20:25 gaskell rebooted roc 11
98766 06/28/05 20:24 cdaq Run 55830: HKS sieve slit
98765 06/28/05 20:21 gaskell weird prescale behavior
98764 06/28/05 20:15 cdaq Run 55829: HKS sieve slit
98763 06/28/05 20:09 cdaq Run 55828: HKS sieve slit
98762 06/28/05 20:07 cdaq Run 55827: HKS sieve slit
98761 06/28/05 20:05 gaskell run 55826 junk
98760 06/28/05 20:04 cdaq Run 55826: HKS sieve slit
98759 06/28/05 19:57 yuan Enge Raytrace data card tuning
98758 06/28/05 19:56 Tang Status and online replay
98757 06/28/05 19:56 Tang Status and online replay
98756 06/28/05 19:45 cdaq Run 55825: Enge sieve slit
98755 06/28/05 19:39 cdaq Run 55824: Enge sieve slit
98754 06/28/05 19:34 cdaq Run 55823: Enge sieve slit
98753 06/28/05 19:31 cdaq Run 55822: Enge sieve slit
98752 06/28/05 19:07 Reinhold Set trigger to [H1X&H2X&H1Y&WC(vetoAC)] & ENGE
98751 06/28/05 18:48 gaskell new nominal beam positions
98750 06/28/05 18:05 gaskell switch back to BeO target
98749 06/28/05 17:54 gaskell splitter tripped off
98748 06/28/05 17:47 okayasu AC discri.-TUL channel assign table corrected.
98747 06/28/05 17:42 reinhold trigger01: last entry at 30 uA
98746 06/28/05 17:42 Reinhold trigger01: timing of AC
98745 06/28/05 17:20 okayasu ENGE slit patterns improved (... Goal is almost there!?)
98744 06/28/05 17:17 Reinhold trigger01: timing of H2X and H1Y
98743 06/28/05 17:13 paul The AC threshold here is -10mV.
98742 06/28/05 17:11 Paul The run is not appropriate for analysis
98741 06/28/05 17:03 cdaq Run 55820: AC self trigger // 0uA / 1pe test
98740 06/28/05 17:02 gaskell carbon target in
98739 06/28/05 16:54 cdaq Run 55819: Aerogel Self Trigger / 0uA
98738 06/28/05 16:49 Reinhold Set trigger to aerogel selftrigger
98737 06/28/05 16:43 Reinhold Target motion GUI (Pay attention)
98736 06/28/05 16:37 gaskell Beam is back
98735 06/28/05 16:26 reinhold BPM position lock
98734 06/28/05 16:21 gaskell late entry: BeO target is in
98733 06/28/05 16:20 gaskell RF separators tripped
98732 06/28/05 16:13 saw vmec12 reboot
98731 06/28/05 16:11 gaskell BPM H00C may be unreliable
98730 06/28/05 16:05 Petkovic Summary of the calibration runs for the June 28, 2005 (Day Shift)
98729 06/28/05 16:02 cdaq Beam Time Accounting
98728 06/28/05 15:48 Reinhold trigger01: WC trigger rate
98727 06/28/05 15:45 Akihiko About figures in log98725
98726 06/28/05 15:42 Akihiko trigger01: Discriminator threshold and width
98725 06/28/05 15:40 Akihiko trigger01:Coincidence timing of 1X and WC
0 06/28/05 14:49 no_name no_key
98723 06/28/05 13:56 okayasu WC threshold results.
98722 06/28/05 13:09 Reinhold trigger01: EHODO T&B output is roughly 30 ns
98721 06/28/05 13:03 Akihiko VMEC12 and VMEC11 rebooted
98720 06/28/05 13:02 Nue Signal widths of AC and WC
98719 06/28/05 13:01 Kawama WC threshold study(run#55803)
98718 06/28/05 12:59 reinhold trigger01: AC thresholds are at -50 mV
98717 06/28/05 12:57 Reinhold BPM position
98716 06/28/05 12:45 Reinhold trigger01: set WC thresholds to -75 mV
98715 06/28/05 12:38 cdaq Run 55817: WC threshold study, AC threshold =-50mV
98714 06/28/05 12:15 cdaq Run 55816: WC threshold study, AC threshold =-50mV
98713 06/28/05 12:11 Akihiko trigger02: set AC and WC discriminators output width
98712 06/28/05 11:50 reinhold trigger01: set AC and WC discriminators to non-uopdating
98711 06/28/05 11:49 reinhold trigger01: set AC and WC discriminators to non-uopdating
98710 06/28/05 11:00 Akihiko Scalers with 5 uA CW on carbon
98709 06/28/05 10:42 Akihiko EDC status
98708 06/28/05 10:11 cdaq Run 55814: WC threshold study, AC threshold =-50mV
98707 06/28/05 10:09 Akihiko F1(VME12,slot10) Resolution NOT Locked
98706 06/28/05 10:05 Akihiko Changed HKS charged particle trigger
98705 06/28/05 10:02 cdaq Run 55813: WC threshold study, AC threshold =-50mV
98703 06/28/05 10:00 cdaq Run 55812: junk
98702 06/28/05 09:57 okayasu WC HV updated
98701 06/28/05 09:48 cdaq Run 55811: WC gain matching, AC threshold =-50mV
98699 06/28/05 09:28 cdaq Run 55810: WC gain matching, AC threshold =-50mV
98698 06/28/05 09:18 cdaq Run 55809: WC gain matching, AC threshold =-30mV
98697 06/28/05 09:11 cdaq Run 55808: WC gain matching, AC threshold =-10mV
98696 06/28/05 09:10 cdaq Run 55807: WC gain matching, AC threshold =-30mV
98695 06/28/05 09:01 cdaq Run 55806: WC gain matching, AC threshold =-30mV
98694 06/28/05 08:58 cdaq Run 55805: WC gain matching, AC threshold =-10mV
98693 06/28/05 08:35 cdaq Run 55804: WC gain matching, AC threshold =-30mV
98692 06/28/05 08:29 cdaq Run 55803: WC gain matching, AC threshold =-10mV
98691 06/28/05 08:01 cdaq Beam Time Accounting
98690 06/28/05 07:59 R. Asaturyan Shift summary
98689 06/28/05 07:59 R. Asaturyan Shift summary
98688 06/28/05 06:41 Paul B. Wron' threshold values on AC disc.
98687 06/28/05 06:36 Akihiko "..&EN1" means "..&EN1&GO"
98686 06/28/05 06:16 Akihiko Visual scaler arranged
98685 06/28/05 06:10 cdaq Run 55802: test run
98684 06/28/05 05:56 cdaq Run 55801: test run
98683 06/28/05 05:54 cdaq Run 55800: test run
98682 06/28/05 05:11 Sumihama New map file -change WC1-4B
98681 06/28/05 04:58 Paul B. WC threshold scan results
98680 06/28/05 04:26 cdaq Run 55799: WC gain matching
98679 06/28/05 04:12 Miz & Vic & HTOF HV adjustment finished
98678 06/28/05 04:10 cdaq Run 55798: WC gain matching
98677 06/28/05 04:02 cdaq Run 55797: WC gain matching
98676 06/28/05 03:57 Razmik Beam current was reduced to 5 uA:
98675 06/28/05 03:51 Nue ELOG has an entry for our chicane tune.
98674 06/28/05 03:49 cdaq Run 55796: WC gain matching
98673 06/28/05 03:48 Reinhold Set trigger to pions
98672 06/28/05 03:32 cdaq Run 55795: TOF gain matching
98671 06/28/05 03:24 cdaq Run 55794: TOF gain matching
98670 06/28/05 03:18 Nue Oscilloscope snap shot for the wrong WC timing
98669 06/28/05 03:16 cdaq Run 55793: TOF gain matching
98668 06/28/05 03:10 Akihiko F1 in VMEC11 NOT Initialized
98667 06/28/05 03:09 Víctor Bad Channel in Flat cable for ADC WC1-4B
98666 06/28/05 03:05 Víctor 1X, 1Y and 2X were gain matched
98665 06/28/05 03:04 cdaq Run 55791: TOF gain matching
98664 06/28/05 02:55 cdaq Run 55790: TOF gain matching
98663 06/28/05 02:43 Razmik Beam current was reduced to 5 uA:
98662 06/28/05 02:14 cdaq Run 55789: TOF gain matching
98661 06/28/05 02:06 cdaq Run 55788: TOF gain matching
98660 06/28/05 01:59 cdaq Run 55787: TOF gain matching
98659 06/28/05 01:51 cdaq Run 55786: WC Threshold study &TOF gain matching
98658 06/28/05 01:50 Razmik Wrong header for run 55785
98657 06/28/05 01:43 cdaq Run 55785: WC Threshold study &TOF gain matching
98656 06/28/05 01:36 cdaq Run 55784: WC Threshold study
98655 06/28/05 01:33 Tang Run 55783: WC threshold is -250mV
98654 06/28/05 01:25 cdaq Run 55783: HKS TOF gain matching
98653 06/28/05 01:22 Reinhold WC trigger timing was wrong before run 55782
98652 06/28/05 01:18 cdaq Run 55782: HKS TOF gain matching
98651 06/28/05 01:15 cdaq Run 55781: HKS TOF gain matching
98650 06/28/05 00:54 Akihiko VMEC12 down several times and VMEC11 also down
98649 06/28/05 00:49 cdaq Run 55780: WC Threshold study
98648 06/28/05 00:39 cdaq Run 55779: junk
98647 06/28/05 00:28 cdaq Run 55778: WC Threshold study
98646 06/28/05 00:20 cdaq Run 55777: HKS trigger study
98645 06/28/05 00:15 cdaq Run 55776: HKS trigger study
98644 06/28/05 00:08 cdaq Beam Time Accounting
98643 06/28/05 00:08 Danagouli9an Shift summary
98642 06/28/05 00:06 cdaq Run 55775: HKS trigger study
98641 06/28/05 00:04 okayasu ENGE slit hole patterns.
98640 06/28/05 00:02 Reinhold Beam line/chicane magnet settings
98639 06/28/05 00:00 Reinhold Splitter tripps 2nd time on inpvolt
Monday
98638 06/27/05 23:56 cdaq Run 55774: HKS trigger study
98637 06/27/05 23:48 cdaq Run 55773: HKS trigger study
98636 06/27/05 23:44 Danagoulian junk runs
98635 06/27/05 23:37 Reinhold Splitter tripps 2nd time on inpvolt
98634 06/27/05 23:35 cdaq Run 55772: HKS trigger study: HKS
98633 06/27/05 23:28 cdaq Run 55771: HKS trigger study: HKS
98632 06/27/05 23:19 Reinhold 30 uA CW on carbon
98631 06/27/05 23:17 Reinhold Splitter tripped/FSD worked
98630 06/27/05 23:17 Reinhold Splitter tripped/FSD worked
98629 06/27/05 23:13 Danagoulian Beam tune
98628 06/27/05 23:00 Reinhold HKS magnet controls
98627 06/27/05 22:54 okayasu Brief results for ENGE target angle reconstruction(Correction)
98626 06/27/05 22:48 Danagoulian Beam tune
98625 06/27/05 22:31 Naipy Perez Carbon target in
98624 06/27/05 22:28 Reinhold 30 uA CW on dump w/out target
98623 06/27/05 21:56 Naipy Perez target pulled out
98622 06/27/05 21:54 Reinhold Magnet settings at beginning of chicane tune
98621 06/27/05 21:45 Reinhold Cycling of Q2
98620 06/27/05 21:42 Reinhold Yesterday, magnets might now have been cycled properly
98619 06/27/05 21:34 Reinhold Splitter still stuck
98618 06/27/05 21:31 Reinhold HKS magnets cycling procedure
98617 06/27/05 21:15 reinhold Splitter seems to be stuck too
98616 06/27/05 21:09 okayasu Brief results for ENGE target angle reconstruction
98615 06/27/05 21:05 reinhold HKS-D initialized and set to 1056
98614 06/27/05 20:59 reinhold Q1 trips on MagTemp/DCOCMOS
98613 06/27/05 20:55 Reinhold started initialize for HKS-D&Q1
98612 06/27/05 20:50 Danagoulian Beam permit
98611 06/27/05 20:22 Reinhold Turned on HKS-D&Q1
98610 06/27/05 19:36 Reinhold Hall from restricted to controlled; still problems with trim cards
98609 06/27/05 19:35 Reinhold When tuning resumes, TURN OFF HV to HDC and EDC (wirechambers)
98608 06/27/05 19:30 Reinhold RunPlan for the evening
98607 06/27/05 19:07 Sumihama Time resolution of EHODO
98606 06/27/05 19:05 Nue Distance between our target and Hall C target
98605 06/27/05 18:54 Danagoulian Work in the Hall
98604 06/27/05 18:26 Danagoulian Hall C status
98603 06/27/05 18:18 Danagoulian Hall C status
98602 06/27/05 17:49 yuan Raster setting for CH2
98601 06/27/05 15:59 cdaq Beam Time Accounting
98600 06/27/05 14:14 T. Petkovic current limit for splitter
98599 06/27/05 11:44 okayasu Effects on optics from Splitter & ENGE magnetic field ramping up.(Correction)
98598 06/27/05 10:57 okayasu Effects on optics from Splitter & ENGE magnetic field ramping up.
98597 06/27/05 10:42 cdaq Run 55769: ENGE detectors test, Triggrt EHODOand
98596 06/27/05 10:36 cdaq Run 55768: HTOF test
98595 06/27/05 10:31 cdaq Run 55767: HTOF test
98594 06/27/05 10:27 cdaq Run 55766: HTOF test
98593 06/27/05 10:23 Victor Patch Pannel connection
98592 06/27/05 10:15 Akihiko Correct figure
98591 06/27/05 10:10 Akihiko 1X-15B re-connected in Hall
98590 06/27/05 10:08 Reinhold Status
98589 06/27/05 09:21 Akihiko DAQ test memo
98588 06/27/05 09:13 cdaq Run 55765: DAQ test
98587 06/27/05 09:07 cdaq Run 55764: DAQ test
98586 06/27/05 09:06 cdaq Run 55763: DAQ test
98585 06/27/05 08:59 cdaq Run 55762: DAQ test
98584 06/27/05 08:58 cdaq Run 55761: DAQ test
98583 06/27/05 08:56 cdaq Run 55760: DAQ test
98582 06/27/05 08:54 cdaq Run 55759: DAQ test
98581 06/27/05 08:52 cdaq Run 55758: DAQ test
98580 06/27/05 08:27 Akihiko 1-D histogram of run55703 and run55753
98579 06/27/05 08:04 Akihiko Shift summary
98578 06/27/05 08:03 cdaq Beam Time Accounting
98577 06/27/05 08:01 Kawama A short report for WC threashold
98574 06/27/05 07:50 Akihiko Preliminary result of run55753
98573 06/27/05 07:23 Akihiko Hall goes to controlled access
98572 06/27/05 06:38 Nue Current status, 15uA CW rates, HTF ADC gain
98571 06/27/05 06:33 cdaq Run 55757: EDC,EHODO test: trigger EHODOand
98570 06/27/05 06:33 cdaq Run 55756: EDC,EHODO test: trigger EHODOand
98569 06/27/05 06:31 cdaq Run 55755: test
98568 06/27/05 05:48 Akihiko Late entry: rebooted VMEC11 and VMEC12 before run55750
98567 06/27/05 05:10 Akihiko HKS collimator in
98566 06/27/05 04:27 Kawama HHODO 1x-15b has bad signal
98565 06/27/05 03:59 R.Asaturyan Run 55754 is junk
98564 06/27/05 03:53 Akihiko ARC1 magnet down, beam stopped
98563 06/27/05 03:52 cdaq Run 55754: Optics data: HKS sieve slit
98562 06/27/05 03:49 Akihiko ENGE collimator in, HKS sieve slit in
98561 06/27/05 03:46 Akihiko EDC HV
98560 06/27/05 03:35 Akihiko ENGE sieve slit in around 3:00 am
98559 06/27/05 03:33 Akihiko Run 55752 is junk
98558 06/27/05 03:31 cdaq Run 55753: Optics data: ENGE sieve slit
98557 06/27/05 03:24 cdaq Run 55752: Optics data: HKS sieve slit
98556 06/27/05 03:21 cdaq Run 55751: Optics data: ENGE sieve slit
98555 06/27/05 03:19 Kawama Magnet Status
98554 06/27/05 03:16 R.Asaturyan BCM and BPM Screens
98553 06/27/05 03:15 cdaq Run 55750: test
98552 06/27/05 03:07 Akihiko Singles rates of both arms
98551 06/27/05 02:57 Akihiko ARC1 magnet tripped sometimes and need to be fixed
98550 06/27/05 02:41 Akihiko 12C target in
98549 06/27/05 02:37 Akihiko BeO in.
98548 06/27/05 02:16 Akihiko 12C target in
98547 06/27/05 00:38 Akihiko Increase ENGE field about 8 % higher than original setting
98546 06/27/05 00:05 Paul B. All targets out
98545 06/27/05 00:02 Paul Baturin Shift Summary
Sunday
98544 06/26/05 23:57 cdaq Beam Time Accounting
98543 06/26/05 23:52 Naipy Perez MCC will continue adjusting the beam.
98542 06/26/05 23:45 Reinhold RunPlan for the night
98541 06/26/05 23:04 Naipy Perez Carbon target in.
98540 06/26/05 23:03 Naipy Perez SLI, BPM, BCM screen shots
98539 06/26/05 22:50 Naipy Perez no target
98538 06/26/05 22:15 Reinhold Can we scale Splitter up by 8.5% from the nominal value?
98537 06/26/05 22:11 Reinhold Can we scale Splitter up by 8.5% from the nominal value?
98536 06/26/05 22:07 Reinhold Hall C Spectrometer Coordinate System Convention
98535 06/26/05 21:52 Paul B. Splitter might go higher
98534 06/26/05 21:06 Naipy Perez Beam permit
98533 06/26/05 21:03 Naipy Perez Beam permit
98532 06/26/05 20:18 Naipy Perez We might get a beam 5uA later today.
98531 06/26/05 20:04 yuan HKS tof calibration code is ready
98530 06/26/05 20:03 cdaq Run 55749: ff detector test
98529 06/26/05 20:01 Sumihama HTOF-1Y pos <-> low momentum/neg <-> hight momentum
98528 06/26/05 19:13 Naipy Perez going to controlled access
98527 06/26/05 18:41 Sumihama ENGINE updated.
98526 06/26/05 17:33 Tang FF test runs without trigger enabled
98525 06/26/05 16:51 Naipy Perez target movement: Carbon in.
98524 06/26/05 16:43 Paul B. MCC is still in the process of chicane tune
98523 06/26/05 16:30 Naipy Perez target pulled out
98522 06/26/05 16:06 cdaq Beam Time Accounting
98521 06/26/05 16:06 Reinhold BPM & magnet settings for current tune
98520 06/26/05 14:33 cdaq Run 55748: Amur test
98519 06/26/05 14:28 cdaq Run 55747: Amur testing
98518 06/26/05 14:11 reinhold Access to Hall to reset HKS-D and Q2
98517 06/26/05 13:49 neven HKS-q2
98516 06/26/05 12:45 reinhold Trip of Q2
98515 06/26/05 12:45 reinhold ramped up ENGE and Q1
98514 06/26/05 12:16 reinhold Start ramping ENGE
98513 06/26/05 10:55 Reinhold Keep wire chambers off for tuning
98512 06/26/05 10:50 Reinhold chicane tune status & plans
98511 06/26/05 05:40 Akihiko F1 trigger latency for EHODO changed
98510 06/26/05 05:38 cdaq Run 55746: EHODO&EDC test, Trigger EHODOand
98509 06/26/05 04:06 cdaq Run 55744: EHODO&EDC test, Trigger EHODOand
98508 06/26/05 04:05 cdaq Run 55743: test
98507 06/26/05 03:54 Akihiko EDC tuned on
98506 06/26/05 02:56 Paul B. Shift Summary
98505 06/26/05 02:49 cdaq Beam Time Accounting
98504 06/26/05 02:45 reinhold moved target all out
98503 06/26/05 02:38 Reinhold Chicane tune abandoned; meet again tomorrow
98502 06/26/05 01:40 Paul B. Back to C-12 target
98501 06/26/05 01:29 Paul B. Target is OUT
98500 06/26/05 00:56 Akihiko Change measurement window for multihit TDC(1877)
98499 06/26/05 00:48 cdaq Run 55742: 1Y test
98498 06/26/05 00:42 cdaq Run 55741: 1Y test
98497 06/26/05 00:32 Paul B. The C12 target is in
98496 06/26/05 00:28 cdaq Run 55740: test
98495 06/26/05 00:28 Víctor HHodo gain matching
98494 06/26/05 00:22 Paul B. BeO target is in
98493 06/26/05 00:21 cdaq Run 55739: test
98492 06/26/05 00:11 Fatiha Summary
98491 06/26/05 00:10 cdaq Run 55738: test
98490 06/26/05 00:03 cdaq Beam Time Accounting
Saturday
98489 06/25/05 23:56 cdaq Run 55737: test
98488 06/25/05 23:46 Naipy Perez movement of the target
98487 06/25/05 23:35 Naipy Perez movement of the target
98486 06/25/05 23:27 Akihiko CVS updated
98485 06/25/05 23:26 Fatiha Put BeO Target
98484 06/25/05 22:34 Naipy Perez movement of the target
98483 06/25/05 21:13 Naipy Perez movement of the target
98482 06/25/05 21:08 FatihaDrift Drift chambers HVs turned off
98481 06/25/05 21:08 FatihaDrift Drift chambers HVs turned off
98480 06/25/05 20:57 Fatiha Moved target to All out
98479 06/25/05 20:41 Reinhold MCC starts beam tune
98478 06/25/05 20:32 Victor Vacuum valve problem solved
98477 06/25/05 20:18 Fatiha Beam Permit
98476 06/25/05 20:16 okayasu WC threshold optimization
98475 06/25/05 20:13 Victor If FST set need to be set again
98474 06/25/05 20:02 Joe, Paul &V FST set at 90%
98473 06/25/05 19:55 Fatiha Moved to BeO target
98472 06/25/05 19:37 Kawama TOF analysis(low momentum side)
98471 06/25/05 19:14 Nue Q2 communication problem
98470 06/25/05 19:11 Nue He gas
98469 06/25/05 18:17 perez FST set
98468 06/25/05 18:15 Fatiha EZ megnet tripped twice
98467 06/25/05 17:48 Reinhold Hall C Beam Delivery Procedure
98466 06/25/05 16:36 Reinhold Please do NOT submit PostScript figures to logbook
98465 06/25/05 16:32 cdaq Beam Time Accounting
98464 06/25/05 16:23 okayasu WC HV update
98463 06/25/05 12:50 cdaq Run 55736: ff detector test
98462 06/25/05 12:22 Sumihama beta of HKS particles vs. coin. time
98461 06/25/05 07:48 cdaq Beam Time Accounting
98460 06/25/05 04:30 cdaq Beam Time Accounting
98459 06/25/05 04:27 cdaq Beam Time Accounting
98458 06/25/05 04:24 Akihiko EDC status
98457 06/25/05 03:41 Akihiko CVS updated
98456 06/25/05 00:12 Fujii Impact of E=1.85GeV, I=1 to 5uA CW electron beam on EZ vacuum chamber
Friday
98455 06/24/05 23:15 Kawama The problem has solved
98454 06/24/05 21:48 Sumihama Coincidence time between HKS-time at target and Ehodo-meantime
98453 06/24/05 21:42 okayasu Enge slit hole patterns on sieve slit.
98452 06/24/05 17:49 lcole F1TDC Gate Width
98451 06/24/05 17:49 lcole F1TDC Gate Width
98450 06/24/05 17:25 cdaq Run 55735: ff detector test
98449 06/24/05 16:43 beaufait mag. fsd
98448 06/24/05 16:18 paul&seva&na AC and 1X HKS // grouping study
98447 06/24/05 12:45 Reinhold Magnet settings last evening 19:00 - 21:00
98446 06/24/05 12:43 cdaq Run 55734: ff detector test
98445 06/24/05 12:08 cdaq Run 55733: ff detector test
98444 06/24/05 10:16 Akihiko EDC status
98443 06/24/05 10:16 Nue Discussion note with Chen about Raster
98442 06/24/05 10:04 cdaq Run 55732: EHODO&EDC test, EHODO trigger
98441 06/24/05 09:59 M Jones Do not use /work/hallc/hks disk from noon-1 today.
98440 06/24/05 09:33 yan Hall C FR absolute calibration
98439 06/24/05 09:32 yan Hall C FR absolute calibration
98438 06/24/05 09:11 Reinhold Burn through in EZ magnet chamber
98437 06/24/05 09:01 cdaq Run 55731: EHODO&EDC test, EHODO trigger
98436 06/24/05 08:41 cdaq Run 55730: test
98435 06/24/05 08:36 Akihiko Correct figure
98434 06/24/05 08:14 Akihiko Coloring with sieve slit
98433 06/24/05 08:09 cdaq Beam Time Accounting
98432 06/24/05 08:01 Kawama Cherencov counter with TOF cut
98431 06/24/05 05:57 cdaq Run 55729: test
98430 06/24/05 05:57 cdaq Run 55728: test
98429 06/24/05 05:49 cdaq Run 55727: test
98428 06/24/05 05:48 Akihiko CVS updated
98427 06/24/05 05:47 cdaq Run 55726: test
98426 06/24/05 03:37 Kawama HHODO 1x-11t ADC pedestal
98425 06/24/05 03:32 cdaq Run 55725: test
98424 06/24/05 03:25 cdaq Run 55724: test
98423 06/24/05 03:20 cdaq Run 55723: test
98422 06/24/05 03:08 cdaq Run 55722: test
98421 06/24/05 02:02 cdaq Run 55720: test
98420 06/24/05 01:55 Fujii Q2 power supply stays Inpvolt fault
98419 06/24/05 01:42 Reinhold Turned Q1,Q2,D,ENGE off and asked MCC to turn Splitter off
98418 06/24/05 01:35 Reinhold Vacuum problem: leak in EZ magnet chamber
98417 06/24/05 01:23 cdaq Run 55719: test
98416 06/24/05 01:15 cdaq Run 55718: Optics data: HKS sieve slit
98415 06/24/05 00:52 Naipy Perez Correlation-----> hx1 and hx2
98414 06/24/05 00:01 cdaq Beam Time Accounting
Thursday
98413 06/23/05 23:54 yuan HKS tof status
98412 06/23/05 23:43 Fujii Q2 tripped twice by Inpvolt fault
98411 06/23/05 23:03 Nue He bag gas
98410 06/23/05 22:50 Sumihama TOF calibration for EHODO
98409 06/23/05 21:20 Reinhold Vacuum problem
98408 06/23/05 21:04 Fujii Q2 tripped again by Inpvolt heavy fault
98407 06/23/05 20:43 Reinhold EZ supposedly back again but now vacuum problems
98406 06/23/05 20:05 Q2 tripped again by Inpvolt fault
98405 06/23/05 19:44 Tang 55717 does not exist, ROC12 no response, reboot
98404 06/23/05 19:41 Fatiha EZ Dipole Overload
98403 06/23/05 19:28 cdaq Run 55717: Optics data: HKS sieve slit
98402 06/23/05 17:32 cdaq Run 55716: DAQ test
98401 06/23/05 17:31 Reinhold Changed trigger to HKS or ENGE for DAQ test before closing hall
98400 06/23/05 17:10 beaufait q2 trip
98399 06/23/05 16:28 cdaq Beam Time Accounting
98398 06/23/05 15:21 cdaq Run 55715: ff detector test
98397 06/23/05 14:04 Reinhold KAONS in TOF??!!!
98396 06/23/05 13:44 neven HKS q2 tripped
98395 06/23/05 12:38 cdaq Run 55714: ff detector test after deley correction
98394 06/23/05 12:06 Akihiko EDC status
98393 06/23/05 11:18 cdaq Run 55713: ff detector test
98392 06/23/05 11:13 cdaq Run 55712: test
98391 06/23/05 11:09 seva checked AC channels
98390 06/23/05 10:59 beaufait Q2 tripps
98389 06/23/05 10:24 cdaq Run 55711: test
98388 06/23/05 10:23 Kawama The 'Kaon' figure
98387 06/23/05 10:10 cdaq Run 55710: ff detector test
98386 06/23/05 09:40 Kawama The result of my tonght's analysis(run#55670,threashold=50mV)
98385 06/23/05 09:21 cdaq Run 55709: ff detector test
98384 06/23/05 09:19 amour change trigger to the ff detector
98383 06/23/05 08:52 neven Beam off. Restricted access
98382 06/23/05 08:09 Fujii Data summary of 6/23 OWL shift
98381 06/23/05 08:08 cdaq Beam Time Accounting
98380 06/23/05 08:01 Akihiko Parameter files are on CVS
98379 06/23/05 07:58 cdaq Run 55708: Optics data: HKS sieve slit
98378 06/23/05 07:47 Fujii Some Aerogels have no ADC
98377 06/23/05 07:40 Akihiko preliminary result of run55703
98376 06/23/05 07:26 Fujii Q2 frequently tripped due to Inpcurr fault, should be inspected and fixed today
98375 06/23/05 07:10 Fujii BPM and SLI screen shots at 7:00AM
98374 06/23/05 07:04 cdaq Run 55707: Optics data: Enge sieve slit
98373 06/23/05 06:40 cdaq Run 55705: Optics data: Enge sieve slit
98372 06/23/05 06:39 Akihiko HKS-Q2 Tripped again
98371 06/23/05 06:32 Akihiko HKS-Q2 Tripped
98370 06/23/05 06:26 Akihiko F1 (slot9, VMEC11) Resolution NOT Locked
98369 06/23/05 06:23 cdaq Run 55704: test
98368 06/23/05 05:32 cdaq Run 55703: Optics data: Enge sieve slit
98367 06/23/05 05:14 cdaq Run 55702: Test run after long beam down
98366 06/23/05 04:56 cdaq Run 55701: Test run after long beam down
98365 06/23/05 04:40 Fujii Status update of no beam
98364 06/23/05 03:56 cdaq Run 55700: Cosmic ray data during accerelator down time.
98363 06/23/05 01:50 Fujii Q2 tripped, Inpvolt fault
98362 06/23/05 01:40 cdaq Run 55699: Optics data: Enge sieve slit
98361 06/23/05 00:29 Reinhold Run plan for the night
98360 06/23/05 00:21 cdaq Run 55698: test
98359 06/23/05 00:09 cdaq Run 55697: test
98358 06/23/05 00:04 cdaq Beam Time Accounting
98357 06/23/05 00:03 cdaq Run 55696: test
Wednesday
98356 06/22/05 21:27 abdellah trip of HKS-q2 + Splitter
98355 06/22/05 20:34 Sumihama Plots of ENGE with Sieve slit
98354 06/22/05 20:27 abdellah CHL down
98353 06/22/05 20:10 cdaq Run 55694: Optics data: Enge sieve slit
98352 06/22/05 20:06 abdellah HKS-q2 trip
98351 06/22/05 20:03 cdaq Run 55693: Optics data: Enge sieve slit
98350 06/22/05 18:52 Kawama Sorry, the #98319's threashold is 50mV.
98349 06/22/05 18:42 cdaq Run 55692: trigger =ENGE, 1 uA CW, C12 target, ps5=300
98348 06/22/05 18:38 Reinhold Changed trigger to ENGE singles
98347 06/22/05 16:45 cdaq Run 55691: New beam tune ENGE/HKS Sieve Slit, trigger = HKS(1X AND 2X AND ACveto) AND ENGE, 1 uA CW, C12 target, ps5=1
98346 06/22/05 16:42 cdaq Run 55690: New beam tune ENGE/HKS Sieve Slit, trigger = HKS(1X AND 2X AND ACveto) AND ENGE, 1 uA CW, C12 target, ps5=1
98345 06/22/05 16:35 okayasu First Kaon ?
98344 06/22/05 15:59 Reinhold Splitter and ENGE tripped
98343 06/22/05 15:58 cdaq Beam Time Accounting
98342 06/22/05 15:57 cdaq Run 55689: New beam tune ENGE/HKS Sieve Slit, trigger = HKS(1X AND 2X AND ACveto) AND ENGE, 5 uA CW, C12 target, ps5=1
98341 06/22/05 15:47 cdaq Run 55688: roc12 reset !!!!
98340 06/22/05 14:40 Darko Moving target out
98339 06/22/05 13:30 yuan Recheck Enge focal plane coordinate system
98338 06/22/05 12:18 neven Few Changes
98337 06/22/05 12:16 cdaq Run 55687: ENGE/HKS collimator in, trigger = HKS(1X AND 2X AND ACveto) AND ENGE, 5 uA CW, C12 target, ps5=1
98336 06/22/05 12:02 cdaq Run 55686: ENGE/HKS collimator in, trigger = HKS(1X AND 2X AND ACveto) AND ENGE, 5 uA CW, C12 target, ps5=1
98335 06/22/05 11:59 cdaq Run 55685: ENGE/HKS collimator in, trigger = HKS(1X AND 2X AND ACveto) AND ENGE, 5 uA CW, C12 target, ps5=1
98334 06/22/05 11:19 okayasu Preliminarily results of WC # of photon w/ PID
98333 06/22/05 10:05 neven No Beam
98332 06/22/05 09:52 Reinhold Grouping study: Paul is working on AC
98331 06/22/05 09:42 Fujii Data analysis for TUL grouping study needed
98330 06/22/05 09:24 Akihiko 1 uA CW beam at run55684
98329 06/22/05 09:21 Akihiko DMA error again in VMEC11
98328 06/22/05 09:20 cdaq Run 55684: ENGE/HKS collimator in, trigger = HKS(1X AND 2X AND ACveto) AND ENGE, 5 uA CW, C12 target, ps5=1
98327 06/22/05 09:13 Akihiko Preliminary result of EDC analysis, run55673,55674
98326 06/22/05 09:08 cdaq Run 55683: ENGE/HKS collimator in, trigger = HKS(1X AND 2X AND ACveto) AND ENGE, 5 uA CW, C12 target, ps5=1
98325 06/22/05 08:57 Akihiko F1 (slot16, VMEC11) and F1(slot16,VMEC14) NOT Initialized
98324 06/22/05 08:56 cdaq Run 55682: test
98323 06/22/05 08:50 cdaq Run 55681: test
98322 06/22/05 08:36 Fujii Proton trigger rate (1X AND 2X AND 1Y) and AC in VETO
98321 06/22/05 08:19 cdaq Run 55680: ENGE/HKS collimator in, trigger = HKS(1X AND 2X AND ACveto) AND ENGE, 5 uA CW, C12 target, ps5=1
98320 06/22/05 08:16 cdaq Run 55679: ENGE/HKS collimator in, trigger = HKS(1X AND 2X AND ACveto) AND ENGE, 5 uA CW, C12 target, ps5=1
98319 06/22/05 08:13 Kawama TOF resolution of run#55670(threashold is 200mV)
98318 06/22/05 08:12 Akihiko DMA errors on VMEC11
98317 06/22/05 08:11 cdaq Run 55678: DAQ test
98316 06/22/05 08:00 Fujii Data summary of 6/22 OWL shift
98315 06/22/05 08:00 cdaq Beam Time Accounting
98314 06/22/05 07:47 Fujii Comparison of coincidence spectrum between 1uA no-PID-trigger and 5uA pion-enriched-trigger
98313 06/22/05 07:11 Fujii HKS notes, records, samples
98312 06/22/05 07:00 Akihiko F1 initialization failed at VMEC11
98311 06/22/05 06:46 Crude PID on HKS-ENGE coincidence spectrum
98310 06/22/05 06:39 cdaq Run 55677: ENGE/HKS collimator in, Pion trigger = HKS(1X AND 2X AND 1Y AND AC AND WC) AND ENGE, 5 uA CW, C12 target, ps5=1
98309 06/22/05 06:29 cdaq Run 55676: test
98308 06/22/05 06:28 Akihiko Pion trigger (1X AND 2X AND 1Y AND AC AND WC)
98307 06/22/05 06:26 Akihiko HKS sieve slit out, collimator in
98306 06/22/05 06:03 Fujii BPM and SLI screen shots at 6:00AM
98305 06/22/05 05:17 cdaq Run 55675: ENGE collimator in, HKS sieve slit in, trigger = HKS AND ENGE, 5 uA CW, C12 target, ps5=1
98304 06/22/05 05:12 Akihiko ENGE sieve slit out, HKS Sieve slit in
98303 06/22/05 04:15 Akihiko Unit of singles rate was wrong
98302 06/22/05 04:10 cdaq Run 55674: ENGE sieve slit in, HKS collimator in, trigger = HKS AND ENGE, 5 uA CW, C12 target, ps5=1
98301 06/22/05 04:08 Akihiko ENGE sieve slit in, beam current 5 uA CW
98300 06/22/05 03:05 Akihiko EDC HV in run55673
98299 06/22/05 02:44 cdaq Run 55673: ENGE/HKS collimator in, trigger = HKS AND ENGE, 1.1uA CW, C12 target, ps5=1
98298 06/22/05 02:35 Akihiko F1TDC (VMEC11, slot 18) Resolution NOT Locked
98297 06/22/05 02:27 cdaq Run 55672: DAQ test
98296 06/22/05 01:52 cdaq Run 55671: ENGE/HKS collimator in, trigger = HKS, 1.1uA, C12 target, ps5=8, HKS data for TOF adjustment
98295 06/22/05 01:12 cdaq Run 55670: ENGE/HKS collimator in, trigger = HKS, 1.1uA, C12 target, ps5=8, HKS data for TOF adjustment
98294 06/22/05 01:10 cdaq Run 55669: ENGE/HKS collimator in, trigger = HKS, 1.1uA, C12 target, ps5=8, HKS data for TOF adjustment
98293 06/22/05 01:05 cdaq Run 55668: ENGE/HKS collimator in, trigger = HKS, 1.1uA, C12 target, ps5=5, HKS data for TOF adjustment
98292 06/22/05 00:59 cdaq Run 55667: ENGE/HKS collimator in, trigger = HKS, 1.1uA, C12 target, ps5=5, HKS data for TOF adjustment
98291 06/22/05 00:53 cdaq Run 55666: ENGE/HKS collimator in, trigger = HKS, 1.1uA, C12 target, ps5=5, HKS data for TOF adjustment
98290 06/22/05 00:49 cdaq Run 55665: test
98289 06/22/05 00:32 Razmik BTA screen error
98288 06/22/05 00:31 cdaq Run 55663: test
98287 06/22/05 00:29 Sumihama ADC gate and analog signals for EHODO.
98286 06/22/05 00:22 Akihiko VMEC11 had bad data from run55656 to 55659
98285 06/22/05 00:12 cdaq Run 55662: ENGE/HKS collimator in, trigger = ENGE&HKS, 1.1uA, C12 target, ps5=1, Coincidence study
98284 06/22/05 00:04 cdaq Run 55661: DAQ test
Tuesday
98283 06/21/05 23:42 Fujii Coincidence between ENGE and HKS
98282 06/21/05 23:24 cdaq Run 55659: ENGE/HKS collimator in, trigger = ENGE&HKS, 1.1uA, C12 target, ps5=1, Coincidence study
98281 06/21/05 23:15 cdaq Run 55658: ENGE/HKS collimator in, trigger = ENGE&HKS, 1.1uA, C12 target, ps5=1, Coincidence study
98280 06/21/05 23:09 cdaq Run 55657: ENGE/HKS collimator in, trigger = ENGE&HKS, 1.1uA, C12 target, ps5=1, Coincidence study
98279 06/21/05 23:04 cdaq Run 55656: ENGE/HKS collimator in, trigger = ENGE&HKS, 1.1uA, C12 target, ps5=1, Coincidence study
98278 06/21/05 22:59 Reinhold Plan for the night
98277 06/21/05 22:50 cdaq Run 55655: ENGE/HKS collimator in, trigger = ENGE&HKS, 1.1uA, C12 target, ps5=1, Coincidence study
98276 06/21/05 22:43 Danagoulian Coincidence
98275 06/21/05 22:30 cdaq Run 55654: ENGE/HKS collimator in, trigger = ENGE&HKS, 1.1uA, C12 target, ps5=1, Coincidence study
98274 06/21/05 22:19 Tang Enge side analysis
98273 06/21/05 22:16 cdaq Run 55653: ENGE/HKS collimator in, trigger = ENGE&HKS, 1.1uA, C12 target, ps5=1, Coincidence study
98272 06/21/05 22:12 cdaq Run 55652: ENGE/HKS collimator in, trigger = ENGE&HKS, 1.1uA, C12 target, ps5=1, Coincidence study
98271 06/21/05 22:11 Tang Single rate measurement
98270 06/21/05 22:02 Kawama HHODO1x-2x TOF resolution(counter#1x-7 and 2x-8) with slewing correction
98269 06/21/05 21:37 Tang HKS Drift chamber HV foil leakage current
98268 06/21/05 21:33 cdaq Run 55651: ENGE/HKS collimator in, trigger = ENGE&HKS, 1.1uA, C12 target, ps5=1, Coincidence study
98267 06/21/05 21:29 Reinhold Since Run 55649: adjusted HKS trigger delay -> ADC gates might be wrong
98266 06/21/05 21:29 cdaq Run 55650: ENGE/HKS collimator in, trigger = ENGE&HKS, 1.1uA, C12 target, ps5=1, Coincidence study
98265 06/21/05 21:29 Tang Beam tune completed: Chicane tune, radiation loss, beam quality and nominials
98264 06/21/05 20:58 Reinhold RUN 55649: played with coincidence timing window.
98263 06/21/05 20:56 Reinhold The referenced run is a test for the coincidence timing
98262 06/21/05 20:51 cdaq Run 55649: ENGE/HKS collimator in, trigger = ENGE&HKS, 1.1uA, C12 target, ps5=2
98261 06/21/05 20:36 abdellah Scalers 1uA Carbon Collimator for Enge
98260 06/21/05 20:28 cdaq Run 55648: ENGE collimator (position 13.12) in, HKS collimator in,
98259 06/21/05 20:21 Sumihama Cycling power for ROC12.
98258 06/21/05 20:08 cdaq Run 55647: ENGE collimator (position 13) in, trigger = ENGE&HKS coin, 1.1uA CW, C12 target, ps5=1
98257 06/21/05 20:05 Nue Picture of the target ladder
98256 06/21/05 19:33 tang Enge collimator/sieve slit conflict check
98255 06/21/05 19:17 cdaq Run 55646: ENGE collimator (position 28.13) in, trigger = ENGE, 1.1uA Duty 1.52%, C12 target, ps5=2
98254 06/21/05 19:08 Danagoulian Collimator
98253 06/21/05 18:44 yuan EDC HV layer#3 trip
98252 06/21/05 18:43 Danagoulian Collimators
98251 06/21/05 18:39 Miyoshi online-replay procedure for shift worker
98250 06/21/05 18:29 Reinhold Ion chambers at 10 uA CW on 100 mg 12C target
98249 06/21/05 18:21 Sumihama Change the delay time for Common start of higjt reso. TDC modules, 32+16->32+8 ns.
98248 06/21/05 18:21 abdellah Scalers for 10 uA on carbon
98247 06/21/05 18:20 Sumihama Run55645 is for test of TDC timing.
98246 06/21/05 18:14 Abdellah 5 uA on Carbon
98245 06/21/05 18:04 Danagoulian Tuned beam
98244 06/21/05 18:02 abdellah CW beam on carbon target
98243 06/21/05 17:58 cdaq Run 55645: trigger = ENGE&HKS coin., 1.32uA Carbon target, ps5=1
98242 06/21/05 17:56 Danagoulian Beam position
98241 06/21/05 17:05 cdaq Run 55644: test
98240 06/21/05 16:05 Sumihama Background events was reduced after putting additional shielding.
98239 06/21/05 15:59 Miyoshi MHTDC window size
98238 06/21/05 15:58 Sumihama PNG figures for the last entry.
98237 06/21/05 15:52 Sumihama TDC timming for HTOF was shifted between run55618 and run55622.
98236 06/21/05 15:43 okayasu WC HV changed
98235 06/21/05 14:50 cdaq Run 55643: ENGE sieve slit in, HKS:colli, trigger = HKS(1X1Y2X), 1uA , BeO target, ps5=1
98234 06/21/05 14:24 Bosted Target change
98233 06/21/05 14:12 cdaq Run 55642: ENGE sieve slit in, trigger = HKS(1X1Y2X), 1uA CW, BeO target, ps5=2
98232 06/21/05 13:43 Bosted Splitter, EZ magnets
98231 06/21/05 13:09 Reinhold Plan for today
98230 06/21/05 13:03 Bosted Hall C to Beam Permit
98229 06/21/05 13:02 Reinhold Access report
98228 06/21/05 12:09 Reinhold Rad survey around EZ magnet: where do/did we hit??
98227 06/21/05 10:04 okayasu He bag gas flow
98226 06/21/05 09:44 Bosted Hall C in Restricted Access
98225 06/21/05 08:51 Fujii BeO specially mounted, C target position is right
98224 06/21/05 08:03 cdaq Beam Time Accounting
98223 06/21/05 07:35 Kawama The cable problem is solved.
98222 06/21/05 07:21 Kawama 2-"4"t and 2-3b signals are bad
98221 06/21/05 07:13 cdaq Run 55641: ENGE sieve slit in, trigger = ENGE, 1.5uA Duty 1.52%, BeO target, ps5=2
98220 06/21/05 07:08 Kawama Sorry, 2-3t Pluse hight was not so low.
98219 06/21/05 07:04 Kawama 2-3t and 2-3b has noADC signal
98218 06/21/05 06:44 cdaq Run 55640: ENGE sieve slit in, trigger = ENGE, 1.5uA Duty 1.52%, BeO target, ps5=2
98217 06/21/05 06:43 Fujii&Kawama ENGE rate study with 1.5uA pulsed(1.52%duty) beam on BeO
98216 06/21/05 06:17 cdaq Run 55639: ENGE sieve slit in, trigger = ENGE, 1.5uA Duty 1.52%, BeO target, ps5=2
98215 06/21/05 05:19 Reinhold Only 1 uA pulsed beam for the time being
98214 06/21/05 04:59 Reinhold How exactly is the BeO target mounted??
98213 06/21/05 04:41 Reinhold Target ladder misalignment
98212 06/21/05 03:20 Fujii Rate of each arm without target ladder.
98211 06/21/05 02:48 cdaq Run 55638: DAQ test
98210 06/21/05 02:15 Akihiko EDC tripped
98209 06/21/05 00:22 okayasu WC # of photon
98208 06/21/05 00:21 seva&paul aerogel calibration
98207 06/21/05 00:01 cdaq Beam Time Accounting
Monday
98206 06/20/05 23:25 Kawama The cause of bad signal for HHOF 1x-15b and 1x-17b
98204 06/20/05 22:25 okayasu Reminder : Target chamber position suppose to be changed by original design.
98203 06/20/05 22:01 Kawama Hhodo HV fine tune
98202 06/20/05 20:24 beaufait dz fsd fault.
98201 06/20/05 18:04 cdaq Run 55637: ENGE test
98200 06/20/05 18:03 Akihiko MAP file updated
98199 06/20/05 17:55 cdaq Run 55636: ENGE test
98198 06/20/05 17:13 Miyoshi Another SLI monitor
98197 06/20/05 17:12 yuan TOF beta status
98196 06/20/05 17:08 cdaq Run 55635: DAQ test
98195 06/20/05 17:00 cdaq Run 55634: DAQ test
98193 06/20/05 16:18 cdaq Run 55633: DAQ test
98192 06/20/05 16:10 cdaq Run 55632: DAQ test
98191 06/20/05 16:08 cdaq Run 55631: DAQ test
98190 06/20/05 15:59 cdaq Run 55630: WC self trigger, po5=1000
98189 06/20/05 15:57 Akihiko Network had problem, now fixed
98188 06/20/05 15:33 cdaq Run 55629: test
98187 06/20/05 15:29 cdaq Run 55628: DAQ test
98186 06/20/05 15:03 cdaq Run 55627: DAQ test
98185 06/20/05 15:02 okayasu WC HV have been changed.
98184 06/20/05 14:44 cdaq Run 55626: DAQ test
98183 06/20/05 14:17 cdaq Run 55625: DAQ test
98182 06/20/05 13:30 cdaq Run 55624: DAQ test
98181 06/20/05 13:05 cdaq Run 55623: DAQ test
98180 06/20/05 12:27 beaufait *****POLARITY OF ENGE CHANGED AS OF 12:15 *******
98179 06/20/05 11:28 Sumihama Bad connection in the patch pannel for HTOF
98178 06/20/05 10:54 Sumihama Signals for ADC of H2X9T is now fine.
98177 06/20/05 09:01 Fujii Re: Coincidence of ENGE&HKS is all accidental
98176 06/20/05 08:56 Reinhold ENGE sieve slit
98175 06/20/05 08:01 cdaq Beam Time Accounting
98174 06/20/05 07:38 cdaq Run 55622: trigger = (1X & 1Y & 2X & ) & EHODO, -50 mV, 1.0 uA CW, BeO target, ps5=1, ENGE sieve slit in
98173 06/20/05 07:33 cdaq Run 55621: test
98172 06/20/05 07:16 Akihiko ROC12 had error
98171 06/20/05 07:11 Fujii BPM snapshot at 7:09AM, including period of beam position change
98170 06/20/05 07:09 cdaq Run 55620: test
98169 06/20/05 07:09 Fujii Detector rates are much higher after hall access
98168 06/20/05 07:03 cdaq Run 55619: test
98167 06/20/05 06:38 Akihiko HDC tripped
98166 06/20/05 06:28 Akihiko ENGE sieve slit in @ run 55618
98165 06/20/05 06:23 cdaq Run 55618: trigger = (1X & 1Y & 2X & ) & EHODO, -50 mV, 1.2 uA CW, BeO target, ps5=1
98164 06/20/05 06:02 Fujii & Mats Late entry : ENGE trigger rate study
98163 06/20/05 06:00 Fujii ENGE slit movement is fine
98162 06/20/05 05:44 Fujii Asked MCC Hall access to check ENGE slit movement
98161 06/20/05 05:15 Fujii Late entry: Asked MCC to give us 0.1uA CW beam for p trigger
98160 06/20/05 05:03 cdaq Run 55616: trigger = (1X & 1Y & 2X & WC bar) + AC in veto, -50 mV, 0.1uA CW, BeO target, ps5=1
98159 06/20/05 04:57 cdaq Run 55615: trigger = (1X & 1Y & 2X & WC bar) + AC in veto, -50 mV, 0.1uA CW, BeO target, ps5=1
98158 06/20/05 04:40 cdaq Run 55614: trigger = (1X & 1Y & 2X & WC bar) + AC in veto, -50 mV, 0.9uA CW, BeO target, ps5=30
98157 06/20/05 04:34 cdaq Run 55613: BAD trigger, Junk
98156 06/20/05 03:57 Fujii SLI and BPM screen as of 6/20 3:55
98155 06/20/05 02:46 cdaq Run 55612: trigger = (1X & 1Y & 2X & WC) + NOT(AC) in veto, -50 mV, 0.9uA CW, BeO target, ps5=1
98154 06/20/05 01:02 cdaq Run 55611: trigger = (1X & 1Y & 2X & WC) + NOT(AC) in veto, -50 mV, 0.9uA CW, BeO target, ps5=1
98153 06/20/05 01:00 Akihiko All ROCs reboot and restart CODA
98152 06/20/05 00:43 Fujii ROC12 and 13 hang, rebooted
98151 06/20/05 00:41 cdaq Run 55610: trigger = (1X & 1Y & 2X & WC) + NOT(AC) in veto, -50 mV, 0.9uA CW, BeO target, ps5=1
98150 06/20/05 00:24 Sumihama Report of threshold scanning study of HTOF.
98149 06/20/05 00:14 Fujii SLI and BPM screen
98148 06/20/05 00:01 cdaq Beam Time Accounting
Sunday
98147 06/19/05 23:34 Reinhold some IMPORTANT ANALYSIS TASKS
98146 06/19/05 23:32 ent shift summary
98145 06/19/05 23:24 cdaq Run 55609: trigger = (1X & 1Y & 2X & WC) + NOT(AC) in veto, -50 mV, 0.9uA CW, BeO target, ps5=1
98144 06/19/05 23:21 cdaq Run 55608: trigger = (1X & 1Y & 2X & WC) + NOT(AC) in veto, -50 mV, 0.9uA CW, BeO target, ps5=1
98143 06/19/05 23:15 cdaq Run 55607: trigger = (1X & 1Y & 2X & WC) + NOT(AC) in veto, -50 mV, 0.9uA CW, BeO target, ps5=1
98142 06/19/05 23:03 cdaq Run 55606: trigger = (1X & 1Y & 2X & WC) + NOT(AC) in veto, -50 mV, 0.9uA CW, BeO target, ps5=1
98141 06/19/05 22:56 cdaq Run 55605: trigger = (1X & 1Y & 2X & WC) + NOT(AC) in veto, -50 mV, 0.9uA CW, BeO target, ps5=1
98140 06/19/05 22:47 cdaq Run 55604: trigger = (1X & 1Y & 2X & WC) + NOT(AC) in veto, -50 mV, 0.9uA CW, BeO target, ps5=1
98139 06/19/05 22:47 Tang Beam quality check and monitoring
98138 06/19/05 21:20 cdaq Run 55603: trigger = (1X & 1Y & 2X), -50 mV, 0.9uA CW, BeO target, ps5=40
98137 06/19/05 21:08 cdaq Run 55602: trigger = (1X & 1Y & 2X) + AC in veto, -50 mV, 0.9uA CW, BeO target, ps5=25
98136 06/19/05 20:49 Reinhold ENGE sieve slit
98135 06/19/05 20:24 cdaq Run 55601: trigger = (1X & 1Y & 2X) + NOT(AC) in veto, -50 mV, 0.9uA CW, BeO target, ps5=1
98134 06/19/05 20:09 cdaq Run 55600: trigger = (1X & 1Y & 2X) + NOT(AC) in veto, -50 mV, 0.9uA CW, BeO target, ps5=1
98133 06/19/05 20:01 cdaq Run 55599: trigger = (1X & 1Y & 2X) + AC in veto, -50 mV, 0.9uA CW, BeO target, ps5=20
98132 06/19/05 19:53 cdaq Run 55598: trigger = (1X & 1Y & 2X), -50 mV, 0.9uA CW, BeO target, ps5=40
98131 06/19/05 19:51 cdaq Run 55597: trigger = (1X & 1Y & 2X), -50 mV, 0.9uA CW, BeO target, ps5=20
98130 06/19/05 19:35 Sumihama Threshold is -50 mV for HHODO.
98129 06/19/05 19:03 cdaq Run 55596: trigger = (1X & 1Y & 2X), -100 mV, 0.9uA CW, BeO target, ps5=20
98128 06/19/05 18:51 cdaq Run 55595: trigger = (1X & 1Y & 2X) + AC in veto, -100 mV, 0.9uA CW, BeO target, ps5=10
98127 06/19/05 18:44 cdaq Run 55594: trigger = (1X & 1Y & 2X) + AC in veto, -100 mV, 0.9uA CW, BeO target, ps5=5
98126 06/19/05 18:20 cdaq Run 55593: trigger = (1X & 1Y & 2X) + NOT(AC) in veto, -100 mV, 0.9uA CW, BeO target, ps5=1
98125 06/19/05 18:11 Reinhold Trigger rates with HHODO thresholds -200 mV
98124 06/19/05 18:06 Reinhold Set HHODO thresholds from -200 mV to -100 mV
98123 06/19/05 17:24 Reinhold Run #55589: new trigger (followup)
98122 06/19/05 17:21 Reinhold Run 55591: new trigger notACveto
98121 06/19/05 17:20 cdaq Run 55592: trigger = (1X & 1Y & 2X) + NOT(AC) in veto, -200 mV, 0.9uA CW, BeO target, ps5=1
98120 06/19/05 17:17 cdaq Run 55591: trigger = (1X & 1Y & 2X) + NOT(AC) in veto, -200 mV, 0.9uA CW, BeO target, ps5=3
98119 06/19/05 17:04 cdaq Run 55590: trigger = (1X & 1Y & 2X) + AC in veto, -200 mV, 0.9uA CW, BeO target, ps5=5
98118 06/19/05 16:59 Reinhold Run #55589: new trigger
98117 06/19/05 16:51 cdaq Run 55589: trigger = (1X & 1Y & 2X) + AC in veto, -200 mV, 0.9uA CW, BeO target, ps5=5
98116 06/19/05 16:50 okayasu Commissioning run sheet
98115 06/19/05 16:40 cdaq Run 55588: trigger = (1X & 1Y & 2X), -200 mV, 0.9uA CW, BeO target, ps5=10
98114 06/19/05 16:39 Reinhold Changed trigger
98113 06/19/05 16:29 cdaq Run 55587: trigger = (1X & 1Y & 2X), -200 mV, 0.9uA CW, BeO target, ps5=1
98112 06/19/05 16:02 cdaq Beam Time Accounting
98111 06/19/05 15:49 cdaq Run 55586: WC self trigger, 0.9uA CW, BeO target, ps5=1
98110 06/19/05 15:37 cdaq Run 55585: Junk
98109 06/19/05 15:30 cdaq Run 55584: WC self trigger, 1.3uA pulsed, BeO target, ps5=1
98108 06/19/05 15:19 cdaq Run 55583: AC self trigger, 1.3uA pulsed, BeO target, ps5=1, WC single
98107 06/19/05 14:55 Paul B. Thresholds for WC set to 9mV
98106 06/19/05 14:53 cdaq Run 55582: WC self trigger, 1.4uA pulsed, BeO target, ps5=1
98105 06/19/05 14:49 ReinholdChan Changed trigger to WC self
98104 06/19/05 14:31 cdaq Run 55581: AC self trigger, 1.3uA pulsed, BeO target, ps5=1
98103 06/19/05 14:28 Paul. B Switched to pulse mode
98102 06/19/05 14:22 Reinhold Changed trigger to AC self
98101 06/19/05 14:10 cdaq Run 55580: Aerogel Set trigger / ps5=4000
98100 06/19/05 14:06 Paul B. SLI, BPM and BCM screens
98099 06/19/05 13:09 cdaq Run 55579: 1X1 & 2X1 & ENGE trigger, 1uA CW, BeO target, ps5=1
98098 06/19/05 13:00 Paul B.
98097 06/19/05 12:45 Paul B. Run#55578 was stoped. Might be Junk
98096 06/19/05 12:38 cdaq Run 55578: 1X1 & 2X1 & ENGE trigger, 1uA CW, BeO target, ps5=1
98095 06/19/05 12:38 Paul B. Error messages
98094 06/19/05 12:23 Paul B. The Rocks problems
98093 06/19/05 12:17 cdaq Run 55577: 1X1 & 2X1 & ENGE trigger, 1uA CW, BeO target, ps5=1
98092 06/19/05 12:14 Paul B. Rock 13 is down
98091 06/19/05 11:57 yuan A first look at HKS sieve slit reconstruction
98090 06/19/05 11:56 cdaq Run 55576: 1X1 & 2X1 & ENGE trigger, 1uA CW, BeO target, ps5=1
98089 06/19/05 11:16 okayasu HV changed for WC1-04T.
98088 06/19/05 11:08 cdaq Run 55575: 1X1 & 2X1 & ENGE trigger, 1uA CW, BeO target, ps5=1
98087 06/19/05 10:28 cdaq Run 55574: 1X1 & 2X1 & ENGE trigger, 1uA CW, BeO target, ps5=1
98086 06/19/05 09:50 cdaq Run 55573: 1X1 & 2X1 & ENGE trigger, 1uA CW, BeO target, ps5=1
98085 06/19/05 09:12 Paul B. HDC tripped
98084 06/19/05 09:10 Sumihama Up-to-date TOF
98083 06/19/05 09:07 cdaq Run 55572: 1X1 & 2X1 & ENGE trigger, 1uA CW, BeO target, ps5=1
98082 06/19/05 08:58 cdaq Run 55571: 1X1 & 2X1 & ENGE trigger, 1uA CW, BeO target, ps5=1
98081 06/19/05 08:46 cdaq Run 55570: DAQ test
98080 06/19/05 08:41 cdaq Run 55569: DAQ test
98079 06/19/05 08:36 cdaq Run 55568: DAQ test
98078 06/19/05 08:30 cdaq Run 55567: DAQ test
98077 06/19/05 08:22 Akihiko VMEC11 rebooted due to F1 had error
98076 06/19/05 08:16 cdaq Run 55566: DAQ test
98075 06/19/05 08:00 cdaq Beam Time Accounting
98074 06/19/05 07:09 Akihiko No "ERROR: too many return value"
98073 06/19/05 06:39 cdaq Run 55565: 1Xor & 2Xor & ENGE trigger, 1uA CW, BeO target, ps5=1
98072 06/19/05 06:21 Fujii Late entry: Before run 55564, both ENGE and HKS sieve slits are out
98071 06/19/05 05:55 Fujii Better EDC TDC stop timing by using EHOD timing
98070 06/19/05 05:54 Akihiko Window and latency for VMEC14 modified
98069 06/19/05 05:48 Akihiko Change F1 TDC window & latency
98068 06/19/05 05:10 cdaq Run 55564: 1Xor & 2Xor & ENGE trigger, 1uA CW, BeO target, ps5=1
98067 06/19/05 05:04 cdaq Run 55563: DAQ test
98066 06/19/05 04:59 cdaq Run 55562: DAQ test
98065 06/19/05 04:55 cdaq Run 55561: DAQ test
98064 06/19/05 04:54 Sumihama Quick analysis of HTOF
98063 06/19/05 04:52 cdaq Run 55560: DAQ test
98062 06/19/05 04:50 Akihiko VMEC13 rebooted
98061 06/19/05 04:33 Akihiko VMEC11 down
98060 06/19/05 04:03 cdaq Run 55558: DAQ test
98059 06/19/05 04:01 cdaq Run 55557: DAQ test
98058 06/19/05 03:33 Akihiko Resolution of F1(VMEC12, slot 16) Not Locked
98057 06/19/05 03:32 cdaq Run 55556: DAQ test
98056 06/19/05 03:14 cdaq Run 55555: 1X1 & 2X1 rigger, 1uA CW, BeO target, ps5=65
98055 06/19/05 03:00 cdaq Run 55554: ENGE trigger, Both sieve slit in, 1uA CW, BeO target, ps5=28
98054 06/19/05 03:00 Akihiko Sieve slit in for both side
98053 06/19/05 02:46 cdaq Run 55553: 1Xor & 2Xor & ENGE trigger, 1uA CW, BeO target, ps5=1
98052 06/19/05 01:57 Akihiko Trigger timing of each group
98051 06/19/05 01:46 cdaq Run 55552: 1X1 & 2X1 & ENGE trigger, 1uA CW, BeO target, ps5=1
98050 06/19/05 01:25 cdaq Run 55550: 1X1 & 2X1 & ENGE trigger, 1uA CW, BeO target, ps5=2
98049 06/19/05 01:09 Kawama HHODO1x-2x TOF resolution(counter#1x-7 and 2x-8)
98047 06/19/05 00:39 Reinhold Plan for the night & morning
Saturday
98046 06/18/05 23:59 cdaq Beam Time Accounting
98045 06/18/05 23:58 ent shift summary
98044 06/18/05 23:49 yuan HKS hodoscope time offset parameters are (partially) calibrated
98043 06/18/05 22:10 cdaq Run 55549: No AC and no WC in trigger (1X & 1Y & 2X), pulsed beam, BeO target, ps5=1
98042 06/18/05 22:08 Reinhold WC-TUL output set to 70 ns
98041 06/18/05 22:08 Sumihama MAP files are updated for wrong AC channel asign on cvs.
98040 06/18/05 21:57 cdaq Run 55548: No AC and no WC in trigger (1X & 1Y & 2X), pulsed beam, BeO target, ps5=1
98039 06/18/05 21:56 Paul B. Updated map file for AC tdc
98038 06/18/05 21:56 Paul B. Updated map file for AC tdc
98037 06/18/05 21:55 Paul B. Updated map file for AC tdc
98036 06/18/05 21:55 Paul B. Updated map file for AC tdc
98035 06/18/05 21:55 Paul B. Updated map file for AC tdc
98034 06/18/05 21:39 Reinhold Kaon Segment 1 trigger study
98033 06/18/05 21:03 cdaq Run 55547: No AC in trigger (1X & 1Y & 2X & WC), pulsed beam, BeO target, ps5=1
98032 06/18/05 20:57 cdaq Run 55546: No AC in trigger (1X & 1Y & 2X & WC), pulsed beam, BeO target, ps5=1
98031 06/18/05 20:53 cdaq Run 55545: No AC in trigger (1X & 1Y & 2X & WC), pulsed beam, BeO target, ps5=1
98030 06/18/05 20:39 cdaq Run 55544: No AC in trigger (1X & 1Y & 2X & WC), pulsed beam, BeO target, ps5=1
98029 06/18/05 19:44 reinhold Changed tigger to AC veto
98028 06/18/05 19:27 cdaq Run 55543: Non-Pion trigger (1X & 1Y & 2X & WC veto by AC (1/3), i.e. pions vetoed), pulsed beam, BeO target, ps5=1
98027 06/18/05 18:32 Reinhold During run 55542 start playing with EHODO
98026 06/18/05 17:56 cdaq Run 55542: Pion trigger (1X & 1Y & 2X & WC veto by No AC (1/3)), pulsed beam, BeO target, ps5=1
98025 06/18/05 17:52 Reinhold Run 55540: H1X1T-8B ADC unplugged
98024 06/18/05 17:52 cdaq Run 55541: Pion trigger (1X & 1Y & 2X & WC veto by No AC (1/3)), no beam :Testrun.
98023 06/18/05 17:04 Reinhold AC trigger rates
98022 06/18/05 16:52 Reinhold Run #55540: Analysis tasks
98021 06/18/05 16:50 saw Modification of F1 event readout list
98020 06/18/05 16:30 gabriel shift summary owl shift (belated)
98019 06/18/05 16:26 Víctor Shift Summary
98018 06/18/05 16:21 cdaq Run 55540: Pion trigger (1X & 1Y & 2X & WC veto by No AC (1/3)), pulsed beam, BeO target, ps5=1
98017 06/18/05 16:17 cdaq Run 55539: Pion trigger (1X & 1Y & 2X & WC veto by No AC), pulsed beam, BeO target, ps5=1
98016 06/18/05 16:13 cdaq Beam Time Accounting
98015 06/18/05 16:10 cdaq Run 55537: Pion trigger (1X & 1Y & 2X & WC veto by No AC), Pulse beam, 1 uA, BeO target, ps5=1
98014 06/18/05 16:00 cdaq Run 55536: Pion trigger (1X & 1Y & 2X & WC veto by No AC), Pulse beam, 1 uA, BeO target, ps5=1
98013 06/18/05 15:55 Víctor Change to pulse beam at 15:55
98012 06/18/05 15:50 yuan Preli. study of HKS DC rate and tracking
98011 06/18/05 15:43 Víctor & Joe DAQ and CODA Reboot
98010 06/18/05 15:38 cdaq Run 55535: Pion trigger (1X & 1Y & 2X & WC veto by No AC), CW beam, 1 uA, BeO target, ps5=1
98009 06/18/05 14:58 cdaq Run 55533: Pion trigger (1X & 1Y & 2X & WC veto by No AC), CW beam, 1 uA, BeO target, ps5=1
98008 06/18/05 14:54 cdaq Run 55532: Pion trigger (1X & 1Y & 2X & WC veto by No AC), CW beam, 1 uA, BeO target, ps5=1
98007 06/18/05 14:46 Reinhold Rebooted VMEC13 via APC
98006 06/18/05 14:37 Victor ROC 12 and 13 errors
98005 06/18/05 14:30 cdaq Run 55531: Pion trigger (1X & 1Y & 2X & WC veto by No AC), CW beam, 1 uA, BeO target, ps5=1
98004 06/18/05 14:28 Victor DAQ Hung up run 55530
98003 06/18/05 14:23 Reinhold Scope shot of AC trigger
98002 06/18/05 14:15 cdaq Run 55530: Pion trigger (1X & 1Y & 2X & WC veto by No AC), CW beam, 1 uA, BeO target, ps5=1
98001 06/18/05 14:12 Reinhold Set trigger (1X&2X&1Y&WC) veto by .not.AC HKS only
98000 06/18/05 14:10 cdaq Run 55529: Junk
97999 06/18/05 12:42 cdaq Run 55528: Coin of HKS AND ENGE, CW beam, 1 uA, BeO target, ps5=1
97998 06/18/05 12:27 Victor Day Shift Screen Shots BCM, BPM and SLI
97997 06/18/05 11:13 Víctor We have again beam (1.1 microA)
97996 06/18/05 11:11 cdaq Run 55527: Coin of HKS AND ENGE, CW beam, 1 uA, BeO target, ps5=1
97995 06/18/05 11:04 Víctor MCC Power Supply tripped
97994 06/18/05 10:41 seva HDC tripped
97993 06/18/05 09:15 Víctor HDC1 Tripped
97992 06/18/05 08:05 cdaq Beam Time Accounting
97991 06/18/05 06:46 cdaq Run 55526: Coin of HKS AND ENGE, CW beam, 1 uA, BeO target, ps5=1
97990 06/18/05 06:33 Akihiko Problem solved, now network is fine
97989 06/18/05 06:27 cdaq Run 55525: DAQ test
97988 06/18/05 06:24 cdaq Run 55524: test
97987 06/18/05 04:33 Akihiko Network problem
97986 06/18/05 02:57 cdaq Run 55523: Coin of HKS AND ENGE, CW beam, 1 uA, BeO target, ps5=1
97985 06/18/05 02:55 cdaq Run 55522: Coin of HKS AND ENGE, CW beam, 1 uA, BeO target, ps5=1
97984 06/18/05 02:52 Akihiko CW beam, 1 uA
97983 06/18/05 02:26 cdaq Run 55521: ENGE tracking study w/ collimator, EHODOand, Pulsed beam, 1.5 uA, BeO target, ps5=1
97982 06/18/05 02:24 Akihiko Collimator is set for ENGE side
97981 06/18/05 02:13 cdaq Run 55520: ENGE tracking study w/ sieve slit, EHODOand, Pulsed beam, 1.5 uA, BeO target, ps5=1
97980 06/18/05 02:11 Akihiko Change collimator to sieve slit for EMGE side
97979 06/18/05 01:16 cdaq Run 55519: HKS tracking study, H1X AND H2X AND H1Y AND WCor, Pulsed beam, 1 uA, ps5=10
97978 06/18/05 00:44 cdaq Run 55518: HKS tracking study, H1X AND H2X AND H1Y AND WCor, Pulsed beam, 1 uA, ps5=10
97977 06/18/05 00:43 cdaq Run 55517: HKS tracking study, H1X AND H2X AND H1Y AND WCor, Pulsed beam, 1 uA, ps5=10
97976 06/18/05 00:37 cdaq Run 55516: HKS tracking study, H1X AND H2X AND H1Y AND WCor, CW beam, 1 uA, ps5=10
97975 06/18/05 00:16 cdaq Run 55515: HKS tracking study, H1X AND H2X AND H1Y AND WCor, CW beam, 1 uA, ps5=10
97974 06/18/05 00:14 cdaq Run 55514: HKS tracking study, H1X AND H2X AND H1Y AND WCor, CW beam, 1 uA, ps5=10
97973 06/18/05 00:02 cdaq Run 55513: HKS tracking study, H1X AND H2X AND H1Y AND WCor, Pulsed beam, 5 uA, ps5=2
97972 06/18/05 00:00 cdaq Run 55512: HKS tracking study, H1X AND H2X AND H1Y AND WCor, Pulsed beam, 5 uA, ps=1
Friday
97971 06/17/05 23:48 Kawama Enge ADC signal was completed
97970 06/17/05 23:47 Akihiko VMEC11 crate down
97969 06/17/05 23:44 Reinhold Splitter tripped on Inpvolt
97968 06/17/05 23:43 cdaq Run 55511: test
97967 06/17/05 23:31 cdaq Run 55510: HKS tracking study, H1X AND H2X AND H1Y AND WCor, Pulsed beam, 5 uA, ps=1
97966 06/17/05 23:28 cdaq Run 55509: test
97965 06/17/05 23:27 cdaq Run 55508: test for ENGE detectors, EHODO AND, cw 1.12 uA, BeO,ps5=50
97964 06/17/05 23:25 cdaq Run 55507: test for ENGE detectors, EHODO AND, cw 1.12 uA, BeO,ps5=50
97963 06/17/05 23:19 Tang More careful shielding is needed for both HKS and Enge arms
97962 06/17/05 23:17 cdaq Run 55506: test for ENGE detectors, EHODO AND, cw 1.12 uA, BeO,ps5=50
97961 06/17/05 23:15 yuan Shift Summary
97960 06/17/05 23:14 cdaq Beam Time Accounting
97959 06/17/05 23:12 cdaq Run 55505: test for ENGE detectors, EHODO AND, cw 1.12 uA, BeO,ps5=50
97958 06/17/05 23:04 cdaq Run 55504: test for ENGE detectors, EHODO AND, cw 1.12 uA, BeO,ps5=50
97957 06/17/05 22:57 Akihiko Resolition of F1 TDC(VMEC12, slot10) was not locked
97956 06/17/05 22:53 Akihiko How to reboot VME crate by remote
97955 06/17/05 22:41 cdaq Run 55503: test
97954 06/17/05 22:38 cdaq Run 55502: test
97953 06/17/05 22:06 Akihiko One F1 TDC in VMEC11 had problem
97952 06/17/05 22:05 cdaq Run 55500: test for HKS detectors, H1X AND H2X AND H1Y AND WC, cw 1.10 uA,ps5=10
97951 06/17/05 21:39 Akihiko VMEC11 problem
97950 06/17/05 21:30 cdaq Run 55497: test
97949 06/17/05 21:22 cdaq Run 55496: test for trigger study, H1X AND H2X AND Enge, cw 1.07 uA,ps=1
97948 06/17/05 21:18 cdaq Run 55495: DAQ test
97947 06/17/05 21:16 Reinhold VESDA network error
97946 06/17/05 20:30 cdaq Run 55494: DAQ test
97945 06/17/05 20:16 Kawama Hhodo 1x-5t signal
97944 06/17/05 19:57 cdaq Run 55493: test
97943 06/17/05 19:28 cdaq Run 55492: test for trigger study, H1X AND H2X AND Enge, cw 1.07 uA,ps=1
97942 06/17/05 19:08 cdaq Run 55490: test for trigger study, H1X AND H2X AND Enge, cw 1.07 uA,ps=1
97941 06/17/05 18:50 cdaq Run 55489: test for trigger study, H1X AND H2X AND Enge, cw 1.07 uA,ps=1
97940 06/17/05 18:50 Sumihama ADC gate for EHODO was adjusted.
97939 06/17/05 18:12 cdaq Run 55486: test for trigger study, H1X AND H2X AND Enge, cw 1.07 uA,ps=1
97938 06/17/05 18:01 paul Changed PMTs signals back and chenged thresholds!
97937 06/17/05 17:49 cdaq Run 55484: test for trigger study, H1X AND H2X AND Enge, cw 1.07 uA,ps=1
97936 06/17/05 17:39 Paulie & Vic Switch AC2 Patch connection in CH
97935 06/17/05 17:37 cdaq Run 55483: test for trigger study, H1X AND H2X AND Enge, cw 1.07 uA,ps=1 (AC2T and AC2B2 are switched around)
97934 06/17/05 17:30 saw EN1bar for Enge OK
97933 06/17/05 17:30 Miyoshi how to grub screen
97932 06/17/05 17:18 cdaq Run 55482: test for trigger study, H1X AND H2X AND Enge, cw 1.07 uA,ps=1
97931 06/17/05 16:56 cdaq Run 55481: test for trigger study, H1X AND H2X AND Enge, cw 1.07 uA,ps=1
97930 06/17/05 16:54 Miyoshi EN1bar in downstair
97929 06/17/05 16:46 Miyoshi replay CVS updated
97928 06/17/05 16:45 cdaq Run 55480: test for trigger study, H1X AND H2X AND Enge, cw 1.07 uA,ps=1
97927 06/17/05 16:41 saw Clock and EN1Bar signals to Enge scalers fixed
97926 06/17/05 16:29 saw Not all modules converted in vmec11
97925 06/17/05 16:22 saw Scaler display update
97924 06/17/05 16:14 cdaq Run 55479: test for trigger study, H1X AND H2X AND Enge, cw 1.07 uA,ps=1
97923 06/17/05 16:12 saw Scaler clock and gate in Enge electronics hut
97922 06/17/05 16:11 Sumihama Trigger timing and rate study
97921 06/17/05 16:10 cdaq Run 55478: test for trigger study, cw 1.07 uA,ps=100
97920 06/17/05 16:09 cdaq Run 55477: test for trigger study, cw 1.07 uA,ps=100
97919 06/17/05 15:52 cdaq Beam Time Accounting
97918 06/17/05 15:45 cdaq Run 55476: Test data during trigger study, ps5=1, BeO 1uA
97917 06/17/05 15:42 cdaq Run 55475: HKS and ENGE coin, 1.1uA, BeO, ps5=10
97916 06/17/05 15:31 cdaq Run 55474: HKS and Enge coin. 1.11 uA. BeO. ps5=10
97915 06/17/05 15:19 yuan BPM, BCM and SLI information windows
97914 06/17/05 15:14 cdaq Run 55473: ENGE and HKS coin. 1uA BeO ps5=10
97913 06/17/05 14:53 cdaq Run 55469: HKS and ENGE coiun beam 10uA ps5=1
97912 06/17/05 14:51 cdaq Run 55468: HKS&ENGE coni ps5=1
97911 06/17/05 14:31 Miyoshi please provide detail information for Analyzer crush
97910 06/17/05 14:12 cdaq Run 55467: Test data during trigger study
97909 06/17/05 13:38 cdaq Run 55466: fission test for gate check trigger=1 out of 4 ps5=1
97908 06/17/05 13:29 Sumihama Trigger rate with 0,2uA beam and BeO
97907 06/17/05 13:11 Sumihama &Fu BG trigger rate with beam
97906 06/17/05 12:35 Fujii Get 0.1uA CW beam on BeO
97905 06/17/05 11:59 Reinhold Get out of controlled access
97904 06/17/05 11:44 beaufait q1 overtemp trip
97903 06/17/05 11:12 Fujii Q1 tripped
97902 06/17/05 11:09 Fujii Q1 set to 597A
97901 06/17/05 09:25 Reinhold Dropped to Controlled Access
97900 06/17/05 09:01 Reinhold Moved target to empty and short time later to BeO
97899 06/17/05 08:41 Reinhold Moved target to BeO
97898 06/17/05 08:04 cdaq Beam Time Accounting
97897 06/17/05 08:04 gabriel shift summary
97896 06/17/05 04:10 Tang FSD system from HKS
97895 06/17/05 04:05 Tang Hall dropped to power permit due to a dipole trip at BSY
97894 06/17/05 03:57 Tang Q1 tripping problem needs to be solved
97893 06/17/05 01:09 Reinhold Splitter and EZ hall probe interlocks are wrong
97892 06/17/05 00:51 reinhold Q1 trip DCOverVolt/Overtemp
97891 06/17/05 00:02 cdaq Run 55465: DAQ test
97890 06/17/05 00:01 Reinhold Splitter failed on MagWater/Inpvolt
Thursday
97889 06/16/05 23:57 Reinhold Reset Q1 ans set 10% lower at 540 A
97888 06/16/05 23:54 cdaq Beam Time Accounting
97887 06/16/05 23:54 yuan Shift Summary
97886 06/16/05 23:44 Reinhold Q1 tripped again on DCOverVolt/Overt
97885 06/16/05 23:30 Akihiko Trigger window & latency for F1TDC changed
97884 06/16/05 23:30 Reinhold HKS and ENGE magnets on
97883 06/16/05 22:46 saw HKS Scaler Display
97882 06/16/05 22:43 Reinhold LCW flow scheme (continued)
97881 06/16/05 22:33 Reinhold LCW flow scheme
97880 06/16/05 21:55 cdaq Run 55464: DAQ test
97879 06/16/05 21:53 Reinhold Magnet trouble
97878 06/16/05 21:45 cdaq Run 55463: DAQ test
97877 06/16/05 21:41 cdaq Run 55462: DAQ test
97876 06/16/05 21:19 Nue EZ PS bad, Q2 PS problem, Q1 PS is not healthy
97875 06/16/05 21:18 Sumihama Back to the original program for Splitter control.
97874 06/16/05 19:55 yuan Hall in controlled access
97873 06/16/05 17:57 yuan Jorge is in MCC for beam tuning
97872 06/16/05 17:40 Miyoshi Analyzer developper tips
97871 06/16/05 17:34 cdaq Run 55460: fission test for gate check trigger=1 out of 4 ps5=1
97870 06/16/05 17:32 cdaq Run 55459: fission test 1 (after ADC gate fixed)
97869 06/16/05 17:13 Reinhold Update: Status and schedule for the next 24 hrs
97868 06/16/05 16:35 okayasu About AC & WC timing w/ Multihit TDC(discussed w/ Miyoshi)
97867 06/16/05 16:32 cdaq Run 55458: fission test for gate check trigger=1 out of 4 ps5=1
97866 06/16/05 16:30 cdaq Run 55457: fission test trigger=4 of 4 ps5=100
97865 06/16/05 16:12 Reinhold hks_data_structures.cmn needs update
97864 06/16/05 15:28 okayasu Timing study for TUL1X using real signals(2)
97863 06/16/05 15:25 reinhold e01011-replay (may or may not have messed with it)
97862 06/16/05 14:56 reinhold Turned off HKS HV and ENGE DC
97861 06/16/05 14:48 Fujii Target ladder is competely out
97860 06/16/05 14:41 cdaq Run 55456: BeO tgt, cca 5uA, Trigger EHODO AND, ps5=100, epics check
97859 06/16/05 14:35 Fujii BeO in, CW 5uA
97858 06/16/05 13:10 Miyoshi updated e01011.map.55290 again
97857 06/16/05 13:05 okayasu AC, WC timing check w/ TUL out & Discri out
97856 06/16/05 13:01 Miyoshi updated e01011.map.55290
97855 06/16/05 11:03 cdaq Run 55455: ps5=100, WC trig.
97854 06/16/05 10:53 cdaq Run 55454: ps5=1000, PION trig.
97853 06/16/05 10:20 cdaq Run 55453: ps5=100, WC trig.
97852 06/16/05 09:58 cdaq Run 55452: ps5=1000, PION trig.
97851 06/16/05 09:53 cdaq Run 55451: ps5=1000, KAON trig.
97850 06/16/05 09:32 cdaq Run 55450: ps5=1000, pion trig.
97849 06/16/05 08:58 cdaq Run 55449: Timing test w/ pion trig.
97848 06/16/05 08:33 cdaq Run 55448: test
97847 06/16/05 08:26 Reinhold Tentative schedule for the day
97846 06/16/05 08:09 Akihiko EDC tripped
97845 06/16/05 07:49 gabriel shift summary
97844 06/16/05 05:06 cdaq Run 55447: DAQ test
97843 06/16/05 05:01 cdaq Run 55446: DAQ test
97842 06/16/05 04:02 Akihiko ROC11 had problem
97841 06/16/05 03:57 cdaq Run 55445: DAQ test
97840 06/16/05 03:54 cdaq Run 55444: DAQ test
97839 06/16/05 02:46 cdaq Run 55443: BeO tgt, cca 6.0uA, Trigger EHODO AND, ps5=100
97838 06/16/05 02:42 cdaq Run 55442: BeO tgt, cca 6.0uA, Trigger EHODO AND, ps5=100
97837 06/16/05 02:24 Kawama Some bad ADC channels
97836 06/16/05 02:05 Akihiko Beam on and some HV tripped
97835 06/16/05 00:49 cdaq Run 55441: DAQ {test;} 1X OR 2X
97834 06/16/05 00:07 Sumihama Sieve slits are at a collimator and BeO target.
97833 06/16/05 00:07 Sumihama pc104 is up.
Wednesday
97832 06/15/05 22:13 Reinhold DZ power supply up and running
97831 06/15/05 22:13 Miyoshi New connection for scalers
97830 06/15/05 22:01 cdaq Run 55440: DAQ {test;} EHODO OR
97829 06/15/05 21:52 Nue TUL async vs sync
97828 06/15/05 21:49 Reinhold Cold cathode gauge controllers turned off too
97827 06/15/05 21:38 Akihiko NIM & VME on
97826 06/15/05 21:24 cdaq Run 55439: DAQ {test;} EHODO OR
97825 06/15/05 21:15 cdaq Run 55438: DAQ test; EHODO OR
97824 06/15/05 20:56 Danagoulian Hall C power is on
97823 06/15/05 19:57 Nue Joerg went to Hall C to switch off all ion gauges
97822 06/15/05 19:48 okayasu Timing study for TUL1X using real signals.
97821 06/15/05 19:36 Nue Switch off Hall C VME, NIM crates
97820 06/15/05 19:00 Nue New helium bottle for He bag
97819 06/15/05 18:51 Danagoulian Hall C power off
97818 06/15/05 17:03 Víctor BLM-1 and BLM-2 are set at 750 V
97817 06/15/05 17:00 Víctor BLM-1 and BLM-2 On
97816 06/15/05 16:54 Víctor BLM High Voltage
97815 06/15/05 16:47 Sumihama AC HITS MAX # ->170
97814 06/15/05 15:59 cdaq Beam Time Accounting
97813 06/15/05 15:54 Reinhold ENGINE inconsistencies
97812 06/15/05 15:30 Reinhold HV
97811 06/15/05 14:46 okayasu TUL 1X & 2X have been downloaded.
97810 06/15/05 14:34 Sumihama replay updated
97809 06/15/05 14:03 lcole Dead Channel Fixed
97808 06/15/05 14:02 lcole Dead Channel Fixed
97807 06/15/05 12:07 Reinhold No CW last night
97806 06/15/05 10:08 Fujii Hall C is in Restricted access
97805 06/15/05 09:46 Fujii Amount of He gas for HKS He bag
97804 06/15/05 08:56 Nue Hall C Controlled Access
97803 06/15/05 08:34 Nue Hall C Controlled Access
97802 06/15/05 08:09 cdaq Beam Time Accounting
97801 06/15/05 07:38 gueye Ask for controlled access
97800 06/15/05 07:27 cdaq Beam Time Accounting
97799 06/15/05 05:37 gueye magnet sets to 0
97798 06/15/05 05:31 gueye No more beam tonight - DZ & H00A viewer problems
97797 06/15/05 03:38 cdaq Run 55437: DAQ test
97796 06/15/05 03:32 cdaq Run 55436: DAQ test
97795 06/15/05 03:25 cdaq Run 55435: DAQ test
97794 06/15/05 03:11 cdaq Run 55434: DAQ test
97793 06/15/05 02:58 cdaq Run 55433: DAQ test
97792 06/15/05 02:24 gueye New magnet settings
97791 06/15/05 02:21 Nue ELOG 1275488 without stray field?
97790 06/15/05 01:38 gueye Beam through the HKS chicane
97789 06/15/05 01:04 gueye all target out
97788 06/15/05 00:33 okayasu TUL 2X updated(3)
97787 06/15/05 00:30 okayasu TUL 2X updated(2)
97786 06/15/05 00:15 okayasu TUL 2X updated(1)
Tuesday
97785 06/14/05 23:05 okayasu TUL 1X updated(3).
97784 06/14/05 23:03 okayasu Target has been moved.
97783 06/14/05 23:01 okayasu TUL 1X updated(2).
97782 06/14/05 22:58 Akihiko Empty target
97781 06/14/05 22:57 okayasu TUL 1X updated(1).
97780 06/14/05 22:17 Akihiko ROC12 down
97779 06/14/05 22:13 cdaq Run 55431: DAQ test
97778 06/14/05 22:00 Akihiko
97777 06/14/05 22:00 Kawama Some PMTs are tripped
97776 06/14/05 21:38 Maruyama turned on DCs
97775 06/14/05 21:33 cdaq Run 55429: BeO tgt, cca 4.5uA, timing check
97774 06/14/05 21:17 cdaq Run 55428: BeO tgt, cca 4.5uA, Trigger EHODO AND, ps5=10
97773 06/14/05 21:11 Akihiko Trigger rate with beam
97772 06/14/05 21:00 okayasu 6 uA beam might come from now.
97771 06/14/05 20:56 Akihiko turned off EDC
97770 06/14/05 20:54 Miyoshi Update replay CVS for chrenkov ntuple and others
97769 06/14/05 20:21 Miyoshi CVS tips (corrected)
97768 06/14/05 20:20 Miyoshi CVS tips
97767 06/14/05 19:41 Masashi Kane The reason is simple
97766 06/14/05 19:05 Reinhold INCLUDE files inconsistency
97765 06/14/05 18:28 Reinhold MHTDC buffer window
97764 06/14/05 18:24 Reinhold Problem creating ntuples
97763 06/14/05 18:14 Nue EZ can be set manually, tuning is in process
97762 06/14/05 17:50 cdaq Run 55426: Empty tgt, cca 0uA, Trigger 1X AND 2X, ps5=1
97761 06/14/05 17:24 Miyoshi MHTDC window 2us ==> 1us
97760 06/14/05 17:19 cdaq Run 55425: BeO, cca 5uA, Trigger 1X AND 2X, ps5=1
97759 06/14/05 17:16 Nue Empty Target In
97758 06/14/05 16:51 Nue Beam stopped EZ DC overload
97757 06/14/05 16:35 Nue HDC tripped
97756 06/14/05 16:25 Nue Hall C goes to Beam permit, Magnets setting
97755 06/14/05 16:03 cdaq Beam Time Accounting
97754 06/14/05 16:01 saw MCC had wrong variable name for splitter set
97753 06/14/05 15:47 Masashi Kane MCC had mistake to set the variable name to get magnet information
97752 06/14/05 15:43 Nue Splitter current set procedure updates
97751 06/14/05 15:32 Masashi Kane splitter magnet problem
97750 06/14/05 14:49 Masashi Kane hcpc4 is rebooted
97749 06/14/05 14:20 Miyoshi Another how to file for analysis
97748 06/14/05 13:46 Masashi Kane Hall probe problem
97747 06/14/05 12:23 Masashi Kane It was due to Bill's work
97746 06/14/05 12:21 Reinhold Turned bucking coils on
97745 06/14/05 12:12 Masashi Kane HKS-Q1 is tripped
97744 06/14/05 11:47 Miyoshi Update replay and CODA:sfich3.crl
97743 06/14/05 11:24 Nue Wrong DZ, EZ polarity
97742 06/14/05 11:23 cdaq Run 55424: multigit TDC window 2micro sec
97740 06/14/05 11:12 Masashi Kane HKS-D, Q1, Q2 and ENGE magnets are on
97739 06/14/05 10:39 Miyoshi 1877MHTDC
97738 06/14/05 10:24 Masashi Kane DZ magnet
97737 06/14/05 09:30 Masashi Kane DZ magnet turned off
97736 06/14/05 09:23 Masashi Kane ENGE magnet field is off
97735 06/14/05 09:22 Masashi Kane time is 8Am, not 9Am
97734 06/14/05 08:42 Masashi Kane off-magnet-field
97733 06/14/05 07:36 cdaq Beam Time Accounting
97732 06/14/05 04:58 cdaq Run 55423: Cosmic-ray, Trigger 1X AND 2X,
97731 06/14/05 04:55 Akihiko HV of DCs
97730 06/14/05 04:46 Akihiko ROC6 had NO error
97729 06/14/05 04:32 Darko Beam status
97728 06/14/05 04:11 Akihiko Preliminary result of EDC analysis, run55381
97727 06/14/05 03:52 DArko ... to vontrolled access
97726 06/14/05 02:36 Sumihama Histgrams for RF signals are ready.
97725 06/14/05 02:27 Sumihama AC channel asign in e01011.map.55290 was wrong.
97724 06/14/05 02:27 cdaq Run 55422: BeO, cca 8uA, Trigger 1X AND 2X, ps5=1
97723 06/14/05 02:11 Reinhold Turned aerogel bucking coils off
97722 06/14/05 01:20 cdaq Run 55421: BeO, cca 5uA, 950 MeV, Trigger 1X AND 2X, ps5=1
97721 06/14/05 00:30 cdaq Run 55420: BeO, no beam, Trigger 1X AND 2X, ps5=10, all H1X on
97720 06/14/05 00:08 cdaq Beam Time Accounting
Monday
97719 06/13/05 22:59 Nue Magnets setting for 1 pass chicane beam (SPL, Q1, Q2, D, ENGE)
97718 06/13/05 22:11 Nue BeO target in
97717 06/13/05 21:58 Nue Empty target
97716 06/13/05 21:45 Nue 1 pass straight beam
97715 06/13/05 21:20 Nue Singles rate for 1 pass straight beam
97714 06/13/05 21:16 Nue Singles rate for 1 pass straight beam
97713 06/13/05 21:14 Sumihama Trigg-TDC channel map in e01011.map.55290 was updated and commited.
97712 06/13/05 21:13 Nue HKS, ENGE are off
97711 06/13/05 21:13 Akihiko Beam on and some HV tripped
97710 06/13/05 21:12 Nue 1 pass beam to Hall C
97709 06/13/05 21:10 Nue, Liguang Students, come to CR at least once per day
97708 06/13/05 20:53 Sumihama NO TDC of AC/WC problem was fixed.
97707 06/13/05 20:43 Nue Tomorrow, what can we do about DZ PS?
97706 06/13/05 20:32 Nue Q1, Q2, D, ENGE magnet setting for 1 pass beam
97705 06/13/05 20:24 cdaq Run 55419: DAQ test
97704 06/13/05 20:16 okayasu TUL starting time gap checks (Excellent News !!) again w/ figure
97703 06/13/05 20:14 cdaq Run 55418: DAQ test
97702 06/13/05 20:13 cdaq Run 55417: DAQ test
97701 06/13/05 20:08 cdaq Run 55416: DAQ test
97700 06/13/05 20:01 okayasu TUL starting time gap checks (Excellent News !!)
97699 06/13/05 20:00 cdaq Run 55415: DAQ test
97698 06/13/05 19:42 Reinhold First Pass for the night
97697 06/13/05 19:20 Reinhold MAP file for trigger TDCs
97696 06/13/05 19:12 Reinhold ENGE/HKS pre trigger TDC signals swapped
97695 06/13/05 18:59 Nue DZ PS will not be fixed tonight
97694 06/13/05 18:41 paul&seva Problem solved ! Please enjoy!
97693 06/13/05 18:39 Reinhold Aerogel Cerenkov at 0.6 GeV/c (1-pass beam)
97692 06/13/05 18:17 Sumihama Modify the Monitor/Controller for magnets.
97691 06/13/05 18:09 Sumihama Bug fix in MAPfile but still no TDC data for AC/WC
97690 06/13/05 17:21 saw ROC6 Not all modules converted! errors
97689 06/13/05 17:09 Nue Today's plan
97688 06/13/05 16:47 Nue Viewer A, YAG viewer and DZ PS
97687 06/13/05 16:38 cdaq Run 55414: DAQ test
97686 06/13/05 16:17 Kawama Sorry, this title is wrong.
97685 06/13/05 16:10 cdaq Beam Time Accounting
97684 06/13/05 15:58 Masashi Kane HKS Dipole fault
97683 06/13/05 15:53 cdaq Run 55413: test
97682 06/13/05 15:52 cdaq Run 55412: BeO, cca 5uA, Trigger 1X AND 2X, ps5=10, all H1X on
97681 06/13/05 15:35 okayasu HV turned on again.
97680 06/13/05 15:30 okayasu HV turned off
97679 06/13/05 14:51 Maruyama HHODO problems
97678 06/13/05 14:04 Nue Scalers in Hall C
97677 06/13/05 13:52 Nue HMS water leak stopped
97676 06/13/05 10:58 Sumihama Update replay for pedestal
97675 06/13/05 10:35 Nue Mike and Greg are in Hall C
97674 06/13/05 10:33 Nue He bag gas status
97673 06/13/05 10:18 Nue Water dripping from HMS
97672 06/13/05 09:50 Masashi Kane BIll and MCC people are now in Hall C
97671 06/13/05 09:35 Masashi Kane higher radiation level than expected
97670 06/13/05 09:05 cdaq Run 55411: BeO, no beam,Trigger 1X AND 2X, ps5=10, all H1X on
97669 06/13/05 08:55 Masashi Kane Hall C is in controlled access
97668 06/13/05 08:48 cdaq Run 55410: BeO, cca 5uA, Trigger 1X AND 2X, ps5=10, all H1X on
97667 06/13/05 08:35 cdaq Beam Time Accounting
97666 06/13/05 08:07 cdaq Beam Time Accounting
97665 06/13/05 08:04 Darko HKS 1X-hodoscope study
97664 06/13/05 07:42 cdaq Run 55409: BeO, cca 5uA, Trigger 1X AND 2X, ps5=10, all H1X on
97663 06/13/05 07:40 cdaq Run 55408: BeO, cca 5uA, Trigger 1X AND 2X, ps5=10, all H1X on
97662 06/13/05 07:39 Nue Note to TUL experts (Okayasu, Fujii, Nue)
97661 06/13/05 07:38 cdaq Run 55407: BeO, cca 5uA, Trigger 1X AND 2X, ps5=10, all H1X on
97660 06/13/05 07:36 Akihiko 1X-1T to 1X-6B was on
97659 06/13/05 07:32 Akihiko F1 had a problem
97658 06/13/05 07:17 cdaq Run 55406: BeO, cca 5uA, Trigger 1X AND 2X, ps5=10, all H1X on
97657 06/13/05 07:00 cdaq Run 55404: BeO, cca 5uA, Trigger 1X AND 2X, ps5=10, all H1X on
97656 06/13/05 06:41 cdaq Run 55403: BeO, cca 5uA, Trigger 1X AND 2X, ps5=1, only H1X-06T&B with power on
97655 06/13/05 06:25 cdaq Run 55402: BeO, cca 5uA, Trigger 1X AND 2X, ps5=1, only H1X-05T&B with power on
97654 06/13/05 05:55 cdaq Run 55401: BeO, cca 5uA, Trigger 1X AND 2X, ps5=1, only H1X-05T&B with power on
97653 06/13/05 05:27 cdaq Run 55400: BeO, cca 5uA, Trigger 1X AND 2X, ps5=1, only H1X-04T&B with power on
97652 06/13/05 05:00 cdaq Run 55399: BeO, cca 5uA, Trigger 1X AND 2X, ps5=1, only H1X-03T&B with power on
97651 06/13/05 04:36 cdaq Run 55398: BeO, cca 5uA, Trigger 1X AND 2X, ps5=10,
97650 06/13/05 04:21 Darko Long run for Yuan DC test
97649 06/13/05 04:11 cdaq Run 55397: BeO, cca 5uA, Trigger 1X AND 2X, ps5=10,
97648 06/13/05 03:34 Darko Enge trips too many times ...
97647 06/13/05 03:10 cdaq Run 55396: DAQ test, ADC gate check, ps5=1, trying 400k events in 2Gb run
97646 06/13/05 02:44 cdaq Run 55395: BeO, 5.3 uA, Trigger 1X AND 2X, ps5=10
97645 06/13/05 02:32 cdaq Run 55394:
97644 06/13/05 02:28 cdaq Run 55393: Long Run ?
97643 06/13/05 02:25 cdaq Run 55392: test
97642 06/13/05 02:22 cdaq Run 55391: test
97641 06/13/05 02:21 cdaq Run 55390: test
97640 06/13/05 02:15 cdaq Run 55389: test
97639 06/13/05 02:12 cdaq Run 55388: test
97638 06/13/05 01:55 cdaq Run 55387: Usefull ? run , ps5=10
97637 06/13/05 01:52 Joerg and Mi Adjusted HWC ADC gate
97636 06/13/05 01:50 Joerg and Mi Checked some trigger and gate timing
97635 06/13/05 01:42 cdaq Run 55386: Test, ps5=10
97634 06/13/05 01:35 Akihiko Preliminary result of EDC analysis
97633 06/13/05 01:27 cdaq Run 55385: DAQ test, ADC gate check, ps5=1
97632 06/13/05 01:26 cdaq Run 55384: DAQ test, ADC gate check, ps5=100
97631 06/13/05 00:56 yuan HDC current limit increased
97630 06/13/05 00:30 Darko Enge magnet setpoint(s)
97629 06/13/05 00:28 Miyoshi replay execute file
97628 06/13/05 00:01 Reinhold H1X-TUL6 cabled right
Sunday
97627 06/12/05 23:50 Nue ENGE 323.5A again
97626 06/12/05 23:50 Nue Coin Rates
97625 06/12/05 23:30 cdaq Run 55383: DAQ test, ADC gate check, ps5=100
97624 06/12/05 23:23 cdaq Run 55382: BeO, Beam 5.4 uA pulsed
97623 06/12/05 23:09 Nue ENGE current 280A
97622 06/12/05 23:07 Sumihama Q2 and Enge tripped twice.
97621 06/12/05 23:05 Akihiko 1X-9T&B signal with beam
97620 06/12/05 22:59 Nue Q1, Q2, Enge tripped
97619 06/12/05 22:38 cdaq Run 55381: BeO, Beam 1.4 uA
97618 06/12/05 22:38 Reinhold 1X-TUL6 cabled wrong??
97617 06/12/05 22:15 Reinhold Bill came out of hall and DZ not quite fixed yet
97616 06/12/05 21:32 Nue Bill is in Hall C to fix DZ PS
97615 06/12/05 20:35 Akihiko HKS threshold file is generated correctly
97614 06/12/05 19:13 Reinhold DZ power supply trouble
97613 06/12/05 19:13 yuan Preliminary HKS tracking and target reconstruction; comparing with simulation
97612 06/12/05 19:07 Reinhold ODH Alarm in Hall C
97611 06/12/05 18:41 Akihiko HKS threshold file
97610 06/12/05 18:03 Nue, Joerg HKS Dipole polarity check
97609 06/12/05 17:47 Nue Low pulse height signals
97608 06/12/05 17:40 cdaq Run 55380: HHODO test: 1Xor .AND. 2Xor
97607 06/12/05 17:39 Reinhold Set HHODO to 1Xor .AND. 2Xor
97606 06/12/05 17:36 cdaq Run 55379: HHODO test: 1Xor .OR. 2Xor
97605 06/12/05 17:31 Nue Singles rates without beam for 200mV threshold
97604 06/12/05 17:30 Reinhold Set prescale ps5=10 to ps5=1
97603 06/12/05 17:28 cdaq Run 55378: HHODO test: 1Xor .OR. 2Xor
97602 06/12/05 17:11 Reinhold Set HHODO thresholds from -10 mV to -200 mV
97601 06/12/05 16:47 Miyoshi E01011-replay update for pedestal analysis
97600 06/12/05 16:35 Nue HTF1X rates
97599 06/12/05 15:59 cdaq Beam Time Accounting
97598 06/12/05 15:32 Miyoshi HV setting note
97597 06/12/05 14:30 beaufait ez water failure
97596 06/12/05 14:16 Reinhold MEZ water leak fixed; supply still not working
97595 06/12/05 14:14 saw Network speed tests
97594 06/12/05 13:47 cdaq Run 55377: DAQ test
97593 06/12/05 13:29 Masashi Kane please try to restart GUI
97592 06/12/05 12:00 Reinhold HKS magnet control
97591 06/12/05 11:58 cdaq Run 55375: DAQ test
97590 06/12/05 11:53 cdaq Run 55374: DAQ test
97589 06/12/05 11:42 cdaq Run 55373: DAQ test
97588 06/12/05 11:38 Akihiko 1X-3T and 1X-5T are connected wrong position
97587 06/12/05 11:30 cdaq Run 55372: DAQ test
97586 06/12/05 11:01 Reinhold H1X ADC distributions
97585 06/12/05 11:01 Reinhold H1X ADC distributions
97584 06/12/05 10:33 Reinhold Joe will come in ti fix MEZ
97583 06/12/05 10:32 cdaq Run 55371: HHODO test w/out beam
97582 06/12/05 10:28 Reinhold H1X15B HV off
97581 06/12/05 10:20 Reinhold HHODO ADC distributions
97580 06/12/05 10:15 Reinhold Viewer manually locked
97579 06/12/05 10:14 Reinhold MEZ water leak
97578 06/12/05 09:42 Reinhold Viewer expert is here
97577 06/12/05 09:26 yuan Effect of HKS hodo HV decrease on HDC
97576 06/12/05 09:09 Reinhold MCC calls: can give us beam
97575 06/12/05 09:09 Reinhold PD visits counting house
97574 06/12/05 08:40 Masashi Kane Proposing HV scan instead of threshold changing
97573 06/12/05 08:13 cdaq Beam Time Accounting
97572 06/12/05 08:05 gueye Shift Summary
97571 06/12/05 07:48 Miyoshi an example of adc spectrum for HKS hodoscope
97570 06/12/05 06:45 cdaq Run 55370: BeO test run
97569 06/12/05 06:41 cdaq Run 55369: BeO test run
97568 06/12/05 06:29 cdaq Run 55368: Test run
97567 06/12/05 06:01 cdaq Run 55367: test run for gate matching
97566 06/12/05 05:58 Miyoshi Trigger study with beam
97565 06/12/05 05:41 Sumihama & M Timing study of HTOF
97564 06/12/05 05:21 cdaq Run 55366: BeO target run
97563 06/12/05 05:18 cdaq Run 55365: BeO target run
97562 06/12/05 05:13 cdaq Run 55364: test run for gate matching
97561 06/12/05 04:04 gueye EZ magnet hall probe masked
97560 06/12/05 03:59 cdaq Run 55363: test run for gate matching
97559 06/12/05 03:28 cdaq Run 55362: DAQ test
97558 06/12/05 03:22 cdaq Run 55361: DAQ test
97557 06/12/05 03:22 gueye Beam in the Hall
97556 06/12/05 03:20 cdaq Run 55360: DAQ test
97555 06/12/05 03:15 gueye ITV3H00A elog info
97554 06/12/05 02:32 gueye ITV3H00A
97553 06/12/05 02:12 cdaq Run 55359: DAQ test
97552 06/12/05 02:10 cdaq Run 55358: DAQ test
97551 06/12/05 02:07 cdaq Run 55357: DAQ test
97550 06/12/05 01:54 cdaq Run 55356: DAQ test
97549 06/12/05 01:54 gueye MCC needs Hall access to fix downstream beamline diagnostics
97548 06/12/05 01:45 cdaq Run 55355: DAQ test
97547 06/12/05 01:43 cdaq Run 55354: DAQ test
97546 06/12/05 01:39 cdaq Run 55353: DAQ test
97545 06/12/05 01:35 cdaq Run 55352: DAQ test
97544 06/12/05 01:32 cdaq Run 55351: DAQ test
97543 06/12/05 01:28 Akihiko HV for EDC and HDC
97542 06/12/05 01:22 cdaq Beam Time Accounting
97541 06/12/05 00:52 cdaq Run 55350: DAQ test
97540 06/12/05 00:16 Masashi Kane modification of e01011-replay/SRC/engine.f
Saturday
97539 06/11/05 23:52 Nue Vacuum status update (errata)
97538 06/11/05 23:51 Nue Vacuum status update
97537 06/11/05 23:22 Nue Vacuum status update
97536 06/11/05 23:22 Reinhold AC2-3T has bipolar disorder
97535 06/11/05 23:07 Nue HDC, EDC HV
97534 06/11/05 23:05 Nue Viewer problem is not about interlock, CW/Tune mode
97533 06/11/05 23:00 Reinhold AC 1pe test: all OK but AC2-3T
97532 06/11/05 23:00 Reinhold AC 1pe test: all OK but AC2-3T
97531 06/11/05 22:57 Nue View problem, Hall C stays in controlled access
97530 06/11/05 22:54 cdaq Run 55348: DAQ test
97529 06/11/05 22:51 Nue HTF1Y tripped
97528 06/11/05 22:48 cdaq Run 55346: DAQ test
97527 06/11/05 22:45 cdaq Run 55345: DAQ test
97526 06/11/05 22:41 Nue Helium bag
97525 06/11/05 22:32 Nue Target controller reset
97524 06/11/05 22:26 cdaq Run 55344: DAQ test
97523 06/11/05 22:15 cdaq Run 55343: DAQ test
97522 06/11/05 22:13 Nue Hall C controlled access
97521 06/11/05 22:09 Nue HKS, ENGE are ON (Bug of the Mag controller program)
97520 06/11/05 22:07 cdaq Run 55342: DAQ test
97519 06/11/05 22:06 Reinhold AC3 was in slot 7-3 instead of 10-3
97518 06/11/05 21:39 Nue Vacuum status
97517 06/11/05 21:39 cdaq Run 55341: AC 1pe test
97516 06/11/05 21:35 cdaq Run 55340: DAQ test
97515 06/11/05 21:32 cdaq Run 55339: DAQ test
97514 06/11/05 21:31 Reinhold Also set the 2nd module from ENGE to HKS
97513 06/11/05 21:27 cdaq Run 55338: AC 1pe run trigger AC-TUL6
97512 06/11/05 21:26 okayasu TUL WC(top x bottom), AC(top + bottom) versions were released.
97511 06/11/05 21:20 Nue Target cannot be moved
97510 06/11/05 21:18 cdaq Run 55337: AC 1pe run trigger AC-TUL6
97509 06/11/05 21:17 Reinhold Set trigger to B with AC-TUL6 is input
97508 06/11/05 21:13 paul Module 10?
97507 06/11/05 21:06 Nue DC HV off
97506 06/11/05 19:27 Maruyama MAP file was changed
97505 06/11/05 19:03 cdaq Run 55336: DAQ test
97504 06/11/05 19:01 cdaq Run 55335: DAQ test
97503 06/11/05 18:57 Kawama Hhodo 2x-8t cable was dead
97502 06/11/05 18:53 cdaq Run 55334: DAQ test
97501 06/11/05 18:49 cdaq Run 55333: DAQ test
97500 06/11/05 18:35 reinhold 3C07 ion pump vacuum
97499 06/11/05 18:05 Reinhold found AC3 ADC unplugged
97498 06/11/05 17:44 cdaq Run 55332: DAQ test
97497 06/11/05 17:40 cdaq Run 55331: DAQ test
97496 06/11/05 17:20 cdaq Run 55330: DAQ test
97494 06/11/05 17:13 cdaq Run 55329: DAQ test
97493 06/11/05 16:02 cdaq Beam Time Accounting
97492 06/11/05 15:13 Kawama We remove the noise for hodoscope.
97491 06/11/05 15:01 cdaq Run 55328: pedestal test
97490 06/11/05 14:29 cdaq Run 55327: pedestal test
97489 06/11/05 14:17 cdaq Run 55326: pedestal test
97488 06/11/05 14:17 cdaq Run 55325: pedestal test
97487 06/11/05 14:07 cdaq Run 55324: pedestal test
97486 06/11/05 13:56 Nue Vacuum is improving
97485 06/11/05 13:45 cdaq Run 55323: pedestal test
97484 06/11/05 13:24 cdaq Run 55322: pedestal test
97483 06/11/05 12:54 cdaq Run 55321: pedestal test
97482 06/11/05 12:41 Reinhold Beam line vacuum improving
97481 06/11/05 12:40 Reinhold Moeller turbo on again
97480 06/11/05 12:31 cdaq Run 55320: pedestal test
97479 06/11/05 12:23 cdaq Run 55319: pedestal test
97478 06/11/05 12:20 cdaq Run 55318: DAQ test
97477 06/11/05 12:10 Reinhold Moeller Turbo pump
97476 06/11/05 11:57 cdaq Run 55317: pedestal test
97475 06/11/05 11:38 Nue Waiting Vacuum, ion pumps ON, but ...
97474 06/11/05 11:38 cdaq Run 55316: pedestal test
97473 06/11/05 11:36 cdaq Run 55315: pedestal test
97472 06/11/05 11:17 Reinhold AC .OR. rate
97471 06/11/05 11:11 Reinhold Turned on AC HV
97470 06/11/05 09:02 cdaq Run 55314: test
97469 06/11/05 08:05 cdaq Beam Time Accounting
97468 06/11/05 00:48 Nue 3C07 valve was changed
Friday
97467 06/10/05 23:55 cdaq Beam Time Accounting
97466 06/10/05 22:44 cdaq Run 55313: DAQ test
97465 06/10/05 22:38 Akihiko Modified F1TDC library
97464 06/10/05 22:28 smithg Valve will be replaced- estimate 2+5 hours till we're back up
97463 06/10/05 22:26 cdaq Run 55312: DAQ test
97462 06/10/05 21:52 cdaq Run 55311: DAQ test
97461 06/10/05 21:47 cdaq Run 55310: DAQ test
97460 06/10/05 21:32 cdaq Run 55309: DAQ test
97459 06/10/05 20:56 smithg Nue going into switchyard
97458 06/10/05 20:34 cdaq Run 55308: pedestal test
97457 06/10/05 20:31 cdaq Run 55307: pedestal test
97456 06/10/05 20:16 Kawama Some channles are bad.
97455 06/10/05 20:10 Reinhold CH2 target
97454 06/10/05 20:09 smithg bad news- possibly no beam for 3 shifts!
97453 06/10/05 19:27 Kawama The result of new panels
97452 06/10/05 18:13 smithg status
97451 06/10/05 17:24 smithg sending beam into our hall
97450 06/10/05 16:54 smithg Beam should come again around 17:15
97449 06/10/05 16:48 cdaq Run 55306: DAQ test, EHODO trigger
97448 06/10/05 16:47 Maruyama change to the AC couple modified panels
97447 06/10/05 16:37 smithg Back in beam permit
97446 06/10/05 16:06 cdaq Run 55305: Pedestal for hodoscopes
97445 06/10/05 16:04 cdaq Beam Time Accounting
97444 06/10/05 16:02 cdaq Run 55304: Pedestal run
97443 06/10/05 15:50 saw Additional reboot capability for F1TDC crates.
97442 06/10/05 15:45 saw Fastbus and VME readout times
97441 06/10/05 15:25 Miyoshi replay update
97440 06/10/05 15:17 cdaq Run 55303: DAQ test readout time measurements
97439 06/10/05 15:04 cdaq Run 55302: DAQ test readout time measurements
97438 06/10/05 15:00 cdaq Run 55301: DAQ test readout time measurements
97437 06/10/05 14:53 cdaq Run 55300: DAQ test readout time measurements
97436 06/10/05 14:49 cdaq Run 55299: DAQ test
97435 06/10/05 14:43 cdaq Run 55298: DAQ test readout time tests
97434 06/10/05 14:04 cdaq Run 55297: test
97433 06/10/05 12:43 gaskell beam permit - but valve won't open
97432 06/10/05 12:34 cdaq Run 55294: DAQ test
97431 06/10/05 12:24 cdaq Run 55293: DAQ test
97430 06/10/05 12:18 Akihiko Fuse of F1TDC is replaced
97429 06/10/05 12:07 cdaq Run 55291: DAQ test
97428 06/10/05 12:01 cdaq Run 55290: DAQ test
97427 06/10/05 11:54 beaufait ez mag repair
97426 06/10/05 11:26 Reinhold Followup
97425 06/10/05 11:24 reinhold H1X & H2X coincidence
97424 06/10/05 11:02 Reinhold vme 14 problem
97423 06/10/05 10:14 cdaq Beam Time Accounting
97422 06/10/05 09:01 Miyoshi Current trigger logic before starting electronics work
97421 06/10/05 08:46 cdaq Run 55289: DAQ test
97420 06/10/05 08:39 cdaq Run 55288: DAQ test
97419 06/10/05 07:02 horn Magnet power supply problems
97418 06/10/05 06:46 horn Hall in Controlled Access
97417 06/10/05 04:00 horn status - no beam in hall
97416 06/10/05 00:30 cdaq Beam Time Accounting
Thursday
97415 06/09/05 22:54 smithg Pass change finally started
97414 06/09/05 22:10 cdaq Run 55287: DAQ test
97413 06/09/05 21:55 cdaq Run 55286: DAQ test
97412 06/09/05 21:16 smithg Start of pass change delayed to 21:45
97411 06/09/05 21:15 cdaq Run 55285: WC test
97410 06/09/05 21:11 okayasu TUL update
97409 06/09/05 21:10 cdaq Run 55284: WC test
97408 06/09/05 20:42 smithg tgt motion mystery solved
97407 06/09/05 20:41 cdaq Run 55283: WC test
97406 06/09/05 20:02 Nue ENGE right NIM Crate GND offset
97405 06/09/05 20:00 Nue DAQ/TRIG Gr. Tonight Goal
97404 06/09/05 19:55 smithg status
97403 06/09/05 19:38 Reinhold Adjusted HHODO and EHODO discriminator thresholds
97402 06/09/05 19:37 cdaq Run 55282: DAQ test
97401 06/09/05 19:29 Kawama Discriminators for WC and AC
97400 06/09/05 19:27 smithg going to beam permit
97399 06/09/05 18:41 cdaq Run 55281: DAQ test
97398 06/09/05 18:24 cdaq Run 55280: DAQ test
97397 06/09/05 17:43 smithg Target gui acting strangely. Moves on its own.
97396 06/09/05 17:27 Masashi Kane meeting minutes
97395 06/09/05 17:25 cdaq Run 55279: EHODO test
97394 06/09/05 17:11 cdaq Run 55277: EHODO test
97393 06/09/05 16:54 cdaq Run 55276: DAQ test
97392 06/09/05 16:45 cdaq Run 55275: DAQ test
97391 06/09/05 16:30 cdaq Run 55274: DAQ test
97390 06/09/05 16:21 cdaq Run 55273: DAQ test
97389 06/09/05 16:15 cdaq Run 55272: DAQ test
97388 06/09/05 16:03 cdaq Beam Time Accounting
97387 06/09/05 16:02 gaskell shift summary
97386 06/09/05 15:14 cdaq Run 55271: DAQ test, NO beam, All magnets ON
97385 06/09/05 13:55 gaskell back to controlled access
97384 06/09/05 12:49 Miyoshi module specification note
97383 06/09/05 12:38 beaufait power supply water leak
97382 06/09/05 12:35 Nue Water leak pictures
97381 06/09/05 12:05 Nue HTFX1 with and without AC coupler
97380 06/09/05 10:51 gaskell power supply water leak
97379 06/09/05 10:45 okayasu Time jitter issue for HTOF1X on TUL.
97378 06/09/05 10:19 yuan Turn off HKS Dipole
97377 06/09/05 10:15 yuan Hall in Controlled Access
97376 06/09/05 08:32 cdaq Beam Time Accounting
97375 06/09/05 06:28 horn Enge Singles Rate estimate
97374 06/09/05 05:15 horn EZ and Splitter Magnets trips
97373 06/09/05 03:35 horn No Value for 3H00A
97372 06/09/05 03:19 horn Beam Tuning - DW Optics Calculation Check
97371 06/09/05 02:50 cdaq Run 55270: DAQ test, NO beam, All magnets ON
97370 06/09/05 02:04 Akihiko MAP file updated
Wednesday
97369 06/08/05 23:44 cdaq Beam Time Accounting
97368 06/08/05 23:33 Akihiko Singles rate
97367 06/08/05 23:32 yuan RF signals plugged into HKS TDC
97366 06/08/05 23:31 Akihiko DC tripped
97365 06/08/05 22:57 Danagoulian Beam status
97364 06/08/05 22:41 Danagoulian Beam status
97363 06/08/05 21:47 cdaq Run 55269: DAQ test
97362 06/08/05 21:45 cdaq Run 55268: DAQ test
97361 06/08/05 21:42 cdaq Run 55267: DAQ test
97360 06/08/05 21:21 Danagoulian Beam status
97359 06/08/05 21:07 cdaq Run 55266: DAQ test
97358 06/08/05 21:03 cdaq Run 55265: DAQ test
97357 06/08/05 21:02 cdaq Run 55264: DAQ test
97356 06/08/05 20:58 cdaq Run 55263: DAQ test
97355 06/08/05 20:46 Danagoulian Beam in the Hall
97354 06/08/05 20:41 cdaq Run 55262: DAQ test
97353 06/08/05 20:37 cdaq Run 55261: DAQ test
97352 06/08/05 20:25 cdaq Run 55260: DAQ test
97351 06/08/05 20:22 cdaq Run 55259: DAQ test
97350 06/08/05 20:10 cdaq Run 55258: DAQ test
97349 06/08/05 20:07 cdaq Run 55257: DAQ test
97348 06/08/05 20:03 Masashi Kane Memo from today's trigger meeting
97347 06/08/05 19:58 cdaq Run 55256: wc test
97346 06/08/05 18:58 cdaq Run 55255: wc test
97345 06/08/05 18:47 cdaq Run 55254: wc test
97344 06/08/05 18:46 cdaq Run 55253: HDC test with AC bucking coils on
97343 06/08/05 18:36 cdaq Run 55252: wc test
97342 06/08/05 18:27 cdaq Run 55251: test
97341 06/08/05 18:27 cdaq Run 55250: test
97340 06/08/05 18:10 aerogel staf bucking coil data analysis
97339 06/08/05 18:02 cdaq Run 55249: wc test(and trig)
97338 06/08/05 18:02 cdaq Run 55248: wc test
97337 06/08/05 17:53 paul&seva coil current on aerogel
97336 06/08/05 17:36 cdaq Run 55247: wc test
97335 06/08/05 17:22 cdaq Run 55246: wc test gate 100n delay width=200n
97334 06/08/05 17:05 cdaq Run 55245: Gate 100n delay width 600n->200n
97333 06/08/05 16:55 cdaq Run 55244: test
97332 06/08/05 16:54 cdaq Run 55243: test
97331 06/08/05 16:52 cdaq Run 55242: test
97330 06/08/05 16:36 cdaq Run 55241: wc test
97329 06/08/05 16:35 cdaq Run 55240: wc test
97328 06/08/05 15:56 cdaq Beam Time Accounting
97327 06/08/05 15:54 cdaq Beam Time Accounting
97326 06/08/05 15:39 cdaq Run 55239: WC test
97325 06/08/05 15:38 cdaq Run 55238: WC test
97324 06/08/05 15:32 cdaq Run 55237: WC test
97323 06/08/05 15:13 cdaq Run 55236: WC pedestal
97322 06/08/05 15:06 cdaq Run 55235: test
97321 06/08/05 14:57 cdaq Run 55234: DAQ test
97320 06/08/05 14:34 cdaq Run 55233: WC test
97319 06/08/05 14:31 cdaq Run 55232: test
97318 06/08/05 14:25 cdaq Run 55231: DAQ test
97317 06/08/05 14:19 cdaq Run 55230: HDC test with AC bucking coils on
97316 06/08/05 13:20 cdaq Run 55228: wc test
97315 06/08/05 13:17 cdaq Run 55227: wc test
97314 06/08/05 13:17 cdaq Run 55226: wc pedestal
97313 06/08/05 13:13 cdaq Run 55225: wc pedestal
97312 06/08/05 12:59 cdaq Run 55224: wc test
97311 06/08/05 12:51 Reinhold Turned AC bucking coils on
97310 06/08/05 12:04 Reinhold AC Bucking coil does not generate noise on ADCs
97309 06/08/05 11:13 cdaq Run 55223: wc test
97308 06/08/05 11:11 cdaq Run 55222: WC gain matching
97307 06/08/05 11:09 cdaq Run 55221: WC gain matching
97306 06/08/05 11:07 cdaq Run 55220: WC gain matching
97305 06/08/05 11:04 cdaq Run 55219: WC gain matching
97304 06/08/05 10:52 cdaq Run 55218: WC gain matching
97303 06/08/05 10:50 cdaq Run 55217: WC gain matching
97302 06/08/05 10:47 cdaq Run 55216: WC gain matching
97301 06/08/05 10:45 cdaq Run 55215: WC gain matching
97300 06/08/05 10:43 cdaq Run 55214: WC gain matching
97299 06/08/05 10:41 cdaq Run 55213: WC gain matching
97298 06/08/05 10:39 cdaq Run 55212: WC gain matching
97297 06/08/05 10:38 okayasu TUL TOF2X was fixed.
97296 06/08/05 10:37 cdaq Run 55211: WC gain matching
97295 06/08/05 10:33 Reinhold AC Bucking Coil test Tuesday
97294 06/08/05 10:31 cdaq Run 55210: WC test
97293 06/08/05 10:15 Maruyama Helium back
97292 06/08/05 09:38 cdaq Run 55209: HDC test
97291 06/08/05 08:57 gunning check out field pickup
97290 06/08/05 08:05 cdaq Run 55208: HDC test
97289 06/08/05 01:29 Nue TUL HTF2X NIMO6,7 are strange
97288 06/08/05 01:23 Miyoshi raster fr-x and fr-y
97287 06/08/05 01:14 Miyoshi Current trigger
97286 06/08/05 00:13 cdaq Run 55207: DAQ test
Tuesday
97285 06/07/05 23:58 cdaq Beam Time Accounting
97284 06/07/05 23:53 smithg Vacuum: just need patience
97283 06/07/05 23:17 smithg Vacuum not improving
97282 06/07/05 22:58 Miyoshi e01011-replay CVS update
97281 06/07/05 22:35 cdaq Run 55206: DAQ test,nped=1000
97280 06/07/05 22:27 smithg back in beam permit
97279 06/07/05 21:00 smithg called for a sweep
97278 06/07/05 20:34 okayasu TUL update
97277 06/07/05 20:28 cdaq Run 55205: AC test: magnet ON, coil ON
97276 06/07/05 20:26 cdaq Run 55204: AC test: magnet ON, coil ON
97275 06/07/05 20:24 cdaq Run 55203: AC test: magnet ON, coil ON
97274 06/07/05 20:22 cdaq Run 55202: AC test: magnet ON, coil ON
97273 06/07/05 20:20 cdaq Run 55201: AC test: magnet ON, coil ON
97272 06/07/05 20:19 cdaq Run 55200: Junk
97271 06/07/05 20:18 cdaq Run 55199: AC test: magnet ON, coil ON
97270 06/07/05 19:55 cdaq Run 55198: AC test: magnet ON, coil ON
97269 06/07/05 19:53 cdaq Run 55197: AC test: magnet ON, coil ON
97268 06/07/05 19:51 cdaq Run 55196: AC test: magnet ON, coil ON
97267 06/07/05 19:44 cdaq Run 55195: AC test: magnet ON, coil ON
97266 06/07/05 19:40 cdaq Run 55194: AC test: magnet ON, coil ON
97265 06/07/05 19:36 Miyoshi Noise test for ehodo & hhodo
97264 06/07/05 19:36 Nue Cathode Gauge ON
97263 06/07/05 19:35 cdaq Run 55193: AC test: magnet ON, coil OFF
97262 06/07/05 19:14 cdaq Run 55192: AC test: magnet OFF, coil OFF
97261 06/07/05 19:12 cdaq Run 55191: noise test
97260 06/07/05 19:11 Kawama WC trriger signal was "really" completed!
97259 06/07/05 19:11 cdaq Run 55190: AC test: magnet OFF, coil OFF
97258 06/07/05 19:07 cdaq Run 55189: AC test
97257 06/07/05 19:04 cdaq Run 55188: AC test
97256 06/07/05 19:00 cdaq Run 55187: AC test
97255 06/07/05 18:57 cdaq Run 55185: noise test
97254 06/07/05 18:55 cdaq Run 55184: AC test
97253 06/07/05 18:50 cdaq Run 55183: AC test
97252 06/07/05 18:50 cdaq Run 55182: noise test
97251 06/07/05 18:48 cdaq Run 55181: noise test
97250 06/07/05 18:47 Nue Vacuum Gauges
97249 06/07/05 18:47 cdaq Run 55180: noise test
97248 06/07/05 18:45 smithg Viewer installation finished, etc.
97247 06/07/05 18:43 cdaq Run 55179: DAQ test
97246 06/07/05 18:30 cdaq Run 55178: DAQ test
97245 06/07/05 18:15 cdaq Run 55177: DAQ test
97244 06/07/05 18:08 cdaq Run 55176: noise test
97243 06/07/05 18:03 cdaq Run 55175: noise test
97242 06/07/05 18:02 cdaq Run 55174: DAQ test
97241 06/07/05 17:59 cdaq Run 55173: noise test
97240 06/07/05 17:59 cdaq Run 55172: noise test
97239 06/07/05 17:53 Nue He bag gas flow
97238 06/07/05 17:52 cdaq Run 55171: DAQ test
97237 06/07/05 17:46 cdaq Run 55170: DAQ test
97236 06/07/05 17:39 cdaq Run 55169: DAQ test
97235 06/07/05 17:33 cdaq Run 55168: test
97234 06/07/05 17:31 cdaq Run 55167: test
97233 06/07/05 17:30 cdaq Run 55166: test
97232 06/07/05 17:28 cdaq Run 55165: noise test
97231 06/07/05 17:23 cdaq Run 55164: noise test
97230 06/07/05 17:07 cdaq Run 55163: noise test
97229 06/07/05 16:53 cdaq Run 55162: noise test
97228 06/07/05 16:51 cdaq Run 55161: noise test
97227 06/07/05 16:48 cdaq Run 55160: coin test
97226 06/07/05 16:46 cdaq Run 55158: noise test
97225 06/07/05 16:43 cdaq Run 55157: noise test
97224 06/07/05 16:41 Kawama The map of NIM1,2
97223 06/07/05 16:41 cdaq Run 55156: noise test
97222 06/07/05 16:36 cdaq Run 55155: noise test
97221 06/07/05 16:33 cdaq Run 55154: noise test
97220 06/07/05 16:29 cdaq Run 55153: noise test
97219 06/07/05 16:10 cdaq Beam Time Accounting
97218 06/07/05 15:31 cdaq Run 55152: noise test
97217 06/07/05 15:12 Nue HKS Target Ladder Exchange Procedure
97216 06/07/05 14:49 cdaq Run 55151: HDC test
97215 06/07/05 14:45 cdaq Run 55149: noise test
97214 06/07/05 14:43 cdaq Run 55148: noise test
97213 06/07/05 14:31 cdaq Run 55147: HDC test, most power for Bucking coil is on.
97212 06/07/05 14:22 cdaq Run 55146: HDC test
97211 06/07/05 14:11 cdaq Run 55145: noise test
97210 06/07/05 13:55 cdaq Run 55144: Test Aerogel Ch Current 0A
97209 06/07/05 13:55 cdaq Run 55144: junk
97208 06/07/05 13:50 cdaq Run 55142: AC test
97207 06/07/05 13:47 cdaq Run 55141: AC test
97206 06/07/05 13:47 cdaq Run 55141: AC test
97205 06/07/05 13:37 cdaq Run 55139: AC test
97204 06/07/05 13:36 cdaq Run 55138: junk
97203 06/07/05 13:34 cdaq Run 55137: noise study
97202 06/07/05 13:07 cdaq Run 55136: HDC test
97201 06/07/05 12:18 saw Remote rebooting of vmec13 and vmec14
97200 06/07/05 11:47 yuan HKS DC HV HDC1-P connector loose on CAEN crate
97199 06/07/05 11:44 cdaq Run 55135: noise study
97198 06/07/05 11:43 cdaq Run 55134: noise study
97197 06/07/05 11:33 cdaq Run 55133: noise study
97196 06/07/05 11:11 cdaq Run 55132: DAQ test
97195 06/07/05 11:03 cdaq Run 55131: Testing TS scalers
97194 06/07/05 11:01 cdaq Run 55130: DAQ test
97193 06/07/05 10:50 cdaq Run 55129: noise study
97192 06/07/05 10:37 Maruyama connect loosely
97191 06/07/05 10:20 Maruyama WC TUL #6 NIM output
97190 06/07/05 09:29 cdaq Run 55128: DAQ Test
97189 06/07/05 08:15 Masashi Kane Restricted Access
97188 06/07/05 08:06 cdaq Beam Time Accounting
97187 06/07/05 02:30 gueye CHL down - machine down
97186 06/07/05 02:21 gueye beam back
97185 06/07/05 02:15 gueye MDZ/MEZ magnets
97184 06/07/05 00:55 gueye Target change
97183 06/07/05 00:50 Akihiko VMEC 11 and VMEC12 off
97182 06/07/05 00:30 gueye drift chambers off for the night
97181 06/07/05 00:02 cdaq Beam Time Accounting
Monday
97180 06/06/05 23:58 Akihiko VMEC11 had a problem
97179 06/06/05 23:51 cdaq Run 55127: test
97178 06/06/05 23:44 cdaq Run 55125: BeO target
97177 06/06/05 23:42 okayasu BPM monitor
97176 06/06/05 23:36 smithg Put in BeO target. See a spot!
97175 06/06/05 23:25 Akihiko Drift chamber tripped
97174 06/06/05 22:54 cdaq Run 55122: test
97173 06/06/05 22:48 cdaq Run 55121: test
97172 06/06/05 22:20 cdaq Run 55120: Noise study
97171 06/06/05 21:37 cdaq Run 55119: HTOF test
97170 06/06/05 21:32 Miyoshi Noise reduction effort
97169 06/06/05 21:13 smithg Gas shed AC was tripped
97168 06/06/05 19:51 smithg pulsed beam imminent
97167 06/06/05 19:01 cdaq Run 55118: HTOF test
97166 06/06/05 18:56 cdaq Run 55117: HTOF test
97165 06/06/05 18:53 smithg beam status
97164 06/06/05 18:06 smithg Hall C sweep complete.
97163 06/06/05 18:04 cdaq Run 55116: coin test
97162 06/06/05 18:04 paul&victor AC2T2
97161 06/06/05 17:18 Kawama WC "row" signal is completed
97160 06/06/05 17:16 smithg Gas shack fridge temps a little high
97159 06/06/05 16:57 cdaq Run 55115: wc study
97158 06/06/05 16:54 cdaq Run 55114: noise study
97157 06/06/05 16:39 cdaq Run 55113: noise study
97156 06/06/05 16:39 cdaq Run 55113: noise study
97155 06/06/05 16:30 cdaq Run 55112: noise study
97154 06/06/05 15:41 cdaq Run 55110: noise study
97153 06/06/05 15:18 Beaufait Hall Probe Move
97152 06/06/05 14:45 cdaq Run 55109: noise study
97151 06/06/05 14:38 cdaq Run 55108: DAQ Test
97150 06/06/05 14:28 cdaq Run 55106: noise study
97149 06/06/05 14:16 gaskell closed SOS door
97148 06/06/05 14:15 Kawama 1x 1-16t dignal was not seen, but--
97147 06/06/05 14:12 cdaq Run 55104: noise study
97146 06/06/05 14:08 cdaq Run 55103: noise study
97145 06/06/05 14:00 cdaq Run 55102: noise study
97141 06/06/05 13:23 cdaq Beam Time Accounting
97140 06/06/05 13:07 cdaq Run 55101: noise study
97139 06/06/05 12:58 cdaq Run 55100: noise study
97138 06/06/05 12:56 cdaq Run 55099: noise study
97137 06/06/05 11:53 cdaq Run 55097: noise study
97136 06/06/05 11:28 cdaq Run 55096: noise study
97135 06/06/05 11:13 cdaq Run 55095: noise study
97134 06/06/05 10:44 cdaq Run 55094: noise study
97133 06/06/05 10:37 cdaq Run 55093: noise study
97132 06/06/05 10:31 cdaq Run 55092: noise study
97131 06/06/05 10:25 cdaq Run 55091: noise study
97130 06/06/05 10:11 cdaq Run 55090: noise study
97129 06/06/05 10:00 cdaq Run 55089: test
97128 06/06/05 10:00 Miyoshi HKS1x,2x,1y are all on
97127 06/06/05 09:27 cdaq Run 55088: test
97126 06/06/05 09:03 Miyoshi HKS1x1t,1b are off from now
97125 06/06/05 08:49 Miyoshi Trigger switched to pulser
97124 06/06/05 08:48 cdaq Run 55087: test
97123 06/06/05 05:09 Nue BCM problem
97122 06/06/05 04:57 Nue Still no beam, things to do during day time
97121 06/06/05 04:29 Nue TUL ECL inputs should be always connected to modules
97120 06/06/05 02:54 Nue MCC cleared the interlock
97119 06/06/05 02:28 Nue, Kaneta Target Interlock cannot be removed
Sunday
97118 06/05/05 23:40 tangl HKS Magnet setting
97117 06/05/05 21:33 cdaq Run 55086: 1X AND 1Y AND 2X
97116 06/05/05 21:29 Tang Magnet Setpoints (Re-re-submit)
97115 06/05/05 21:29 Tang Magnet Setpoints (Re-re-submit)
97114 06/05/05 21:21 Tang Magnet setpoint list (re-submit)
97113 06/05/05 21:18 Tang Magnet setpoints
97112 06/05/05 21:05 Kawama The result of WC gain matching
97111 06/05/05 21:04 Nue HKS Vacuum after the target change
97110 06/05/05 20:56 cdaq Run 55085: Trigger: 1X AND 2X AND 1Y
97109 06/05/05 19:48 Reinhold Aerogel test with bucking coil
97108 06/05/05 18:58 Kawama, Maru WC gain matching & some problems
97107 06/05/05 17:06 cdaq Run 55084: 1X AND 2X AND 1Y 0.2 Hz
97106 06/05/05 16:49 cdaq Run 55083: WC gain matching
97105 06/05/05 16:46 cdaq Run 55082: WC gain matching
97104 06/05/05 16:46 Sumihama No TDC signal from 1X16T
97103 06/05/05 16:41 cdaq Run 55081: WC gain matching
97102 06/05/05 16:39 cdaq Run 55080: WC gain matching
97101 06/05/05 16:37 cdaq Run 55079: WC gain matching
97100 06/05/05 16:32 cdaq Run 55078: WC gain matching
97099 06/05/05 16:23 yuan some comic tracking plots for HKS DC
97098 06/05/05 16:11 cdaq Run 55077: WC gain matching
97097 06/05/05 16:02 cdaq Run 55076: 1X AND 2X
97096 06/05/05 15:59 cdaq Run 55075: 1X OR 2X
97095 06/05/05 15:54 Akihiko epics.dictionary modified
97094 06/05/05 15:49 cdaq Run 55074: test
97093 06/05/05 14:36 Tang Updated ramping procedure for HKS-D, Enge, and Splitter
97092 06/05/05 14:31 cdaq Run 55073: WC gain matching
97091 06/05/05 14:31 cdaq Run 55073: WC gain matching
97090 06/05/05 14:28 cdaq Run 55071: WC gain matching
97089 06/05/05 14:27 cdaq Run 55070: WC gain matching
97088 06/05/05 14:25 cdaq Run 55069: WC gain matching
97087 06/05/05 14:24 cdaq Run 55069: WC gain matching
97086 06/05/05 14:23 cdaq Run 55067: WC gain matching
97085 06/05/05 14:21 cdaq Run 55066: WC gain matching
97084 06/05/05 14:21 cdaq Run 55065: WC gain matching
97083 06/05/05 14:17 cdaq Run 55064: WC gain matching
97082 06/05/05 14:15 cdaq Run 55063: WC gain matching
97081 06/05/05 14:14 cdaq Run 55062: WC gain matching
97080 06/05/05 14:12 cdaq Run 55061: WC gain matching
97079 06/05/05 14:10 cdaq Run 55060: WC gain matching
97078 06/05/05 14:03 cdaq Run 55059: WC gain matching
97077 06/05/05 13:39 cdaq Run 55058: WC gain matching
97076 06/05/05 13:38 cdaq Run 55057: WC gain matching
97075 06/05/05 13:37 cdaq Run 55056: WC gain matching
97074 06/05/05 13:35 cdaq Run 55055: WC gain matching
97073 06/05/05 13:32 cdaq Run 55054: WC gain matching
97072 06/05/05 13:30 cdaq Run 55053: WC gain matching
97071 06/05/05 13:29 cdaq Run 55052: WC gain matching
97070 06/05/05 13:29 cdaq Run 55051: WC gain matching
97069 06/05/05 13:27 cdaq Run 55050: WC gain matching
97068 06/05/05 13:25 cdaq Run 55049: WC gain matching
97067 06/05/05 13:24 cdaq Run 55048: WC gain matching
97066 06/05/05 13:23 cdaq Run 55047: WC gain matching
97065 06/05/05 13:22 cdaq Run 55046: WC gain matching
97064 06/05/05 13:20 cdaq Run 55045: WC gain matching
97063 06/05/05 13:19 cdaq Run 55044: WC gain matching
97062 06/05/05 13:17 cdaq Run 55043: WC gain matching
97061 06/05/05 13:13 cdaq Run 55042: WC gain matching
97060 06/05/05 13:10 cdaq Run 55041: WC gain matching
97059 06/05/05 13:09 cdaq Run 55040: WC gain matching
97058 06/05/05 13:06 cdaq Run 55039: WC gain matching
97057 06/05/05 13:04 cdaq Run 55038: WC gain matching
97056 06/05/05 13:02 cdaq Run 55037: WC gain matching
97055 06/05/05 13:01 cdaq Run 55036: WC gain matching
97054 06/05/05 12:59 cdaq Run 55035: WC gain matching
97053 06/05/05 12:56 cdaq Run 55034: WC gain matching
97052 06/05/05 12:50 cdaq Run 55033: WC gain matching
97051 06/05/05 12:47 cdaq Run 55032: WC gain matching
97050 06/05/05 12:47 cdaq Run 55031: WC gain matching
97049 06/05/05 12:39 cdaq Run 55030: WC gain matching
97048 06/05/05 12:34 cdaq Run 55029: WC gain matching
97047 06/05/05 12:31 Akihiko Dalay for 1872 start signal changed
97046 06/05/05 12:30 cdaq Run 55028: WC gain matching
97045 06/05/05 12:21 cdaq Run 55027: WC gain matching
97044 06/05/05 12:19 cdaq Run 55026: WC gain matching
97043 06/05/05 12:14 cdaq Run 55025: WC gain matching
97042 06/05/05 12:11 cdaq Run 55024: WC gain matching
97041 06/05/05 11:58 cdaq Run 55023: AC timing test
97040 06/05/05 11:52 cdaq Run 55022: test
97039 06/05/05 11:49 cdaq Run 55021: WC gain matching
97038 06/05/05 11:39 cdaq Run 55020: test
97037 06/05/05 11:38 cdaq Run 55019: WC gain matching
97036 06/05/05 11:36 cdaq Run 55018: test
97035 06/05/05 11:35 cdaq Run 55017: WC gain matching
97034 06/05/05 11:27 cdaq Run 55016: test
97033 06/05/05 11:24 cdaq Run 55015: test
97032 06/05/05 11:19 cdaq Run 55014: test
97031 06/05/05 11:07 cdaq Run 55013: Coin test
97030 06/05/05 11:04 cdaq Run 55012: pedestal test
97029 06/05/05 11:02 cdaq Run 55011: pedestal test
97028 06/05/05 11:00 cdaq Run 55010: pedestal test
97027 06/05/05 09:53 cdaq Run 55009: test
97026 06/05/05 01:21 reinhold turned HKS dipole completely off
97025 06/05/05 01:06 Reinhold Don't forget to check hall tomorrow morning before closing.
97024 06/05/05 01:02 Reinhold HKS Dipole Remote control
97023 06/05/05 00:55 paul&seva&vi Aerogel Progress !!!
97022 06/05/05 00:26 cdaq Run 55008: AC test
97021 06/05/05 00:24 cdaq Run 55007: AC test
97020 06/05/05 00:17 cdaq Run 55006: AC test
97019 06/05/05 00:17 cdaq Run 55006: AC test
97018 06/05/05 00:17 cdaq Run 55006: AC test
97017 06/05/05 00:08 cdaq Run 55003: AC test
97016 06/05/05 00:00 cdaq Run 55002: AC test
Saturday
97015 06/04/05 23:51 cdaq Run 55001: AC test
97014 06/04/05 23:49 cdaq Run 55000: AC test
97012 06/04/05 23:28 cdaq Run 54998: AC test
97011 06/04/05 23:04 cdaq Run 54997: test
97010 06/04/05 22:17 Miyoshi correct figure
97009 06/04/05 22:13 Miyoshi still bad noise (hscin,escin)
97008 06/04/05 22:10 cdaq Run 54996: Coin test
97007 06/04/05 21:59 Akihiko Noisy channel of EDC
97006 06/04/05 21:49 cdaq Run 54995: Coin test
97005 06/04/05 21:47 cdaq Run 54994: Coin test
97004 06/04/05 21:40 cdaq Run 54993: noise test
97003 06/04/05 21:35 cdaq Run 54992: noise test
97002 06/04/05 21:32 cdaq Run 54991: Coin test
97001 06/04/05 21:27 cdaq Run 54990: noise test
97000 06/04/05 21:23 cdaq Run 54989: noise test
96999 06/04/05 21:21 cdaq Run 54988: noise test
96998 06/04/05 21:11 cdaq Run 54987: noise test
96997 06/04/05 21:10 cdaq Run 54986: noise test
96996 06/04/05 21:07 cdaq Run 54985: noise test
96995 06/04/05 21:00 cdaq Run 54984: AC test
96994 06/04/05 20:54 cdaq Run 54983: AC test
96993 06/04/05 20:50 cdaq Run 54982: AC test
96992 06/04/05 20:46 cdaq Run 54981: AC Magn test / AC2
96991 06/04/05 20:42 cdaq Run 54980: Junk
96990 06/04/05 20:41 cdaq Run 54979: junk
96989 06/04/05 20:36 cdaq Run 54978: AC test magn field / G1 is adjusted to max
96988 06/04/05 20:07 cdaq Run 54977: noise test
96987 06/04/05 19:56 cdaq Run 54976: AC test magn. test
96986 06/04/05 19:06 cdaq Run 54975: AC test
96985 06/04/05 18:51 cdaq Run 54974: WC gain matching
96984 06/04/05 18:36 cdaq Run 54973: junk
96983 06/04/05 18:36 cdaq Run 54973: junk
96982 06/04/05 18:32 cdaq Run 54971: xxx
96981 06/04/05 17:11 cdaq Run 54970: Coin test
96980 06/04/05 17:06 cdaq Run 54969: Coin test
96979 06/04/05 16:46 cdaq Run 54968: Coin test
96978 06/04/05 16:31 cdaq Run 54967: Coin test
96977 06/04/05 16:27 cdaq Run 54966: Coin test
96976 06/04/05 16:17 cdaq Run 54965: Coin test
96975 06/04/05 15:58 cdaq Run 54964: Coin test
96974 06/04/05 15:56 Akihiko MAP file updated
96973 06/04/05 15:48 cdaq Run 54963: WC gain matching
96972 06/04/05 15:34 cdaq Run 54962: Coin test
96971 06/04/05 15:02 cdaq Run 54961: WC gain matching
96970 06/04/05 15:00 cdaq Run 54960: WC gain matching
96969 06/04/05 14:58 cdaq Run 54959: WC gain matching
96968 06/04/05 14:57 cdaq Run 54958: WC gain matching
96967 06/04/05 14:53 cdaq Run 54957: WC gain matching
96966 06/04/05 14:51 Nue Bill fixed DZ power supply problem
96965 06/04/05 14:38 cdaq Run 54956: WC gain matching
96964 06/04/05 14:36 cdaq Run 54955: WC gain matching
96963 06/04/05 14:35 cdaq Run 54954: WC gain matching
96962 06/04/05 14:35 cdaq Run 54954: WC gain matching
96961 06/04/05 14:32 cdaq Run 54952: WC gain matching
96960 06/04/05 14:32 cdaq Run 54952: WC gain matching
96959 06/04/05 14:30 cdaq Run 54950: WC gain matching
96958 06/04/05 14:29 cdaq Run 54949: WC gain matching
96957 06/04/05 14:26 cdaq Run 54948: WC gain matching
96956 06/04/05 14:24 cdaq Run 54947: WC gain matching
96955 06/04/05 14:21 cdaq Run 54946: WC gain matching
96954 06/04/05 14:19 cdaq Run 54945: WC gain matching
96953 06/04/05 14:17 cdaq Run 54944: WC gain matching
96952 06/04/05 14:15 cdaq Run 54943: WC gain matching
96951 06/04/05 14:13 cdaq Run 54942: WC gain matching
96950 06/04/05 14:08 cdaq Run 54941: WC gain matching
96949 06/04/05 14:06 cdaq Run 54940: WC gain matching
96948 06/04/05 14:05 cdaq Run 54939: WC gain matching
96947 06/04/05 14:03 cdaq Run 54938: WC gain matching
96946 06/04/05 14:02 cdaq Run 54937: WC gain matching
96945 06/04/05 14:00 cdaq Run 54936: WC gain matching
96944 06/04/05 13:58 cdaq Run 54936: WC gain matching
96943 06/04/05 13:56 cdaq Run 54934: WC gain matching
96942 06/04/05 13:53 cdaq Run 54933: noise test
96941 06/04/05 13:51 cdaq Run 54932: WC gain matching
96940 06/04/05 13:49 cdaq Run 54931: test
96939 06/04/05 13:49 cdaq Run 54930: WC gain matching
96938 06/04/05 13:46 cdaq Run 54929: WC gain matching
96937 06/04/05 13:44 cdaq Run 54928: WC gain matching
96936 06/04/05 13:44 cdaq Run 54928: WC gain matching
96935 06/04/05 13:39 cdaq Run 54926: noise test
96934 06/04/05 13:35 cdaq Run 54925: WC gain matching
96933 06/04/05 13:32 cdaq Run 54924: WC gain matching
96932 06/04/05 13:29 cdaq Run 54923: WC gain matching
96931 06/04/05 13:24 cdaq Run 54922: WC gain matching
96930 06/04/05 13:21 cdaq Run 54921: WC gain matching
96929 06/04/05 13:17 cdaq Run 54920: WC gain matching
96928 06/04/05 13:16 cdaq Run 54919: Coin test
96927 06/04/05 13:13 cdaq Run 54918: WC gain matching
96926 06/04/05 13:12 cdaq Run 54917: AC test
96925 06/04/05 13:05 cdaq Run 54916: WC gain matching
96924 06/04/05 13:00 cdaq Run 54915: WC gain matching
96923 06/04/05 12:56 cdaq Run 54914: noise test
96922 06/04/05 12:40 cdaq Run 54913: Coin test
96921 06/04/05 12:29 cdaq Run 54912: WC gain matching
96920 06/04/05 12:28 cdaq Run 54911: WC gain matching
96919 06/04/05 12:22 cdaq Run 54910: WC gain matching
96918 06/04/05 12:19 cdaq Run 54909: WC gain matching
96917 06/04/05 12:14 cdaq Run 54908: WC gain matching
96916 06/04/05 12:14 cdaq Run 54908: WC gain matching
96915 06/04/05 12:14 cdaq Run 54908: WC gain matching
96914 06/04/05 12:10 cdaq Run 54906: WC gain matching
96913 06/04/05 12:07 cdaq Run 54904: WC gain matching
96912 06/04/05 12:03 reinhold removed AC2-2T from discriminator
96911 06/04/05 11:57 cdaq Run 54903: WC gain matching
96910 06/04/05 11:50 cdaq Run 54902: WC gain matching
96909 06/04/05 11:48 saw Scalers
96908 06/04/05 11:48 cdaq Run 54901: WC gain matching
96907 06/04/05 11:46 paul&seva HV crate 32
96906 06/04/05 11:45 cdaq Run 54900: WC gain matching
96905 06/04/05 11:30 cdaq Run 54899: DAQ Test. Adding vmec9.
96904 06/04/05 11:28 cdaq Run 54898: DAQ Test. Adding vmec9.
96903 06/04/05 11:23 cdaq Run 54897: WC gain matching
96902 06/04/05 11:12 paul HV crate 32
96901 06/04/05 11:03 cdaq Run 54896: noise test
96900 06/04/05 10:55 cdaq Run 54895: WC gain matching
96899 06/04/05 10:47 cdaq Run 54894: WC gain matching
96898 06/04/05 10:40 cdaq Run 54893: WC gain matching
96897 06/04/05 10:39 cdaq Run 54892: WC gain matching
96896 06/04/05 10:33 cdaq Run 54891: WC gain matching
96895 06/04/05 10:29 cdaq Run 54890: WC gain matching
96894 06/04/05 10:26 cdaq Run 54889: WC gain matching
96893 06/04/05 10:24 cdaq Run 54888: WC gain matching
96892 06/04/05 10:21 cdaq Run 54887: WC gain matching
96891 06/04/05 10:20 cdaq Run 54886: WC gain matching
96890 06/04/05 10:12 cdaq Run 54885: WC gain matching
96889 06/04/05 10:09 cdaq Run 54884: WC gain matching
96888 06/04/05 10:08 cdaq Run 54883: WC gain matching
96887 06/04/05 10:07 cdaq Run 54882: WC gain matching
96886 06/04/05 10:05 cdaq Run 54881: WC gain matching
96885 06/04/05 10:02 cdaq Run 54880: WC gain matching
96884 06/04/05 09:59 cdaq Run 54879: WC gain matching
96883 06/04/05 09:53 cdaq Run 54878: WC gain matching
96882 06/04/05 09:50 cdaq Run 54877: WC gain matching
96881 06/04/05 09:48 cdaq Run 54876: WC gain matching
96880 06/04/05 09:46 cdaq Run 54875: WC gain matching
96879 06/04/05 09:45 cdaq Run 54874: WC gain matching
96878 06/04/05 09:42 cdaq Run 54873: Trigger rate test
96877 06/04/05 09:40 cdaq Run 54873: Trigger rate test
96876 06/04/05 09:39 cdaq Run 54872: Trigger rate test
96875 06/04/05 09:37 cdaq Run 54870: Trigger rate test
96874 06/04/05 09:33 cdaq Run 54869: Trigger rate test
96873 06/04/05 09:32 cdaq Run 54868: Trigger rate test
96872 06/04/05 09:27 cdaq Run 54867: Trigger rate test
96871 06/04/05 09:26 cdaq Run 54866: Trigger rate test
96870 06/04/05 09:23 cdaq Run 54865: Trigger rate test
96869 06/04/05 09:20 cdaq Run 54864: Trigger rate test
96868 06/04/05 09:18 cdaq Run 54863: WC gain matching
96867 06/04/05 09:09 cdaq Run 54862: Trigger rate test
96866 06/04/05 09:07 cdaq Run 54861: Trigger rate test
96865 06/04/05 09:05 cdaq Run 54860: Trigger rate test
96864 06/04/05 09:04 cdaq Run 54859: Trigger rate test
96863 06/04/05 09:01 cdaq Run 54858: Trigger rate test
96861 06/04/05 08:59 cdaq Run 54857: Trigger rate test
96860 06/04/05 08:59 cdaq Run 54857: Trigger rate test
96859 06/04/05 08:53 cdaq Run 54855: WC gain matching
Friday
96858 06/03/05 23:30 cdaq Run 54854: EDC & EHODO test
96857 06/03/05 23:25 Akihiko DAQ tigger rate study
96856 06/03/05 22:21 cdaq Run 54853: Trigger rate test
96855 06/03/05 22:12 cdaq Run 54852: Trigger rate test
96854 06/03/05 22:01 cdaq Run 54851: Trigger rate test
96853 06/03/05 21:52 cdaq Run 54850: Trigger rate test
96852 06/03/05 21:44 cdaq Run 54849: Trigger rate test
96851 06/03/05 21:43 reinhold turned HKD dipole off
96850 06/03/05 21:18 Reinhold AC2-2T broken
96849 06/03/05 21:04 cdaq Run 54848: test
96848 06/03/05 20:32 cdaq Run 54847: AC test
96847 06/03/05 20:22 cdaq Run 54846: AC test
96846 06/03/05 20:15 cdaq Run 54845: AC test
96845 06/03/05 20:15 Reinhold Turned on HKD Dipole I=1060 A
96844 06/03/05 20:03 Akihiko Fuse of F1TDC is replaced
96843 06/03/05 19:59 cdaq Run 54844: AC test
96842 06/03/05 19:55 cdaq Run 54843: AC test
96841 06/03/05 19:49 cdaq Run 54842: AC test
96840 06/03/05 19:34 cdaq Run 54841: AC test
96839 06/03/05 19:32 cdaq Run 54840: AC test
96838 06/03/05 19:30 cdaq Run 54839: DAQ test
96837 06/03/05 19:28 cdaq Run 54838: AC test
96836 06/03/05 19:20 cdaq Run 54837: test
96835 06/03/05 19:18 cdaq Run 54836: test
96834 06/03/05 19:17 cdaq Run 54835: test
96833 06/03/05 19:13 cdaq Run 54834: AC test
96832 06/03/05 19:12 Miyoshi Noise investigation
96831 06/03/05 18:32 cdaq Run 54833: WC gain matching
96830 06/03/05 18:28 cdaq Run 54832: WC gain matching
96829 06/03/05 18:21 cdaq Run 54831: WC gain matching
96828 06/03/05 18:18 cdaq Run 54830: WC gain matching
96827 06/03/05 18:17 cdaq Run 54829: WC gain matching
96826 06/03/05 18:15 cdaq Run 54828: WC gain matching
96825 06/03/05 18:11 cdaq Run 54827: WC gain matching
96824 06/03/05 18:09 cdaq Run 54826: WC gain matching
96823 06/03/05 17:53 cdaq Run 54825: WC gain matching
96822 06/03/05 17:51 cdaq Run 54824: WC gain matching
96821 06/03/05 17:50 cdaq Run 54823: WC gain matching
96820 06/03/05 17:49 cdaq Run 54822: WC gain matching
96819 06/03/05 17:46 cdaq Run 54821: WC gain matching
96818 06/03/05 17:44 cdaq Run 54820: WC gain matching
96817 06/03/05 17:42 cdaq Run 54819: WC gain matching
96816 06/03/05 17:41 cdaq Run 54818: WC gain matching
96815 06/03/05 17:38 cdaq Run 54817: WC gain matching
96814 06/03/05 17:37 cdaq Run 54816: WC gain matching
96813 06/03/05 17:37 cdaq Run 54816: WC gain matching
96812 06/03/05 17:28 cdaq Run 54814: WC gain matching
96811 06/03/05 17:20 cdaq Run 54813: WC gain matching
96810 06/03/05 17:16 cdaq Run 54812: WC gain matching
96809 06/03/05 17:16 cdaq Run 54812: WC gain matching
96808 06/03/05 17:11 cdaq Run 54810: WC gain matching
96807 06/03/05 17:10 cdaq Run 54809: WC gain matching
96806 06/03/05 17:07 Maruyama shield cables was setted
96805 06/03/05 17:07 cdaq Run 54808: WC gain matching
96804 06/03/05 17:04 Miyoshi up-to-date noise
96803 06/03/05 17:02 cdaq Run 54807: WC gain matching
96802 06/03/05 16:55 cdaq Run 54806: WC gain matching
96801 06/03/05 16:34 yuan CAEN crate for DC an Aerogel turned on
96800 06/03/05 16:33 cdaq Run 54805: WC gain matching
96799 06/03/05 16:10 cdaq Run 54803: WC gain matching
96798 06/03/05 16:07 cdaq Run 54802: WC gain matching
96797 06/03/05 15:47 saw Added Enge PS to logging
96796 06/03/05 15:41 cdaq Run 54801: test
96795 06/03/05 14:53 saw New readout list for coin mode
96794 06/03/05 14:18 paul HV crate 32
96793 06/03/05 14:16 cdaq Run 54800: test
96792 06/03/05 14:11 cdaq Run 54799: test
96791 06/03/05 13:33 Miyoshi epics.dictionary update
96790 06/03/05 12:54 Miyoshi FB, SLI information
96789 06/03/05 12:27 cdaq Run 54798: test
96788 06/03/05 12:27 cdaq Run 54797: test
96787 06/03/05 12:05 cdaq Run 54796: test
96786 06/03/05 12:03 paul HV crate 32
96785 06/03/05 11:30 cdaq Run 54795: test
96784 06/03/05 11:30 cdaq Run 54795: test
96783 06/03/05 11:26 cdaq Run 54793: test
96782 06/03/05 11:23 cdaq Run 54792: test
96781 06/03/05 11:23 cdaq Run 54792: test
96780 06/03/05 09:30 Akihiko HV for EDC
Thursday
96779 06/02/05 23:57 cdaq Run 54790: HDC test
96778 06/02/05 22:32 cdaq Run 54788: test
96777 06/02/05 22:25 cdaq Run 54787: test
96776 06/02/05 22:08 Miyoshi beam status GUI reminder
96775 06/02/05 22:06 cdaq Run 54786: test
96774 06/02/05 22:01 cdaq Run 54785: test
96773 06/02/05 21:45 cdaq Run 54784: test
96772 06/02/05 21:43 cdaq Run 54783: test
96771 06/02/05 21:32 cdaq Run 54781: test
96770 06/02/05 21:31 cdaq Run 54780: test
96769 06/02/05 21:23 cdaq Run 54779: AC test
96768 06/02/05 21:17 tangl HKS target mounting plan
96767 06/02/05 21:17 tangl HKS target mounting plan
96766 06/02/05 21:11 cdaq Run 54778: AC test
96765 06/02/05 21:05 Akihiko Blown fuse generates bad data
96764 06/02/05 21:04 cdaq Run 54777: AC test
96763 06/02/05 21:02 Kawama EHODO timing check
96762 06/02/05 20:53 cdaq Run 54776: AC test
96761 06/02/05 20:44 cdaq Run 54775: AC test
96760 06/02/05 20:40 Akihiko New readout list works fine
96759 06/02/05 20:39 cdaq Run 54774: AC test
96758 06/02/05 20:37 cdaq Run 54773: AC test
96757 06/02/05 20:30 cdaq Run 54772: vme_f1tdc.crl test, ~2kHz trigger
96756 06/02/05 20:26 cdaq Run 54771: vme_f1tdc.crl test, ~2kHz trigger
96755 06/02/05 20:22 Akihiko Fuse of another F1TDC is blown
96754 06/02/05 19:38 cdaq Run 54770: vme_f1tdc.crl test, ~2kHz trigger
96753 06/02/05 19:27 cdaq Run 54769: vme_f1tdc.crl test, ~2kHz trigger
96752 06/02/05 19:19 cdaq Run 54768: vme_f1tdc.crl test, ~2kHz trigger
96751 06/02/05 19:12 cdaq Run 54767: vme_f1tdc.crl test, ~2kHz trigger
96750 06/02/05 19:00 cdaq Run 54766: vme_f1tdc.crl test, ~2kHz trigger
96748 06/02/05 18:55 Akihiko Fuse on F1TDC is blown
96747 06/02/05 18:28 Miyoshi Update Analyzer for HDC hits
96745 06/02/05 17:54 cdaq Run 54765: vme_f1tdc.crl test, ~2kHz trigger
96744 06/02/05 17:38 cdaq Run 54764: vme_f1tdc.crl test
96743 06/02/05 17:19 cdaq Run 54763: test
96742 06/02/05 16:51 cdaq Run 54762: HDC test
96741 06/02/05 16:43 Mizuki & Víc Threshold Voltage for Enge
96740 06/02/05 16:42 cdaq Run 54761: test
96739 06/02/05 16:37 cdaq Run 54760: test
96738 06/02/05 16:20 cdaq Run 54759: AC test
96737 06/02/05 16:13 cdaq Run 54758: AC test
96736 06/02/05 16:09 cdaq Run 54757: AC test
96735 06/02/05 16:02 cdaq Run 54756: AC test
96734 06/02/05 16:02 cdaq Run 54755: AC test
96733 06/02/05 15:50 cdaq Run 54754: hdc signal test
96732 06/02/05 15:05 Akihiko HV for ENGE side ON
96731 06/02/05 15:05 Reinhold Active magnetic shield test
96730 06/02/05 14:57 reinhold AC active shield test
96729 06/02/05 14:41 cdaq Run 54752: test
96728 06/02/05 14:31 cdaq Run 54751: AC test
96727 06/02/05 14:30 cdaq Run 54750: AC test
96726 06/02/05 14:23 cdaq Run 54748: test
96725 06/02/05 14:18 cdaq Run 54747: est
96724 06/02/05 13:45 cdaq Run 54746: AC test
96723 06/02/05 13:21 cdaq Run 54745: AC test
96722 06/02/05 13:17 cdaq Run 54745: AC test
96721 06/02/05 13:17 cdaq Run 54745: AC test
96720 06/02/05 13:17 cdaq Run 54745: AC test
96719 06/02/05 12:51 cdaq Run 54741: AC test
96718 06/02/05 11:54 Miyoshi moved H00Cx,y cable
96717 06/02/05 11:27 Akihiko Trigger of run 54739
Wednesday
96716 06/01/05 23:24 reinhold AC fieldtest with new wall
96715 06/01/05 23:15 cdaq Run 54739: HDC test
96714 06/01/05 23:12 paul AC Magnetic field test // Rough analysis
96713 06/01/05 23:10 cdaq Run 54738: HDC test
96712 06/01/05 23:00 Reinhold Turned HKS dipole off
96711 06/01/05 22:54 Miyoshi No FR Y output
96710 06/01/05 22:49 cdaq Run 54737: AC test
96709 06/01/05 22:42 cdaq Run 54736: AC test
96708 06/01/05 22:38 cdaq Run 54735: AC test
96707 06/01/05 22:34 cdaq Run 54734: AC test
96706 06/01/05 22:26 yuan HKS e arm (Splitter+Enge) central path length from Raytrace
96705 06/01/05 22:20 cdaq Run 54733: AC test
96704 06/01/05 22:18 cdaq Run 54732: raster test
96703 06/01/05 22:06 Miyoshi vmec9 scalers
96702 06/01/05 22:05 cdaq Run 54731: AC test
96701 06/01/05 22:01 cdaq Run 54730: AC test
96700 06/01/05 21:59 cdaq Run 54729: AC test
96699 06/01/05 21:56 cdaq Run 54728: AC test
96698 06/01/05 21:55 cdaq Run 54727: AC test
96697 06/01/05 21:55 cdaq Run 54727: AC test
96696 06/01/05 21:48 cdaq Run 54725: AC test
96695 06/01/05 21:46 cdaq Run 54724: AC test
96694 06/01/05 21:42 cdaq Run 54723: AC test
96693 06/01/05 21:39 cdaq Run 54722: AC test
96692 06/01/05 21:34 cdaq Run 54721: AC test
96691 06/01/05 21:29 cdaq Run 54720: AC test
96690 06/01/05 21:19 Miyoshi power distribution unit
96689 06/01/05 21:18 cdaq Run 54718: AC test
96688 06/01/05 21:18 cdaq Run 54717: AC test
96687 06/01/05 21:17 cdaq Run 54716: AC test
96686 06/01/05 21:02 cdaq Run 54715: test
96685 06/01/05 20:50 cdaq Run 54714: test
96684 06/01/05 20:47 cdaq Run 54713: test
96683 06/01/05 20:35 cdaq Run 54711: test
96682 06/01/05 20:11 cdaq Run 54710: test
96681 06/01/05 19:58 cdaq Run 54709: pedestal test
96680 06/01/05 19:35 cdaq Run 54707: pedestal test
96679 06/01/05 19:31 cdaq Run 54706: pedestal test
96678 06/01/05 19:28 cdaq Run 54705: pedestal test
96677 06/01/05 19:17 cdaq Run 54703: pedestal test
96676 06/01/05 18:30 cdaq Run 54702: pedestal test
96675 06/01/05 18:24 Sumihama ADC spectrum of 1Y1 with 60Co source
96674 06/01/05 18:14 cdaq Run 54701: test
96673 06/01/05 18:11 cdaq Run 54700: test
96672 06/01/05 17:47 cdaq Run 54699: test
96671 06/01/05 17:46 cdaq Run 54698: test
96670 06/01/05 17:44 Akihiko Ar gas is arrived
96669 06/01/05 17:33 cdaq Run 54697: test
96668 06/01/05 17:30 cdaq Run 54696: test
96667 06/01/05 17:18 cdaq Run 54695: HDC Signal Test
96666 06/01/05 17:12 cdaq Run 54694:
96665 06/01/05 17:09 cdaq Run 54693: AC trigger test
96664 06/01/05 17:06 cdaq Run 54692: 1Y gain matching
96663 06/01/05 16:58 cdaq Run 54691: 1Y gain matching
96662 06/01/05 16:57 cdaq Run 54690: 1Y gain matching
96661 06/01/05 16:33 cdaq Run 54689: HDC Signal Test
96660 06/01/05 16:30 cdaq Run 54688: AC test LED
96659 06/01/05 16:28 cdaq Run 54687: 1Y gain matching
96658 06/01/05 15:59 cdaq Run 54686: AC noise test // without HV
96657 06/01/05 15:32 cdaq Run 54685: Noise test // AC1T7 is on (localy in hall)
96656 06/01/05 15:13 cdaq Run 54684: AC17T is ON // noise test
96655 06/01/05 15:05 cdaq Run 54683: AC noise test // PMTs are off
96654 06/01/05 13:30 Kawama 1Y Gain Matcing
96653 06/01/05 13:24 cdaq Run 54682: 1Y gain matching
96652 06/01/05 12:51 Akihiko Water leak of ENGE magnet
96651 06/01/05 12:45 cdaq Run 54681: 1Y gain matching
96650 06/01/05 12:43 cdaq Run 54680: 1Y gain matching
96649 06/01/05 12:40 cdaq Run 54679: 1Y gain matching
96648 06/01/05 12:38 cdaq Run 54678: 1Y gain matching
96647 06/01/05 12:38 Akihiko Plastic sheets removed
96646 06/01/05 12:29 cdaq Run 54677: 1Y gain matching
96645 06/01/05 12:24 cdaq Run 54676: 1Y gain matching
96644 06/01/05 12:21 cdaq Run 54675: 1Y gain matching
96643 06/01/05 12:19 cdaq Run 54674: 1Y gain matching
96642 06/01/05 12:16 cdaq Run 54673: 1Y gain matching
96641 06/01/05 12:13 cdaq Run 54672: 1Y gain matching
96640 06/01/05 12:12 cdaq Run 54671: 1Y gain matching
96639 06/01/05 12:10 cdaq Run 54670: 1Y gain matching
96638 06/01/05 12:10 cdaq Run 54670: 1Y gain matching
96637 06/01/05 12:06 cdaq Run 54668: 1Y gain matching
96636 06/01/05 12:01 reinhold AC field effect with iron shield
96635 06/01/05 11:58 cdaq Run 54667: 1Y gain matching
96634 06/01/05 11:58 cdaq Run 54667: 1Y gain matching
96633 06/01/05 11:52 cdaq Run 54665: 1Y gain matching
96632 06/01/05 11:50 cdaq Run 54664: 1Y gain matching
96631 06/01/05 11:46 cdaq Run 54663: 1Y gain matching
96630 06/01/05 11:46 cdaq Run 54662: 1Y gain matching
96629 06/01/05 11:31 cdaq Run 54661: 1Y gain matching
96628 06/01/05 11:27 cdaq Run 54660: 1Y gain matching
96627 06/01/05 11:26 cdaq Run 54659: 1Y gain matching
96626 06/01/05 11:18 cdaq Run 54658: 1Y gain matching
96625 06/01/05 11:14 cdaq Run 54657: 1Y gain matching
96624 06/01/05 11:10 cdaq Run 54656: 1Y gain matching
96623 06/01/05 11:03 cdaq Run 54655: 1Y gain matching
96622 06/01/05 10:54 cdaq Run 54654: 1Y gain matching
96621 06/01/05 10:51 cdaq Run 54653: 1Y gain matching
96620 06/01/05 10:46 cdaq Run 54652: DMA error check
96619 06/01/05 10:42 cdaq Run 54651: DMA error check
96618 06/01/05 10:05 cdaq Run 54650: DMA error check
96617 06/01/05 10:00 cdaq Run 54649: DMA error check
96616 06/01/05 08:01 okayasu EDC window cover
96615 06/01/05 00:03 cdaq Run 54648: Config. :coin
This file generated by /group/hallc/www/hallcweb/apps/logbooks/hclog/src/hclogscript version HC2.05
If you have any comments or problems, please contact:
Stephen A. Wood
saw@jlab.org