Log entry time 08:03:53 on July 9, 2005

Entry number 99240

keyword=Beam Time Accounting
Hall C

07/09/05 0000-0800
Experiment #: E01-011
Shift Leader: R.Asaturyan
Shift Workers: Y.Sato

00000100020003000400050006000700Total Time
Acceptable Beam
in Use
0.000.000.000.000.000.150.880.921.95
Beam Available
but Not in Use
0.000.000.000.000.000.000.000.000.00
Beam Not Available
or Unacceptable
1.001.001.001.001.000.850.120.086.05
Accelerator Con-
figuration Change
0.000.000.000.000.000.000.000.000.00
Experiment
Ready
1.001.001.001.001.001.001.001.008.00
Planned Config-
uration Change
0.000.000.000.000.000.000.000.000.00
Unplanned
Experiment Down
0.000.000.000.000.000.000.000.000.00
Hall not
ready reasons
Target0.000.000.000.000.000.000.000.000.00
DAQ0.000.000.000.000.000.000.000.000.00
HKS0.000.000.000.000.000.000.000.000.00
Enge0.000.000.000.000.000.000.000.000.00
Detectors0.000.000.000.000.000.000.000.000.00
Other0.000.000.000.000.000.000.000.000.00

Comments: During the our shift, mostly the beam tunning was done by MCC, at the end of shift some data on C12 target was taken. Beam current ~30uA.

Data Entry by: R.Asaturyan