Jefferson Lab Hall C Logbook for April 06 - Full Listing
Main INDEX
Sunday
116795 04/30/06 23:46 Armstrong/Bo Run plan for last shift
116794 04/30/06 23:32 Armstrong SMS: Magnet polarity change underwy (started at 23:10)
116793 04/30/06 22:46 muether SMS: Magnet Ramped Down
116792 04/30/06 22:16 Bosted Started SMS ramping to zero
116791 04/30/06 22:11 gzero End of Run 29204:
116790 04/30/06 21:56 gzero Run 29204: Production Run, LD2 3500 A , 10 muA prescale=3000, FC disabled, IA on, IHWP OUT
116789 04/30/06 21:51 gzero End of Run 29203:
116788 04/30/06 21:08 gzero Run 29203: Production Run, LD2 3500 A , 10 muA prescale=3000, FC disabled, IA on, IHWP OUT
116787 04/30/06 21:07 gzero End of Run 29202:
116786 04/30/06 21:05 gzero Run 29202: Production Run, LD2 3500 A , 10 muA prescale=3000, FC disabled, IA on, IHWP OUT
116785 04/30/06 21:04 gzero End of Run 29201:
116784 04/30/06 20:49 gzero Run 29201: LD2 3500 A , 2 muA prescale=20, FC enabled, FPD tubes swapped
116783 04/30/06 19:49 gzero End of Run 29200:
116782 04/30/06 19:31 muether SMS: LN2 Bayonet Vacuum Alarm
116781 04/30/06 18:57 gzero Run 29200: LD2 3500 A , 2 muA prescale=20, FC enabled
116780 04/30/06 18:55 gzero End of Run 29199:
116779 04/30/06 18:54 Armstrong Snapshot of the matrix
116778 04/30/06 18:44 Armstrong Beam: Halo snapshot
116777 04/30/06 18:22 gzero Run 29199: LD2 3500 A , 2 muA prescale=3000, FC disabled
116776 04/30/06 18:22 muether SMS: LN2 Bayonet/Cryobox Vacuum Burp
116775 04/30/06 17:58 Armstrong Plan for some PMT swaps
116774 04/30/06 17:51 muether SMS: SMS: Back on track
116773 04/30/06 17:27 Bosted arget: lowered gpt5 low limit from 6.4 to 6.2
116772 04/30/06 16:52 muether Target: lowered gpt5 low limit from 6.5 to 6.4
116771 04/30/06 16:48 muether Target: Recieving repeated gpt5 low pressure alarms
116770 04/30/06 16:45 Armstrong Plan to reverse SMS polarity this evening
116769 04/30/06 16:05 hamlet Day Shift Summary
116768 04/30/06 16:04 cdaq Beam Time Accounting
116767 04/30/06 15:32 muether SMS: SMS Fastdump
116766 04/30/06 14:35 gzero End of Run 29198:
116765 04/30/06 14:35 hamlet Controlled Access for SMS
116764 04/30/06 14:19 gzero Run 29198: Production Run, LD2 3500 A , 10 muA prescale=3000, FC disabled, IA on, IHWP OUT
116763 04/30/06 14:17 gzero End of Run 29197:
116762 04/30/06 14:17 gzero End of Run 29197:
116761 04/30/06 13:33 gzero Run 29197: Production Run, LD2 3500 A , 10 muA prescale=100, FC enabled, IA on, IHWP OUT
116760 04/30/06 13:30 gzero End of Run 29196:
116759 04/30/06 12:58 muether Target: Rebooted IOC after receiving a communication error
116758 04/30/06 12:54 gzero Run 29196: Production Run, LD2 3500 A , 10 muA prescale=3000, FC disabled, IA on, IHWP OUT
116757 04/30/06 12:47 gzero End of Run 29195:
116756 04/30/06 12:15 gzero Run 29195: Production Run, LD2 3500 A , 10 muA prescale=3000, FC disabled, IA on, IHWP OUT
116755 04/30/06 12:12 gzero End of Run 29194:
116754 04/30/06 11:10 muether/haml G0 beam feedback not updating since 1:20am
116753 04/30/06 11:00 gzero Run 29194: Production Run, LD2 3500 A , 10 muA prescale=3000, FC disabled, IA on, IHWP OUT
116752 04/30/06 10:57 gzero End of Run 29193:
116751 04/30/06 10:19 gzero Run 29193: Production Run, LD2 3500 A , 10 muA prescale=3000, FC disabled, IA on, IHWP OUT
116750 04/30/06 10:14 gzero End of Run 29192:
116749 04/30/06 09:32 hamlet Half wave plate OUT
116748 04/30/06 09:31 gzero Run 29192: Production Run, LD2 3500 A , 10 muA prescale=100, FC enabled, IA on, IHWP OUT
116747 04/30/06 09:26 gzero End of Run 29191:
116746 04/30/06 09:15 ramsay Sunday morning RC report
116745 04/30/06 08:33 gzero Run 29191: Production Run, LD2 3500 A , 10 muA prescale=3000, FC disabled, IA on, IHWP IN
116744 04/30/06 08:31 gzero End of Run 29190:
116743 04/30/06 08:03 cdaq Beam Time Accounting
116742 04/30/06 08:01 muether X variation in beam position
116741 04/30/06 07:29 gzero Run 29190: Production Run, LD2 3500 A , 10 muA prescale=3000, FC disabled, IA on, IHWP IN
116740 04/30/06 07:28 ellis Owl Summary
116739 04/30/06 07:27 gzero End of Run 29189:
116738 04/30/06 06:39 gzero Run 29189: Production Run, LD2 3500 A , 10 muA prescale=3000, FC disabled, IA on, IHWP IN
116737 04/30/06 06:38 gzero End of Run 29189:
116736 04/30/06 06:31 Juliette Target: some target alarms
116735 04/30/06 05:51 gzero Run 29188: Production Run, LD2 3500 A , 10 muA prescale=100, FC enabled, IA on, IHWP IN
116734 04/30/06 05:48 gzero End of Run 29187:
116733 04/30/06 04:54 gzero Run 29187: Production Run, LD2 3500 A , 10 muA prescale=3000, FC disabled, IA on, IHWP IN
116732 04/30/06 04:53 gzero End of Run 29186:
116731 04/30/06 04:05 gzero Run 29186: Production Run, LD2 3500 A , 10 muA prescale=3000, FC disabled, IA on, IHWP IN
116730 04/30/06 04:05 gzero End of Run 29186:
116729 04/30/06 03:07 Juliette Target: LD2 target in place
116728 04/30/06 03:03 ellis pzt complete--35 min total
116727 04/30/06 03:01 gzero Run 29185: Production Run, LD2 3500 A , 10 muA prescale=3000, FC disabled, IA on, IHWP IN
116726 04/30/06 02:32 Juliette Target: moving target out for PZT scan
116725 04/30/06 02:30 ellis PZT scan
116724 04/30/06 02:22 gzero End of Run 29184:
116723 04/30/06 01:37 gzero Run 29184: Production Run, LD2 3500 A , 10 muA prescale=100, FC enabled, IA on, IHWP IN
116722 04/30/06 01:33 gzero End of Run 29183:
116721 04/30/06 00:07 cdaq Beam Time Accounting
116720 04/30/06 00:04 saw Swing shift summary
Saturday
116719 04/29/06 23:58 gzero Run 29183: Production Run, LD2 3500 A , 10 muA prescale=3000, FC disabled, IA on, IHWP IN
116718 04/29/06 23:56 gzero End of Run 29182:
116717 04/29/06 23:15 J.W. Martin report on results of threshold scan - conclusion = ?
116716 04/29/06 23:00 gzero Run 29182: Production Run, LD2 3500 A , 10 muA prescale=3000, FC disabled, IA on, IHWP IN
116715 04/29/06 22:58 gzero End of Run 29181:
116714 04/29/06 21:59 saw IHWP IN, return to production running
116713 04/29/06 21:58 muether Analysis: B field scan at 2uA on LD2
116712 04/29/06 21:58 gzero Run 29181: Production Run, LD2 3500 A , 10 muA prescale=3000, FC disabled, IA on, IHWP IN
116711 04/29/06 21:52 J.W. Martin Target: reduce JT by 3 clicks for 10 uA running.
116710 04/29/06 21:45 gzero End of Run 29180:
116709 04/29/06 21:36 gzero Run 29180: Matrix Crosstalk Run, LD2 3500 A , 30 muA prescale=200, FC enabled, IA off
116708 04/29/06 21:33 gzero End of Run 29179:
116707 04/29/06 21:29 saw Fastclear disabled for run 29179
116706 04/29/06 21:24 J.W. Martin Target: two more clicks open on JT
116705 04/29/06 21:23 gzero Run 29179: Matrix Crosstalk Run, LD2 3500 A , 30 muA prescale=3000, FC enabled, IA off
116704 04/29/06 21:18 gzero End of Run 29178:
116703 04/29/06 21:15 J.W. Martin Target: opened JT two clicks
116702 04/29/06 20:33 saw Feedbacks not running due to low beam current
116701 04/29/06 20:17 gzero Run 29178: Production Run, LD2 3500 A , 2 muA prescale=100, FC enabled, IA on
116700 04/29/06 20:16 gzero End of Run 29177:
116699 04/29/06 19:57 cdaq Beam Time Accounting
116698 04/29/06 19:42 mack pulsed mode run on LD2? plus less useful background musings.
116697 04/29/06 19:18 gzero Run 29177: Production Run, LD2 3500 A , 2 muA prescale=3000, FC disabled, IA on
116696 04/29/06 19:16 gzero End of Run 29176:
116695 04/29/06 18:33 ramsay Note on the threshold runs
116694 04/29/06 18:22 ramsay Matrix Crosstalk run
116693 04/29/06 18:18 gzero Run 29176: Production Run, LD2 3500 A , 2 muA prescale=3000, FC disabled, IA on
116692 04/29/06 18:17 gzero End of Run 29175:
116691 04/29/06 17:45 saw Loaded new CED8 HV settings
116690 04/29/06 17:16 gzero Run 29175: Production Run, LD2 3500 A , 2 muA prescale=3000, FC disabled, IA on
116689 04/29/06 17:12 gzero End of Run 29174:
116688 04/29/06 17:12 gzero Run 29174: Production Run, LD2 3500 A , 2 muA prescale=3000, FC enabled, IA on
116687 04/29/06 17:08 gzero End of Run 29173:
116686 04/29/06 16:33 gzero Run 29173: Threshold scan, LD2 3500 A , 2 muA prescale=3000, FC enabled, IA on
116685 04/29/06 16:32 gzero End of Run 29172:
116684 04/29/06 16:24 saw Run 29172 is a threshold scan run
116683 04/29/06 16:03 gzero Run 29172: Magnet scan, LD2 3500 A , 2 muA prescale=3000, FC enabled, IA on
116682 04/29/06 15:59 gzero End of Run 29171:
116681 04/29/06 15:58 beise day shift summary
116680 04/29/06 15:57 beise Analysis: Simulation of rates at 360 MeV, for future reference
116679 04/29/06 15:52 Breuer/Guill Changed ARS cabling: summed signals replace octants 3, 4
116678 04/29/06 15:44 gzero Run 29171: Magnet scan, LD2 3500 A , 2 muA prescale=3000, FC enabled, IA on
116677 04/29/06 15:27 gzero End of Run 29170:
116676 04/29/06 15:18 gzero Run 29170: Magnet scan, LD2 4900 A , 2 muA prescale=3000, FC disabled, IA on
116675 04/29/06 15:10 gzero End of Run 29169:
116674 04/29/06 14:58 gzero Run 29169: Magnet scan, LD2 4400 A , 2 muA prescale=3000, FC disabled, IA on
116673 04/29/06 14:52 gzero End of Run 29168:
116672 04/29/06 14:40 gzero Run 29168: Magnet scan, LD2 3900 A , 2 muA prescale=3000, FC disabled, IA on
116671 04/29/06 14:34 gzero End of Run 29167:
116670 04/29/06 14:23 gzero Run 29167: Magnet scan, LD2 3400 A , 2 muA prescale=3000, FC disabled, IA on
116669 04/29/06 14:17 gzero End of Run 29166:
116668 04/29/06 13:58 gzero Run 29166: Magnet scan, LD2 2900 A , 2 muA prescale=3000, FC disabled, IA on
116667 04/29/06 13:53 gzero End of Run 29165:
116666 04/29/06 13:48 gzero Run 29165: Magnet scan, LD2 2400 A , 2 muA prescale=3000, FC disabled, IA on
116665 04/29/06 13:36 gzero End of Run 29164:
116664 04/29/06 13:23 gzero Run 29164: Magnet scan, LD2 1900 A , 2 muA prescale=3000, FC disabled, IA on
116663 04/29/06 12:59 beise SMS: ramping the SMS current down to 1900 Amps
116662 04/29/06 12:53 gzero End of Run 29163:
116661 04/29/06 12:38 beise Beam: Lower beam current for magnet scan
116660 04/29/06 12:36 gzero Run 29163: Magnet scan, LD2 3500 A , 2 muA prescale=3000, FC disabled, IA on
116659 04/29/06 12:30 gzero End of Run 29162:
116658 04/29/06 11:35 beise Analysis: Corrupt file for Carbon boiling run 29154
116657 04/29/06 11:23 gzero Run 29162: Production LD2 3500 A ,10 muA prescale=3000, FC disabled, IA on
116656 04/29/06 11:17 gzero End of Run 29161:
116655 04/29/06 10:30 gzero Run 29161: Production LD2 3500 A ,10 muA prescale=3000, FC enabled, IA on
116654 04/29/06 10:28 gzero End of Run 29160:
116653 04/29/06 10:08 beise Analysis: Pedestal values for LUMIS have been wrong for a while
116652 04/29/06 09:51 ramsay Saturday Morning RC report
116651 04/29/06 09:46 Beise Beam: Half wave plate state changed to OUT
116650 04/29/06 09:40 gzero Run 29160: Production LD2 3500 A ,10 muA prescale=3000, FC enabled, IA on
116649 04/29/06 09:30 gzero End of Run 29159:
116648 04/29/06 08:38 ellis Owl shift summary
116647 04/29/06 08:37 gzero Run 29159: Production LD2 3500 A ,10 muA prescale=3000, FC eabled, IA on
116646 04/29/06 08:34 gzero End of Run 29158:
116645 04/29/06 08:29 cdaq Beam Time Accounting
116644 04/29/06 07:27 gzero Run 29158: Production LD2 3500 A ,10 muA prescale=3000, FC disabled, IA on
116643 04/29/06 07:26 gzero End of Run 29157:
116642 04/29/06 07:23 Juliette Target: LD2 target in before run 29155
116641 04/29/06 06:25 gzero Run 29157: Production LD2 3500 A ,10 muA prescale=3000, FC disabled, IA on
116640 04/29/06 06:22 gzero End of Run 29156:
116639 04/29/06 05:38 Juliette Target: JT valve setting
116638 04/29/06 05:36 gzero Run 29156: Production LD2 3500 A ,10 muA prescale=3000, FC disabled, IA on
116637 04/29/06 05:33 gzero End of Run 29155:
116636 04/29/06 05:14 ellis keyword correction--run29151
116635 04/29/06 05:10 ellis keyword correction
116634 04/29/06 04:56 gzero Run 29155: Production LD2 3500 A ,10 muA prescale=3000, FC disabled, IA on
116633 04/29/06 04:38 ellis 29153 Junk due to Coda
116632 04/29/06 04:33 gzero End of Run 29154:
116631 04/29/06 04:27 Juliette Target: C target in place before run 29153
116630 04/29/06 03:28 ellis Coda restart
116629 04/29/06 03:25 gzero Run 29154: Boiling run Carbon 3500 A ,10-60 muA prescale=3000, FC enabled, IA on
116628 04/29/06 03:09 gzero Run 29153: Boiling run Carbon 3500 A ,10-60 muA prescale=3000, FC enabled, IA on
116627 04/29/06 02:40 ellis PZT scan
116626 04/29/06 02:35 gzero End of Run 29152:
116625 04/29/06 02:17 Breuer Cerenkov Deuterium rates/current maybe not that strange
116624 04/29/06 01:45 Juliette Target: problems increasing HPH/opening JT valve
116623 04/29/06 01:40 ellis Boiling/dead time LD2--Run 29152
116622 04/29/06 01:30 gzero Run 29152: Production LD2 3500 A ,10 muA prescale=3000, FC disabled, IA on
116621 04/29/06 01:27 gzero End of Run 29151:
116620 04/29/06 01:19 gzero Run 29151: Production LD2 3500 A ,10 muA prescale=3000, FC disabled, IA on
116619 04/29/06 01:16 gzero End of Run 29150:
116618 04/29/06 01:06 Breuer clarification: this new HV file has Cerenkovs at 1/2 gain
116617 04/29/06 01:05 gzero Run 29150: Production LD2 3500 A ,10 muA prescale=3000, FC disabled, IA on
116616 04/29/06 01:03 J.W. Martin Target: a few items about the gui that I had to call Greg about
116615 04/29/06 00:56 gzero End of Run 29149:
116614 04/29/06 00:49 J.W. Martin Analysis: scaling of paddle and Cherenkov rates
116613 04/29/06 00:02 cdaq Beam Time Accounting
Friday
116612 04/28/06 23:59 hamlet Swing Shift Summary
116611 04/28/06 23:59 hamlet Swing Shift Summary
116610 04/28/06 23:53 gzero Run 29149: Production LD2 3500 A ,10 muA prescale=3000, FC disabled, IA on
116609 04/28/06 23:50 J.W. Martin Target: moved back to LD2
116608 04/28/06 23:40 gzero End of Run 29148:
116607 04/28/06 23:28 gzero Run 29148: Radiator only, 3500 A ,30 muA prescale=3000, FC disabled, IA on
116606 04/28/06 23:22 Breuer New saved HV backup file HV.2006-04-28-CEDs8etc.hvc
116605 04/28/06 23:17 hamlet Will take short run on "Radiator"
116604 04/28/06 23:16 Breuer Changed one HV before run 29147, left others as changed last night
116603 04/28/06 23:16 J.W. Martin Target: moving to radiator
116602 04/28/06 23:14 gzero End of Run 29147:
116601 04/28/06 22:36 hamlet From Run 29147 new HV on octan5 04FL
116600 04/28/06 22:36 J.W. Martin/ Analysis: paddle theory
116599 04/28/06 22:27 gzero Run 29147: Production LD2 3500 A ,10 muA prescale=3000, FC disabled, IA on
116598 04/28/06 22:24 gzero End of Run 29146:
116597 04/28/06 22:21 gzero Run 29146: Production LD2 3500 A ,10 muA prescale=3000, FC disabled, IA on
116596 04/28/06 22:20 gzero End of Run 29145:
116595 04/28/06 21:18 gzero Run 29145: Production LD2 3500 A ,10 muA prescale=100, FC enabled, IA on
116594 04/28/06 21:15 gzero End of Run 29144:
116593 04/28/06 20:17 gzero Run 29144: Production LD2 3500 A ,10 muA prescale=3000, FC disabled, IA on
116592 04/28/06 20:16 gzero End of Run 29143:
116591 04/28/06 20:12 hamlet Screen capture funny due to cdaqs1
116590 04/28/06 19:49 ramsay Screen capture funny
116589 04/28/06 19:05 gzero Run 29143: Production LD2 3500 A ,10 muA prescale=3000, FC disabled, IA on
116588 04/28/06 19:03 gzero End of Run 29142:
116587 04/28/06 18:23 hamlet Cerenkov Rates at 10 uA on LD2
116586 04/28/06 18:14 J.W. Martin Target: tweaked JT back down one click
116585 04/28/06 18:04 gzero Run 29142: Production LD2 3500 A ,10 muA prescale=3000, FC disabled, IA on
116584 04/28/06 18:02 J.W. Martin Target: D2 in, tweaked JT up one click, and loloalarm
116583 04/28/06 17:55 gzero End of Run 29141:
116582 04/28/06 17:55 hamlet SOS Cerenkov pmts HV now ON.
116581 04/28/06 17:53 hamlet Moved from 12C to LD2. Will start production data taking.
116580 04/28/06 17:43 J.W. Martin Target: moving to D2
116579 04/28/06 17:19 ellis Lumi yields (normalized) LH2 vs LD2
116578 04/28/06 16:36 suleiman Beam: The Parity Quality of G0 Beam
116577 04/28/06 16:31 gzero Run 29141: Current Calibration run
116576 04/28/06 16:27 gzero End of Run 29140:
116575 04/28/06 16:08 cdaq Beam Time Accounting
116574 04/28/06 15:51 S. Bailey Day Shift Summary
116573 04/28/06 15:49 Goulven Target: Carbon moved in
116572 04/28/06 15:48 S. Bailey Cherenkov rate with carbon
116571 04/28/06 15:31 gzero Run 29140: carbon target, 30 hz, FC disabled, PS4=3000, 30 uA
116570 04/28/06 15:12 S. Bailey Escorted access to remove flyswatter
116569 04/28/06 15:12 gzero End of Run 29139:
116568 04/28/06 15:01 S. Bailey Cherenkov rate with radiator out, empty target, flyswatter in
116567 04/28/06 14:57 Goulven Target: Radiator removed
116566 04/28/06 14:57 gzero Run 29139: flyswatter in, empty target, radiator out, 30 hz, FC disabled, PS4=3000, 30 uA, coilmod on
116565 04/28/06 14:50 S. Bailey radiator out, empty target in
116564 04/28/06 14:39 gzero End of Run 29138:
116563 04/28/06 13:55 S. Bailey Cherenkov rates with no target, radiator in, flyswatter in
116562 04/28/06 13:43 Maud, Philip Analysis: Gain Matching
116561 04/28/06 13:42 gzero Run 29138: flyswatter in, target out, radiator in, 30 hz, FC disabled, PS4=3000, 30 uA, coilmod on
116560 04/28/06 13:39 gzero End of Run 29137:
116559 04/28/06 13:38 gzero Run 29137: flyswatter in, target out, radiator in, 30 hz, FC disabled, PS4=3000, 20 uA, coilmod on
116558 04/28/06 13:37 gzero End of Run 29136:
116557 04/28/06 13:35 smithg Target: rebooted IOC to improve tach readout
116556 04/28/06 13:28 gzero Run 29136: flyswatter in, target out, radiator in, 30 hz, FC disabled, PS4=3000, 10 uA, coilmod on
116555 04/28/06 13:24 S. Bailey All HV turned ON
116554 04/28/06 13:18 Furget Delays on NA ARS
116553 04/28/06 13:14 Breuer Argon gas flow in Cerenkov octant 6.
116552 04/28/06 13:14 S. Bailey beam in hall 1 uA
116551 04/28/06 12:50 smithg Target: reduce4d coolant flow
116550 04/28/06 12:40 Breuer moved paddle higher up
116549 04/28/06 12:39 S. Bailey Halo and Lumi HV turned on
116548 04/28/06 12:34 S. Bailey magnet is ramping up
116547 04/28/06 12:32 S. Bailey Target OUT, radiator IN
116546 04/28/06 12:31 S. Bailey Flyswatter In
116545 04/28/06 12:29 S. Bailey HV crates turned back on in the cage
116544 04/28/06 12:29 S. Bailey When HV turned off, HV control is constant beeping (Stephanie go crazy)
116543 04/28/06 12:05 pking Analysis: Updated and recompiled G0Scripts on the gzero account
116542 04/28/06 12:02 J.W. Martin some borated poly available in Hall C electronics room
116541 04/28/06 11:20 real pion efficiency from c12 32 ns runs
116540 04/28/06 10:51 J.W. Martin/ inserted lexan sheets over octant 4 cryostat exit
116539 04/28/06 10:11 ramsay Friday morning RC report
116538 04/28/06 09:37 S. Bailey MCC is delivering beam to other halls now
116537 04/28/06 09:14 S. Bailey Flipped IHWP from OUT to IN for Halls B and C
116536 04/28/06 09:06 S. Bailey Hall in restricted access
116535 04/28/06 09:05 S. Bailey Turned off HV crates in cage with key
116534 04/28/06 09:00 S. Bailey Turned off all HV
116533 04/28/06 08:55 S. Bailey Ramping down magnet
116532 04/28/06 08:41 muether Analysis: Field scan results for LD2
116531 04/28/06 08:21 gzero End of Run 29135:
116530 04/28/06 08:20 S. Bailey Beginning procedure to go to restricted access now
116529 04/28/06 08:09 gzero Run 29135: JUNK
116528 04/28/06 08:03 cdaq Beam Time Accounting
116527 04/28/06 08:03 Furget Shift summary
116526 04/28/06 08:03 muether SMS: Ramping to 3500A
116525 04/28/06 08:01 gzero End of Run 29134:
116524 04/28/06 07:52 gzero Run 29134: SMS scan 4700 A, LD2, 15 uA, 30Hz +Fastbus (FasClear disable) prescale=3000
116523 04/28/06 07:50 muether SMS: ramping to 4900
116522 04/28/06 07:49 gzero End of Run 29133:
116521 04/28/06 07:43 gzero Run 29133: SMS scan 4700 A, LD2, 15 uA, 30Hz +Fastbus (FasClear disable) prescale=3000
116520 04/28/06 07:40 muether SMS: ramping to 4700
116519 04/28/06 07:39 gzero End of Run 29132:
116518 04/28/06 07:31 gzero Run 29132: SMS scan 4500 A, LD2, 15 uA, 30Hz +Fastbus (FasClear disable) prescale=3000
116517 04/28/06 07:29 muether SMS: ramping to 4500
116516 04/28/06 07:28 gzero End of Run 29131:
116515 04/28/06 07:21 gzero Run 29131: SMS scan 4300 A, LD2, 15 uA, 30Hz +Fastbus (FasClear disable) prescale=3000
116514 04/28/06 07:18 gzero End of Run 29130:
116513 04/28/06 07:16 muether SMS: ramping to 4300
116512 04/28/06 07:08 gzero Run 29130: SMS scan 4100 A, LD2, 15 uA, 30Hz +Fastbus (FasClear disable) prescale=3000
116511 04/28/06 07:05 muether SMS: ramping to 4100
116510 04/28/06 07:05 gzero End of Run 29129:
116509 04/28/06 06:57 gzero Run 29129: SMS scan 3900 A, LD2, 15 uA, 30Hz +Fastbus (FasClear disable) prescale=3000
116508 04/28/06 06:56 muether SMS: SMS ramped to 3900
116507 04/28/06 06:54 gzero End of Run 29128:
116506 04/28/06 06:46 gzero Run 29128: SMS scan 3700 A, LD2, 15 uA, 30Hz +Fastbus (FasClear disable) prescale=3000
116505 04/28/06 06:46 muether SMS: ramped to 3700
116504 04/28/06 06:44 gzero End of Run 29127:
116503 04/28/06 06:36 gzero Run 29127: SMS scan 3500 A, LD2, 15 uA, 30Hz +Fastbus (FasClear disable) prescale=3000
116502 04/28/06 06:35 gzero End of Run 29126:
116501 04/28/06 06:34 muether SMS: ramping to 3500A
116500 04/28/06 06:25 gzero Run 29126: SMS scan 3300 A, LD2, 15 uA, 30Hz +Fastbus (FasClear disable) prescale=3000
116499 04/28/06 06:24 muether SMS: ramped to 3300A
116498 04/28/06 06:23 gzero End of Run 29125:
116497 04/28/06 06:15 gzero Run 29125: SMS scan 3100 A, LD2, 15 uA, 30Hz +Fastbus (FasClear disable) prescale=3000
116496 04/28/06 06:12 muether SMS: ramping to 3100A
116495 04/28/06 06:11 gzero End of Run 29124:
116494 04/28/06 06:03 gzero Run 29124: SMS scan 2900 A, LD2, 15 uA, 30Hz +Fastbus (FasClear disable) prescale=3000
116493 04/28/06 06:01 muether SMS: ramping the 2900
116492 04/28/06 06:00 gzero End of Run 29123:
116491 04/28/06 05:51 gzero Run 29123: SMS scan 2700 A, LD2, 15 uA, 30Hz +Fastbus (FasClear disable) prescale=3000
116490 04/28/06 05:50 gzero End of Run 29122:
116489 04/28/06 05:49 muether SMS: ramping to 2700A
116488 04/28/06 05:39 gzero Run 29122: SMS scan 2500 A, LD2, 15 uA, 30Hz +Fastbus (FasClear disable) prescale=3000
116487 04/28/06 05:37 muether SMS: ramping to 2500A
116486 04/28/06 05:36 gzero End of Run 29121:
116485 04/28/06 05:33 muether Target: Tachometer readback problems?
116484 04/28/06 05:28 gzero Run 29121: SMS scan 2300 A, LD2, 15 uA, 30Hz +Fastbus (FasClear disable) prescale=3000
116483 04/28/06 05:25 gzero End of Run 29120:
116482 04/28/06 05:21 muether Target: More target craziness
116481 04/28/06 05:17 gzero Run 29120: SMS scan 2100 A, LD2, 15 uA, 30Hz +Fastbus (FasClear disable) prescale=3000
116480 04/28/06 05:16 Furget Temperature changed during the run29119
116479 04/28/06 05:13 gzero End of Run 29119:
116478 04/28/06 05:00 muether Target: Target Upset Summary
116477 04/28/06 05:00 gzero Run 29119: SMS scan 2100 A, LD2, 15 uA, 30Hz +Fastbus (FasClear disable) prescale=3000
116476 04/28/06 04:57 gzero End of Run 29118:
116475 04/28/06 04:50 gzero Run 29118: SMS scan 1900 A, LD2, 15 uA, 30Hz +Fastbus (FasClear disable) prescale=3000
116474 04/28/06 04:31 muether Target: Rebooted Target IOC - Target cold again
116473 04/28/06 03:54 muether Target: Heater going crazy
116472 04/28/06 03:28 muether Target: LD2 moving back in
116471 04/28/06 03:27 muether SMS: RAmping down to 1900A
116470 04/28/06 03:27 gzero End of Run 29117:
116469 04/28/06 03:18 Furget Reduced halo rates (numbers)
116468 04/28/06 03:14 Furget Reduced halo rates
116467 04/28/06 03:10 gzero Run 29117: C12 lrun, 30Hz +Fastbus (FasClear disable), 3500 A, 60 muA, prescale=3000
116466 04/28/06 03:08 gzero End of Run 29116:
116465 04/28/06 03:07 muether wrong attachment
116464 04/28/06 03:03 Dave's position plot
116463 04/28/06 03:00 Furget HV killed by the sniper
116462 04/28/06 02:34 muether Beam noise in Couting room dead
116461 04/28/06 02:26 Furget Herbert paddle on 12C
116460 04/28/06 02:19 gzero Run 29116: C12 lrun, 30Hz +Fastbus (FasClear disable), 3500 A, 60 muA, prescale=3000
116459 04/28/06 02:07 Furget Flipper running
116458 04/28/06 01:56 muether Target: Moving Carbon Target in
116457 04/28/06 01:17 muether Target: Target moving out
116456 04/28/06 01:08 Breuer Paddle location details, before and after move
116455 04/28/06 01:07 gzero End of Run 29115:
116454 04/28/06 01:05 muether Plant Services On Call: Paul Powers 584-7258
116453 04/28/06 01:04 gzero Run 29115: Production LH2 3500 A 10 muA prescale=150, FC enabled, IA on
116452 04/28/06 01:03 Breuer New threshold files for changed Cerenkov HVs.
116451 04/28/06 01:00 Furget Paddle current after moving it
116450 04/28/06 00:51 muether Cage temperature alarm again
116449 04/28/06 00:49 Breuer Change of Cerenkov HVs: gain reduced to 50 %
116448 04/28/06 00:30 J.W. Martin run-by-run Cherenkov in Octant 3
116447 04/28/06 00:26 J.W. Martin Beam: half wave plate reversal in 5 mins
116446 04/28/06 00:07 cdaq Beam Time Accounting
116445 04/28/06 00:05 hamlet Swing Shift Summary
116444 04/28/06 00:05 gzero End of Run 29114:
116443 04/28/06 00:03 hamlet Controlled Access to move Paddle
Thursday
116442 04/27/06 23:54 J.W. Martin beam motion in y affects g0rate3,4,5,6
116441 04/27/06 23:24 J.W. Martin Target: increased JT
116440 04/27/06 23:13 gzero Run 29114: Production LH2 3500 A 10 muA prescale=150, FC enabled, IA on
116439 04/27/06 23:11 gzero End of Run 29113:
116438 04/27/06 22:37 gzero Run 29113: Production LH2 3500 A 10 muA prescale=150, FC enabled, IA on
116437 04/27/06 22:36 gzero End of Run 29112:
116436 04/27/06 22:02 hamlet New position, 1/2 gain and new thresholds started run 29112
116435 04/27/06 21:49 gzero Run 29112: Production LH2 3500 A 10 muA prescale=150, FC enabled, IA on
116434 04/27/06 21:39 gzero End of Run 29111:
116433 04/27/06 21:28 hamlet Ready for beam
116432 04/27/06 21:00 hamlet Ask MCC for Controlled Access to move Ferris wheel
116431 04/27/06 20:08 gzero Run 29111: Herberts run for FR Cerenkov, prescale=100, FastClear enabled, ferris wheel 8 in
116430 04/27/06 20:04 gzero End of Run 29110:
116429 04/27/06 19:35 spwells nominal SMS setting for 8"
116428 04/27/06 19:08 gzero Run 29110: Herberts run for NA Cerenkov, prescale=100, FastClear enabled, ferris wheel 8 in
116427 04/27/06 19:03 gzero End of Run 29109:
116426 04/27/06 18:44 Furget Configuration file for FR Cerenkov
116425 04/27/06 18:44 Furget Configuration file for FR Cerenkov
116424 04/27/06 18:39 J.W. Martin Target: target movement - final entry until next shift
116423 04/27/06 18:36 muether Analysis: Effect of field on Cerenkov rates
116422 04/27/06 18:25 hamlet HV trip on 6CER1
116421 04/27/06 18:17 gzero Run 29109: 30 Hz + Fastbus, LD2 3500 A, 10 uA, prescale=100, FastClear enabled, ferris wheel 8 in
116420 04/27/06 18:14 hamlet Run 29108 ended, need to reboot ROC5
116419 04/27/06 18:12 J.W. Martin Target: false target movement alarm, again
116418 04/27/06 18:08 J.W. Martin Target: false target movement alarm
116417 04/27/06 17:52 J.W. Martin Target: target movement alarm - yes - again.
116416 04/27/06 17:44 gzero Run 29108: 30 Hz + Fastbus, LD2 3500 A, 10 uA, prescale=100, FastClear enabled, ferris wheel 8 in
116415 04/27/06 17:39 gzero End of Run 29107:
116414 04/27/06 17:38 ramsay Hall-C restricted access tomorrow 8am
116413 04/27/06 17:21 J.W. Martin Target: target movement alarm - again
116412 04/27/06 16:43 gzero Run 29107: 30 Hz + Fastbus, LD2 3500 A, 10 muA, prescale=3000, FastClear disabled, ferris wheel 8 in
116411 04/27/06 16:42 gzero End of Run 29106:
116410 04/27/06 16:09 cdaq Beam Time Accounting
116409 04/27/06 16:07 Goulven Analysis: Quick ARS-based analysis of a deuterium run
116408 04/27/06 15:50 S. Bailey Day Shift Summary
116407 04/27/06 15:44 gzero Run 29106: 30 Hz + Fastbus, LD2 3500 A, 10 muA, prescale=3000, FastClear disabled, ferris wheel 8 in
116406 04/27/06 15:40 gzero End of Run 29105:
116405 04/27/06 14:53 gzero Run 29105: 30 Hz + Fastbus, LD2 3500 A, 10 muA, prescale=100, FastClear enabled, ferris wheel 8 in
116404 04/27/06 14:50 gzero End of Run 29104:
116403 04/27/06 14:30 S. Bailey current snapshot of CED FPD Coincidence Matrix
116402 04/27/06 14:14 gzero Run 29104: 30 Hz + Fastbus, LD2 3500 A, 10 muA, prescale=3000, FastClear disabled, ferris wheel 8 in, NA CER single=0.5 sum=3
116401 04/27/06 14:11 gzero End of Run 29103:
116400 04/27/06 13:44 S. Bailey HV trip on Oct 6, Che 1
116399 04/27/06 13:42 S. Bailey HV Trip on Halos and Lumis
116398 04/27/06 13:14 gzero Run 29103: 30 Hz + Fastbus, LD2 3500 A, 10 muA, prescale=3000, FastClear disabled, ferris wheel 8 in, NA CER single=0.5 sum=2
116397 04/27/06 13:12 gzero End of Run 29102:
116396 04/27/06 12:27 mack Same ideas as a month ago, but now with less time for long term procurements/simulations/R&D
116395 04/27/06 12:18 gzero Run 29102: 30 Hz + Fastbus, LD2 3500 A, 10 muA, prescale=3000, FastClear disabled, ferris wheel 8 in, NA CER single=0.5 sum=1
116394 04/27/06 12:12 gzero End of Run 29101:
116393 04/27/06 11:28 gzero Run 29101: 30 Hz + Fastbus, LD2 3500 A, 10 muA, prescale=100, FastClear enabled, ferris wheel 8 in
116392 04/27/06 11:25 gzero End of Run 29100:
116391 04/27/06 11:19 Breuer Ideas for improving Cerenkov rates.
116390 04/27/06 11:08 Breuer Cerenkov tripping base
116389 04/27/06 10:52 S. Bailey HV trip on oct 6, che 1
116388 04/27/06 10:41 mack suggest swapping any tripping HV channels before summer run
116387 04/27/06 10:27 gzero Run 29100: 30 Hz + Fastbus, LD2 3500 A, 10 muA, prescale=3000, FastClear disabled, ferris wheel 8 in
116386 04/27/06 10:17 gzero End of Run 29099:
116385 04/27/06 10:09 S. Bailey MCC lost RF cavity ->Beam down for a few minutes
116384 04/27/06 09:59 Furget FR Cerenkov thresholds
116383 04/27/06 09:58 ramsay Thursday morning RC report
116382 04/27/06 09:58 gzero ASCS summary for Wed Apr 26 2006
116381 04/27/06 09:49 S. Bailey Beam feedback updating again
116380 04/27/06 09:41 S. Bailey Beam Feedback not updating
116379 04/27/06 09:41 gzero Run 29099: 30 Hz + Fastbus, LD2 3500 A, 10 muA, prescale=3000, FastClear disabled, ferris wheel 8 in
116378 04/27/06 09:38 gzero End of Run 29098:
116377 04/27/06 09:35 gzero Run 29098: DAQ test
116376 04/27/06 09:35 pking Analysis: Corrected G0RateMonitor display of CED SDMCH rates
116375 04/27/06 09:32 gzero End of Run 29097:
116374 04/27/06 09:14 S. Bailey Cherenkov rates @ 8 in position (still too high)
116373 04/27/06 09:06 ramsay "things to fix" job list
116372 04/27/06 09:03 ramsay Don' t forget the half-wave plate
116371 04/27/06 09:02 gzero Run 29097: 30 Hz + Fastbus, LD2 3500 A, 10 muA, prescale=3000, FastClear disabled, ferris wheel 8 in
116370 04/27/06 08:59 S. Bailey Beam is back, 10 uA
116369 04/27/06 08:44 S. Bailey Flip IHWP from OUT to IN
116368 04/27/06 08:40 gzero End of Run 29096:
116367 04/27/06 08:39 S. Bailey Hall C to controlled access to move ferris wheel from 4 in to 8 in
116366 04/27/06 08:35 S. Bailey HV trip on Oct 6, Che 1
116365 04/27/06 08:10 cdaq Beam Time Accounting
116364 04/27/06 08:09 Furget Shift summary
116363 04/27/06 08:03 gzero Run 29096: Standard configuration 30 Hz +Fastbus, LD2 3500 A 10 muA prescale=100 FastClear enable
116362 04/27/06 07:48 gzero End of Run 29095:
116361 04/27/06 07:26 gzero Run 29095: NA counting rate study, LD2 3500 A 10 muA prescale=100 FastClear disable
116360 04/27/06 07:21 gzero End of Run 29094:
116359 04/27/06 07:02 gzero Run 29094: FR CER test 0.75 p.e., LD2 3500 A 10 muA prescale=3000 FastClear disable
116358 04/27/06 07:00 Furget Counting rates in G0realtimemonitor to be changed
116357 04/27/06 06:46 gzero End of Run 29093:
116356 04/27/06 06:43 Furget Run 29093 is : FR CER test 0.75 p.e., LD2 3500 A 5 muA prescale=3000 FastClear disable
116355 04/27/06 06:36 gzero Run 29093: FR CER test 1 p.e., LD2 3500 A 5 muA prescale=3000 FastClear disable
116354 04/27/06 06:32 gzero End of Run 29092:
116353 04/27/06 06:25 muether Target: More target motion alarms
116352 04/27/06 05:36 gzero Run 29092: FR CER test 1 p.e., LD2 3500 A 5 muA prescale=3000 FastClear enable
116351 04/27/06 05:31 gzero End of Run 29091:
116350 04/27/06 05:07 muether Analysis: Cerenkov PMT rates vs run number
116349 04/27/06 04:58 Furget Wrong heading for run 29090
116348 04/27/06 04:55 gzero Run 29091: FR CER test 1 p.e., LD2 3500 A 10 muA prescale=3000 FastClear enable
116347 04/27/06 04:51 gzero End of Run 29090:
116346 04/27/06 04:09 muether Analysis: Rate Matrices for LD2
116345 04/27/06 04:04 Furget Problem in the G0Integrity file related to CODA
116344 04/27/06 04:02 gzero Run 29090: Production LH2 3500 A 60 muA prescale=3000, FC disabled, IA on
116343 04/27/06 03:47 muether Target: Repeated Target Motion Alarms
116342 04/27/06 03:45 gzero End of Run 29089:
116341 04/27/06 03:31 gzero Run 29089: Fastbus(ps4=50,FastClear enable) + 30Hz, 10 uA, LD2 target
116340 04/27/06 03:30 Furget g0beam feedback was off
116339 04/27/06 03:25 gzero End of Run 29088:
116338 04/27/06 02:54 gzero Run 29088: Fastbus(ps4=50,FastClear enable) + 30Hz, 10 uA, LD2 target
116337 04/27/06 02:50 Furget Oct6 Cer 1 has tripped
116336 04/27/06 02:47 gzero End of Run 29087:
116335 04/27/06 02:36 Furget Anode current on the FR Cerenkov
116334 04/27/06 02:18 gzero Run 29087: Fastbus (ps4=50,FastClear enable) +30Hz ; 20 {uA;} LD2 target
116333 04/27/06 02:15 gzero End of Run 29086:
116332 04/27/06 01:51 gzero Run 29086: FasBus(Gain {calibration);} 20 {uA;} LD2 target
116331 04/27/06 01:43 muether Target: LD2 Target moved in
116330 04/27/06 01:34 Breuer First look at anode currents and rates for LD2 running.
116329 04/27/06 01:27 muether Target: Target moved out
116328 04/27/06 01:15 gzero End of Run 29085:
116327 04/27/06 01:10 Furget Single counting on LD2
116326 04/27/06 01:06 Furget CED-FPD coincidence on LD2
116325 04/27/06 00:53 Breuer HV's for French CED 9s changed before run 29085
116324 04/27/06 00:41 gzero Run 29085: FasBus(Gain {calibration);} 5 {uA;} LD2 target
116323 04/27/06 00:32 gzero End of Run 29084:
116322 04/27/06 00:01 cdaq Beam Time Accounting
Wednesday
116321 04/26/06 23:58 hamlet Swing shift summary
116320 04/26/06 23:49 hamlet Turned OFF SOS Cerenkov HV
116319 04/26/06 23:45 gzero Run 29084: FasBus(Gain {calibration);} 5 {uA;} LD2 target
116318 04/26/06 23:44 gzero End of Run 29083:
116317 04/26/06 22:50 gzero Run 29083: FasBus(Gain {calibration);} 5 {uA;} LD2 target
116316 04/26/06 22:47 gzero End of Run 29082:
116315 04/26/06 22:02 gzero Run 29082: FasBus(Gain {calibration);} 5 {uA;} LD2 target
116314 04/26/06 21:58 gzero End of Run 29081:
116313 04/26/06 21:57 gzero End of Run 29081:
116312 04/26/06 21:12 gzero Run 29081: FasBus(Gain {calibration);} 5 {uA;} LD2 target
116311 04/26/06 21:06 gzero End of Run 29080:
116310 04/26/06 20:29 gzero Run 29080: FasBus(Gain calibration); 20 uA; LD2 target
116309 04/26/06 20:26 gzero End of Run 29079:
116308 04/26/06 19:59 Breuer/Ellis New pre/post-amplifiers installed for CED 8 s, new prelim. HVs; revised
116307 04/26/06 19:58 hamlet Paddle current on 12C with beam
116306 04/26/06 19:53 gzero Run 29079: Anode current measurement at 10 uA
116305 04/26/06 19:51 J.W. Martin Target: moving LD2 target in
116304 04/26/06 19:26 hamlet Paddle anode current
116303 04/26/06 19:23 Breuer/Ellis New pre/post-amplifiers installed for CED 8 s, new prelim. HVs
116302 04/26/06 19:16 J.W. Martin Target: moving to carbon target
116301 04/26/06 19:00 J.W. Martin Target: target moving out
116300 04/26/06 18:02 gzero End of Run 29078:
116299 04/26/06 17:32 hamlet Ask MCC for "sweep" and go to beam permit
116298 04/26/06 17:21 suleiman Beam: T Allison Entry Regarding Hall C Current
116297 04/26/06 16:47 muether SMS: Ramping Magnet to 3500A after target switch over
116296 04/26/06 16:44 smithg Target: Setup new alarm file. Fan now at 30.4 Hz.
116295 04/26/06 16:00 smithg Target: LD2 cooldown complete
116294 04/26/06 16:00 cdaq Beam Time Accounting
116293 04/26/06 15:54 suleiman Beam: IA Slopes from run 29006. This time CAV1C1 plot is included
116292 04/26/06 15:53 S. Bailey Day Shift Summary
116291 04/26/06 15:33 mack More Unser checkout
116290 04/26/06 14:56 gzero Run 29078: run for Herbert
116289 04/26/06 14:54 gzero End of Run 29077:
116288 04/26/06 14:54 S. Bailey HV trip on all Cherenkov
116287 04/26/06 14:38 gzero Run 29077: Unser Calib
116286 04/26/06 13:58 gaskell SOS cerenkov - signal!
116285 04/26/06 13:37 Furget Beam position
116284 04/26/06 13:01 S. Bailey Target ready at 4 pm +/- 1 hour
116283 04/26/06 12:24 smithg Target: Max loop temp rise during cold swap
116282 04/26/06 12:10 smithg Target: Pumping coolant IV
116281 04/26/06 11:41 smithg Target: Pumping coolant IV
116280 04/26/06 11:39 smithg Target: On D2 tank now. Pump & purge finished. Started cooldown.
116279 04/26/06 10:51 S. Bailey HV trip on Oct6, Cherenkov 1
116278 04/26/06 09:47 ramsay Wednesday Morning RC report
116277 04/26/06 09:33 S. Bailey Magnet is off
116276 04/26/06 09:23 S. Bailey Hall C is in restricted access now
116275 04/26/06 09:22 smithg Target: Completed 15K warmup procedure. Switching to deuterium.
116274 04/26/06 09:05 beise Target: Piminus rates in deuterium
116273 04/26/06 09:05 muether SMS: Ramping down magnet
116272 04/26/06 09:04 S. Bailey I requested restricted access
116271 04/26/06 09:03 S. Bailey MCC secured beam for beam studies
116270 04/26/06 09:02 gzero End of Run 29076:
116269 04/26/06 08:50 S. Bailey Oct4_eCED_FPD fixed
116268 04/26/06 08:42 S. Bailey 30 Hz Gas target run -> Oct4_eCED_FPD is empty
116267 04/26/06 08:33 gzero Run 29076: Gas target run, 30 Hz data, LH2 3500 A 5 muA prescale=16777215 (max), FC enabled, IA off
116266 04/26/06 08:30 gzero End of Run 29075:
116265 04/26/06 08:20 cdaq Beam Time Accounting
116264 04/26/06 08:10 gzero Run 29075: Gas target run, LH2 3500 A 5 muA prescale=0, FC enabled, IA off
116263 04/26/06 08:06 gzero End of Run 29074:
116262 04/26/06 08:03 Furget Shift summary
116261 04/26/06 07:42 Furget Gas target at 5 muA NOT at 60uA !
116260 04/26/06 07:31 gzero Run 29074: Gas target run, LH2 3500 A 60 muA prescale=0, FC enabled, IA off
116259 04/26/06 07:30 gzero End of Run 29073:
116258 04/26/06 07:24 muether Target: Warming up the target to 30K for gas running
116257 04/26/06 07:23 gzero Run 29073: Gas target run, LH2 3500 A 60 muA prescale=0, FC enabled, IA off
116256 04/26/06 06:19 Furget Pion coincidence of oct 2 and 4 are wrong !
116255 04/26/06 06:14 gzero End of Run 29072:
116254 04/26/06 06:02 real Fr cerenkov efficiency after timing change
116253 04/26/06 05:49 gzero Run 29072: Production LH2 3500 A 60 muA prescale=3000, FC disabled, IA on
116252 04/26/06 05:49 gzero End of Run 29071:
116251 04/26/06 05:22 Furget FR Cer timing
116250 04/26/06 05:19 gzero Run 29071: Production LH2 3500 A 60 muA prescale=3000, FC disabled, IA on
116249 04/26/06 05:13 gzero End of Run 29070:
116248 04/26/06 05:13 gzero Run 29070: Production LH2 3500 A 60 muA prescale=3000, FC disabled, IA on
116247 04/26/06 05:07 Furget AC system works again
116246 04/26/06 05:02 muether Chiller back on
116245 04/26/06 04:47 Furget Electronics crate is now too high
116244 04/26/06 04:33 gzero End of Run 29069:
116243 04/26/06 04:13 gzero Run 29069: Production LH2 3500 A 60 muA prescale=3000, FC disabled, IA on
116242 04/26/06 04:11 gzero End of Run 29068:
116241 04/26/06 04:10 Furget G0 electronics temperature is still growing
116240 04/26/06 03:50 muether Temps still on the rise
116239 04/26/06 03:33 muether Alarm on Cage Temperature
116238 04/26/06 03:11 Furget Trouble with CAEN HV Oct 2 and last runs junk
116237 04/26/06 03:03 gzero Run 29068: Production LH2 3500 A 60 muA prescale=3000, FC disabled, IA on
116236 04/26/06 03:02 gzero End of Run 29067:
116235 04/26/06 02:56 gzero Run 29067: Production LH2 3500 A 60 muA prescale=3000, FC disabled, IA on
116234 04/26/06 02:53 gzero End of Run 29066:
116233 04/26/06 02:39 gzero Run 29066: Production LH2 3500 A 60 muA prescale=3000, FC disabled, IA on
116232 04/26/06 02:38 gzero End of Run 29065:
116231 04/26/06 02:19 Furget halo rates are unstable
116230 04/26/06 02:10 Furget Change in the FR Cerenkov timing
116229 04/26/06 02:03 gzero Run 29065: Production LH2 3500 A 60 muA prescale=3000, FC disabled, IA on
116228 04/26/06 01:37 muether Target: LH2 Target moved back in
116227 04/26/06 01:11 muether Target: Target moved out for PZT scan
116226 04/26/06 01:03 J.W. Martin Analysis: Cherenkov and G0 beam
116225 04/26/06 01:00 gzero End of Run 29064:
116224 04/26/06 00:42 Furget Gas Cerenkov threshold
116223 04/26/06 00:38 gzero End of Run 29064:
116222 04/26/06 00:14 gzero End of Run 29064:
116221 04/26/06 00:05 gzero Run 29064: Production LH2 3500 A 60 muA prescale=3000, FC disabled, IA on
116220 04/26/06 00:01 hamlet Swing shift summary, April 25
116219 04/26/06 00:01 cdaq Beam Time Accounting
Tuesday
116218 04/25/06 23:52 hamlet Beam Strip Chart during run 29063
116217 04/25/06 23:22 J.W. Martin/ Analysis: a search for SOS Cherenkov information
116216 04/25/06 23:04 gzero Run 29063: Production LH2 3500 A 60 muA prescale=3000, FC disabled, IA on
116215 04/25/06 23:03 gzero End of Run 29062:
116214 04/25/06 22:06 gzero Run 29062: Production LH2 3500 A 60 muA prescale=3000, FC disabled, IA on
116213 04/25/06 21:45 hamlet 6CER1 HV was off ~2 min during run 29061
116212 04/25/06 21:10 gzero Run 29061: Production LH2 3500 A 60 muA prescale=100, FC enabled, IA on
116211 04/25/06 21:08 gzero End of Run 29060:
116210 04/25/06 19:53 ellis 31Mhz quicklook
116209 04/25/06 19:43 gzero Run 29060: Production LH2 3500 A 60 muA prescale=3000, FC disabled, IA on
116208 04/25/06 19:41 gzero End of Run 29059:
116207 04/25/06 19:40 hamlet Evnt/q Beam monitor histogram look strange
116206 04/25/06 19:27 Fatiha The matrix for the Double peak with the 31 ns beam structure.
116205 04/25/06 18:47 Fatiha Changed the Delays for teh ARS in the soft
116204 04/25/06 18:33 gzero Run 29059: Production LH2 3500 A 60 muA prescale=3000, FC disabled, IA on
116203 04/25/06 18:32 gzero End of Run 29058:
116202 04/25/06 18:27 Beise Target: LD2 quasielastic rate simulation
116201 04/25/06 18:27 Beise Target: LD2 quasielastic rate simulation
116200 04/25/06 18:17 hamlet Run 29057 is a 31 MHz run with different thresholds
116199 04/25/06 17:42 hamlet Beam back. Start production data taking
116198 04/25/06 17:41 gzero Run 29058: Production LH2 3500 A 60 muA prescale=3000, FC disabled, IA on
116197 04/25/06 17:34 J.W. Martin Target: JT opened
116196 04/25/06 17:33 muether Analysis: "Blair" plots for recent fielf scan
116195 04/25/06 17:21 pking Where in the datastream is the Gas Cerenkov, and how can you look at the data
116194 04/25/06 17:05 hamlet Beam OFF. MCC will change time structure
116193 04/25/06 17:02 gzero End of Run 29057:
116192 04/25/06 16:39 gzero Run 29057: Production LH2 3500 A 60 muA prescale=3000, FC disabled, IA on
116191 04/25/06 16:38 gzero End of Run 29056:
116190 04/25/06 16:36 gzero End of Run 29056:
116189 04/25/06 16:06 cdaq Beam Time Accounting
116188 04/25/06 15:50 S. Bailey Special Instructions to Swing Shift : change gain of BCMs back to 3 before production data taking
116187 04/25/06 15:47 S. Bailey Day Shift Summary
116186 04/25/06 15:40 gzero Run 29056: LH2, 30 Hz data, 31 MHz, I=0.7 uA, FC enabled, NA sum=1.5 pe, FR sum=special,IA off, no coil pulsing, PS4=0
116185 04/25/06 15:24 gzero End of Run 29055:
116184 04/25/06 15:19 mack BCM calibration for gain setting 3
116183 04/25/06 15:19 ramsay Plan for overnight and tomorrow.
116182 04/25/06 15:04 gzero Run 29055: Carbon, 30 Hz data, 31 MHz, I=0.7 uA, FC enabled, NA sum=0.5pe, FR sum=2 pe,IA off, no coil pulsing
116181 04/25/06 15:01 gzero End of Run 29054:
116180 04/25/06 14:38 pking Removed extra splitter on 499 MHz signal and resynched our TDC start
116179 04/25/06 14:26 gzero Run 29054: Carbon, 30 Hz data, 31 MHz, I=0.7 uA, FC enabled, NA sum=0.5pe, FR sum=2 pe,IA off, no coil pulsing
116178 04/25/06 14:23 Goulven Target: Target changed to carbon
116177 04/25/06 14:13 pking Found the 499 MHz signal in G0 cage and resynched our TDC start signal
116176 04/25/06 14:10 gzero End of Run 29053:
116175 04/25/06 14:00 ramsay Update on 31 MHz running
116174 04/25/06 13:31 S. Bailey "Real" data taking begins with run 29053
116173 04/25/06 13:18 S. Bailey King & Mack save the day! Hooray!!!!!
116172 04/25/06 13:16 gzero Run 29053: no TED, 31 MHz, I=0.7 uA, FC enabled, NA sum=0.5pe, FR sum=2 pe,IA off, no coil pulsing
116171 04/25/06 13:11 gzero End of Run 29052:
116170 04/25/06 12:57 gzero Run 29052: no TED, 31 MHz, I=0.7 uA, FC enabled, NA sum=0.5pe, FR sum=2 pe,IA off, no coil pulsing
116169 04/25/06 12:56 gzero End of Run 29051:
116168 04/25/06 12:37 S. Bailey HV trip on octant 6, cherenkov 1
116167 04/25/06 12:09 S. Bailey 31 MHz update (uh oh)
116166 04/25/06 11:51 gzero Run 29051: no TED, 31 MHz, I=0.7 uA, FC enabled, NA sum=0.5pe, FR sum=2 pe,IA off, no coil pulsing
116165 04/25/06 11:49 gzero End of Run 29050:
116164 04/25/06 11:32 ellis beam parameter script
116163 04/25/06 11:20 S. Bailey Turned off HV on all octant 7 except ...
116162 04/25/06 10:52 gzero Run 29050: no TED, 31 MHz, I=0.7 uA, FC enabled, NA sum=0.5pe, FR sum=2 pe,IA off, no coil pulsing
116161 04/25/06 10:51 gzero End of Run 29049:
116160 04/25/06 10:39 gzero Run 29049: no TED, 31 MHz, I=0.7 uA, FC enabled, NA sum=0.5pe, FR sum=2 pe,IA off, no coil pulsing
116159 04/25/06 10:37 gaskell SOS cerenkov setup
116158 04/25/06 10:36 gzero Run 29048: no TED, 31 MHz, I=0.7 uA, FC enabled, NA sum=0.5pe, FR sum=2 pe,IA off, no coil pulsing
116157 04/25/06 10:33 gzero End of Run 29047:
116156 04/25/06 10:19 S. Bailey MCC is sending 0.7 uA
116155 04/25/06 10:18 ramsay Tuesday Morning RC report
116154 04/25/06 10:14 gzero Run 29047: 31 MHz, I=0.7 uA, FC enabled, NA sum=0.5pe, FR sum=2 pe,IA off, no coil pulsing
116153 04/25/06 10:14 S. Bailey Problems with CODA : no events
116152 04/25/06 10:13 S. Bailey HV Trip
116151 04/25/06 10:09 gzero Run 29046: 31 MHz, I=0.7 uA, FC enabled, NA sum=0.5pe, FR sum=2 pe,IA off, no coil pulsing
116150 04/25/06 10:05 cdaq Beam Time Accounting
116149 04/25/06 10:04 gzero Run 29045: Production LH2 3500 A 60 muA prescale=3000, FC disabled, IA on
116148 04/25/06 09:52 S. Bailey MCC is sending pulsed beam now
116147 04/25/06 09:25 S. Bailey MCC is going to bypass the RF zone. 31 MHz beam in 10 or 15 minutes.
116146 04/25/06 09:21 gzero End of Run 29044:
116145 04/25/06 09:20 gzero Run 29044: daq test
116144 04/25/06 09:07 S. Bailey MCC almost ready to deliver beam : problem with RF zone
116143 04/25/06 08:43 S. Bailey I turned up the gain on our BCM1 and BCM2 from 3 to 4
116142 04/25/06 08:05 S. Bailey MCC secured beam top begin 31 MHz preparation
116141 04/25/06 08:02 gzero End of Run 29043:
116140 04/25/06 08:00 Furget Shift summary
116139 04/25/06 07:53 Furget Oct5 FPD 3 Left is coming back completely
116138 04/25/06 06:57 gzero Run 29043: Production LH2 3500 A 60 muA prescale=3000, FC disabled, IA on
116137 04/25/06 06:55 gzero End of Run 29042:
116136 04/25/06 06:45 Furget Oct5 FPD 3 Left is coming back partially !
116135 04/25/06 05:52 gzero Run 29042: Production LH2 3500 A 60 muA prescale=3000, FC disabled, IA on
116134 04/25/06 05:49 gzero End of Run 29041:
116133 04/25/06 05:43 muether Analysis: Some results from the most recent field scan
116132 04/25/06 05:27 muether Octant 6 CER1 HV Tripped off
116131 04/25/06 04:55 gzero Run 29041: Production LH2 3500 A 60 muA prescale=100, FC Enabled, IA on
116130 04/25/06 04:52 gzero End of Run 29040:
116129 04/25/06 04:50 gzero Run 29040: Production LH2 3500 A 60 muA prescale=100, FC Enabled, IA on
116128 04/25/06 04:46 gzero End of Run 29039:
116127 04/25/06 04:46 Furget Looking at beam properties
116126 04/25/06 04:10 Furget FR Cerenkov configuration files
116125 04/25/06 03:50 gzero Run 29039: Production LH2 3500 A 60 muA prescale=100, FC Enabled, IA on
116124 04/25/06 03:48 gzero End of Run 29038:
116123 04/25/06 03:31 Furget Oct5 FPD 3 is missing
116122 04/25/06 02:53 gzero Run 29038: Production LH2 3500 A 60 muA prescale=100, FC Enabled, IA on
116121 04/25/06 02:50 gzero End of Run 29037:
116120 04/25/06 02:06 Furget Oct6 det6 is solved
116119 04/25/06 01:47 muether Dave's Beam position plot
116118 04/25/06 01:46 gzero Run 29037: Production LH2 3500 A 60 muA prescale=3000, FC disabled, IA on
116117 04/25/06 01:44 gzero End of Run 29036:
116116 04/25/06 01:38 muether Target: LH2 target back in
116115 04/25/06 01:20 muether Target: HPH too high with target out
116114 04/25/06 01:09 muether Target: Target moved out for PZT measurement
116113 04/25/06 00:54 gzero Run 29036: Production LH2 3500 A 60 muA prescale=3000, FC disabled, IA on
116112 04/25/06 00:49 C. Furget Oct6 CED6 problem
116111 04/25/06 00:47 gzero End of Run 29035:
116110 04/25/06 00:42 J.W. Martin Analysis: ARS as a tighter-gated charge ADC
116109 04/25/06 00:01 cdaq Beam Time Accounting
Monday
116108 04/24/06 23:57 suleiman Swing Shift Summary
116107 04/24/06 23:55 suleiman Reboot ROC5
116106 04/24/06 23:52 gzero Run 29035: Production LH2 3500 A 60 muA prescale=100, FC enabled, IA on
116105 04/24/06 23:37 J.W. Martin shift checklist scans
116104 04/24/06 23:35 suleiman Coda Frozen
116103 04/24/06 23:24 gzero Run 29034: Production LH2 3500 A 60 muA prescale=100, FC enabled, IA on
116102 04/24/06 23:22 gzero End of Run 29033:
116101 04/24/06 23:16 J.W. Martin coinc matrix for real this time
116100 04/24/06 23:15 J.W. Martin/ Analysis: coincidence matrix plots for 29031 offline and CED 6 / Octant 6 problem
116099 04/24/06 22:28 gzero Run 29033: Production LH2 3500 A 60 muA prescale=100, FC enabled, IA on
116098 04/24/06 22:25 gzero End of Run 29032:
116097 04/24/06 22:03 gzero ASCS summary for Sun Apr 23 2006
116096 04/24/06 21:31 gzero Run 29032: Production LH2 3500 A 60 muA prescale=100, FC enabled, IA on
116095 04/24/06 21:28 gzero End of Run 29031:
116094 04/24/06 20:50 suleiman Coda ER Warning durin run 29031
116093 04/24/06 20:40 suleiman Beam: Charge Asymmetry and Position Differences for runs:29008-29024 ... IN
116092 04/24/06 20:33 gzero Run 29031: Production LH2 3500 A 60 muA prescale=100, FC enabled, IA on
116091 04/24/06 20:31 gzero End of Run 29030:
116090 04/24/06 19:52 suleiman Beam: Beam Halo and Position
116089 04/24/06 19:43 J.W. Martin Target: tweaked JT upward one click
116088 04/24/06 19:37 gzero Run 29030: Production LH2 3500 A 60 muA prescale=100, FC enabled, IA on
116087 04/24/06 19:32 J.W. Martin Target: reopened JT one click
116086 04/24/06 19:07 gaskell Moller summary
116085 04/24/06 19:06 J.W. Martin Target: moving target in, and tweaked JT valve
116084 04/24/06 19:06 pking G0cage temperature summary; how hot is too hot
116083 04/24/06 18:49 gaskell Moller backout
116082 04/24/06 18:42 cdaq Moller Run 61616: Moller run
116081 04/24/06 18:40 cdaq Moller Run 61615: Moller run
116080 04/24/06 18:37 cdaq Moller Run 61614: Moller run
116079 04/24/06 18:35 cdaq Moller Run 61613: Moller run
116078 04/24/06 18:32 cdaq Moller Run 61612: Moller run -CAMAC run
116077 04/24/06 18:29 cdaq Moller Run 61611: Moller run
116076 04/24/06 18:26 cdaq Moller Run 61610: Junk
116075 04/24/06 17:30 gaskell ramping Moller solenoid to 3 T
116074 04/24/06 17:25 cdaq Moller Run 61609: Junk
116073 04/24/06 17:19 ramsay Update on the Tuesday 31 MHz running
116072 04/24/06 17:16 gaskell Moller setup
116071 04/24/06 17:15 ramsay Update on the Tuesday 31 MHz running
116070 04/24/06 17:11 J.W. Martin Target: target out for Moller run
116069 04/24/06 17:07 gzero End of Run 29029:
116068 04/24/06 16:55 gzero Run 29029: Production LH2 3500 A 60 muA prescale=3000 no FC IA on
116067 04/24/06 16:51 gzero End of Run 29028:
116066 04/24/06 16:30 gzero Run 29028: Production LH2 3500 A 60 muA prescale=3000 no FC IA on
116065 04/24/06 16:27 gzero End of Run 29027:
116064 04/24/06 16:25 ellis, J.W. cage temp alarm limits modified to avoid target crash
116063 04/24/06 16:07 S. Bailey Day Shift Summary
116062 04/24/06 16:04 cdaq Beam Time Accounting
116061 04/24/06 15:46 gzero Run 29027: Production LH2 3500 A 60 muA prescale=3000 no FC IA on
116060 04/24/06 15:45 S. Bailey Flip IHWP from IN to OUT for Hall B
116059 04/24/06 15:40 gzero End of Run 29026:
116058 04/24/06 15:34 S. Bailey More info on closed valve
116057 04/24/06 15:28 gzero Run 29026: Production LH2 3500 A 60 muA prescale=3000 no FC IA on
116056 04/24/06 15:26 gzero End of Run 29025:
116055 04/24/06 15:25 gzero Run 29025: Production LH2 3500 A 60 muA prescale=3000 no FC IA on
116054 04/24/06 15:25 ppillot Analysis: PMT threshold study for French CED/FPD (30Hz data)
116053 04/24/06 15:24 S. Bailey Beam is back -> A valve was closed
116052 04/24/06 15:08 S. Bailey MCC cannot deliver beam -> there is something blocking the beamline at 3C17
116051 04/24/06 14:47 gaskell/haml SOS cerenkov installation
116050 04/24/06 14:40 S. Bailey Turn off all HV, turn on HALO, LUMI, Herbert's Paddle
116049 04/24/06 14:17 S. Bailey Sweeping the hall
116048 04/24/06 12:43 S. Bailey Turned off Halo, Lumi, and Herbert's paddle HV to test SOS Cherenkov
116047 04/24/06 12:32 pking G0 cage thermocouple sensors
116046 04/24/06 12:04 S. Bailey Analysis: Shielding wall reduces yield of second peak by a factor of 1.5 in CED 9
116045 04/24/06 10:34 S. Bailey HV Trip on Octant 6, Cherenkov 1
116044 04/24/06 10:34 ellis G0Gage Blower
116043 04/24/06 10:30 ellis G0CageTemp2 Alarm
116042 04/24/06 09:55 ellis G0gagetemp1 Yellow alarm
116041 04/24/06 09:42 ramsay Monday morning RC report
116040 04/24/06 09:38 S. Bailey Hall C in Restricted Access
116039 04/24/06 09:36 gzero End of Run 29024:
116038 04/24/06 09:24 ramsay Monday run plan
116037 04/24/06 09:02 S. Bailey Beam: MCC took away beam to begin pass change
116036 04/24/06 08:07 cdaq Beam Time Accounting
116035 04/24/06 08:06 Furget Shift summary
116034 04/24/06 08:03 gzero Run 29024: Production LH2 3500 A 60 muA prescale=3000 no FC IA on
116033 04/24/06 07:43 gzero End of Run 29023:
116032 04/24/06 06:52 Furget FR Cerenkov timing
116031 04/24/06 06:49 gzero Run 29023: Production LH2 3500 A 60 muA prescale=3000 no FC IA on
116030 04/24/06 06:48 gzero End of Run 29022:
116029 04/24/06 05:39 gzero Run 29022: Production LH2 3500 A 60 muA prescale=3000 no FC IA on
116028 04/24/06 05:38 gzero End of Run 29021:
116027 04/24/06 04:37 gzero Run 29021: Production LH2 3500 A 60 muA prescale=3000 no FC IA on
116026 04/24/06 04:29 gzero End of Run 29020:
116025 04/24/06 03:31 gzero Run 29020: Production LH2 3500 A 60 muA prescale=3000 no FC IA on
116024 04/24/06 03:00 gzero End of Run 29019:
116023 04/24/06 02:41 Furget Beam position
116022 04/24/06 02:26 gzero Run 29019: Production LH2 3500 A 60 muA prescale=3000 no FC IA on
116021 04/24/06 02:21 gzero End of Run 29018:
116020 04/24/06 02:20 muether SMS: Collimators now down to temperatures prior to cryo outage
116019 04/24/06 02:15 muether Dave's Beam postion script
116018 04/24/06 01:47 Furget Beam position and halo rates
116017 04/24/06 01:15 Furget Lumi and halo HV control silenced
116016 04/24/06 01:07 gzero End of Run 29018:
116015 04/24/06 01:07 gzero Run 29018: Production LH2 3500 A 60 muA prescale=3000 no FC IA on
116014 04/24/06 00:01 cdaq Beam Time Accounting
116013 04/24/06 00:01 gzero Run 29017: Production LH2 3500 A 60 muA prescale=3000 no FC IA on
Sunday
116012 04/23/06 23:59 suleiman Swing Shift Summary
116011 04/23/06 23:59 gzero End of Run 29016:
116010 04/23/06 23:46 suleiman Beam: Coil Modulation Cycle from Production Run 29015 - Reduce the Energy Limit
116009 04/23/06 23:02 gzero Run 29016: Production LH2 3500 A 60 muA prescale=3000 no FC IA on
116008 04/23/06 22:59 gzero End of Run 29015:
116007 04/23/06 22:59 suleiman Beam: Hall A and Hall B confirmed that G0 Coil Modulation (position + Energy) did not affect the Quality of their Data
116006 04/23/06 22:58 suleiman Beam: Hall A and Hall C confirmed that G0 Coil Modulation (position + Energy) did not affect the Quality of their Data
116005 04/23/06 22:50 suleiman Beam: Modulation Should be Kept ON
116004 04/23/06 22:39 gzero Run 29015: Production LH2 3500 A 60 muA prescale=3000 no FC IA on
116003 04/23/06 22:37 gzero End of Run 29014:
116002 04/23/06 22:00 gzero Run 29014: Coil Modulation - LH2 3500 A 60 muA prescale=3000 no FC IA on
116001 04/23/06 21:58 gzero End of Run 29013:
116000 04/23/06 21:37 suleiman Beam: IHWP IN vs. OUT Data: 23.1 hours IN vs 42.2 hours OUT
115999 04/23/06 21:29 gzero Run 29013: Production LH2 3500 A 60 muA prescale=3000 no FC IA on
115998 04/23/06 21:18 suleiman Beam: Slugs Update
115997 04/23/06 21:14 J.W. Martin electronics cage temperature update 3
115996 04/23/06 21:11 gzero End of Run 29012:
115995 04/23/06 20:37 suleiman Beam: Charge Asymmetry and Position Differences for runs: 28988 & 2995-29004 ... OUT
115994 04/23/06 20:32 gzero Run 29012: Production LH2 3500 A 60 muA prescale=3000 no FC IA on
115993 04/23/06 20:30 gzero End of Run 29011:
115992 04/23/06 19:47 suleiman Beam: Charge Asymmetry and Position Differences for runs: 28958-28960 & 2984-28987 ... IN
115991 04/23/06 19:33 gzero Run 29011: Production LH2 3500 A 60 muA prescale=3000 no FC IA on
115990 04/23/06 19:31 gzero End of Run 29010:
115989 04/23/06 19:27 suleiman Beam: Charge Asymmetry and Position Differences for runs: 28946-28957 ... OUT
115988 04/23/06 19:15 J.W. Martin electronics cage temperatures update 2
115987 04/23/06 19:10 suleiman Beam: Charge Asymmetry and Position Differences for runs: 28937, 28939, & 28945 ... IN
115986 04/23/06 18:55 suleiman CED - FPD Coincidence Plot from run 29010
115985 04/23/06 18:38 suleiman Beam: Charge Feedback medm Screens
115984 04/23/06 18:30 gzero Run 29010: Production LH2 3500 A 60 muA prescale=3000 no FC IA on
115983 04/23/06 18:28 gzero End of Run 29009:
115982 04/23/06 18:27 suleiman Beam: Hall C BPMs Raw Signals and Position Differences during run 29004
115981 04/23/06 18:12 J.W. Martin electronics cage temperatures update
115980 04/23/06 17:52 suleiman Beam: PITA Slopes for IN (29007)
115979 04/23/06 17:41 muether Analysis: Octant averaged asymmetries
115978 04/23/06 17:31 suleiman Feedback did not update ... kill coda and Realtime
115977 04/23/06 17:28 muether Analysis: Asymmetry properties per octant
115976 04/23/06 17:27 gzero Run 29009: Production LH2 3500 A 60 muA prescale=3000 no FC IA on
115975 04/23/06 17:24 gzero End of Run 29008:
115974 04/23/06 17:19 ellis G0 Cage
115973 04/23/06 17:11 suleiman Back to production
115972 04/23/06 17:06 suleiman/Ell Beam: PITA Scan ... IHWP=IN
115971 04/23/06 17:06 gzero Run 29008: Production LH2 3500 A 60 muA prescale=3000 no FC IA on
115970 04/23/06 17:03 gzero End of Run 29007:
115969 04/23/06 16:56 suleiman Beam: New G0 IA Slope for Charge Feedback = -492.0
115968 04/23/06 16:54 suleiman Beam: IA Slopes (29006)
115967 04/23/06 16:38 muether SMS: Asymetries for "good runs"
115966 04/23/06 16:38 ellis G0 Cage Cooling Problem
115965 04/23/06 16:37 suleiman Beam: Beam Halo
115964 04/23/06 16:36 ellis G0cage cooling
115963 04/23/06 16:34 muether Analysis: Comparison of runs before and after Herberts wall
115962 04/23/06 16:14 ellis Day Shift Summary
115961 04/23/06 16:11 cdaq Beam Time Accounting
115960 04/23/06 16:08 gzero Run 29007: PITA Scan, IN, LH2 3500 A 60 muA prescale=3000 no FC IA off
115959 04/23/06 16:06 suleiman Beam: IHWP Changed to IN, Ran flipper
115958 04/23/06 16:03 suleiman/ell Beam: IA Scan
115957 04/23/06 16:02 gzero End of Run 29006:
115956 04/23/06 15:58 ellis g0cagetemp alarm
115955 04/23/06 15:50 suleiman Beam: PITA Slopes for OUT (29005)
115954 04/23/06 15:15 gzero Run 29006: IA Scan LH2 3500 A 60 muA prescale=3000 no FC IA off
115953 04/23/06 15:12 suleiman/ell Beam: PTA Scan ... IHWP=OUT
115952 04/23/06 15:11 gzero End of Run 29005:
115951 04/23/06 14:57 ramsay More pictures of the diagnostic wall
115950 04/23/06 14:33 ellis cerenkov 1 oct 6 tripped
115949 04/23/06 14:17 gzero Run 29005: PITA Scan LH2 3500 A 60 muA prescale=3000 no FC IA off
115948 04/23/06 14:13 gzero End of Run 29004:
115947 04/23/06 14:09 ellis End of Run 29003
115946 04/23/06 13:42 gzero End of Run 29004:
115945 04/23/06 13:32 mack lumi carbon rise at low beam currents: least count again?
115944 04/23/06 13:28 ppillot/furg pictures of the shielding wall
115943 04/23/06 13:24 ppillot Analysis: Comparison between target out runs with and without magnetic field
115942 04/23/06 13:19 gzero Run 29004: Production LH2 3500 A 60 muA prescale=3000 no FC IA on
115941 04/23/06 12:23 gzero Run 29003: Production LH2 3500 A 60 muA prescale=3000 no FC IA on
115940 04/23/06 12:22 gzero End of Run 29002:
115939 04/23/06 12:01 ellis Intermittent alarm that "G0 or G0B wire readouts appears STUCK!!!"
115938 04/23/06 11:24 gzero Run 29002: Production LH2 3500 A 60 muA prescale=3000 no FC IA on
115937 04/23/06 11:23 gzero End of Run 29001:
115936 04/23/06 10:38 ellis Coda back
115935 04/23/06 10:36 gzero Run 29001: Production LH2 3500 A 60 muA prescale=3000 no FC IA on
115934 04/23/06 10:31 ellis DAQ problems
115933 04/23/06 10:21 gzero Run 29000: Production LH2 3500 A 60 muA prescale=3000 no FC IA on
115932 04/23/06 10:13 gzero Run 28999: Production LH2 3500 A 60 muA prescale=3000 no FC IA on
115931 04/23/06 09:52 ellis Oct 6, Cer 1 Tripped
115930 04/23/06 09:06 gzero Run 28998: Production LH2 3500 A 60 muA prescale=3000 no FC IA on
115929 04/23/06 09:05 gzero End of Run 28997:
115928 04/23/06 09:02 ramsay Corrected Sunday morning report
115927 04/23/06 08:23 ramsay Sunday morning RC report
115926 04/23/06 08:15 Ramsay Sunday-Monday runplan
115925 04/23/06 08:12 gzero Run 28997: Production LH2 3500 A 60 muA prescale=3000 no FC IA on
115924 04/23/06 08:09 gzero End of Run 28996:
115923 04/23/06 08:01 cdaq Beam Time Accounting
115922 04/23/06 07:54 S. Bailey Owl Shift Summary
115921 04/23/06 07:20 gzero Run 28996: Production LH2 3500 A 60 muA prescale=3000 no FC IA on
115920 04/23/06 07:19 gzero End of Run 28995:
115919 04/23/06 06:35 S. Bailey Ask MCC to Reboot IOCSE20
115918 04/23/06 06:20 gzero Run 28995: Production LH2 3500 A 60 muA prescale=3000 no FC IA on
115917 04/23/06 06:15 gzero End of Run 28994:
115916 04/23/06 06:12 gzero Run 28994: Production LH2 3500 A 60 muA prescale=3000 no FC IA on
115915 04/23/06 06:10 S. Bailey Halo Rates to the Moon!
115914 04/23/06 06:06 gzero End of Run 28993:
115913 04/23/06 05:39 S. Bailey Intermittent alarm that "G0 or G0B wire readouts appears STUCK!!!"
115912 04/23/06 05:24 S. Bailey CODA: End of run failed, CODA crashed
115911 04/23/06 05:17 gzero Run 28993: Production LH2 3500 A 60 muA prescale=3000 no FC IA on
115910 04/23/06 05:16 gzero End of Run 28992:
115909 04/23/06 05:10 gzero Run 28992: test to recover CODA
115908 04/23/06 04:55 gzero End of Run 28991:
115907 04/23/06 04:53 gzero End of Run 28991:
115906 04/23/06 04:53 ppillot Analysis: Threshold study for French and NA CED/FPD
115905 04/23/06 03:52 gzero Run 28991: Deadtime LH2 3500 A 10 muA prescale=3000 no FC IA on
115904 04/23/06 03:49 gzero End of Run 28990:
115903 04/23/06 03:07 S. Bailey HV trip on Octant 6 Cherenkov 1
115902 04/23/06 03:02 S. Bailey Analysis: Summary of my analysis on the double peak structure
115901 04/23/06 02:56 S. Bailey Beam: Halo/Lumi HV silenced after HV trip
115900 04/23/06 02:49 gzero Run 28990: Deadtime LH2 3500 A 20 muA prescale=3000 no FC IA on
115899 04/23/06 02:47 gzero End of Run 28989:
115898 04/23/06 01:39 S. Bailey Beam: Beam trip -> HV Trip
115897 04/23/06 01:37 gzero Run 28989: Deadtime LH2 3500 A 40 muA prescale=3000 no FC IA on
115896 04/23/06 01:28 gzero End of Run 28988:
115895 04/23/06 00:42 S. Bailey Beam: IHWP now OUT
115894 04/23/06 00:39 gzero Run 28988: Production LH2 3500 A 60 muA prescale=3000 no FC IA on
115893 04/23/06 00:35 gzero End of Run 28987:
115892 04/23/06 00:07 cdaq Beam Time Accounting
Saturday
115891 04/22/06 23:57 Bosted Swing shift summary
115890 04/22/06 23:27 gzero Run 28987: Production LH2 3500 A 60 muA prescale=3000 no FC IA on
115889 04/22/06 23:25 gzero End of Run 28986:
115888 04/22/06 23:24 J.W. Martin shift checklist scans
115887 04/22/06 22:24 gzero Run 28986: Production LH2 3500 A 60 muA prescale=3000 no FC IA on
115886 04/22/06 22:22 gzero End of Run 28985:
115885 04/22/06 21:22 gzero Run 28985: Production LH2 3500 A 60 muA prescale=3000 no FC IA on
115884 04/22/06 21:20 gzero End of Run 28984:
115883 04/22/06 20:31 Bosted Strange-looking FPD/CED pattern for no-target runs
115882 04/22/06 20:27 Bosted Target for runs 28980 to 83 is really "out of beam"
115881 04/22/06 20:24 gzero Run 28984: Production LH2 3500 A 60 muA prescale=3000 no FC IA on
115880 04/22/06 20:21 J.W. Martin Target: target in
115879 04/22/06 20:16 gzero End of Run 28983:
115878 04/22/06 19:48 gzero Run 28983: SMS scan LH2 3500 A 40 muA prescale=0 with FC IA on
115877 04/22/06 19:46 gzero End of Run 28982:
115876 04/22/06 19:45 gzero Run 28982: SMS scan LH2 3500 A 40 muA prescale=3000 no FC IA on
115875 04/22/06 19:44 gzero End of Run 28981:
115874 04/22/06 19:43 gzero Run 28981: SMS scan LH2 3500 A 40 muA prescale=100 with FC IA on
115873 04/22/06 19:41 gzero End of Run 28980:
115872 04/22/06 19:21 Bosted HV trip Octant 6, CER 1
115871 04/22/06 19:16 J.W. Martin Target: target out
115870 04/22/06 19:08 gzero Run 28980: SMS scan LH2 3500 A 40 muA prescale=3000 no FC IA on
115869 04/22/06 19:04 gzero End of Run 28979:
115868 04/22/06 18:44 gzero Run 28979: SMS scan LH2 4900 A 55 muA prescale=3000 no FC IA on
115867 04/22/06 18:42 gzero End of Run 28978:
115866 04/22/06 18:33 gzero Run 28978: SMS scan LH2 4700 A 55 muA prescale=3000 no FC IA on
115865 04/22/06 18:28 gzero End of Run 28977:
115864 04/22/06 18:21 gzero Run 28977: SMS scan LH2 4500 A 55 muA prescale=3000 no FC IA on
115863 04/22/06 18:17 gzero End of Run 28976:
115862 04/22/06 18:11 gzero Run 28976: SMS scan LH2 4300 A 55 muA prescale=3000 no FC IA on
115861 04/22/06 18:07 gzero End of Run 28975:
115860 04/22/06 18:00 gzero Run 28975: SMS scan LH2 4100 A 55 muA prescale=3000 no FC IA on
115859 04/22/06 17:59 gzero End of Run 28974:
115858 04/22/06 17:59 gzero End of Run 28974:
115857 04/22/06 17:58 ellis graph info
115856 04/22/06 17:53 ellis graphs of beam parameters vs run number
115855 04/22/06 17:44 gzero Run 28974: SMS scan LH2 3900 A 55 muA prescale=3000 no FC IA on
115854 04/22/06 17:33 gzero Run 28973: SMS scan LH2 3700 A 55 muA prescale=3000 no FC IA on
115853 04/22/06 17:00 gzero End of Run 28972:
115852 04/22/06 16:59 gzero Run 28972: SMS scan LH2 3700 A 55 muA prescale=3000 no FC IA on
115851 04/22/06 16:54 gzero End of Run 28971:
115850 04/22/06 16:48 gzero Run 28971: SMS scan LH2 3500 A 55 muA prescale=3000 no FC IA on
115849 04/22/06 16:47 gzero End of Run 28970:
115848 04/22/06 16:45 gzero Run 28970: SMS scan LH2 3500 A 55 muA prescale=3000 no FC IA on
115847 04/22/06 16:41 gzero End of Run 28969:
115846 04/22/06 16:35 gzero Run 28969: SMS scan LH2 3300 A 55 muA prescale=3000 no FC IA on
115845 04/22/06 16:34 gzero End of Run 28968:
115844 04/22/06 16:34 gzero End of Run 28968:
115843 04/22/06 16:26 gzero Run 28968: SMS scan LH2 3100 A 55 muA prescale=3000 no FC IA on
115842 04/22/06 16:18 cdaq Beam Time Accounting
115841 04/22/06 16:17 gzero Run 28967: SMS scan LH2 2900 A 55 muA prescale=3000 no FC IA on
115840 04/22/06 16:13 gzero End of Run 28966:
115839 04/22/06 16:07 gzero Run 28966: SMS scan LH2 2700 A 60 muA prescale=3000 no FC IA on
115838 04/22/06 16:02 benesch shift summary
115837 04/22/06 16:02 gzero End of Run 28965:
115836 04/22/06 15:56 gzero Run 28965: SMS scan LH2 2500 A 60 muA prescale=3000 no FC IA on
115835 04/22/06 15:53 gzero End of Run 28964:
115834 04/22/06 15:47 gzero Run 28964: SMS scan LH2 2300 A 60 muA prescale=3000 no FC IA on
115833 04/22/06 15:44 gzero End of Run 28963:
115832 04/22/06 15:38 gzero Run 28963: SMS scan LH2 2100 A 60 muA prescale=3000 no FC IA on
115831 04/22/06 15:35 gzero End of Run 28962:
115830 04/22/06 15:30 gzero Run 28962: SMS scan LH2 1900 A 60 muA prescale=3000 no FC IA on
115829 04/22/06 15:25 gzero End of Run 28961:
115828 04/22/06 15:25 gzero Run 28961: SMS scan LH2 1900 A 60 muA prescale=3000 no FC IA on
115827 04/22/06 15:14 gzero End of Run 28960:
115826 04/22/06 14:14 gzero Run 28960: Production LH2 3500 A 60 muA prescale=3000 no FC IA on
115825 04/22/06 13:55 gzero End of Run 28959:
115824 04/22/06 13:38 Goulven Target: conditionned air temperature limit change
115823 04/22/06 13:06 gzero Run 28959: Production LH2 3500 A 60 muA prescale=3000 no FC IA on
115822 04/22/06 13:05 gzero End of Run 28958:
115821 04/22/06 12:01 gzero Run 28958: Production LH2 3500 A 60 muA prescale=3000 no FC IA on
115820 04/22/06 11:51 gzero End of Run 28957:
115819 04/22/06 11:12 gzero Run 28957: Production LH2 3500 A 60 muA prescale=3000 no FC IA on
115818 04/22/06 11:10 gzero End of Run 28956:
115817 04/22/06 10:08 gzero Run 28956: Production LH2 3500 A 60 muA prescale=3000 no FC IA on
115816 04/22/06 10:07 gzero End of Run 28955:
115815 04/22/06 09:06 ramsay Saturday Morning RC report
115814 04/22/06 09:04 gzero Run 28955: Production LH2 3500 A 60 muA prescale=3000 no FC IA on
115813 04/22/06 09:02 gzero End of Run 28954:
115812 04/22/06 08:09 ppillot HV change for French and North-American CED/FPD PMTs
115811 04/22/06 08:05 cdaq Beam Time Accounting
115810 04/22/06 08:04 Franklin Owl Shift Run Summary
115809 04/22/06 08:01 ramsay note to Owl shifters - "daily PZT monitoring"
115808 04/22/06 07:58 gzero Run 28954: Production LH2 3500 A 60 muA prescale=3600 no FC IA on
115807 04/22/06 07:54 gzero End of Run 28953:
115806 04/22/06 07:37 ramsay Run Plan for Saturday
115805 04/22/06 06:52 gzero Run 28953: Production LH2 3500 A 60 muA prescale=1800 FC Enabled IA on
115804 04/22/06 06:45 gzero End of Run 28952:
115803 04/22/06 06:05 gzero Run 28952: Production LH2 3500 A 60 muA prescale=3600 no FC IA on
115802 04/22/06 06:02 gzero End of Run 28951:
115801 04/22/06 05:06 gzero Run 28951: Production LH2 3500 A 60 muA prescale=1800 FC enabled IA on
115800 04/22/06 05:03 gzero End of Run 28950:
115799 04/22/06 04:25 Franklin Correction to Correction
115798 04/22/06 04:18 Franklin Correction to run 28949 comment
115797 04/22/06 04:10 gzero Run 28950: Production LH2 3500 A 60 muA prescale=3600 no FC IA on
115796 04/22/06 04:06 gzero End of Run 28949:
115795 04/22/06 03:06 gzero Run 28949: Production LH2 3500 A 60 muA prescale=1800 FC Enabled IA on
115794 04/22/06 03:03 gzero End of Run 28948:
115793 04/22/06 02:07 gzero Run 28948: Production LH2 3500 A 60 muA prescale=1800 FC enabled IA on
115792 04/22/06 02:04 gzero End of Run 28947:
115791 04/22/06 01:33 Breuer Prediction of anode currents for LD2; needed change of gain
115790 04/22/06 01:08 gzero Run 28947: Production LH2 3500 A 60 muA prescale=1800 FC on IA on
115789 04/22/06 01:04 gzero End of Run 28946:
115788 04/22/06 00:11 suleiman Swing Shift Summary
115787 04/22/06 00:09 cdaq Beam Time Accounting
115786 04/22/06 00:05 suleiman Beam: New Epics Constants
Friday
115785 04/21/06 23:58 suleiman BCM/BPM Calibration constants
115784 04/21/06 23:54 gzero Run 28946: Production LH2 3500 A 60 muA prescale=3600 no FC IA on
115783 04/21/06 23:51 suleiman Beam: IHWP is Changed to OUT, Ran Flipper
115782 04/21/06 23:46 gzero End of Run 28945:
115781 04/21/06 22:53 gzero Run 28945: Production LH2 3500 A 60 muA prescale=3600 no FC IA on
115780 04/21/06 22:48 muether SMS: Comparison of run with and without Herberts wall
115779 04/21/06 22:48 suleiman Beam: BCM/BPM Calibration
115778 04/21/06 22:48 gzero End of Run 28944:
115777 04/21/06 21:42 Breuer ACM measurements, good beam, 53 to 60 uA, LH2 target
115776 04/21/06 21:26 suleiman Beam: Charge Asymmetry and Position Differences for runs: 28937 & 28939 ... IN
115775 04/21/06 21:07 pking Analysis: Installed the new G0Analysis version on the gzero account
115774 04/21/06 20:01 gzero Run 28944: BCM/BPM Calibration
115773 04/21/06 19:53 gzero End of Run 28943:
115772 04/21/06 19:51 suleiman Beam: G0B Raw Signal at 60 uA (from run 28937)
115771 04/21/06 19:48 suleiman Target: Something wrong with C07A Y+
115770 04/21/06 19:39 suleiman Beam: Charge Asymmetry and Position Differences for runs:28932-28936 ... OUT (at IN Settings)
115769 04/21/06 19:10 gzero End of Run 28943:
115768 04/21/06 19:02 gzero Run 28943: dummy run for anode current measurement
115767 04/21/06 18:54 gzero Run 28942: dummy run for anode current measurement
115766 04/21/06 18:52 ellis Target: Target at 19
115765 04/21/06 18:51 gzero End of Run 28941:
115764 04/21/06 18:51 gzero Run 28941: junk
115763 04/21/06 18:10 ellis Target: Target at 19.5 K
115762 04/21/06 18:03 suleiman Beam: Lost communication with iocse20
115761 04/21/06 17:41 gzero End of Run 28940:
115760 04/21/06 17:23 gzero Run 28940: BCM/BPM Calibration
115759 04/21/06 17:17 gzero End of Run 28939:
115758 04/21/06 16:47 ramsay New RC contact information
115757 04/21/06 16:46 suleiman Beam: Halo rates
115756 04/21/06 16:41 Lassiter Cryo burps
115755 04/21/06 16:38 ramsay Halfwave Plate IN
115754 04/21/06 16:21 suleiman Beam: Hall C Current Reading (53.2) vs. MCC Current Reading (59.7 uA)
115753 04/21/06 16:16 gzero Run 28939: Production LH2 3500 A 60 muA prescale=3600 no FC IA on
115752 04/21/06 16:14 gzero End of Run 28938:
115751 04/21/06 16:01 cdaq Beam Time Accounting
115750 04/21/06 15:55 benesch shift summary
115749 04/21/06 15:45 gzero End of Run 28938:
115748 04/21/06 15:20 gzero Run 28938: Production LH2 3500 A 60 muA prescale=3600 no FC IA on
115747 04/21/06 14:34 S. Bailey Analysis: Coil Modulation - Yup, we are scraping
115746 04/21/06 14:26 muether SMS: Cryo Upset
115745 04/21/06 14:25 spwells Octant 6 Cerenkov 1 trip
115743 04/21/06 14:19 Fatiha Lumi Results From DataBase and Ntuple
115742 04/21/06 14:17 ppillot Analysis: double peak study from LH2 target runs (fastbus data)
115741 04/21/06 14:14 gzero End of Run 28937:
115740 04/21/06 13:23 gzero Run 28937: Production LH2 3500 A 60 muA prescale=1800 FCE IA on
115739 04/21/06 12:23 muether SMS: LHe Level stabalized...try to ramp again
115738 04/21/06 11:16 muether SMS: Another Slow Dump
115737 04/21/06 11:00 gaskell Moller cooldown complete
115736 04/21/06 10:41 muether SMS: Ramp SMS back to 3500A
115735 04/21/06 10:23 benesch Beam: energy lowered when A went to fourth pass
115734 04/21/06 10:08 spwells Thursday/Friday RC Report
115733 04/21/06 09:31 gaskell Moller cooldown: switching to cold return
115732 04/21/06 08:37 ppillot Analysis: comparison of coincidence rates before and after the shielding wall was built
115731 04/21/06 08:34 muether SMS: More on slow dump
115730 04/21/06 08:13 muether SMS: Slow Dump
115729 04/21/06 08:09 cdaq Beam Time Accounting
115728 04/21/06 08:08 Bosted Owl shift summary
115727 04/21/06 07:55 gzero End of Run 28936:
115726 04/21/06 07:52 gzero Run 28936: Production LH2 3500 A 45 muA prescale=3600 FCD
115725 04/21/06 07:46 gzero End of Run 28935:
115724 04/21/06 07:42 Bosted Beam on/off sound box broken
115723 04/21/06 07:39 Bosted BCM display frozen
115722 04/21/06 07:25 gaskell Begin Moller cooldown
115721 04/21/06 06:51 gzero Run 28935: Production LH2 3500 A 45 muA prescale=1800 FCE IA on
115720 04/21/06 06:49 gzero End of Run 28934:
115719 04/21/06 06:26 ppillot double peak study from the target out run 28924 (fastbus data)
115718 04/21/06 06:24 Bosted Beam: Beam halo
115717 04/21/06 05:47 gzero Run 28934: Production LH2 3500 A 30 muA prescale=3600 FCD IA on
115716 04/21/06 04:57 gzero End of Run 28933:
115715 04/21/06 04:31 Bosted Analysis: Octant 6, Cerenkov 1 HV trip
115714 04/21/06 04:10 gzero Run 28933: Production LH2 3500 A 45 muA prescale=3600 FCD IA on
115713 04/21/06 03:39 ppillot effects of the shielding wall on the rates in target out runs
115712 04/21/06 03:23 Bosted Beam: Charge feedback turned on
115711 04/21/06 03:09 gzero Run 28932: Production LH2 3500 A 45 muA prescale=1800 FCE IA on
115710 04/21/06 03:03 gzero End of Run 28931:
115709 04/21/06 02:33 Breuer NA Scaler matrices EMPTY! -->Cycle power on encoder/decoder VME crates<--!!! Run 28929.
115708 04/21/06 02:03 Breuer Octant 5, mult. switch bad, single photon = electron for last few runs, repaired during run 20930
115707 04/21/06 01:54 gzero Run 28931: Production LH2 3500 A 45 muA prescale=100
115706 04/21/06 01:54 gzero End of Run 28931:
115705 04/21/06 01:51 gzero End of Run 28930:
115704 04/21/06 01:29 gzero Run 28930: Production LH2 3500 A 45 muA prescale=100
115703 04/21/06 01:06 gzero Run 28929: Production LH2 3500 A 45 muA prescale=100
115702 04/21/06 00:15 gzero Run 28928: magnet on lH2 target in prescale=100
115701 04/21/06 00:13 gzero End of Run 28927:
115700 04/21/06 00:09 cdaq Beam Time Accounting
115699 04/21/06 00:03 gzero Run 28927: magnet on lH2 target in prescale=0
115698 04/21/06 00:00 Armstrong Swing Shift Summary
Thursday
115697 04/20/06 23:59 ellis Target: LH2 target In
115696 04/20/06 23:35 gzero End of Run 28926:
115695 04/20/06 23:13 gzero Run 28926: Magnet on no target fastclear disabled
115694 04/20/06 23:10 gzero End of Run 28925:
115693 04/20/06 22:42 gzero Run 28925: Magnet on no target fastclear disabled
115692 04/20/06 22:40 gzero End of Run 28924:
115691 04/20/06 22:11 Armstrong The CFD hit patterns
115690 04/20/06 22:02 muether SMS: Picture of the recent cooldown
115689 04/20/06 22:00 Armstrong The matrix...
115688 04/20/06 22:00 ellis Target: Target HPH gui reading
115687 04/20/06 21:46 ellis Target: Target at 19, gui problem
115686 04/20/06 21:42 muether SMS: Magnet Ramped to 3500A
115685 04/20/06 21:40 gzero Run 28924: no target, SMS=3500A, FASTBUS fastclear on
115684 04/20/06 21:30 Armstrong cdaql6 rebooted
115683 04/20/06 21:28 Armstrong How to: launch edm to see fancy halo monitor
115682 04/20/06 21:24 muether SMS: rebooted cdaql6 Epics variables now updating.
115681 04/20/06 21:18 muether SMS: Not reading in EPICS variable
115680 04/20/06 20:59 muether SMS: Slowly Ramping Up
115679 04/20/06 20:35 gzero End of Run 28923:
115678 04/20/06 20:33 Armstrong Realtime:a look at the CFD TDC hits
115677 04/20/06 20:26 ellis Target: Lowered target temp to 19.5
115676 04/20/06 19:46 gzero Run 28923: Magnet off, target out, prescale=0, FastClear enabled
115675 04/20/06 19:43 ramsay cerenkov anode current
115674 04/20/06 19:23 Armstrong Beam: Halo monitors better than golden
115673 04/20/06 19:19 ellis Beam: Gaskell plot following tune
115672 04/20/06 19:17 Armstrong Beam: Beam positions
115671 04/20/06 19:08 Armstrong Beam: Halo and paddle rates with beam current
115670 04/20/06 19:08 Armstrong Halo picture at 37 µA
115669 04/20/06 19:06 ellis Beam: Paddle strip readout during beam tune
115668 04/20/06 19:05 Armstrong Beam: Halo and paddle rates with beam current
115667 04/20/06 18:18 spwells Status and Run Plan - Mini RC report
115666 04/20/06 18:18 ellis Target: Target is out
115665 04/20/06 18:17 ellis Target: target
115664 04/20/06 18:14 Armstrong Target: Target ready; moved out for tuning
115663 04/20/06 17:39 smithg Target: Target cool down finished
115662 04/20/06 17:07 S. Bailey Analysis: New distances for theta x and theta y calculations
115661 04/20/06 16:35 S. Bailey Analysis: Linear Regression - Now we're cookin
115660 04/20/06 16:30 smithg Target: Completed transition to cold return
115659 04/20/06 14:26 muether SMS: VCL Flow
115658 04/20/06 14:05 smithg Target: STarted to open JT
115657 04/20/06 12:46 smithg Target: Put "LH2" tgt IN, rebooted IOC, restarted archiver
115656 04/20/06 12:44 Fatiha Analysis: Work Disk is Full
115655 04/20/06 12:28 smithg Target: Started 15K target cooldown procedure
115654 04/20/06 12:20 muether SMS: SMS Cooldown Status - Back in PID
115653 04/20/06 11:55 muether SMS: SMS Switchover to cold return sucessful
115652 04/20/06 11:52 gzero End of Run 28922:
115651 04/20/06 11:46 gzero Run 28922: test
115650 04/20/06 11:45 gzero End of Run 28921:
115649 04/20/06 11:41 gzero Run 28921: Test
115648 04/20/06 11:40 gzero End of Run 28920:
115647 04/20/06 11:38 gzero Run 28920: Test
115646 04/20/06 09:13 muether SMS: SMS Cooldown Status
115645 04/20/06 07:24 real Trying to use fastbus data for cerenkov efficiency determination
115644 04/20/06 06:30 Breuer Beam status; possibly delayed until day shift.
115643 04/20/06 04:49 Breuer beam status
115642 04/20/06 03:42 muether SMS: SMS Cooldown Status
115641 04/20/06 00:12 muether SMS: SMS Cooldown Status
Wednesday
115640 04/19/06 22:28 gzero End of Run 28919:
115639 04/19/06 22:25 Breuer NA Cerenkov relative timing with Cosmics
115638 04/19/06 21:09 Breuer Cahnges for NA CED-9 signals / preamplifiers / capacitive couplers
115637 04/19/06 20:29 Breuer Delayed 12 of 16 NA Cerenkov signals into ARS
115636 04/19/06 20:27 Breuer Added 3 more NA Fastbus trigger TDC channels
115635 04/19/06 20:17 muether SMS: SMS Cooldown Status
115634 04/19/06 20:08 gzero Run 28919: Cosmics run for ARS
115633 04/19/06 20:06 gzero End of Run 28918:
115632 04/19/06 20:05 gzero Run 28918: Cosmic run for ARS
115631 04/19/06 19:58 ellis Lumi Carbon run
115630 04/19/06 19:54 Fatiha Coda Configuration with G0inj
115629 04/19/06 19:50 Fatiha Integrity of the Coil Modulation in CODA / Changing the Online starting event.
115628 04/19/06 19:50 ellis HV gui error msg
115627 04/19/06 19:37 gzero End of Run 28917:
115626 04/19/06 19:30 gzero Run 28917: test
115625 04/19/06 19:12 gzero End of Run 28916:
115624 04/19/06 19:08 gzero Run 28916: test
115623 04/19/06 18:49 gzero End of Run 28915:
115622 04/19/06 18:47 gzero Run 28915: test
115621 04/19/06 18:46 gzero End of Run 28914:
115620 04/19/06 18:42 gzero Run 28914: Online test
115619 04/19/06 18:41 gzero End of Run 28913:
115618 04/19/06 18:37 gzero Run 28913: test
115617 04/19/06 18:36 gzero End of Run 28912:
115616 04/19/06 18:33 gzero Run 28912: test
115615 04/19/06 18:31 gzero End of Run 28911:
115614 04/19/06 18:28 suleiman Beam: Coil Modulation is now launched by CODA
115613 04/19/06 18:23 gzero Run 28911: test
115612 04/19/06 18:23 muether SMS: Problems switching to cold return
115611 04/19/06 18:04 gzero End of Run 28910:
115610 04/19/06 17:59 gzero Run 28910: Coil modulation script test
115609 04/19/06 17:55 gzero End of Run 28909:
115608 04/19/06 17:40 gzero Run 28909: Coil modulation script test
115607 04/19/06 17:34 gzero End of Run 28908:
115606 04/19/06 17:32 gzero Run 28908: Coil modulation script test
115605 04/19/06 17:31 gzero End of Run 28907:
115604 04/19/06 17:30 gzero Run 28907: Coil Modulation script test
115603 04/19/06 17:28 smithg Target: moved tgt out
115602 04/19/06 17:25 gzero End of Run 28906:
115601 04/19/06 17:23 gzero Run 28906: G0inj test
115600 04/19/06 17:15 gzero End of Run 28905:
115599 04/19/06 17:14 gzero Run 28905: JUNK
115598 04/19/06 17:14 gzero End of Run 28904:
115597 04/19/06 17:14 gzero Run 28904: DAQ Test
115596 04/19/06 16:56 gzero End of Run 28902:
115595 04/19/06 15:18 smithg Target: target cooldown plans for tomorrow
115594 04/19/06 15:06 vulcan Beam: clarification
115593 04/19/06 14:49 ellis Lumis vs Beam position
115592 04/19/06 14:38 vulcan Removal of protector cover for raster magnet
115591 04/19/06 14:09 muether SMS: Reservior Level at 45%
115590 04/19/06 13:46 S. Bailey Analysis: More linear regression
115589 04/19/06 13:12 Maud Analysis: Coinc count rates vs B field analysis
115588 04/19/06 12:39 mueter SMS: Level apearing in the reservior
115587 04/19/06 12:37 mueter SMS: JT6 Opened to 55%
115586 04/19/06 12:24 ppillot PMT Threshold for French and NA CEDs
115585 04/19/06 11:56 suleiman Beam: This will only give us more level arm to measure the angle of the beam at G0 target - Will not change how the beam hits the target
115584 04/19/06 11:48 muether SMS: Increase JT6 to 50%
115583 04/19/06 11:44 suleiman Beam: Using one of the Pivot BPMs - Pahse advance is good now
115582 04/19/06 11:21 muether SMS: CC Vacuum
115581 04/19/06 11:17 muether SMS: Switch over to JT6
115580 04/19/06 11:00 gzero Run 28902: Cosmics...
115579 04/19/06 10:57 gzero End of Run 28901:
115578 04/19/06 09:10 muether SMS: Cooling Down
Tuesday
115577 04/18/06 23:35 muether SMS: SMS vacuum status
115576 04/18/06 23:33 muether SMS: LN2 back on PID
115575 04/18/06 21:30 Goulven NA ARS : problem solved.
115574 04/18/06 20:50 gzero Run 28901: Another cosmic run for ARS...
115573 04/18/06 20:49 gzero End of Run 28900:
115572 04/18/06 19:58 muether SMS: Plug Valve Frozen Shut
115571 04/18/06 17:07 S. Bailey Analysis: Linear Regression continued
115570 04/18/06 17:05 gzero Run 28900: Cosmic run for ARS, FC enable
115569 04/18/06 17:03 gzero End of Run 28899:
115568 04/18/06 17:03 gzero Run 28899: BPM test: x- calib osc. on G0 and G0B to test the y-signals
115567 04/18/06 16:59 muether SMS: LN2 Status
115566 04/18/06 16:51 suleiman Beam: Start Slugs Counting: Charge Asymmetry and Position Differences vs. Slug Number
115565 04/18/06 16:14 gaskell more quads a bad idea
115564 04/18/06 14:29 spwells Hall C optics and angle differences
115563 04/18/06 14:01 suleiman Beam: G0B Y+ & Y- signals are now fine
115562 04/18/06 13:29 S. Bailey Analysis: Linear Regression
115561 04/18/06 12:53 gzero End of Run 28898:
115560 04/18/06 12:53 gzero Run 28898: BPM test: x- calib osc. on G0 and G0B to test the y-signals
115559 04/18/06 12:50 gzero End of Run 28897:
115558 04/18/06 12:49 gzero Run 28897: BPM test: x= calib osc. on G0 and G0B to test the y-signals
115557 04/18/06 12:47 gzero End of Run 28896:
115556 04/18/06 12:46 gzero Run 28896: BPM test: y- calib osc. on G0 and G0B to test the x-signals
115555 04/18/06 12:43 gzero End of Run 28895:
115554 04/18/06 12:42 gzero Run 28895: BPM test: y+ calib osc. on G0 and G0B to test the x-signals
115553 04/18/06 12:31 gzero End of Run 28894:
115552 04/18/06 12:31 gzero Run 28894: BPM test: x- calib osc. on G0 and G0B to test the y-signals, BPMs are at their original S/H cards
115551 04/18/06 12:26 gzero End of Run 28893:
115550 04/18/06 12:25 gzero Run 28893: BPM test: x- calib osc. on G0 and G0B to test the y-signals, BPMs are swapped at the S/H cards
115549 04/18/06 12:16 gzero End of Run 28892:
115548 04/18/06 12:12 gzero Run 28892: BPM test: x- calib osc. on G0 and G0B to test the y-signals
115547 04/18/06 12:10 gzero End of Run 28891:
115546 04/18/06 12:08 gzero Run 28891: BPM test: x calib osc. on G0 and G0B to test the y-signals
115545 04/18/06 11:55 S. Bailey New distances inserted into analyzer
115544 04/18/06 11:15 spwells Pseudo RC report for Monday/Tuesday
115543 04/18/06 09:30 muether SMS: cc Vaccum alarm raised
115542 04/18/06 09:16 muether SMS: Previous Cool-down curves
115541 04/18/06 06:54 muether SMS: Vaccum CC Alarm
115540 04/18/06 01:21 muether SMS: LN2 status
Monday
115539 04/17/06 23:44 Breuer returned NA trigger to normal CED/FPD coinc.
115538 04/17/06 23:42 Breuer Added TDC signal for NA fastbus trigger
115537 04/17/06 21:28 Breuer NA trigger currently any CED from trigger/splitter module!
115536 04/17/06 21:27 Breuer HV off
115535 04/17/06 21:24 gzero End of Run 28890:
115534 04/17/06 21:18 Fatiha/Goulv NA ARS : problem solved ?
115533 04/17/06 21:17 Fatiha/Goulv NA ARS : problem solved ?
115532 04/17/06 21:14 cellis Lumi graph
115531 04/17/06 21:08 gzero Run 28890: ARS test
115530 04/17/06 21:07 gzero End of Run 28889:
115529 04/17/06 20:50 suleiman Beam: An example of good phase advace from Happex
115528 04/17/06 20:45 gzero Run 28889: ARS test
115527 04/17/06 20:43 gzero End of Run 28888:
115526 04/17/06 20:32
115525 04/17/06 20:15 muether SMS: LN2 Status
115524 04/17/06 20:00 gzero Run 28888: ARS test
115523 04/17/06 20:00 gzero End of Run 28887:
115522 04/17/06 19:12 muether SMS: LN2 Status
115521 04/17/06 18:56 Fatiha/Goulv Changed the delay in the readout of the ARS.
115520 04/17/06 18:43 gzero Run 28887: ARS test
115519 04/17/06 18:18 gzero End of Run 28886:
115518 04/17/06 18:12 gzero Run 28886: ARS test
115517 04/17/06 18:09 gzero End of Run 28885:
115516 04/17/06 18:08 gzero Run 28885: ARS test
115515 04/17/06 17:17 muether SMS: LN2 Flow low, Level dropping
115514 04/17/06 16:09 M Jones Beam: Beam Energy Measurement
115513 04/17/06 15:55 suleiman Beam: The run number for the last OUT state.
115512 04/17/06 15:52 suleiman Beam: Charge Asymmetry and Position Differences for runs: 28864-28877 ( OUT)
115511 04/17/06 15:20 suleiman Beam: We still have problem with G0B Y+ & Y-
115510 04/17/06 14:52 gzero End of Run 28884:
115509 04/17/06 14:51 gzero Run 28884: Test of G0B wire signals during the energy measurement
115508 04/17/06 14:45 gzero End of Run 28883:
115507 04/17/06 14:33 gzero Run 28883: Test of G0B wire signals during the energy measurement
115506 04/17/06 14:31 gzero End of Run 28882:
115505 04/17/06 14:30 gzero Run 28882: Test of G0B wire signals during the energy measurement
115504 04/17/06 13:38 ellis Lumi cal and boiling plots--quick look
115503 04/17/06 12:54 gzero End of Run 28881:
115502 04/17/06 12:47 suleiman Beam: G0B Autogain Max
115501 04/17/06 12:44 carlini Beam: Cu Disk
115500 04/17/06 12:14 suleiman Beam: Phase Advance in Hall C Line
115499 04/17/06 11:34 gzero Run 28881: Cosmic run
115498 04/17/06 11:33 gzero End of Run 28880:
115497 04/17/06 09:56 cdaq Beam Time Accounting
115496 04/17/06 08:58 spwells No RC report for Sunday/Monday
115495 04/17/06 08:54 spwells Potential uses of beam during down time
115494 04/17/06 08:50 spwells The Skinny on the ESR Failure
115493 04/17/06 01:12 muether SMS: LN2 back on PID control
115492 04/17/06 01:03 muether Analysis: Asymmetries since new cuts and "good" beam
Sunday
115491 04/16/06 23:15 muether SMS: LN2 Level recovering
115490 04/16/06 22:35 Muether SMS: LN Level dropped below 50%
115489 04/16/06 20:53 Breuer Shall we remove "HALO ENHANCER" disk from beam line?
115488 04/16/06 20:45 Breuer changed NA ARS trigger signal width/delay, beginning of run 28880
115487 04/16/06 19:17 ppillot position where the straight line between CEDi and FPDj crosses the beam axis
115486 04/16/06 19:01 gzero Run 28880: Cosmics, Fastbus presc.=0, with fast clear
115485 04/16/06 18:47 Breuer HV: removed SMS interlock cable, turned on HV
115484 04/16/06 17:13 muether SMS: Closed Jt4
115483 04/16/06 15:44 muether SMS: 4K Helium stopped
115482 04/16/06 14:58 neven If you want to know more:
115481 04/16/06 14:43 neven Day shift summary
115480 04/16/06 14:34 gaskell warming up Moller
115479 04/16/06 13:58 tforest Target: Performed Warm up procedure
115478 04/16/06 13:56 neven Good news and bad news.
115477 04/16/06 12:28 spwells coincidnece matrices for 12C
115476 04/16/06 12:27 spwells coincidnece matrices for 12C
115475 04/16/06 11:55 neven Target saga
115474 04/16/06 11:28 gzero End of Run 28879:
115473 04/16/06 11:25 spwells 12C target run and ABU's
115472 04/16/06 10:53 tforest Target: Lost Hydrogen target
115471 04/16/06 10:42 spwells RC report for Saturday/Sunday
115470 04/16/06 10:35 gzero Run 28879: Carbon Target; 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115469 04/16/06 10:10 tforest Target: 15 K LHe supply warming up
115468 04/16/06 09:28 gzero ASCS summary for Sat Apr 15 2006
115467 04/16/06 09:10 neven RF Cavity Problem
115466 04/16/06 08:50 neven IWHP was changed and fliper was runned. Current status: INN
115465 04/16/06 08:49 neven PzT Test
115464 04/16/06 08:46 gzero End of Run 28878:
115463 04/16/06 08:29 neven Reduced beam current. Helium cullant problem.
115462 04/16/06 08:03 seva owl hift summary
115461 04/16/06 08:03 cdaq Beam Time Accounting
115460 04/16/06 07:32 ppillot Target: increase of the coolant temperature
115459 04/16/06 07:28 gzero Run 28878: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115458 04/16/06 07:27 gzero End of Run 28877:
115457 04/16/06 06:33 gzero Run 28877: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115456 04/16/06 06:22 gzero End of Run 28876:
115455 04/16/06 05:16 gzero Run 28876: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115454 04/16/06 05:14 gzero End of Run 28875:
115453 04/16/06 04:21 gzero Run 28875: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115452 04/16/06 04:09 gzero End of Run 28874:
115451 04/16/06 03:05 gzero Run 28874: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115450 04/16/06 03:03 gzero End of Run 28873:
115449 04/16/06 02:05 gzero Run 28873: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115448 04/16/06 02:03 seva RF whole zone triped, no beam for 30 min
115447 04/16/06 02:00 gzero End of Run 28872:
115446 04/16/06 00:52 gzero Run 28872: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115445 04/16/06 00:51 gzero End of Run 28871:
115444 04/16/06 00:01 cdaq Beam Time Accounting
Saturday
115443 04/15/06 23:49 suleiman Swing Shift Summary
115442 04/15/06 23:41 gzero Run 28871: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115441 04/15/06 23:39 gzero End of Run 28870:
115440 04/15/06 23:28 suleiman Beam: A Coil Modulation Cycle from run 28869
115439 04/15/06 22:39 gzero ASCS summary for Fri Apr 14 2006
115438 04/15/06 22:38 gzero Run 28870: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115437 04/15/06 22:37 suleiman Beam: Coil Modulation Run 28869
115436 04/15/06 22:37 gzero End of Run 28869:
115435 04/15/06 22:03 gzero Run 28869: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115434 04/15/06 21:59 gzero End of Run 28868:
115433 04/15/06 21:53 Breuer Adjusted NA Cerenkov 7 timing, Cerenkov 1,2 width during run 28867
115432 04/15/06 21:13 gzero Run 28868: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115431 04/15/06 21:10 gzero End of Run 28867:
115430 04/15/06 20:23 gzero Run 28867: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115429 04/15/06 19:50 gzero End of Run 28866:
115428 04/15/06 19:49 suleiman Beam: Feedback How-to
115427 04/15/06 19:23 suleiman Beam: Charge Asymmetry and Position Differences for IN - 60 uA
115426 04/15/06 19:20 Breuer empty target background, geometric origin
115425 04/15/06 18:47 gzero Run 28866: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115424 04/15/06 18:46 gzero End of Run 28865:
115423 04/15/06 17:58 suleiman Beam: Charge Asymmetry and Postion differences for OUT - 60 uA
115422 04/15/06 17:44 gzero Run 28865: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115421 04/15/06 17:43 gzero End of Run 28864:
115420 04/15/06 17:32 suleiman Beam: The width of postion Differences in Hall C
115419 04/15/06 17:10 Breuer Paddle strip charts 15-April-2006, 16:55
115418 04/15/06 16:58 suleiman Beam: Charge Asymmetry and Position differences for runs: 28842-28854 (IN - ad PC HV & angle)
115417 04/15/06 16:37 cdaq Beam Time Accounting
115416 04/15/06 16:37 gzero Run 28864: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115415 04/15/06 16:36 suleiman Beam: Change IHWP to OUT, Ran Flipper, Start run 28864
115414 04/15/06 16:29 gzero End of Run 28863:
115413 04/15/06 15:51 neven Day Shift Summary
115412 04/15/06 15:20 gzero Run 28863: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115411 04/15/06 15:08 gzero End of Run 28862:
115410 04/15/06 14:08 gzero Run 28862: Target Boiling Studies: beam 10,25,40,50,60 uA, 2x2 raster, 30 Hz pump, Carbon Target
115409 04/15/06 14:03 gzero End of Run 28861:
115408 04/15/06 13:48 gzero Run 28861: Target Boiling Studies: 10 uA, 3x3 raster, 40 Hz pump, Carbon target
115407 04/15/06 13:34 gzero End of Run 28860:
115406 04/15/06 13:18 gzero Run 28860: Target Boiling Studies: 10 uA, 3x3 raster, 40 Hz pump
115405 04/15/06 13:06 gzero End of Run 28859:
115404 04/15/06 12:20 neven Correction: beam 60,50,40,25,10 uA
115403 04/15/06 12:10 gzero Run 28859: Target boiling run: beam 60,50,40,25,20 uA, 2x2 raster, 30Hz pump
115402 04/15/06 12:07 neven Target boiling studies
115401 04/15/06 12:05 gzero End of Run 28858:
115400 04/15/06 12:05 ppillot Time difference between Cerenkov and CED/FPD in the Fastbus TDCs
115399 04/15/06 11:32 ppillot Analysis: coincidences counting rates from target out run and WITHOUT HALO MONITOR
115398 04/15/06 11:07 gzero Run 28858: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115397 04/15/06 10:50 neven RF Problem
115396 04/15/06 10:49 gzero End of Run 28857:
115395 04/15/06 10:40 spwells RC Report Friday/Saturday
115394 04/15/06 10:36 gzero Run 28857: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115393 04/15/06 10:34 gzero End of Run 28856:
115392 04/15/06 10:31 cdaq Beam Time Accounting
115391 04/15/06 10:30 cdaq Beam Time Accounting
115390 04/15/06 09:35 gzero Run 28856: Production 30Hz fast clear enable, PS4=1800 I=60uA, mag@3500 A
115389 04/15/06 09:23 neven RF Cavity off
115388 04/15/06 09:22 gzero End of Run 28855:
115387 04/15/06 08:49 gzero Run 28855: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115386 04/15/06 08:47 gzero End of Run 28854:
115385 04/15/06 08:23 neven Laser Polarization and Parity Control
115384 04/15/06 08:08 cdaq Beam Time Accounting
115383 04/15/06 08:08 vipuli Owl Shift Summary
115382 04/15/06 07:48 gzero Run 28854: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115381 04/15/06 07:45 gzero End of Run 28853:
115380 04/15/06 06:49 gzero Run 28853: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115379 04/15/06 06:48 gzero End of Run 28852:
115378 04/15/06 06:44 gzero Run 28852: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115377 04/15/06 06:42 gzero End of Run 28851:
115376 04/15/06 04:43 gzero Run 28851: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115375 04/15/06 04:42 gzero End of Run 28850:
115374 04/15/06 03:44 ppillot Analysis: ... if you want t compare with a previous target out run
115373 04/15/06 03:41 gzero Run 28850: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115372 04/15/06 03:39 gzero End of Run 28849:
115371 04/15/06 03:02 Breuer Oct 7 Cernkov discr. signal short; change for run 28847,28848,28849 ff (now formatted)
115370 04/15/06 03:00 Breuer Oct 7 Cernkov discr. signal short; change for run 28847,28848,28849 ff
115369 04/15/06 02:30 gzero Run 28849: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115368 04/15/06 02:28 gzero End of Run 28848:
115367 04/15/06 01:57 gzero Run 28848: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115366 04/15/06 01:54 gzero End of Run 28847:
115365 04/15/06 01:47 gzero Run 28847: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115364 04/15/06 01:46 gzero End of Run 28846:
115363 04/15/06 01:41 ppillot Analysis: coincidences counting rates from target out run
115362 04/15/06 01:40 gzero Run 28846: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115361 04/15/06 01:39 gzero End of Run 28845:
115360 04/15/06 00:34 gzero Run 28845: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115359 04/15/06 00:32 gzero End of Run 28844:
Friday
115358 04/14/06 23:33 gzero Run 28844: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115357 04/14/06 23:28 gzero End of Run 28843:
115356 04/14/06 22:26 gzero Run 28843: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115355 04/14/06 21:44 Breuer changed some NA Cerenkov HVs for gain matching
115354 04/14/06 21:33 T>A> Forest Target: Target out runs at 40 microamp
115353 04/14/06 21:24 gzero Run 28842: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115352 04/14/06 21:18 gzero End of Run 28841:
115351 04/14/06 20:23 gzero Run 28841: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115350 04/14/06 20:15 Korkmaz Target: Target changes
115349 04/14/06 20:05 gzero End of Run 28840:
115348 04/14/06 19:55 wells/zorani More tomfoolery with the NA electronics
115347 04/14/06 19:51 gzero Run 28840: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115346 04/14/06 19:43 gzero End of Run 28839:
115345 04/14/06 19:30 gzero Run 28839: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115344 04/14/06 19:30 gzero End of Run 28839:
115343 04/14/06 19:21 ellis lumi pedestals
115342 04/14/06 18:52 spwells Weekend run plan
115341 04/14/06 18:37 Goulven/pkin Changed NA ARS trigger signal during run 28837.
115340 04/14/06 18:02 gzero Run 28838: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115339 04/14/06 17:59 gzero End of Run 28837:
115338 04/14/06 17:44 T.A. Forest Analysis: rubbon cable dislodged
115337 04/14/06 17:12 suleiman Beam: Charge Asymmetry and Position Differences for run 22823-28833 (OUT, 60 uA)
115336 04/14/06 17:00 gzero Run 28837: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115335 04/14/06 16:57 gzero End of Run 28836:
115334 04/14/06 16:41 smithg Target: Planned date to switch to deuterium
115333 04/14/06 16:31 smithg Target: Target logger has been dead all week
115332 04/14/06 16:02 cdaq Beam Time Accounting
115331 04/14/06 15:59 gzero Run 28836: Production 30Hz fast clear enable, PS4=1800 I=60uA, mag@3500 A
115330 04/14/06 15:57 gzero End of Run 28835:
115329 04/14/06 15:54 neven Day shift summary
115328 04/14/06 15:47 suleiman Beam: G0B plots from a good compared to bad run
115327 04/14/06 15:02 suleiman Beam: We are still having problems with G0 and G0B
115326 04/14/06 15:00 neven New threshold file
115325 04/14/06 14:58 gzero Run 28835: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115324 04/14/06 14:57 gzero End of Run 28834:
115323 04/14/06 14:23 Fatiha Analysis: DataBase
115322 04/14/06 14:17 gzero Run 28834: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115321 04/14/06 14:00 gzero End of Run 28833:
115320 04/14/06 13:50 neven PzT Test
115319 04/14/06 13:00 gzero Run 28833: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115318 04/14/06 12:57 gzero End of Run 28832:
115317 04/14/06 12:46 neven HV Octant6 Cerenkov 1 Tripped during this run
115316 04/14/06 12:29 mack electrons at JLab are (fortunately) not exactly minimum ionizing
115315 04/14/06 12:09 gzero Run 28832: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115314 04/14/06 11:54 neven High Voltages OFF
115313 04/14/06 11:52 gzero End of Run 28831:
115312 04/14/06 11:45 Goulven Information : What does an ARS look like ?
115311 04/14/06 11:44 mack mack
115310 04/14/06 11:42 suleiman Beam: Here how it looks for runs 28820 and 28822
115309 04/14/06 11:38 suleiman Beam: Charge asymmetry and Position Differences for run 28821 (IN)
115308 04/14/06 11:33 spwells RC Report for Thursday/Friday
115307 04/14/06 11:25 neven Fast Feedback
115306 04/14/06 11:23 real Energu loss in simulation for pions and electrons
115305 04/14/06 11:14 Serge comments on double peak in ADC spectra
115304 04/14/06 10:43 suleiman Beam: The width of G0 and G0B position differences are back to normal
115303 04/14/06 10:03 gzero Run 28831: Production 30Hz fast clear enable, PS4=1800 I=60uA, mag@3500 A
115302 04/14/06 09:57 gzero End of Run 28830:
115301 04/14/06 08:58 gzero Run 28830: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115300 04/14/06 08:57 gzero End of Run 28829:
115299 04/14/06 08:04 vipuli Owl shift summary
115298 04/14/06 08:03 cdaq Beam Time Accounting
115297 04/14/06 08:00 gzero Run 28829: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115296 04/14/06 07:57 gzero End of Run 28828:
115296 04/14/06 07:57 ppillot Analysis: lost and random coincidences at 60 uA beam current before and after halo problem was solved
115295 04/14/06 07:32 ppillot Analysis: 2 pic in ADC spectra using Cerenkov !
115294 04/14/06 07:06 gzero Run 28828: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115293 04/14/06 07:04 gzero End of Run 28827:
115292 04/14/06 06:00 gzero Run 28827: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115291 04/14/06 05:58 gzero End of Run 28826:
115290 04/14/06 04:49 gzero Run 28826: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115289 04/14/06 04:47 gzero End of Run 28825:
115288 04/14/06 04:38 gzero Run 28825: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115287 04/14/06 04:37 gzero End of Run 28824:
115286 04/14/06 03:38 gzero Run 28824: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115285 04/14/06 03:36 gzero End of Run 28823:
115284 04/14/06 02:40 gzero Run 28823: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115283 04/14/06 02:39 vipuli Half Wave Plate ( Laser polarization and Parity control GUI)
115282 04/14/06 02:35 vipuli Half wave plate OUT
115281 04/14/06 02:23 gzero End of Run 28822:
115280 04/14/06 01:33 gzero Run 28822: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115279 04/14/06 01:32 gzero End of Run 28821:
115278 04/14/06 00:41 Beck Swing shift summary 13 Apr 2006
115277 04/14/06 00:33 gzero Run 28821: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115276 04/14/06 00:09 cdaq Beam Time Accounting
Thursday
115275 04/13/06 23:25 Breuer octant 2, cerenkov 2 disconnected during run 28819
115274 04/13/06 23:23 Breuer Cerenkov anode c. with new 60 uA beam; comparison with rate
115273 04/13/06 23:21 gzero Run 28820: Production 30Hz fast clear disable, PS4=3600 I=60uA, mag@3500 A
115272 04/13/06 23:16 gzero End of Run 28819:
115271 04/13/06 23:16 gzero End of Run 28819:
115270 04/13/06 22:54 gzero Run 28819: Production 30Hz fast clear disable, PS=3600 I=60uA, mag@3500 A
115269 04/13/06 22:40 Beck Beam: Instructions for beam charge and position feedback monitor screen
115268 04/13/06 21:42 gzero Run 28818: Production 30Hz fast clear disable, PS=3600 I=60uA, mag@3500 A, 11 mm halo target
115267 04/13/06 21:32 gzero End of Run 28817:
115266 04/13/06 21:18 mack ... which suggests the Cerenkov gains are stunningly high
115265 04/13/06 21:13 Beck Analysis: Another try at plot
115264 04/13/06 20:48 Beck Beam: Progress on 60 uA beam
115263 04/13/06 20:39 Beck Analysis: Another try with the figure
115262 04/13/06 20:35 Beck Analysis: Preliminary look at field scan data
115261 04/13/06 20:26 gzero Run 28817: Production 30Hz fast clear disable, PS=3600 I=60uA, mag@3500 A
115260 04/13/06 20:24 gzero End of Run 28816:
115259 04/13/06 20:10 Korkmaz Target: Alarm limits change
115258 04/13/06 20:05 Korkmaz Target: LH2 in @ 60 microA
115257 04/13/06 19:57 gzero Run 28816: Production 30Hz fast clear disable, PS=3600 I=60uA, mag@3500 A
115256 04/13/06 19:55 gzero End of Run 28815:
115255 04/13/06 19:51 gzero Run 28815: Production 30Hz fast clear disable, PS=3600 I=60uA
115254 04/13/06 19:46 muether Analysis: One last try
115253 04/13/06 19:45 gzero End of Run 28814:
115252 04/13/06 19:44 muether Analysis: plot
115251 04/13/06 19:41 muether Analysis: Cut definition
115250 04/13/06 19:41 muether Analysis: Cut definition
115249 04/13/06 19:41 muether Analysis: Cut definition
115248 04/13/06 19:28 S. Bailey Beam: double peak structure: my final and failing attempt to shed some light
115247 04/13/06 19:26 gzero Run 28814: DAQ test for new realtime analyzer
115246 04/13/06 18:56 Korkmaz Target: Carbon target in
115245 04/13/06 18:13 Breuer
115244 04/13/06 17:41 suleiman Beam: The raw signals of G0 and G0B for a good and a bad run
115243 04/13/06 17:40 Maud, Philip Final GainMatching Overview
115242 04/13/06 17:30 suleiman Beam: The Width of G0 & G0B Position Differences became large since Saturday April 07, 2006
115241 04/13/06 17:16 gaskell Spin dance results
115240 04/13/06 16:57 gaskell Moller backout
115239 04/13/06 16:56 gaskell Spin dance run summary
115238 04/13/06 16:51 Korkmaz Helium bottle
115237 04/13/06 16:42 mack Stephanie's TDC peaks
115236 04/13/06 16:31 cdaq Moller Run 61608: Moller run: Wien = 5.1957 degrees
115235 04/13/06 16:29 cdaq Moller Run 61607: Moller run: Wien = 5.1957 degrees
115234 04/13/06 16:27 cdaq Moller Run 61606: Moller run: Wien = 5.1957 degrees
115233 04/13/06 16:26 cdaq Moller Run 61605: Moller run: Wien = 5.1957 degrees
115232 04/13/06 16:03 cdaq Beam Time Accounting
115231 04/13/06 15:57 benesch shift summary
115230 04/13/06 15:39 suleiman Beam: Charge Asymmetries and Position Differences - Summary
115229 04/13/06 15:30 cdaq Moller Run 61604: Moller run: Wien = 60.2155 degrees
115228 04/13/06 15:22 cdaq Moller Run 61603: Moller run: Wien = 60.2155 degrees
115227 04/13/06 15:08 cdaq Moller Run 61602: Moller run: Wien = 60.2155 degrees
115226 04/13/06 15:06 cdaq Moller Run 61601: Moller run: Wien = 60.2155 degrees
115225 04/13/06 15:04 cdaq Moller Run 61600: Moller run: Wien = 60.2155 degrees
115224 04/13/06 15:01 cdaq Moller Run 61599: Moller run: Wien = 60.2155 degrees
115223 04/13/06 14:51 ppillot Study of lost and random coincidences at different FW positions (2 in and 4 in)
115222 04/13/06 14:49 suleiman Beam: Charge Asymmetries and Position Differences for runs: 28805, 28806, 28807, 28808, 28810, 28811 (IN)
115221 04/13/06 14:44 cdaq Moller Run 61598: Moller run: Wien = 80.233 degrees
115220 04/13/06 14:41 cdaq Moller Run 61597: Moller run: Wien = 80.233 degrees
115219 04/13/06 14:39 cdaq Moller Run 61596: Moller run: Wien = 80.233 degrees
115218 04/13/06 14:22 cdaq Moller Run 61595: Moller run: Wien = 80.233 degrees
115217 04/13/06 14:20 cdaq Moller Run 61594: Moller run: Wien = 80.233 degrees
115216 04/13/06 14:16 cdaq Moller Run 61593: Moller run: Wien = 80.233 degrees
115215 04/13/06 14:09 suleiman Beam: Charge Asymmetries and Position Differences for runs: 28793, 28794, 28795, 28796, 28804 (OUT)
115214 04/13/06 13:32 mack general PID efficiency comment
115213 04/13/06 12:54 gzero End of Run 28813:
115212 04/13/06 12:50 muether Analysis: 4in Field Scan Study
115211 04/13/06 12:45 cdaq Moller Run 61592: Moller run: Wien = 92.25 degrees
115210 04/13/06 12:43 cdaq Moller Run 61591: Moller run: Wien = 92.25 degrees
115209 04/13/06 12:41 cdaq Moller Run 61590: Moller run: Wien = 92.25 degrees
115208 04/13/06 12:38 cdaq Moller Run 61589: Moller run: Wien = 92.25 degrees
115207 04/13/06 12:35 gzero Run 28813: DAQ test for new realtime analyzer
115206 04/13/06 12:34 cdaq Moller Run 61588: Moller run: Wien = 92.25 degrees
115205 04/13/06 12:31 cdaq Moller Run 61587: Moller run: Wien = 92.25 degrees
115204 04/13/06 12:02 saw Beam: BCM calibration entered into EPICS
115203 04/13/06 11:46 suleiman Beam: Since we are doing moller, I changed the IA back to 5.3
115202 04/13/06 11:46 Carlini Analysis: Figure of merit plots
115201 04/13/06 11:44 gaskell Moller setup
115200 04/13/06 11:39 suleiman Beam: IHWP was changed to IN but flipper was not run
115199 04/13/06 11:31 gzero End of Run 28812:
115198 04/13/06 11:21 cdaq Moller Run 61586: Moller daq test
115197 04/13/06 11:13 cdaq Moller Run 61585: Moller daq test
115196 04/13/06 10:42 cdaq Moller Run 61584: Moller daq test
115195 04/13/06 10:28 spwells Wednesday/Thursday RC Report
115194 04/13/06 10:28 S. Bailey Analysis: Double peaks structure -> contribution by electrons and "not" electrons
115193 04/13/06 10:27 gzero Run 28812: test A beam into C for halo
115192 04/13/06 10:04 cdaq Moller Run 61583: Moller: Memeory check
115191 04/13/06 10:00 cdaq Moller Run 61582: Moller: Memeory check
115190 04/13/06 09:02 gzero End of Run 28811:
115189 04/13/06 08:24 gzero Run 28811: Production 30Hz fast clear disable, PS=3600 I=40uA
115188 04/13/06 08:19 gzero End of Run 28810:
115187 04/13/06 08:04 vipuli Owl Shift Summary
115186 04/13/06 08:03 cdaq Beam Time Accounting
115185 04/13/06 07:34 Fatiha Reseted Roc7
115184 04/13/06 07:17 gzero Run 28810: Production 30Hz fast clear disable, PS=3600 I=40uA
115183 04/13/06 07:05 gzero End of Run 28809:
115182 04/13/06 06:58 gzero Run 28809: Production 30Hz fast clear disable, PS=3600 I=40uA
115181 04/13/06 06:57 gzero End of Run 28808:
115180 04/13/06 05:58 gzero Run 28808: Production 30Hz fast clear disable, PS=3600 I=40uA
115179 04/13/06 05:57 Serge Cherenkov PMT anode current
115178 04/13/06 05:56 gzero End of Run 28807:
115177 04/13/06 05:40 Serge Suggestion ...
115176 04/13/06 04:53 gzero Run 28807: Production 30Hz fast clear disable, PS=3600 I=40uA
115175 04/13/06 04:51 gzero End of Run 28806:
115174 04/13/06 03:47 gzero Run 28806: Production 30Hz fast clear disable, PS=3600 I=40uA
115173 04/13/06 03:46 gzero End of Run 28805:
115172 04/13/06 02:45 gzero Run 28805: Production 30Hz fast clear disable, PS=3600 I=40uA
115171 04/13/06 02:31 gzero End of Run 28804:
115170 04/13/06 02:01 gzero Run 28804: Production 30Hz fast clear disable, PS=3600 I=40uA
115169 04/13/06 01:56 gzero End of Run 28803:
115168 04/13/06 01:45 gzero Run 28803: Cerenkov threshold test, mult=(FR=2 NA=2) SUM THR=3.0 IBeam=1uA PS=4 fast clear
115167 04/13/06 01:44 gzero End of Run 28802:
115166 04/13/06 01:35 gzero Run 28802: Cerenkov threshold test, mult=(FR=2 NA=2) SUM THR=2.5 IBeam=1uA PS=4 fast clear
115165 04/13/06 01:32 gzero End of Run 28801:
115164 04/13/06 01:19 gzero Run 28801: Cerenkov threshold test, mult=(FR=2 NA=2) SUM THR=2.0 IBeam=1uA PS=4 fast clear
115163 04/13/06 01:17 gzero End of Run 28800:
115162 04/13/06 01:07 gzero Run 28800: Cerenkov threshold test, mult=(FR=2 NA=2) SUM THR=1.5 IBeam=1uA PS=4 fast clear
115161 04/13/06 01:06 gzero End of Run 28799:
115160 04/13/06 00:57 gzero Run 28799: Cerenkov threshold test, mult=(FR=2 NA=2) SUM THR=1.0 IBeam=1uA PS=4 fast clear
115159 04/13/06 00:55 gzero End of Run 28798:
115158 04/13/06 00:38 gzero Run 28798: Cerenkov threshold test, mult=(FR=1 NA=2) SUM THR=0.1 IBeam=1uA PS=10 fast clear
115157 04/13/06 00:37 gzero End of Run 28797:
115156 04/13/06 00:20 Beck Swing shift summary
115155 04/13/06 00:15 gzero Run 28797: Cerenkov threshold test, mult=1 SUM THR=0.1 IBeam=1uA PS=10 fast clear
115154 04/13/06 00:12 gzero End of Run 28796:
115153 04/13/06 00:08 cdaq Beam Time Accounting
Wednesday
115152 04/12/06 23:39 Breuer files and thresholds for Cerenkov threshold scans tonight
115151 04/12/06 23:04 gzero Run 28796: production 30Hz+fastbus/fast clear enable, prescale=1000
115150 04/12/06 23:02 gzero End of Run 28795:
115149 04/12/06 22:04 gzero Run 28795: production 30Hz+fastbus/fast clear disable, prescale=5000
115148 04/12/06 22:02 gzero End of Run 28794:
115147 04/12/06 21:46 muether Analysis: 4in field scan study
115146 04/12/06 21:05 Beck Increase prescale for production run 28794
115145 04/12/06 21:05 gzero End of Run 28794:
115144 04/12/06 21:04 gzero Run 28794: production 30Hz+fastbus/fast clear disable, prescale=5000
115143 04/12/06 21:02 Beck Production - try to increase to 45 uA for next run - drop back to 40 uA
115142 04/12/06 20:33 Beck Charge feedback turned on at ~20:30
115141 04/12/06 20:10 Beck Beam: Hall C fast position feedback is off
115140 04/12/06 20:03 Beck Oops
115139 04/12/06 19:53 muether Analysis: Pion Asymmetry Plots
115138 04/12/06 19:51 gzero Run 28793: production 30Hz+fastbus/fast clear disable, prescale=2000
115137 04/12/06 19:50 gzero End of Run 28792:
115136 04/12/06 19:45 muether Analysis: More asymmetry plots (ela,sup,inel)
115135 04/12/06 19:44 Beck Back to production running
115134 04/12/06 19:44 gzero Run 28792: production 30Hz+fastbus/fast clear disable, prescale=2000
115133 04/12/06 19:43 gzero End of Run 28791:
115132 04/12/06 19:42 gzero Run 28791: Junk
115131 04/12/06 19:42 gzero End of Run 28791:
115130 04/12/06 19:27 gzero End of Run 28790:
115129 04/12/06 19:27 Korkmaz Target: Target pump speed
115128 04/12/06 19:23 gzero Run 28790: Junk - tuning
115127 04/12/06 19:21 muether Analysis: Asymetries Averaged over octants by run
115126 04/12/06 19:17 gzero End of Run 28789:
115125 04/12/06 19:05 Korkmaz Target: Target pump speed
115124 04/12/06 19:05 gzero Run 28789: Target boiling baseline: 3x3 raster, LH2, 40 Hz fan speed, 10 uA
115123 04/12/06 18:59 pking Added g0rate9 and g0rate10 to the epics.dictionary for CODA
115122 04/12/06 18:50 Beck Target boiling baseline
115121 04/12/06 18:48 spwells Run plan for Wednesday/Thursday
115120 04/12/06 18:47 gzero End of Run 28788:
115119 04/12/06 18:41 suleiman Beam: BCM Calibration plots for GAIN=3
115118 04/12/06 18:35 Breuer Paddle anode current readings during BCM calibration: 3% of beam current
115117 04/12/06 18:35 gzero Run 28788: Baseline target boiling: 3x3 raster, 10 uA, C target
115116 04/12/06 18:32 suleiman Beam:
115115 04/12/06 18:30 Beck Completing BCM (lumi) calibration
115114 04/12/06 18:23 Korkmaz Target: Target
115113 04/12/06 18:20 S. Bailey Beam: New BCM Pedestals with BCM gain = 3
115112 04/12/06 18:20 Breuer New EPICs variable for Paddle current
115111 04/12/06 17:39 S. Bailey Beam: New BCM/BPM Calibrations Entered Into Database
115110 04/12/06 17:34 suleiman Beam: Charge Asymmetry and Position Differences for run:28757-28762 (IHWP=OUT)
115109 04/12/06 17:21 smithg Target: changed target helium bottle, went back to house helium
115108 04/12/06 17:20 Korkmaz Target: Target
115107 04/12/06 17:18 gzero Run 28787: BPM (lumi) calib 5, 10 ... 60 uA C Target
115106 04/12/06 17:11 gzero End of Run 28786:
115105 04/12/06 16:30 saw Beam: Beam current rough calibration
115104 04/12/06 16:26 Beck BCM (lumi) calibration, LH2 target
115103 04/12/06 16:01 cdaq Beam Time Accounting
115102 04/12/06 15:57 benesch shift summary
115101 04/12/06 15:55 gzero Run 28786: BCM calibration with gain 3
115100 04/12/06 15:49 suleiman Beam: Change gain on BCM1 and BCM2 to 3 from 2.
115099 04/12/06 15:37 suleiman Beam: Charge Asymmetry and Position Differences for run:28731-28739 (IHWP=IN)
115098 04/12/06 15:35 Carlini Analysis: Suggestion
115097 04/12/06 15:05 gzero End of Run 28785:
115096 04/12/06 14:36 mack belated notes: counting experiments with randoms
115095 04/12/06 13:07 S. Bailey Beam: Error in run comment line : Run 28785 is actually a BPM/BCM Calibration
115094 04/12/06 13:01 gzero Run 28785: production 30Hz+fastbus/fast clear disable, prescale=2000
115093 04/12/06 12:57 gzero End of Run 28784:
115092 04/12/06 12:46 Maud, Philip Gain Matching Overview
115091 04/12/06 12:29 gzero Run 28784: BPM/BCM Calibration
115090 04/12/06 12:07 gzero End of Run 28783:
115089 04/12/06 12:06 benesch Beam: VIP3H00G ion pump current is climbing again
115088 04/12/06 11:27 Carlini Beam: Lumi rate
115087 04/12/06 11:12 gzero Run 28783: production 30Hz+fastbus/fast clear disable, prescale=2000
115086 04/12/06 11:00 gzero End of Run 28782:
115085 04/12/06 10:57 mack asymmetry width benchmarks needed
115084 04/12/06 10:53 gzero Run 28782: production 30Hz+fastbus/fast clear disable, prescale=2000
115083 04/12/06 10:48 gzero End of Run 28781:
115082 04/12/06 10:42 gzero Run 28781: production 30Hz+fastbus/fast clear disable, prescale=2000
115081 04/12/06 10:39 ppillot Study of lost and random coincidences at 60 uA beam current
115080 04/12/06 10:39 gzero End of Run 28780:
115079 04/12/06 10:33 mack headline: Ellis lumi data indicts halo for the crime of excess noise
115078 04/12/06 10:33 gzero Run 28780: production 30Hz+fastbus/fast clear disable, prescale=2000
115077 04/12/06 10:29 gzero End of Run 28779:
115076 04/12/06 10:21 gzero Run 28779: production 30Hz+fastbus/fast clear disable, prescale=2000
115075 04/12/06 10:20 spwells Tuesday/Wednesday RC Report
115074 04/12/06 10:20 gzero End of Run 28778:
115073 04/12/06 10:12 gzero Run 28778: production 30Hz+fastbus/fast clear disable, prescale=2000
115072 04/12/06 10:10 gzero End of Run 28777:
115071 04/12/06 10:03 gzero Run 28777: production 30Hz+fastbus/fast clear disable, prescale=2000
115070 04/12/06 10:02 gzero End of Run 28776:
115069 04/12/06 09:55 gzero Run 28776: production 30Hz+fastbus/fast clear disable, prescale=2000
115068 04/12/06 09:54 gzero End of Run 28775:
115067 04/12/06 09:48 gzero Run 28775: production 30Hz+fastbus/fast clear disable, prescale=2000
115066 04/12/06 09:46 gzero End of Run 28774:
115065 04/12/06 09:39 gzero Run 28774: production 30Hz+fastbus/fast clear disable, prescale=2000
115064 04/12/06 09:38 gzero End of Run 28773:
115063 04/12/06 09:32 gzero Run 28773: production 30Hz+fastbus/fast clear disable, prescale=2000
115062 04/12/06 09:31 gzero End of Run 28772:
115061 04/12/06 09:24 gzero Run 28772: production 30Hz+fastbus/fast clear disable, prescale=2000
115060 04/12/06 09:23 gzero End of Run 28771:
115059 04/12/06 09:17 gzero Run 28771: production 30Hz+fastbus/fast clear disable, prescale=2000
115058 04/12/06 09:16 gzero End of Run 28770:
115057 04/12/06 09:10 gzero Run 28770: production 30Hz+fastbus/fast clear disable, prescale=2000
115056 04/12/06 09:06 gzero End of Run 28769:
115055 04/12/06 09:00 gzero Run 28769: production 30Hz+fastbus/fast clear disable, prescale=2000
115054 04/12/06 08:57 gzero End of Run 28768:
115053 04/12/06 08:50 gzero End of Run 28768:
115052 04/12/06 08:47 gzero Run 28768: production 30Hz+fastbus/fast clear disable, prescale=2000
115051 04/12/06 08:37 gzero Run 28767: production 30Hz+fastbus/fast clear disable, prescale=2000
115050 04/12/06 08:36 gzero End of Run 28767:
115049 04/12/06 08:36 gzero Run 28767: production 30Hz+fastbus/fast clear disable, prescale=2000
115048 04/12/06 08:25 gzero Run 28766: production 30Hz+fastbus/fast clear disable, prescale=2000
115047 04/12/06 08:23
115046 04/12/06 08:23 gzero End of Run 28765:
115045 04/12/06 08:23 Maud Target Reboot and pressure alarm lowered
115044 04/12/06 08:10 cdaq Beam Time Accounting
115043 04/12/06 08:07 gzero End of Run 28764:
115042 04/12/06 08:04 vipuli Shift summary
115041 04/12/06 08:03 gzero Run 28764: production 30Hz+fastbus/fast clear disable, prescale=2000
115040 04/12/06 08:00 gzero End of Run 28763:
115039 04/12/06 07:54 gzero Run 28763: production 30Hz+fastbus/fast clear disable, prescale=2000
115038 04/12/06 07:42 gzero End of Run 28762:
115037 04/12/06 06:43 gzero Run 28762: production 30Hz+fastbus/fast clear disable, prescale=2000
115036 04/12/06 06:40 gzero End of Run 28761:
115035 04/12/06 06:38 ppillot Target: decreased low alarm value of PT11 from 290 to 280
115034 04/12/06 05:41 gzero Run 28761: production 30Hz+fastbus/fast clear disable, prescale=2000
115033 04/12/06 05:32 gzero End of Run 28760:
115032 04/12/06 04:33 gzero Run 28760: production 30Hz+fastbus/fast clear disable, prescale=2000
115031 04/12/06 04:28 gzero End of Run 28759:
115030 04/12/06 04:21 ppillot Target: decreased low alarm value of PT11 from 300 to 290
115029 04/12/06 03:30 gzero Run 28759: production 30Hz+fastbus/fast clear disable, prescale=2000
115028 04/12/06 03:21 gzero End of Run 28758:
115027 04/12/06 02:29 Breuer 60 uA beam with low halo rates makes dangerously high detector anode currents.
115026 04/12/06 02:28 ppillot Target: reduced He coolant flow
115025 04/12/06 02:27 gzero Run 28758: production 30Hz+fastbus/fast clear disable, prescale=2000
115024 04/12/06 02:14 gzero End of Run 28757:
115023 04/12/06 01:27 gzero Run 28757: production 30Hz+fastbus/fast clear disable, prescale=2000
115022 04/12/06 01:11 Beck Swing shift summary 11 Apr 2006
115021 04/12/06 00:54 ellis beam parameter vs run number graphs
115020 04/12/06 00:49 gzero End of Run 28756:
115019 04/12/06 00:42 ellis Lumi Data and Pedestals
115018 04/12/06 00:34 cdaq Beam Time Accounting
115017 04/12/06 00:05 ppillot Target: JT valve open a litle bit more
Tuesday
115016 04/11/06 23:50 gzero Run 28756: production 30Hz+fastbus/fast clear enable, prescale=3600
115015 04/11/06 23:50 gzero End of Run 28756:
115014 04/11/06 23:46 breuer turned on and off IA feedback during run 28755
115013 04/11/06 23:38 Beck Anode current measurement, IHWP now OUT
115012 04/11/06 23:36 gzero Run 28755: production 30Hz+fastbus/fast clear disable, prescale=1000, for anode current meas
115011 04/11/06 23:34 gzero End of Run 28754:
115010 04/11/06 23:28 Beck Magnet ramped to 3500 A
115009 04/11/06 23:16 gzero Run 28754: production 30Hz+fastbus/fast clear disable, prescale=3600, for anode current meas
115008 04/11/06 22:51 Beck Move ferris wheel to 4 in.
115007 04/11/06 22:51 gzero End of Run 28753:
115006 04/11/06 22:22 Beck Run 28753 6 mm hole
115005 04/11/06 22:20 gzero Run 28753: production 30Hz+fastbus/fast clear disable, prescale=3600
115004 04/11/06 22:20 gzero End of Run 28752:
115003 04/11/06 22:12 Beck Short baseline run at 60 uA, 11 halo 'target'
115002 04/11/06 22:07 Korkmaz Target:
115001 04/11/06 22:06 gzero Run 28752: production 30Hz+fastbus/fast clear disable, prescale=3600
115000 04/11/06 22:05 spwells modified overnight runplan
114999 04/11/06 22:03 gzero End of Run 28751:
114998 04/11/06 21:52 Beck Stepped current run 28751
114997 04/11/06 21:52 Breuer Copy of text (entry 113920) for entry 113900: Anode current as function of FW location and Magnet current
114996 04/11/06 21:52 muether Analysis: Asymetries and asymetry widths
114995 04/11/06 21:40 gzero Run 28751: production 30Hz+fastbus/fast clear disable, prescale=3600
114994 04/11/06 21:32 Breuer test
114993 04/11/06 21:18 Breuer Collection of (some) effects of FW at 8 vs 2 inch setting
114992 04/11/06 21:11 gzero End of Run 28750:
114991 04/11/06 21:10 Korkmaz Target: target change
114990 04/11/06 21:04 gzero Run 28750: production 30Hz+fastbus/fast clear disable, prescale=3600
114989 04/11/06 20:56 Beck Ramp beam current up in steps for lumi, LH2 target check
114988 04/11/06 20:48 gzero End of Run 28749:
114987 04/11/06 20:27 gzero Run 28749: Junk - tuning
114986 04/11/06 20:16 Beck Beam: Beam back at 60 uA
114985 04/11/06 19:45 gzero End of Run 28748:
114984 04/11/06 18:53 Beck Beam: Tuning for 60 uA!
114983 04/11/06 18:50 Breuer Dates and times of shielding installation phases
114982 04/11/06 17:54 spwells Tues Swing/Wed Owl shift run plan
114981 04/11/06 17:45 gzero Run 28748: Junk - tuning
114980 04/11/06 17:42 cdaq Moller Run 61581: Moller daq test
114979 04/11/06 17:38 Fatiha A_Lumi3 versu A_Lumi(i) for some runs taken on saturday or sunday,
114978 04/11/06 17:31 suleiman Beam: Charge asymmetry and position differences for run 28702
114977 04/11/06 17:14 wells/warner NA electronics
114976 04/11/06 16:28 cdaq Moller Run 61581: Moller daq test
114975 04/11/06 16:18 mack Target hypothesis: 1, Halo hypothesis: 0? and general suggestions for debugging
114974 04/11/06 16:07 cdaq Beam Time Accounting
114973 04/11/06 16:03 suleiman Beam: Charge Asymmetry and Position Differences for run 28602
114972 04/11/06 15:52 cdaq Moller Run 61580: Moller daq test
114971 04/11/06 15:43 cdaq Moller Run 61579: Moller daq test
114970 04/11/06 15:31 suleiman Beam: The results from others PBMs in Hall C for these runs
114969 04/11/06 15:31 cdaq Moller Run 61578: Moller daq test
114968 04/11/06 15:14 benesch Beam: multiple possible causes of halo
114967 04/11/06 15:12 Fatiha ALUMI(i) Versus LUMI(j) Plots
114966 04/11/06 14:11 pking Analysis: Removed empty G0Pass1 files and reset the autoanalyzer for some runs from last night
114965 04/11/06 14:04 Serge RC Report Monday/Tuesday
114964 04/11/06 13:58 Maud, Philip Gain Matching Overview
114963 04/11/06 13:41 lumi oddness
114962 04/11/06 12:24 pking Analysis: Changed option list for G0Pass1 replay beginning for run 28747
114961 04/11/06 12:23 suleiman Beam: Charge Feedback was not working for these runs
114960 04/11/06 12:22 seva LUMI behaviour up to now
114959 04/11/06 12:12 suleiman Beam: Beam Quality for IN, Runs:28602-28607
114958 04/11/06 12:07 smithg Target: IOC reboot to implement some new heater algorithms
114957 04/11/06 11:55 gzero Run 28747: OLD SUBMISSION (run 28747?): production 30Hz+fastbus/fast clear disable, prescale=2000
114956 04/11/06 11:53 Carlini Beam: LUMI noise
114955 04/11/06 11:51 smithg Target: Lumi widths unaffected by faster target fan speed
114954 04/11/06 10:47 mack G0 forward target .NEQ. G0 backward target
114953 04/11/06 09:59 Armstrong If it is boiling, how bad a problem is it?
114952 04/11/06 09:57 gzero End of Run 28747:
114951 04/11/06 09:55 gaskell Reminder: Moller collimators are in (again - better format)
114950 04/11/06 09:52 gaskell Reminder: Moller collimators are in
114949 04/11/06 08:49 gzero End of Run 28746:
114948 04/11/06 08:40 gzero Run 28746: production 30Hz+fastbus/fast clear disable, prescale=20000
114947 04/11/06 08:38 gzero End of Run 28745:
114946 04/11/06 08:14 cdaq Beam Time Accounting
114945 04/11/06 08:02 gzero Run 28745: production 30Hz+fastbus/fast clear disable, prescale=20000
114944 04/11/06 08:01 gzero Run 28744: junk
114943 04/11/06 08:01 gzero End of Run 28744:
114942 04/11/06 07:59 gzero End of Run 28743:
114941 04/11/06 07:59 seva owl shift summary
114940 04/11/06 07:58 jschaub Target: owl shift summary
114939 04/11/06 07:56 gzero ASCS summary for Mon Apr 10 2006
114938 04/11/06 07:56 seva it looks like they went up on monday after moller test
114937 04/11/06 07:48 seva lumi 1 RMS values in last couple of days
114936 04/11/06 07:34 gzero Run 28743: production 30Hz+fastbus/fast clear disable, prescale=2000
114935 04/11/06 07:33 gzero End of Run 28742:
114934 04/11/06 06:39 gzero Run 28742: production 30Hz+fastbus/fast clear disable, prescale=2000
114933 04/11/06 06:38 gzero End of Run 28741:
114932 04/11/06 06:07 jschaub Target: temperature fluctuations
114931 04/11/06 05:33 gzero Run 28741: production 30Hz+fastbus/fast clear disable, prescale=2000
114930 04/11/06 05:31 gzero End of Run 28740:
114929 04/11/06 04:11 gzero Run 28740: production 30Hz+fastbus/fast clear disable, prescale=2000
114928 04/11/06 04:01 gzero End of Run 28739:
114927 04/11/06 03:04 gzero Run 28739: production 30Hz+fastbus/fast clear disable, prescale=2000
114926 04/11/06 03:03 gzero End of Run 28738:
114925 04/11/06 02:51 seva LUMI snapshot at 30uA run 28738
114924 04/11/06 02:50 jschaub Target: closing the JT valve
114923 04/11/06 01:53 gzero Run 28738: production 30Hz+fastbus/fast clear disable, prescale=2000
114922 04/11/06 01:53 seva running at 30uA
114921 04/11/06 01:51 gzero End of Run 28737:
114920 04/11/06 01:48 gzero Run 28737: production 30Hz+fastbus/fast clear disable, prescale=20000
114919 04/11/06 01:46 gzero End of Run 28736:
114918 04/11/06 01:31 gzero Run 28736: production 30Hz+fastbus/fast clear disable, prescale=20000
114917 04/11/06 01:31 gzero End of Run 28735:
114916 04/11/06 01:29 Armstrong Target boiling?
114915 04/11/06 01:28 seva LUMI snapshot at 25uA
114914 04/11/06 01:23 gzero Run 28735: production 30Hz+fastbus/fast clear disable, prescale=20000
114913 04/11/06 01:23 seva LUMI snapshot at 30uA
114912 04/11/06 01:22 gzero End of Run 28734:
114911 04/11/06 01:15 gzero Run 28734: production 30Hz+fastbus/fast clear disable, prescale=20000
114910 04/11/06 01:14 gzero End of Run 28733:
114909 04/11/06 01:12 seva LUMI snapshot at 35uA
114908 04/11/06 01:01 seva LUMI snapshot at 40uA
114907 04/11/06 00:59 gzero Run 28733: production 30Hz+fastbus/fast clear disable, prescale=20000
114906 04/11/06 00:56 gzero End of Run 28732:
114905 04/11/06 00:42 gzero Run 28732: production 30Hz+fastbus/fast clear disable, prescale=20000
114904 04/11/06 00:39 gzero End of Run 28731:
114903 04/11/06 00:36 pking Analysis: Clearing space on the ROOT file directory; Don't run non-official analysis jobs on cdaq machines overnight
114902 04/11/06 00:30 gzero Run 28731: production 30Hz+fastbus/fast clear disable, prescale=2000
114901 04/11/06 00:28 gzero End of Run 28730:
114900 04/11/06 00:28 Armstrong Snapshot of Lumis
114899 04/11/06 00:25 Armstrong Swing Shift Summary
114898 04/11/06 00:17 cdaq Beam Time Accounting
Monday
114897 04/10/06 23:53 Armstrong OK, that last problem was silly...
114896 04/10/06 23:42 Armstrong Why so few entries in asymmetry histograms?
114895 04/10/06 23:34 gzero Run 28730: production 30Hz+fastbus/fast clear disable, prescale=2000
114894 04/10/06 23:32 gzero End of Run 28729:
114893 04/10/06 22:43 Armstrong Launch angle
114892 04/10/06 22:40 muether Analysis: Elastic Asymmetry vs Run Number for all octant
114891 04/10/06 22:22 gzero Run 28729: production 30Hz+fastbus/fast clear enabled, prescale=1000
114890 04/10/06 22:20 gzero End of Run 28728:
114889 04/10/06 22:16 Armstrong CED-FPD matrix
114888 04/10/06 22:11 Armstrong Second peak looks big too...
114887 04/10/06 22:03 Armstrong Lumi widths are crazy - why?
114886 04/10/06 21:47 Armstrong Snapshot of y position differences
114885 04/10/06 21:35 Armstrong Snapshot of X position differences
114884 04/10/06 21:22 gzero Run 28728: production 30Hz+fastbus/fast clear disable, prescale=2000
114883 04/10/06 21:19 gzero End of Run 28727:
114882 04/10/06 20:44 wells/warner limited NA electronics success
114881 04/10/06 20:26 gzero Run 28727: production 30Hz+fastbus/fast clear disable, prescale=2000
114880 04/10/06 20:17 gzero End of Run 28726:
114879 04/10/06 20:14 gzero End of Run 28726:
114878 04/10/06 20:10 Serge RC report Sunday/Monday 04/09
114877 04/10/06 20:00 gzero Run 28726: production 30Hz+fastbus/fast clear disable, prescale=2000
114876 04/10/06 19:56 gzero End of Run 28725:
114875 04/10/06 19:28 Armstrong bta aid is not working properly?
114874 04/10/06 19:01 Armstrong Coincidence matrix realtime snapshot
114873 04/10/06 18:51 gzero Run 28725: production 30Hz+fastbus/fast clear disable, prescale=2000
114872 04/10/06 18:46 Armstrong Halo snapshot at 45 uA
114871 04/10/06 18:40 Korkmaz Target: target change
114870 04/10/06 18:15 gzero End of Run 28724:
114869 04/10/06 18:06 wells/warner NA electronics debugging
114868 04/10/06 17:57 gzero Run 28724: FASTBUS run on Carbon target for ARS
114867 04/10/06 17:34 ellis Updated beam assym plots
114866 04/10/06 17:33 Serge Run plan (my last ??) for swing and owl shifts
114865 04/10/06 17:10 Armstrong Comment on polarimetry result
114864 04/10/06 17:04 gzero End of Run 28723:
114863 04/10/06 17:00 Goulven 58 ns delay for 4th PM, Octant 7
114862 04/10/06 16:52 Benesch Beam: backed out all Moller-related changes and still halo rates aren't back
114861 04/10/06 16:34 gzero Run 28723: NA electronics test run
114860 04/10/06 16:13 cdaq Beam Time Accounting
114859 04/10/06 16:06 ellis day shift summary
114858 04/10/06 16:00 suleiman Beam: A coil Modulation Cycle from run 28706
114857 04/10/06 15:33 suleiman Beam: A coil Modulation Cycle from run 28572
114856 04/10/06 15:26 ellis solenoid ramped down
114855 04/10/06 15:26 ellis beam accounting
114854 04/10/06 15:24 gaskell solenoid is off
114853 04/10/06 14:59 ellis beam current ioc tripped
114852 04/10/06 14:36 muether Analysis: Some more Asymmetry Plots
114851 04/10/06 14:10 gzero Run 28722: NA Electronics check: production 30Hz+fastbus/fast clear disable, prescale=2000
114850 04/10/06 13:55 gzero End of Run 28721:
114849 04/10/06 13:48 ellis Plots of charge & position asymmetries vs run number
114848 04/10/06 13:11 gzero Run 28721: production 30Hz+fastbus/fast clear disable, prescale=2000
114847 04/10/06 12:56 gaskell Moller summary
114846 04/10/06 12:35 muether Analysis: Some Asymmetry Plots
114845 04/10/06 12:34 real Count in CED-FPD matrix normalized
114844 04/10/06 12:25 gaskell Moller backout
114843 04/10/06 12:19 gaskell Moller is tuned!
114842 04/10/06 12:11 gaskell Moller controls screen grab
114841 04/10/06 11:53 cdaq Moller Run 61577: Moller run - 4 um foil leakage run
114840 04/10/06 11:49 cdaq Moller Run 61576: Moller run - 4 um foil
114839 04/10/06 11:47 cdaq Moller Run 61575: Moller run - 4 um foil
114838 04/10/06 11:46 cdaq Moller Run 61574: Moller run - 4 um foil
114837 04/10/06 11:45 cdaq Moller Run 61573: Moller run - 4 um foil
114836 04/10/06 11:43 gaskell Put in 4 um foil
114835 04/10/06 11:33 cdaq Moller Run 61572: Moller run - 1um foil
114834 04/10/06 11:31 cdaq Moller Run 61571: Moller run - 1um foil
114833 04/10/06 11:26 cdaq Moller Run 61570: Moller CAMAC run
114832 04/10/06 11:22 cdaq Moller Run 61569: Moller tuneup - solenoid 3T
114830 04/10/06 10:50 mack impact of low efficiency on achieving counting statistics: probably negligible, except for the obvious
114829 04/10/06 10:23 cdaq Moller Run 61568: Moller tuneup - solenoid 3T
114828 04/10/06 10:21 cdaq Moller Run 61567: Moller tuneup - solenoid 3T
114827 04/10/06 10:17 cdaq Moller Run 61566: Moller tuneup - solenoid 3T
114826 04/10/06 10:12 gaskell Moller BPM positions
114825 04/10/06 10:07 cdaq Moller Run 61565: Moller tuneup - solenoid 3T
114824 04/10/06 10:03 pking When the ER3 is backed up, it may mean that there is something taking too much resources
114823 04/10/06 09:58 cdaq Moller Run 61564: Moller tuneup - solenoid 3T
114822 04/10/06 09:51 cdaq Moller Run 61563: Moller tuneup - solenoid 3T
114821 04/10/06 09:43 cdaq Moller Run 61562: Moller tuneup - solenoid 3T
114820 04/10/06 09:30 cdaq Moller Run 61561: Moller tuneup - solenoid 3T
114819 04/10/06 09:27 cdaq Moller Run 61560: Moller tuneup - solenoid 3T
114818 04/10/06 09:26 wells/warner replaced NA electronics boards/ALTERA chips
114817 04/10/06 09:10 cdaq Moller Run 61559: Moller tuneup - solenoid 3T
114816 04/10/06 08:10 gaskell Moller setup
114815 04/10/06 08:07 gzero End of Run 28720:
114814 04/10/06 08:03 cdaq Beam Time Accounting
114813 04/10/06 08:02 seva CFD TDC hits
114812 04/10/06 08:00 seva owl shift summary
114811 04/10/06 07:42 jschaub Target: owl shift summary
114810 04/10/06 07:37 gzero Run 28720: production 30Hz+fastbus/fast clear disable, prescale=2000
114809 04/10/06 07:35 cdaq Moller Run 61558: Moller JUNK
114808 04/10/06 07:32 seva hall a changed IWHP state to IN; fliper was runed
114807 04/10/06 07:31 gzero End of Run 28719:
114806 04/10/06 07:30 seva warning for ER3
114805 04/10/06 07:16 gzero Run 28719: production 30Hz+fastbus/fast clear disable, prescale=2000
114804 04/10/06 07:14 gzero End of Run 28718:
114803 04/10/06 06:49 jschaub halo rates
114802 04/10/06 06:10 gzero Run 28718: production 30Hz+fastbus/fast clear disable, prescale=2000
114801 04/10/06 06:03 gzero End of Run 28717:
114800 04/10/06 05:51 Target: target alarm
114799 04/10/06 05:34 seva coda froze; reboot
114798 04/10/06 05:33 gzero Run 28717: production 30Hz+fastbus/fast clear disable, prescale=2000
114797 04/10/06 05:18 gzero Run 28716: production 30Hz+fastbus/fast clear disable, prescale=2000
114796 04/10/06 05:12 gzero End of Run 28715:
114795 04/10/06 04:11 gzero Run 28715: production 30Hz+fastbus/fast clear enabled, prescale=1000
114794 04/10/06 04:08 gzero End of Run 28714:
114793 04/10/06 03:12 gzero Run 28714: production 30Hz+fastbus/fast clear disable, prescale=2000
114792 04/10/06 03:09 gzero End of Run 28713:
114791 04/10/06 02:10 gzero Run 28713: production 30Hz+fastbus/fast clear disable, prescale=2000
114790 04/10/06 02:09 gzero End of Run 28712:
114789 04/10/06 01:10 gzero Run 28712: production 30Hz+fastbus/fast clear disable, prescale=2000
114788 04/10/06 01:08 gzero End of Run 28711:
114787 04/10/06 00:09 Serge 11 and 6 mm halo target.
114786 04/10/06 00:08 gzero Run 28711: production 30Hz+fastbus/fast clear enabled prescale=1000
114785 04/10/06 00:07 beise Target: Swing Shift Target Summary
114784 04/10/06 00:02 cdaq Beam Time Accounting
114783 04/10/06 00:00 suleiman Swing Shift Summary
Sunday
114782 04/09/06 23:51 suleiman Analysis: Coinc Yield in (CED,FPD) for Target out of beam and 6mm halo target
114781 04/09/06 23:50 gzero End of Run 28710:
114780 04/09/06 23:40 suleiman 6 mm Halo Target: running at 5 uA
114779 04/09/06 23:40 mack BCM gain settings: educated guess says 3 is okay, but Mark Pitt may know better.
114778 04/09/06 23:39 gzero Run 28710: production 30Hz+fastbus/fast clear enable, prescale=100
114777 04/09/06 23:29 suleiman Move to 6 mm Halo Target
114776 04/09/06 23:27 gzero End of Run 28709:
114775 04/09/06 23:11 suleiman Analysis: Coinc Yield in (CED,FPD) for Target out of beam and 11mm halo target
114774 04/09/06 22:47 Serge Run Plan for the end of swing and owl night shifts
114773 04/09/06 22:30 gzero Run 28709: production 30Hz+fastbus/fast clear enable, prescale=100
114772 04/09/06 22:27 gzero End of Run 28708:
114771 04/09/06 22:26 gzero Run 28708: production 30Hz+fastbus/fast clear enable, prescale=1000
114770 04/09/06 22:24 beise Target: Target is now out of beam
114769 04/09/06 22:10 gzero End of Run 28707:
114768 04/09/06 21:09 gzero Run 28707: production 30Hz+fastbus/fast clear enable, prescale=1000, bad halo
114767 04/09/06 20:38 gzero End of Run 28706:
114766 04/09/06 20:37 suleiman Beam: Coil Modulation Run
114765 04/09/06 20:33 Serge RC Report Saturday/Sunday
114764 04/09/06 20:10 gzero Run 28706: Coil Modulation Run
114763 04/09/06 20:08 gzero End of Run 28705:
114762 04/09/06 20:07 gzero Run 28705: DAQ test with new G0Analysis version (2.11)
114761 04/09/06 20:06 gzero End of Run 28704:
114760 04/09/06 20:05 pking Analysis: Updated the analyzer on gzero account and the farm; run 28703 is the first run analyzed with this version.
114759 04/09/06 19:51 gzero Run 28704: DAQ test with new G0Analysis version (2.11)
114758 04/09/06 19:38 beise Beam: target temperature excursion
114757 04/09/06 19:29 suleiman Beam: BCM signal is small and the charge asymmetry is affected by the bit resolution
114756 04/09/06 19:20 gzero End of Run 28703:
114755 04/09/06 18:53 gzero Run 28703: production 30Hz+fastbus/fast clear disable, prescale=2000
114754 04/09/06 18:50 gzero End of Run 28702:
114753 04/09/06 18:10 pking Found a runaway runinfo2html process
114752 04/09/06 17:58 muether Analysis: Flyswatter minus target out with super elastic contribution removed
114751 04/09/06 17:33 gzero Run 28702: production 30Hz+fastbus/fast clear disable, feedback ON {prescale=2000;}
114750 04/09/06 17:30 gzero End of Run 28701:
114749 04/09/06 16:45 cdaq Beam Time Accounting
114748 04/09/06 16:41 beise Target: Day shift Target summary
114747 04/09/06 16:35 beise Analysis: Summary of runs taken for Wells plot
114746 04/09/06 16:28 gzero End of Run 28700:
114745 04/09/06 16:19 B. Quinn Day shift run summary
114744 04/09/06 15:50 gzero Run 28700: production 30Hz+fastbus/fast clear ON {prescale=1000;}
114743 04/09/06 15:50 beise Beam: restored IA to 5.3 V
114742 04/09/06 15:49 B. Quinn Beam: Hardware limit at 40uA ??
114741 04/09/06 15:48 muether Analysis: Flyswatter minus target out analysis
114740 04/09/06 15:42 B. Quinn Beam: Increasing to 45uA
114739 04/09/06 15:38 beise Target: Exercising the target
114738 04/09/06 15:37 suleiman Beam: IHWP Changed to OUT. Ran Flipper.
114737 04/09/06 15:35 gzero End of Run 28699:
114736 04/09/06 14:59 Beise Beam: Changed IA DAC voltage to 9.3V
114735 04/09/06 14:58 beise Analysis: Asymmetry widths in Integrity Files
114734 04/09/06 14:45 pking Analysis: Found the autoanalyzers had gotten hung up.
114733 04/09/06 14:41 gzero Run 28699: production 30Hz+fastbus/fast clear ON {prescale=1000;}
114732 04/09/06 14:40 gzero End of Run 28698:
114731 04/09/06 14:08 gzero Run 28698: production 30Hz+fastbus/fast clear ON {prescale=1000;}
114730 04/09/06 14:06 S. Bailey Beam: Changed IA to 1.5 DAC Volts
114729 04/09/06 14:06 gzero End of Run 28697:
114728 04/09/06 13:59 pking Analysis: Added the "bf_tests" table to the gzero_back_comm1 database on g0dbserver
114727 04/09/06 13:34 gzero Run 28697: production 30Hz+fastbus/fast clear ON {prescale=1000;}
114726 04/09/06 13:32 S. Bailey Beam: Changed IA to 6.0 DAC Volts.
114725 04/09/06 13:30 gzero End of Run 28696:
114724 04/09/06 13:24 pking Modifed the SIS3801 library to try to make the TS0/ROC31 readouts more robust
114723 04/09/06 13:15 ellis lumi pedestal change
114722 04/09/06 12:58 gzero End of Run 28696:
114721 04/09/06 12:58 S. Bailey Beam: Wells plot -> IA set to 4 DAC V
114720 04/09/06 12:56 gzero Run 28696: production 30Hz+fastbus/fast clear ON {prescale=1000;}
114719 04/09/06 12:54 gzero Run 28695: production 30Hz+fastbus/fast clear ON {prescale=1000;}
114718 04/09/06 12:50 gzero End of Run 28694:
114717 04/09/06 12:42 gzero Run 28694: DAQ test w/ new sis3801 library
114716 04/09/06 12:35 jroche Analysis: Asymmetry width in Integrity files
114715 04/09/06 12:35 gzero End of Run 28693:
114714 04/09/06 12:02 Goulven Analysis: ARS overview : NA octants
114713 04/09/06 11:20 gzero Run 28693: production 30Hz+fastbus/fast clear ON {prescale=1000;}
114712 04/09/06 11:17 gzero End of Run 28692:
114711 04/09/06 11:08 B. Quinn HV trip
114710 04/09/06 11:02 Goulven Analysis: ARS overview : french octants
114709 04/09/06 10:33 gzero Run 28692: production 30Hz+fastbus/fast clear ON {prescale=1000;}
114708 04/09/06 10:31 gzero End of Run 28691:
114707 04/09/06 10:06 Serge Run plan for Sunday (if no new developments)
114706 04/09/06 09:51 beise Analysis: zeros in asymmetry histograms
114705 04/09/06 09:48 B. Quinn TS0 problems
114704 04/09/06 09:43 B. Quinn Beam: Increased to 40 uA
114703 04/09/06 09:41 beise,quinn Analysis: Asymmetry widths in Integrity Files
114702 04/09/06 09:27 gzero Run 28691: production 30Hz+fastbus/fast clear ON {prescale=1000;}
114701 04/09/06 09:19 gzero End of Run 28690:
114700 04/09/06 09:18 gzero Run 28690: production 30Hz+fastbus/fast clear ON {prescale=1000;}
114699 04/09/06 09:03 gzero End of Run 28689:
114698 04/09/06 08:04 seva owl shift summary
114697 04/09/06 08:03 cdaq Beam Time Accounting
114696 04/09/06 08:02 jschaub target owl shift report
114695 04/09/06 07:44 gzero Run 28689: production 30Hz+fastbus/fast clear ON {prescale=1000;}
114694 04/09/06 07:43 seva TS error
114693 04/09/06 07:43 gzero End of Run 28688:
114692 04/09/06 07:25 seva CFD tdc hits screenshot
114691 04/09/06 07:19 gzero Run 28688: production 30Hz+fastbus/fast clear ON {prescale=1000;}
114690 04/09/06 07:18 seva beam back
114689 04/09/06 06:12 seva problems with liquid level in 2L10
114688 04/09/06 05:44 seva no beam; mcc have some problems; its going to take a while
114687 04/09/06 05:37 gzero End of Run 28687:
114686 04/09/06 05:17 gzero Run 28687: production 30Hz+fastbus/fast clear ON {prescale=1000;}
114685 04/09/06 05:17 seva coda is stuck; end run failed
114684 04/09/06 04:33 gzero Run 28686: production 30Hz+fastbus/fast clear ON {prescale=1000;}
114683 04/09/06 04:33 seva octant 6 cerenkov 1 tripped
114682 04/09/06 04:31 gzero End of Run 28685:
114681 04/09/06 04:30 seva TS error
114680 04/09/06 03:56 gzero Run 28685: production 30Hz+fastbus/fast clear ON {prescale=1000;}
114679 04/09/06 03:56 gzero End of Run 28684:
114678 04/09/06 03:56 seva TS error
114677 04/09/06 03:01 gzero Run 28684: production 30Hz+fastbus/fast clear ON {prescale=1000;}
114676 04/09/06 03:01 seva TS error; end run
114675 04/09/06 03:00 gzero End of Run 28683:
114674 04/09/06 02:23 jschaub halo rates with the fast feedback on
114673 04/09/06 02:22 seva TS error; end run
114672 04/09/06 02:21 seva MCC called, they want to use fast feedback to stabilize the beam
114671 04/09/06 02:19 gzero Run 28683: production 30Hz+fastbus/fast clear ON {prescale=1000;}
114670 04/09/06 02:18 seva G0BeamFeedback alarm due to IA voltage value; high value from alarm is set to low?
114669 04/09/06 02:17 gzero End of Run 28682:
114668 04/09/06 02:13 gzero Run 28682: production 30Hz+fastbus/fast clear ON {prescale=1000;}
114667 04/09/06 02:05 gzero End of Run 28681:
114666 04/09/06 01:17 gzero Run 28681: production 30Hz+fastbus/fast clear ON {prescale=1000;}
114665 04/09/06 01:05 gzero Run 28680: production 30Hz+fastbus/fast clear ON {prescale=1000;}
114664 04/09/06 00:45 gzero End of Run 28679:
114663 04/09/06 00:43 seva magnet trip; MCC says a couple of minutes
114662 04/09/06 00:18 seva coda rates with fast clear ON are 85 Hz
114661 04/09/06 00:17 seva changed prescale factor to 1000; fast clear ON(enabled)
114660 04/09/06 00:17 seva TS error; coda is stuck ; reboot
114659 04/09/06 00:16 gzero Run 28679: production 30Hz+fastbus/fast clear ON {prescale=1000;}
114658 04/09/06 00:15 gzero End of Run 28677:
114657 04/09/06 00:12 cdaq Beam Time Accounting
114656 04/09/06 00:01 Serge Mini-Run plan for the night
114655 04/09/06 00:00 mgericke swing shift summary
Saturday
114654 04/08/06 23:52 beise Analysis: g0beamfeedback is crashing and making big core files.
114653 04/08/06 23:46 mgericke Correction about previous message
114652 04/08/06 23:38 mgericke Beam: About previous two runs (feedback off)
114651 04/08/06 23:24 gzero Run 28677: production 30Hz+fastbus/noclear {prescale=2000;}
114650 04/08/06 23:21 gzero End of Run 28676:
114649 04/08/06 23:16 gzero End of Run 28676:
114648 04/08/06 22:32 gzero Run 28676: production 30Hz+fastbus/noclear {prescale=2000;} IA feedback on
114647 04/08/06 22:27 mack not so-o-o funky Moeller ridge
114646 04/08/06 22:17 gzero End of Run 28675:
114645 04/08/06 21:28 mgericke CFD-TDC Plots from g0realtime for run 28674
114644 04/08/06 21:19 gzero Run 28675: production 30Hz+fastbus/noclear {prescale=2000;} IA feedback on
114643 04/08/06 21:06 mgericke Beam: Bad Halo
114642 04/08/06 21:04 mgericke Beam: HWP switch
114641 04/08/06 20:57 mgericke High Voltage Change
114640 04/08/06 20:34 gzero End of Run 28674:
114639 04/08/06 20:26 Goulven Analysis: duplicate ARS are back
114638 04/08/06 19:44 mgericke Continue production running at 34 muAmps
114637 04/08/06 19:43 mgericke DAQ problems with ending runs...
114636 04/08/06 19:40 gzero Run 28674: production 30Hz+fastbus/noclear {prescale=2000;} IA feedback on
114635 04/08/06 19:30 gzero Run 28673: production 30Hz+fastbus/noclear {prescale=2000;} IA feedback on
114634 04/08/06 19:27 Breuer added 3 ns delay cables in Octant 1, CED 8 left and right.
114633 04/08/06 19:22 Breuer Changed oct 7 PBP/LATCH/RESET time by -2ns
114632 04/08/06 19:20 gzero End of Run 28672:
114631 04/08/06 19:18 gzero End of Run 28672:
114630 04/08/06 19:17 gzero End of Run 28672:
114629 04/08/06 19:09 mgericke Plot for run 28672
114628 04/08/06 19:08 mgericke Plots for run 28671
114627 04/08/06 18:59 mgericke Run 28670 CED_FPD coinc plots (Oct 7 delay cable tests)
114626 04/08/06 18:54 mgericke Oct 7 low efficiency tests
114625 04/08/06 18:53 Serge RC Report Friday/Saturday
114624 04/08/06 18:52 gzero Run 28672: production 30Hz+fastbus/noclear {prescale=2000;} IA feedback on
114623 04/08/06 18:47 gzero End of Run 28671:
114622 04/08/06 18:36 gzero Run 28671: production 30Hz+fastbus/noclear {prescale=2000;} IA feedback on
114621 04/08/06 18:35 gzero End of Run 28670:
114620 04/08/06 18:23 gzero Run 28670: production 30Hz+fastbus/noclear {prescale=2000;} IA feedback on
114619 04/08/06 18:22 gzero End of Run 28669:
114618 04/08/06 18:14 gzero Run 28669: production 30Hz+fastbus/noclear {prescale=2000;} IA feedback on
114617 04/08/06 18:12 gzero End of Run 28668:
114616 04/08/06 17:47 Serge ...
114615 04/08/06 17:34 pking Analysis: Modified the local version of G0Analysis and recompiled G0Scripts
114614 04/08/06 17:34 gzero Run 28668: production 30Hz+fastbus/noclear {prescale=1000;} IA feedback on
114613 04/08/06 17:30 gzero End of Run 28667:
114612 04/08/06 17:21 Fatiha Romoved Roc31 from the data stream
114611 04/08/06 16:39 Serge Halo rates and specific beam trip
114610 04/08/06 16:37 Serge PS4 = 2000, fastbus enable
114609 04/08/06 16:37 Brian Quinn Day shift summary
114608 04/08/06 16:32 cdaq Beam Time Accounting
114607 04/08/06 16:25 gzero Run 28667: DAQ test after removing g0inj from teh DataStream
114606 04/08/06 16:13 gzero End of Run 28666:
114605 04/08/06 16:13 gzero End of Run 28666:
114604 04/08/06 16:07 gzero Run 28666: production 30Hz+fastbus/noclear {prescale=1000;} IA feedback on
114603 04/08/06 15:31 mack achieving counting statistics in counting experiments with large nonlinearities and large incoherent background fields
114602 04/08/06 15:01 B. Quinn Crashes of ROC31 (and TS0)
114601 04/08/06 14:54 gzero Run 28665: production 30Hz+fastbus/noclear {prescale=1000;} IA feedback on
114600 04/08/06 14:50 gzero End of Run 28664:
114599 04/08/06 14:20 gzero Run 28664: production 30Hz+fastbus/noclear {prescale=2000;} IA feedback on
114598 04/08/06 14:11 beise, quinn Analysis: More disk cleanup under /net/cdaqfs/home and cdaql3 processes
114597 04/08/06 14:10 gzero End of Run 28663:
114596 04/08/06 14:06 Furget Comment about Gremlin bkg
114595 04/08/06 13:45 Fatiha Cleaned up the core files in the /net/cdaqfs/home/gzero/ account
114594 04/08/06 13:17 gzero Run 28663: production 30Hz+fastbus/noclear {prescale=2000;} IA feedback on
114593 04/08/06 13:06 gzero End of Run 28662:
114592 04/08/06 11:58 gzero Run 28662: production 30Hz+fastbus/noclear {prescale=2000;} IA feedback on
114591 04/08/06 11:57 gzero End of Run 28661:
114590 04/08/06 11:34 gzero Run 28661: production 30Hz+fastbus/noclear {prescale=2000;} IA feedback on
114589 04/08/06 11:32 gzero End of Run 28660:
114588 04/08/06 11:26 Brian Quinn, Analysis: How to for shift takers error
114587 04/08/06 11:17 B. Quinn Beam: Halo target was found to be out
114586 04/08/06 11:15 Serge Halo rates decreasing steadely
114585 04/08/06 10:59 gzero Run 28660: production 30Hz+fastbus/noclear {prescale=2000;} IA feedback on
114584 04/08/06 10:56 mack little bit of good news
114583 04/08/06 10:42 Serge Run plan for WE (intermediate)
114582 04/08/06 10:31 gzero End of Run 28659:
114581 04/08/06 09:35 beise Beam: Follow up on Halo rates for Mark Pitt
114580 04/08/06 09:20 jschaub checklist question
114579 04/08/06 09:15 gzero Run 28659: production 30Hz+fastbus/noclear {prescale=2000;} IA feedback on
114578 04/08/06 08:44 seva double peak in "time difference between CED and FPD"
114577 04/08/06 08:38 gzero End of Run 28658:
114576 04/08/06 08:29 gzero Run 28658: production 30Hz+fastbus/noclear {prescale=2000;} IA feedback on
114575 04/08/06 08:17 seva owl shift summary
114574 04/08/06 08:17 cdaq Beam Time Accounting
114573 04/08/06 07:56 jschaub Target: Target owl shift report
114572 04/08/06 07:39 gzero Run 28657: production 30Hz+fastbus/noclear {prescale=2000;} IA feedback on
114571 04/08/06 07:39 seva TS and ROC 31 errors
114570 04/08/06 07:37 gzero End of Run 28656:
114569 04/08/06 07:03 gzero Run 28656: production 30Hz+fastbus/noclear {prescale=2000;} IA feedback on
114568 04/08/06 07:01 gzero End of Run 28655:
114567 04/08/06 06:07 seva restarted CODA; end run failed
114566 04/08/06 06:07 gzero Run 28655: production 30Hz+fastbus/noclear {prescale=2000;} IA feedback on
114565 04/08/06 06:05 gzero End of Run 28654:
114564 04/08/06 05:38 gzero End of Run 28654:
114563 04/08/06 05:34 gzero Run 28654: production 30Hz+fastbus/noclear {prescale=2000;} IA feedback on
114562 04/08/06 04:25 gzero Run 28653: production 30Hz+fastbus/noclear {prescale=2000;} IA feedback on
114561 04/08/06 04:03 gzero Run 28652: production 30Hz+fastbus/noclear {prescale=2000;} IA feedback on
114560 04/08/06 04:02 gzero End of Run 28651:
114559 04/08/06 03:22 gzero Run 28651: production 30Hz+fastbus/noclear {prescale=2000;} IA feedback on
114558 04/08/06 03:19 seva BPM error still not fixed; getting beam back
114557 04/08/06 02:29 Breuer Restored Oct 7 CED8 to non-amplifier condition.
114556 04/08/06 02:04 Breuer Oct7-CED8 not present in coincidence matrix, source of problem not found yet
114555 04/08/06 01:50 seva hall in contolled access
114554 04/08/06 01:43 gzero End of Run 28650:
114553 04/08/06 01:39 gzero End of Run 28650:
114552 04/08/06 01:14 gzero Run 28650: production 30Hz+fastbus/noclear {prescale=2000;} IA feedback on
114551 04/08/06 01:06 seva halo rates per uA at 30 uA halo target at 39.7 mm
114550 04/08/06 00:54 seva changed prescale to 2000
114549 04/08/06 00:47 gzero Run 28649: production 30Hz+fastbus/noclear {prescale=2000;} IA feedback on
114548 04/08/06 00:46 gzero End of Run 28648:
114547 04/08/06 00:34 gzero Run 28648: test 30Hz+fastbus/noclear {prescale=1000;} IA feedback on
114546 04/08/06 00:32 gzero End of Run 28647:
114545 04/08/06 00:15 Beise Target: Target swing shift report
114544 04/08/06 00:12 gzero Run 28647: test 30Hz+fastbus/noclear {prescale=2000;} IA feedback on
114543 04/08/06 00:10 gzero End of Run 28646:
114542 04/08/06 00:05 cdaq Beam Time Accounting
114541 04/08/06 00:02 mgericke swing shift summary
114540 04/08/06 00:01 mgericke Target: Halo Target is out
Friday
114539 04/07/06 23:51 gzero Run 28646: production 30Hz+fastbus/noclear {prescale=1000;} IA feedback on
114538 04/07/06 23:43 gzero End of Run 28645:
114537 04/07/06 23:43 gzero End of Run 28645:
114536 04/07/06 23:38 gzero Run 28645: production 30Hz+fastbus/noclear {prescale=1000;} IA feedback on
114535 04/07/06 23:29 mgericke Beam: BPMs not updating
114534 04/07/06 23:23 Serge RC report Thursday/Friday
114533 04/07/06 22:52 gzero Run 28644: production 30Hz+fastbus/noclear {prescale=1000;} IA feedback on
114532 04/07/06 22:49 gzero End of Run 28643:
114531 04/07/06 22:22 mgericke CFD-TDC Plots from g0realtime for run 28643
114530 04/07/06 22:07 mgericke Some detector plots for the current run (28643)
114529 04/07/06 21:50 gzero Run 28643: production 30Hz+fastbus/noclear {prescale=1000;} IA feedback on
114528 04/07/06 21:48 gzero End of Run 28642:
114527 04/07/06 21:13 beise Beam: Ask for 30 uA
114526 04/07/06 21:06 ellis Lumi setting change
114525 04/07/06 21:06 gzero Run 28642: production 30Hz+fastbus/noclear {prescale=1000;} IA feedback on
114524 04/07/06 21:04 gzero End of Run 28641:
114523 04/07/06 20:47 mgericke 20 microamps on LH2
114522 04/07/06 20:42 Beise Target: LH2 target is now in beam
114521 04/07/06 20:41 gzero Run 28641: production 30Hz+fastbus/noclear {prescale=1000;} IA feedback on
114520 04/07/06 20:29 gzero End of Run 28640:
114519 04/07/06 20:05 gzero Run 28640: production 30Hz+fastbus/noclear {prescale=1000;} IA feedback on
114518 04/07/06 20:03 gzero End of Run 28639:
114517 04/07/06 19:19 gzero Run 28639: DAQ restart
114516 04/07/06 18:57 cdaq Beam Time Accounting
114515 04/07/06 18:56 muether Field Scans at 2" and 8" FW position
114514 04/07/06 18:25 gzero Run 28637: DAQ restart
114513 04/07/06 18:18 gzero End of Run 28636:
114512 04/07/06 18:16 gzero Run 28636: DAQ restart
114511 04/07/06 18:13 benesch Beam: halo rates up again - gas desorbed during Moller attempts?
114510 04/07/06 18:07 gzero Run 28635: DAQ restart
114509 04/07/06 17:53 gzero End of Run 28634:
114508 04/07/06 17:52 gzero End of Run 28634:
114507 04/07/06 17:40 tiefen Beam: HALLC:p apparent error was only "apparent"
114506 04/07/06 17:36 gzero End of Run 28634:
114505 04/07/06 17:35 gzero Run 28634: DAQ restart
114504 04/07/06 17:10 Breuer removed lead covering Octant 4 Ti window
114503 04/07/06 17:06 Beise Target: Temporary Target-on-Call information -- this weekend only
114502 04/07/06 17:03 Breuer Octant 3 Cerenkov 4 signal restored
114501 04/07/06 17:01 Beise Target: Erroneous heat load alarm (ghtot) while LH2 target is out of beam
114500 04/07/06 16:58 B. Quinn SMS: Removal of lead from cryostat exit window
114499 04/07/06 16:54 Beise Beam: Beam coming up, tuning
114498 04/07/06 16:28 gzero Run 28633: production 30Hz+fastbus/noclear {prescale=1000;} IA feedback on
114497 04/07/06 16:21 B. Quinn Shift Summary for day shift
114496 04/07/06 15:51 mack coincidence matrix data vs simulation: a gremlin bkg, some weak cer.effi bounds, and CED9 oddness
114495 04/07/06 15:14 gaskell Moller summary
114494 04/07/06 15:03 Beise SMS: Ramping down SMS
114493 04/07/06 14:51 gaskell Late entry: Moller backout
114492 04/07/06 14:20 muether pi/e+pi ratio for flyswatter run
114491 04/07/06 14:17 mack target out cerenkov efficiency
114490 04/07/06 14:07 cdaq Moller Run 61557: Moller tune - solenoid at 3 T
114489 04/07/06 14:04 cdaq Moller Run 61556: Moller tune - solenoid at 3 T
114488 04/07/06 14:01 cdaq Moller Run 61555: Moller tune - solenoid at 3 T
114487 04/07/06 13:55 cdaq Moller Run 61554: Moller tune - solenoid at 3 T
114486 04/07/06 13:47 cdaq Moller Run 61553: Moller tune - solenoid at 3 T
114485 04/07/06 13:40 gaskell BCM 2 gain
114484 04/07/06 13:38 cdaq Moller Run 61552: Moller tune - solenoid at 3 T
114483 04/07/06 12:59 smithg Target: HP Heater current readback
114482 04/07/06 12:55 real cerenkov efficiency with no target
114481 04/07/06 12:37 cdaq Moller Run 61551: Moller tune - solenoid at 3 T
114480 04/07/06 12:36 real comparison with simulation (at 2 inches this time) with pions
114479 04/07/06 12:30 cdaq Moller Run 61550: Moller tune - solenoid at 3 T
114478 04/07/06 12:21 arvieux New default file for FR Cerenkov threshold
114477 04/07/06 12:19 S. Bailey Analysis: Correction to my previous entry 114473
114476 04/07/06 12:11 cdaq Moller Run 61549: Moller tune - solenoid at 3 T
114475 04/07/06 12:10 gaskell solenoid at 3 T
114474 04/07/06 11:50 ppillot News about the double peak structure w/wo Cerenkov
114473 04/07/06 11:47 S. Bailey Analysis: 2nd peak with target in and out
114472 04/07/06 11:15 real Elastic rates in measured coincidence is very closed to the simulation
114471 04/07/06 11:00 cdaq Moller Run 61548: Moller tune - solenoid at 1 T
114470 04/07/06 10:25 gaskell Moller target and collimator controls hosed
114469 04/07/06 09:43 gaskell Moller tune plot for solenoid off
114468 04/07/06 09:30 gaskell Ramping solenoid to 1 T
114467 04/07/06 09:24 cdaq Moller Run 61547: Moller tune - solenoid off
114466 04/07/06 09:01 pking Cleaned up some core files; please clean up your own.
114465 04/07/06 08:56 cdaq Moller Run 61546: Moller tune - solenoid off
114464 04/07/06 08:48 cdaq Moller Run 61545: Moller tune - solenoid off
114463 04/07/06 08:43 cdaq Moller Run 61544: Moller tune - solenoid off
114462 04/07/06 08:38 cdaq Moller Run 61543: Moller tune - solenoid off
114461 04/07/06 08:33 cdaq Moller Run 61542: Moller tune - solenoid off
114460 04/07/06 08:18 cdaq Moller Run 61541: Moller tune - solenoid off
114459 04/07/06 08:04 cdaq Beam Time Accounting
114458 04/07/06 08:03 gaskell cdaql3 problems
114457 04/07/06 08:02 pate Target: owl shift summary
114456 04/07/06 08:00 pate Target: moved LH2 target OUT to prepare for Moeller operation
114455 04/07/06 07:57 pate Target: odd recovery when no beam?
114454 04/07/06 07:57 seva owl shift summary
114453 04/07/06 07:57 gaskelld Moller setup
114452 04/07/06 07:45 seva target out; halo target out; Moeller commissioning
114451 04/07/06 07:31 Fatiha Long runs
114450 04/07/06 07:21 seva mcc called, one of magnet power supply triped; 15 min break
114449 04/07/06 07:13 gzero Run 28632: production 30Hz+fastbus/noclear {prescale=1000;} IA feedback on
114448 04/07/06 07:07 gzero End of Run 28631:
114447 04/07/06 06:20 gzero Run 28631: production 30Hz+fastbus/noclear {prescale=1000;} IA feedback on
114446 04/07/06 06:14 gzero End of Run 28630:
114445 04/07/06 06:12 seva same error again
114444 04/07/06 06:08 gzero Run 28630: production 30Hz+fastbus/noclear {prescale=1000;} IA feedback on
114443 04/07/06 06:07 gzero End of Run 28629:
114442 04/07/06 05:35 pate Beam: BPM screens
114441 04/07/06 05:24 pate multiple medm manifestations
114440 04/07/06 05:06 seva rebooted roc 31 because didnt respond
114439 04/07/06 05:02 gzero Run 28629: production 30Hz+fastbus/noclear {prescale=1000;} IA feedback on
114438 04/07/06 04:42 gzero End of Run 28628:
114437 04/07/06 04:41 seva error in TC and roc 31; reboot
114436 04/07/06 04:21 gzero Run 28628: production 30Hz+fastbus/noclear {prescale=1000;} IA feedback on
114435 04/07/06 04:20 gzero End of Run 28627:
114434 04/07/06 03:40 breuer oct 3 cerenkov 4 no signal
114433 04/07/06 03:29 gzero Run 28627: production 30Hz+fastbus/noclear {prescale=1000;} IA feedback on
114432 04/07/06 03:13 gzero End of Run 28626:
114431 04/07/06 02:18 gzero Run 28626: production 30Hz+fastbus/noclear {prescale=1000;} IA feedback on
114430 04/07/06 02:13 gzero End of Run 28625:
114429 04/07/06 02:12 Breuer New Cerenkov anode currents and average pulse hights
114428 04/07/06 02:06 seva no signal on cherenkov octant 3-4
114427 04/07/06 01:21 seva TS rebooted
114426 04/07/06 01:08 gzero Run 28625: production 30Hz+fastbus/noclear {prescale=1000;} IA feedback on
114425 04/07/06 01:06 gzero End of Run 28624:
114424 04/07/06 00:57 gzero Run 28624: production 30Hz+fastbus/noclear {prescale=1000;} IA feedback on
114423 04/07/06 00:55 gzero End of Run 28623:
114422 04/07/06 00:50 gzero Run 28623: production 30Hz+fastbus/noclear {prescale=1000;} IA feedback on
114421 04/07/06 00:35 gzero Run 28622: production 30Hz+fastbus/noclear {prescale=1000;} IA feedback on
114420 04/07/06 00:33 gzero End of Run 28621:
114419 04/07/06 00:21 seva coda is stuck, kill, reboot
114418 04/07/06 00:21 gzero Run 28621: production 30Hz+fastbus/noclear {prescale=1000;} IA feedback on
114417 04/07/06 00:19 Breuer HV changes for NA CED's 8 due to amplifier insertion
114416 04/07/06 00:08 gzero Run 28620: production 30Hz+fastbus/noclear {prescale=1000;} IA feedback on
114415 04/07/06 00:07 gzero End of Run 28619:
114414 04/07/06 00:06 Breuer HV changes for NA CED's 8 due to amplifier insertion
114413 04/07/06 00:04 arvieux Target: target summary Swing 04-07-06
114412 04/07/06 00:01 cdaq Beam Time Accounting
Thursday
114411 04/06/06 23:58 suleimn Swing Shift Summary
114410 04/06/06 23:56 suleimn Swing Shift Summary
114409 04/06/06 23:55 arvieux/breu Measured Cerenkov signal without beam
114408 04/06/06 23:53 jroche/breue Analysis: spot checked the output of G0Integrity against visual scaler : all fine
114407 04/06/06 23:53 gzero Run 28619: production 30Hz+fastbus/noclear {prescale=1000;} IA feedback on
114406 04/06/06 23:51 gzero End of Run 28618:
114405 04/06/06 23:50 pate SMS: ramped down to 3300 A
114404 04/06/06 23:27 gzero Run 28618: production 30Hz+fastbus/noclear {prescale=1000;} IA feedback on
114403 04/06/06 23:22 arvieux SMS: SMS ramped up to 3500 A
114402 04/06/06 23:16 gzero End of Run 28617:
114401 04/06/06 23:15 pking Analysis: I have restarted the autoanalysis processes on cdaql1, cdaql2, cdaql4.
114400 04/06/06 23:10 Breuer NA Cerenkov oct 1 ADC cable fallen out
114399 04/06/06 22:54 gzero Run 28617: production 30Hz+fastbus/noclear {prescale=1000;} IA feedback on
114398 04/06/06 22:51 pking Analysis: The simple approach to get rates per microamp from the online/offline histograms is WRONG.
114397 04/06/06 22:42 arvieux SMS: SMS ramped down to 3100A
114396 04/06/06 22:29 Serge RC Report Wednesdat/Thursday
114395 04/06/06 22:17 gzero End of Run 28616:
114394 04/06/06 21:56 gzero Run 28616: production 30Hz+fastbus/noclear {prescale=1000;} IA on, IA feedback on
114393 04/06/06 21:56 ellis/breuer NA CED 8 Pre-amps installed
114392 04/06/06 21:54 gzero End of Run 28615:
114391 04/06/06 21:22 tiefen Beam: Hall C beam energy HALLC:p has apparent systematic error
114390 04/06/06 20:44 gzero Run 28615: production 30Hz+fastbus/noclear {prescale=1000;} IA off, IA feedback on
114389 04/06/06 20:43 gzero End of Run 28614:
114388 04/06/06 20:41 gzero Run 28614: production 30Hz+fastbus/noclear {prescale=1000;} IA off, IA feedback OFF
114387 04/06/06 20:06
114386 04/06/06 20:01 Serge Run plan for the night
114385 04/06/06 19:52 suleiman Beam: Adjust PC HV and RHW angle to match the OUT state. It was for the IN.
114384 04/06/06 19:42
114383 04/06/06 19:40 breuer Cerenkov rates with nearly no beam (run 28613)
114382 04/06/06 19:39 gzero End of Run 28613:
114381 04/06/06 19:34 gzero Run 28613: 30 hz nearly no
114380 04/06/06 19:09 suleiman Beam: Wrong labels: The run number label is right but IHWP and RHWP is as in this entry
114379 04/06/06 19:03 Serge Nice summary by Joe of the work by accelarator people in hall today
114378 04/06/06 19:01 suleiman Beam: PITA Slopes for IN and OUT
114377 04/06/06 17:34 arvieux Target: SMS is at 3297 A, LH2 target IN, beam off
114376 04/06/06 17:04 gzero End of Run 28612:
114375 04/06/06 16:51 S. Bailey Beam: Progression of Position Differences & Charge Asymmetry in Hall
114374 04/06/06 16:19 muether/breu Current Shielding Configuration upstream of the SMS
114373 04/06/06 16:12 muether Ferris Wheel pushed back to 2in pos. and plastic covers removed from all SMS exit windows.
114372 04/06/06 16:12 muether Ferris Wheel pushed back to 2in pos. and plastic covers removed from all SMS exit windows.
114371 04/06/06 16:09 B. Quinn SMS: Ramping up SMS
114370 04/06/06 16:09 vulcan Day Shift Summary
114369 04/06/06 16:04 cdaq Beam Time Accounting
114368 04/06/06 15:59 Pitt Recommended normalized halo rates - after voltage changes of April 6,
114367 04/06/06 15:31 S. Bailey Beam: Position Differences when charge feedback is turned off
114366 04/06/06 15:12 mack Multi-hit misc.
114365 04/06/06 15:05 ppillot display of single CFD counting rates versu octant
114364 04/06/06 14:59 arvieux SMS: Reconnected SMS interlock to sniper
114363 04/06/06 14:53 gaskell Re-installed lead shielding for Moller scintillators
114362 04/06/06 14:39 gzero Run 28612: production 30Hz+fastbus/noclear {prescale=1000;} IA off, IA feedback on
114361 04/06/06 14:38 gzero End of Run 28611:
114360 04/06/06 14:17 ppillot New double peak structure depending on the Cerenkov
114359 04/06/06 13:36 arieux SMS: Disconneted SMS from sniper
114358 04/06/06 13:24 gzero Run 28611: production 30Hz+fastbus/noclear {prescale=1000;} IA off, IA feedback on
114357 04/06/06 13:20 muether lexan covers installed on octants 4,5,6
114356 04/06/06 13:18 gzero End of Run 28610:
114355 04/06/06 13:14 gzero Run 28610: production 30Hz+fastbus/noclear {prescale=1000;} IA off, IA feedback on
114354 04/06/06 12:56 Serge Work related to Moeller commissioning
114353 04/06/06 12:52 pking ASCS cleanup report
114352 04/06/06 12:44 mack Do randoms make G0 backward different from G0 forward? No, and Yes.
114351 04/06/06 12:08 B. Quinn SMS: Low current alarm
114350 04/06/06 11:56 cdaq Beam Time Accounting
114349 04/06/06 11:56 gaskell increased delay for Moller Memory write-strobe
114348 04/06/06 11:40 B. Quinn SMS: Ramping down SMS
114347 04/06/06 11:34 mack Do randoms make G0 backward different from G0 forward? No, and Yes.
114346 04/06/06 11:30 gzero End of Run 28609:
114345 04/06/06 11:26 pking Problems with prescales last night were due to file permissions
114344 04/06/06 11:17 pking Analysis: Killed several analysis jobs on cdaql4; don't run batch analysis on Hall C CPUs
114343 04/06/06 11:11 Serge Help to have an "Instruction list for beginners"
114342 04/06/06 11:08 S, Bailey Beam: BPM/BCM Calibration 28545 : my thoughts
114341 04/06/06 11:05 seva here is the snapshot of NA cherenkov 1-1 for run 28609
114340 04/06/06 11:04 Serge Run plan for the day
114339 04/06/06 11:02 C. Furget Multi-hits versus beam current
114338 04/06/06 10:45 seva big rates for NA CER octant 1 tube 1, look TDC histogram
114337 04/06/06 10:28 gzero Run 28609: production 30Hz+fastbus/noclear {prescale=1000;} IA off, IA feedback on
114336 04/06/06 10:25 S. Bailey Beam: Power surge yesterday: G0 Database is updating again
114335 04/06/06 10:25 gzero End of Run 28608:
114334 04/06/06 09:27 B. Quinn Target: LH2 target in
114333 04/06/06 09:24 gzero Run 28608: production 30Hz+fastbus/noclear {prescale=1000;} IA off, IA feedback on
114332 04/06/06 09:14 C. Furget Multi-hits shape and CED9
114331 04/06/06 09:04 vulcan fastbus monitoring triggers
114330 04/06/06 08:44 benesch halo calibration current
114329 04/06/06 08:34 B. Quinn Target: Changed to Carbon target
114328 04/06/06 08:10 gzero End of Run 28607:
114327 04/06/06 08:09 seva owl shift summary
114326 04/06/06 07:45 pate Target: shift summary
114325 04/06/06 07:03 gzero Run 28607: production 30Hz+fastbus/noclear prescale=1000 feedback ON
114324 04/06/06 07:02 gzero End of Run 28606:
114323 04/06/06 06:03 seva cherenkov tipr octsn 6-1
114322 04/06/06 06:01 gzero Run 28606: production 30Hz+fastbus/noclear prescale=1000 feedback ON
114321 04/06/06 06:00 gzero End of Run 28605:
114320 04/06/06 05:54 pate Beam: BPM screens
114319 04/06/06 05:30 pate scanned checklist
114318 04/06/06 05:28 gzero Run 28605: production 30Hz+fastbus/noclear prescale=1000 feedback ON
114317 04/06/06 05:27 gzero End of Run 28604:
114316 04/06/06 04:39 gzero Run 28604: production 30Hz+fastbus/noclear prescale=1000 feedback ON
114315 04/06/06 04:38 gzero End of Run 28603:
114314 04/06/06 03:25 gzero Run 28603: production 30Hz+fastbus/noclear prescale=1000 feedback ON
114313 04/06/06 03:23 gzero End of Run 28602:
114312 04/06/06 02:25 gzero Run 28602: production 30Hz+fastbus/noclear {prescale=1000} feedback ON
114311 04/06/06 02:23 seva beam back
114310 04/06/06 02:07 seva WRONG DEFINITION OF THIS RUN; production 30Hz+fastbus/noclear {prescale=1000;} feedback on
114309 04/06/06 01:59 seva MCC called - magnet trip, 10-15 min no beam
114308 04/06/06 01:54 gzero End of Run 28601:
114307 04/06/06 01:53 gzero Run 28601: test
114306 04/06/06 01:51 gzero End of Run 28600:
114305 04/06/06 01:50 gzero Run 28600: test
114304 04/06/06 01:49 gzero End of Run 28599:
114303 04/06/06 01:48 gzero Run 28599: test
114302 04/06/06 01:47 gzero End of Run 28598:
114301 04/06/06 01:47 gzero Run 28598: test
114300 04/06/06 01:45 gzero End of Run 28597:
114299 04/06/06 01:33 Pitt Executive summary of the halo status
114298 04/06/06 01:25 Pitt Swing shift summary
114297 04/06/06 01:10 Pitt Jay Benesch's comments on the 6 mm halo rates
114296 04/06/06 01:06 Pitt Calibrated determination of halo fraction
114295 04/06/06 00:54 Breuer French and NA Cerenkov signals and anode currents at 39.5 uA beam (now full table)
114294 04/06/06 00:51 seva data rates?
114293 04/06/06 00:51 suleiman Beam: PITA Slopes
114292 04/06/06 00:50 seva 12:30 we had HV trip of G0 detectors; reset crates
114291 04/06/06 00:47 gzero Run 28597: production 30Hz+fastbus/noclear {prescale=1000;} IA off, IA feedback on
114290 04/06/06 00:44 gzero End of Run 28596:
114289 04/06/06 00:44 gzero Run 28596: test
114288 04/06/06 00:43 gzero End of Run 28595:
114287 04/06/06 00:42 gzero Run 28595: test
114286 04/06/06 00:40 gzero End of Run 28594:
114285 04/06/06 00:37 gzero Run 28594: production 30Hz+fastbus/noclear {prescale=1000;} IA off, IA feedback on
114284 04/06/06 00:36 gzero End of Run 28593:
114283 04/06/06 00:36 gzero Run 28593: test
114282 04/06/06 00:36 gzero End of Run 28592:
114281 04/06/06 00:33 gzero Run 28592: Test
114280 04/06/06 00:32 gzero End of Run 28591:
114279 04/06/06 00:30 gzero Run 28591: production 30Hz+fastbus/noclear {prescale=1000;} feedback on
114278 04/06/06 00:29 gzero End of Run 28590:
114277 04/06/06 00:24 seva check data
114276 04/06/06 00:23 Breuer French and NA Cerenkov signals and anode currents at 39.5 uA beam
114275 04/06/06 00:22 seva changed charge feeback ON
114274 04/06/06 00:22 gzero Run 28590: production 30Hz+fastbus/noclear {prescale=1000;} feedback on
114273 04/06/06 00:20 gzero End of Run 28589:
114272 04/06/06 00:16 Pitt Summary of halo rates during the swing shift runs
114271 04/06/06 00:14 suleiman Beam: PITA Scan, IHWP=IN
114270 04/06/06 00:10 suleiman Beam: PITA Scan, IHWP=OUT
114269 04/06/06 00:10 suleiman Beam: PITA Scan, IHWP=OUT
114268 04/06/06 00:03 Serge After-pulse run plan
114267 04/06/06 00:01 cdaq Beam Time Accounting
Wednesday
114266 04/05/06 23:58 gzero Run 28589: IA OFF Run (5.045 V). Feedback OFF
114265 04/05/06 23:57 gzero End of Run 28588:
114264 04/05/06 23:57 gzero Run 28588: test run
114263 04/05/06 23:55 gzero End of Run 28587:
114262 04/05/06 23:47 arvieux Target: Target summary swing shift 04-05-06
114261 04/05/06 23:30 Pitt Minutes of Hall C Beam Halo Working Group (4/5/06) from Joe Grames
114260 04/05/06 23:23 Pitt Jay Benesch's summary of his aperture scan
114259 04/05/06 23:15 Fatiha Rebooted the injector crate
114258 04/05/06 23:06 Pitt IHWP to IN
114257 04/05/06 23:05 gzero Run 28587: PITA Scan, IN
114256 04/05/06 23:04 gzero End of Run 28586:
114255 04/05/06 22:57 gzero Run 28586: DAQ test
114254 04/05/06 22:50 gzero End of Run 28585:
114253 04/05/06 22:35 Pitt Note on halo monitor anode currents
114252 04/05/06 22:33 ellis Analysis: Beam variables vs run number
114251 04/05/06 22:31 Pitt Old halo operating voltages for comparison
114250 04/05/06 22:20 Pitt Further notes on halo calibration exercise
114249 04/05/06 22:10 gzero Run 28585: PITA Scan, OUT
114248 04/05/06 22:04 gzero End of Run 28584:
114247 04/05/06 21:59 gzero Run 28584: production 30Hz+fastbus/noclear {prescale=1000;} IA feedback on
114246 04/05/06 21:58 gzero End of Run 28583:
114245 04/05/06 21:56 gzero Run 28583: production 30Hz+fastbus/noclear {prescale=1000;} IA feedback onon
114244 04/05/06 21:53 gzero End of Run 28582:
114243 04/05/06 21:47 gzero Run 28582: production 30Hz+fastbus/noclear {prescale=1000;} IA feedback on
114242 04/05/06 21:42 gzero End of Run 28581:
114241 04/05/06 21:22 gzero Run 28581: 40 uA, 6 mm halo target in, main detector on
114240 04/05/06 21:20 gzero End of Run 28580:
114239 04/05/06 21:13 arvieux Target: Beam back to 40 muA for the night, close JT valve
114238 04/05/06 21:02 gzero Run 28580: 40 uA, 6 mm halo target in
114237 04/05/06 20:38 gzero End of Run 28579:
114236 04/05/06 20:37 arvieux Target: beam 50 muA, target OK
114235 04/05/06 20:33 gzero Run 28579: 50 uA,11 mm halo target in
114234 04/05/06 20:31 gzero End of Run 28578:
114233 04/05/06 20:29 arvieux Beam: beam going up 44 muA, heater down to 0, open JT valve
114232 04/05/06 20:23 gzero Run 28578: 45 uA,11 mm halo target in
114231 04/05/06 20:16 gzero End of Run 28577:
114230 04/05/06 20:11 arvieux Target: LH2 target IN, beam 39 muA
114229 04/05/06 20:11 gzero Run 28577: 29 uA,11 mm halo target in
114228 04/05/06 20:06 gzero End of Run 28576:
114227 04/05/06 20:01 gzero Run 28576: 29 uA, halo target out
114226 04/05/06 19:40 gzero End of Run 28575:
114225 04/05/06 19:38 Serge RC Report (more and more subscribers ;-)
114224 04/05/06 19:18 gzero Run 28575: Run during Jay's aperture studies
114223 04/05/06 18:47 gaskell Moller checkout with no solenoid
114222 04/05/06 18:37 arvieux Target: target out, end of Moeller studies
114221 04/05/06 18:17 cdaq Moller Run 61540: Moller tune - solenoid off
114220 04/05/06 18:16 Fatiha Cleaned the disks
114219 04/05/06 18:11 cdaq Moller Run 61539: Moller tune - solenoid off
114218 04/05/06 18:07 cdaq Moller Run 61538: Moller tune - solenoid off
114217 04/05/06 18:02 cdaq Moller Run 61537: Moller tune - solenoid off
114216 04/05/06 17:42 cdaq Moller Run 61536: Moller tune - solenoid off
114215 04/05/06 17:37 cdaq Moller Run 61535: Moller tune - solenoid off
114214 04/05/06 17:20 smithg Target: target checklist=ksnapshot
114213 04/05/06 17:01 cdaq Moller Run 61534: Moller tune - solenoid off
114212 04/05/06 16:56 cdaq Moller Run 61533: Moller tune - solenoid off
114211 04/05/06 16:43 cdaq Moller Run 61532: Moller tune - solenoid off, 17a = -0.31 mm
114210 04/05/06 16:36 spwells NA electronics testing/fixing
114209 04/05/06 16:33 cdaq Moller Run 61531: Moller tune - solenoid off - run during beam steering
114208 04/05/06 16:09 cdaq Beam Time Accounting
114207 04/05/06 16:08 vulcan Day Shift Summary
114206 04/05/06 16:04 cdaq Moller Run 61530: Moller tune - solenoid off
114205 04/05/06 16:03 B. Quinn Target: Target shift summary
114204 04/05/06 15:42 cdaq Moller Run 61529: Moller tune - solenoid off
114203 04/05/06 14:58 B. Quinn Analysis: Re-started DAQ and Realtime Monitor
114202 04/05/06 14:43 cdaq Moller Run 61528: Moller tune - solenoid off
114201 04/05/06 14:39 pking Analysis: G0Analysis has been updated on gzero account.; all logins need to be refreshed.
114200 04/05/06 14:37 cdaq Moller Run 61527: Moller tune - solenoid off
114199 04/05/06 14:28 smithg Target: Still a small house He leak
114198 04/05/06 14:28 S. Bailey Beam: Halo Anode Currents for new operating voltages
114197 04/05/06 14:25 S. Bailey Beam: New Halo Operating Voltage
114196 04/05/06 14:23 S. Bailey Beam: New Halo Calibration
114195 04/05/06 14:22 B. Quinn Target: Moved target out of beam
114194 04/05/06 14:15 gaskell Pre-Moller setup
114193 04/05/06 14:12 Serge Real-Time Run plan
114192 04/05/06 14:04 gzero End of Run 28574:
114191 04/05/06 13:26 gzero Run 28574: Halo test
114190 04/05/06 13:25 gzero End of Run 28573:
114189 04/05/06 13:17 suleiman G0 and G0B position differences, now it is fixed
114188 04/05/06 13:06 vulcan holo monitor repaired
114187 04/05/06 13:01 gzero Run 28573: Halo test
114186 04/05/06 12:51 pking Analysis: G0Analysis 2.10 is installed on gzero account; will be made default at 2pm
114185 04/05/06 12:47 suleiman Coil Modulation Calibration
114184 04/05/06 12:19 gzero End of Run 28572:
114183 04/05/06 12:00 gzero Run 28572: Coil Modulation - 40 uA
114182 04/05/06 11:59 gzero End of Run 28571:
114181 04/05/06 11:59 gzero Run 28571: Coil Modulation - 40 uA
114180 04/05/06 11:51 gzero End of Run 28570:
114179 04/05/06 11:46 gzero Run 28570: Coil Modulation - tune beam
114178 04/05/06 11:44 gzero End of Run 28569:
114177 04/05/06 11:42 real effect of shielding in front of cerenkov 4,6
114176 04/05/06 11:34 gzero Run 28569: Coil Modulation - tune beam
114175 04/05/06 11:32 Serge Real-Time Run plan
114174 04/05/06 11:31 real cerenkov rates vs threshold
114173 04/05/06 11:21 gzero End of Run 28568:
114172 04/05/06 11:15 gzero End of Run 28568:
114171 04/05/06 11:15 gzero Run 28568: production 30Hz+fastbus/noclear {prescale=1000;} IA off, IA feedback on
114170 04/05/06 11:05 gzero Run 28567: production 30Hz+fastbus/noclear {prescale=1000;} IA feedback on
114169 04/05/06 11:02 gzero End of Run 28566:
114168 04/05/06 10:58 gzero Run 28566: production 30Hz+fastbus/noclear {prescale=1000;} A feedback on
114167 04/05/06 10:53 gzero End of Run 28565:
114166 04/05/06 10:51 gzero Run 28565: production 30Hz+fastbus/noclear {prescale=1000;} IA off, IA feedback on
114165 04/05/06 10:50 gzero End of Run 28565:
114164 04/05/06 10:48 gzero End of Run 28564:
114163 04/05/06 10:45 gzero Run 28564: production 30Hz+fastbus/noclear {prescale=1000;} IA off, IA feedback on
114162 04/05/06 10:41 gzero Run 28563: production 30Hz+fastbus/noclear {prescale=1000;} IA off, IA feedback on
114161 04/05/06 10:38 gzero End of Run 28562:
114160 04/05/06 10:36 gzero Run 28562: production 30Hz+fastbus/noclear {prescale=1000;} IA off, IA feedback on
114159 04/05/06 10:34 gzero End of Run 28561:
114158 04/05/06 10:30 gzero Run 28561: production 30Hz+fastbus/noclear {prescale=1000;} IA off, IA feedback on
114157 04/05/06 10:19 gzero Run 28560: production 30Hz+fastbus/noclear {prescale=1000;} IA off, IA feedback on
114155 04/05/06 09:37 gzero End of Run 28559:
114154 04/05/06 09:34 gzero End of Run 28559:
114153 04/05/06 09:29 gzero Run 28559: production 30Hz+fastbus/noclear {prescale=1000;} IA off, IA feedback on
114152 04/05/06 09:26 gzero End of Run 28558:
114151 04/05/06 09:22 gzero Run 28558: production 30Hz+fastbus/noclear {prescale=1000;} IA off, IA feedback on
114150 04/05/06 09:11 gzero End of Run 28557:
114149 04/05/06 09:11 vulcan Fixing the Halo Monitor
114148 04/05/06 08:33 Quinn Target: heat load alarm
114147 04/05/06 08:07 breuer shift summary 00:00 - 08:00, april 5, 2006
114146 04/05/06 08:05 gzero Run 28557: production 30Hz+fastbus/noclear {prescale=1000;} IA off, IA feedback on
114145 04/05/06 08:04 cdaq Beam Time Accounting
114144 04/05/06 08:03 pate Target: shift summary
114143 04/05/06 08:01 gzero End of Run 28556:
114142 04/05/06 07:08 gzero Run 28556: production 30Hz+fastbus/noclear {prescale=1000;} IA off, IA feedback on
114141 04/05/06 07:02 gzero End of Run 28555:
114140 04/05/06 06:06 gzero Run 28555: production 30Hz+fastbus/noclear {prescale=1000;} IA off, IA feedback on
114139 04/05/06 06:02 gzero End of Run 28554:
114138 04/05/06 05:40 pate Beam: BPM screens
114137 04/05/06 05:05 gzero Run 28554: production 30Hz+fastbus/noclear {prescale=1000;} IA off, IA feedback on
114136 04/05/06 05:03 gzero End of Run 28553:
114135 04/05/06 04:02 Breuer French Gain for Cerenkovs too high?? + oct 6 Cer 1
114134 04/05/06 03:56 gzero Run 28553: production 30Hz+fastbus/noclear prescale=1000; IA off, fixed value of 5.045 V
114133 04/05/06 03:47 gzero End of Run 28552:
114132 04/05/06 03:47 gzero End of Run 28552:
114131 04/05/06 03:33 pate/breuer Beam: beam position on realtime monitor differs from G0BPM.adl
114130 04/05/06 03:24 gzero Run 28552: fastbus data with fast clear, no {30Hz;} Cerekov thre=standard 0.5 PE
114129 04/05/06 03:23 gzero End of Run 28551:
114128 04/05/06 03:22 gzero Run 28551: fastbus data with fast clear, no 30Hz; Cerekov thre=standard 0.5 PE
114127 04/05/06 03:14 gzero End of Run 28550:
114126 04/05/06 03:09 gzero Run 28550: -30Hz, 40 uA -, LH2 target, no {fastbus;} Cerenkov thre = 3.
114125 04/05/06 03:08 gzero End of Run 28549:
114124 04/05/06 03:02 gzero Run 28549: -30Hz, 40 uA -, LH2 target, no {fastbus;} Cerenkov thre = 2.5
114123 04/05/06 03:00 gzero End of Run 28548:
114122 04/05/06 02:55 gzero Run 28548: -30Hz, 40 uA -, LH2 target, no {fastbus;} Cerenkov thre = 2.0
114121 04/05/06 02:54 gzero End of Run 28547:
114120 04/05/06 02:50 gzero Run 28547: -30Hz, 40 uA -, LH2 target, no {fastbus;} Cerenkov thre = 1.5
114119 04/05/06 02:33 gzero Run 28546: -30Hz, 40 uA -, LH2 target, no fastbus; Cerenkov thre = 1.0
114118 04/05/06 02:02 pate Target: moved LH2 target IN
114117 04/05/06 01:58 gzero End of Run 28545:
114116 04/05/06 00:09 Pitt Swing Shift Summary
114115 04/05/06 00:07 cdaq Beam Time Accounting
Tuesday
114114 04/04/06 22:11 Pitt Forced gain values for BPM/BCM calibration
114113 04/04/06 21:56 gzero Run 28545: BPM/BCM calibration run
114112 04/04/06 21:25 arvieux Target: 40 muA beam unstable, gt5 increased from 19.1 to 19.2, move to carbon target
114111 04/04/06 20:41 arvieux Target: Red alarm: short beam glitch at 40 muA
114110 04/04/06 20:12 Breuer Please not not rename the HV shutdown circuit
114109 04/04/06 20:08 arvieux Target: Some beam back, LH2 target is IN
114108 04/04/06 19:33 Serge RC Report Monday/Tuesday
114107 04/04/06 19:26 Pitt Larry's Cerenkov threshold setting scripts
114106 04/04/06 19:03 mack toy models for Cerenkov triggers
114105 04/04/06 18:38 Maud/Serge Analysis: Counting rates and magnetic field
114104 04/04/06 18:38 Larry Cerenkov Threshold files and g0daq_config GUI
114103 04/04/06 18:28 Serge Run plan for Monday, contin'd
114102 04/04/06 16:11 cdaq Beam Time Accounting
114101 04/04/06 15:57 vulcan Day Shift Summary
114100 04/04/06 15:38 gaskell scintillator mapping tests
114099 04/04/06 15:31 cdaq Moller Run 61526: DAQ test left 16,right 15
114098 04/04/06 15:30 cdaq Moller Run 61525: DAQ test left 15,right 15
114097 04/04/06 15:28 cdaq Moller Run 61524: DAQ test left 14,right 14
114096 04/04/06 15:27 cdaq Moller Run 61523: DAQ test left 13,right 13
114095 04/04/06 15:25 cdaq Moller Run 61522: DAQ test left 12,right 12
114094 04/04/06 15:24 cdaq Moller Run 61521: DAQ test left 11,right 11
114093 04/04/06 15:23 cdaq Moller Run 61520: DAQ test left 10,right 10
114092 04/04/06 15:22 cdaq Moller Run 61519: DAQ test left 9,right 9
114091 04/04/06 15:19 cdaq Moller Run 61518: DAQ test left 8,right 8
114090 04/04/06 15:18 cdaq Moller Run 61517: DAQ test left 7,right 7
114089 04/04/06 15:16 cdaq Moller Run 61516: DAQ test left 6,right 6
114088 04/04/06 15:14 cdaq Moller Run 61515: DAQ test left 5,right 5
114087 04/04/06 15:10 cdaq Moller Run 61514: DAQ test left 4,right 4
114086 04/04/06 15:07 cdaq Moller Run 61513: DAQ test left 3,right 3
114085 04/04/06 15:04 cdaq Moller Run 61512: DAQ test left 2,right 2
114084 04/04/06 14:49 cdaq Moller Run 61511: DAQ test left 1,right 1
114083 04/04/06 14:45 pking G0 Cage temperatures are going into EPICS archiver again.
114082 04/04/06 14:23 saw Target: Target reboot again
114081 04/04/06 13:50 saw Target: Target reboot
114080 04/04/06 13:24 mack intermittent feedback in 8-stage PMT's
114079 04/04/06 13:10 suleiman G0XM signal after and before the fix
114078 04/04/06 12:44 suleiman New plots of G0 and G0B with calib oscillator after the fix
114077 04/04/06 12:41 smithg Target: house helium
114076 04/04/06 12:39 saw Beam: New variables in EPICS archiver
114075 04/04/06 12:34 pking CODA and the beamfeedback/realtime analyzers have been relaunched
114074 04/04/06 12:30 real cerenkov random rates versus current
114073 04/04/06 12:23 gzero End of Run 28544:
114072 04/04/06 12:17 gzero Run 28544: DAQ test with PS4==1000
114071 04/04/06 12:09 suleiman How to start the feedback MEDM
114070 04/04/06 12:04 gzero End of Run 28543:
114069 04/04/06 12:00 gzero Run 28543: DAQ test with PS4==1000
114068 04/04/06 12:00 suleiman G0 and G0B are now fixed
114067 04/04/06 11:56 gzero End of Run 28542:
114066 04/04/06 11:54 gzero End of Run 28542:
114065 04/04/06 11:50 arvieux Changed cables on 6-CER1
114064 04/04/06 11:43 gzero Run 28542: BPM study
114063 04/04/06 11:43 gzero End of Run 28541:
114062 04/04/06 11:40 gzero Run 28541: BPM study
114061 04/04/06 11:38 gzero End of Run 28540:
114060 04/04/06 11:36 gzero Run 28540: BPM study
114059 04/04/06 11:35 gzero End of Run 28539:
114058 04/04/06 11:34 gzero Run 28539: BPM study
114057 04/04/06 11:31 gzero End of Run 28538:
114056 04/04/06 11:23 muether Shield configuration clarification
114055 04/04/06 11:20 cdaq Beam Time Accounting
114054 04/04/06 11:06 gzero Run 28538: BPM study
114053 04/04/06 11:05 gzero End of Run 28537:
114052 04/04/06 11:04 gzero Run 28537: BPM study
114051 04/04/06 11:01 gzero End of Run 28536:
114050 04/04/06 10:52 muether/breu New Shielding installed/total accounting of shielding upstream of SMS
114049 04/04/06 10:51 Serge Run plan for Tuesday (Day + Swing)
114048 04/04/06 10:44 gzero Run 28536: BPM study
114047 04/04/06 10:40 gzero End of Run 28535:
114046 04/04/06 10:30 gzero Run 28535: BPM study
114045 04/04/06 10:25 gzero End of Run 28534:
114044 04/04/06 10:20 mack G0 BPM satellites: FR leaking in?
114043 04/04/06 10:14 gzero Run 28534: BPM study
114042 04/04/06 10:14 gzero End of Run 28533:
114041 04/04/06 10:12 gzero Run 28533: BPM study
114040 04/04/06 10:12 gzero End of Run 28532:
114039 04/04/06 10:10 gzero Run 28532: BPM study
114038 04/04/06 10:07 ludwig Beam Time Accounting
114037 04/04/06 09:29 pking Beam feedback analyzer is on ET out of order; was it working?
114036 04/04/06 09:24 saw Target: IOC stuck
114035 04/04/06 09:23 saw Beam: BPM's at time of target alarm and HV sniper
114034 04/04/06 08:40 saw Target: G0 beam position
114033 04/04/06 08:12 gzero Run 28531: -30Hz+fastbus, 37 uA - NA/FR 100 mV threshold, LH2 target, NO fast clear
114032 04/04/06 08:11 pate Scanned checklists
114031 04/04/06 08:06 Breuer Shjift summary for night shift 04/04/06
114030 04/04/06 07:51 gzero End of Run 28530:
114029 04/04/06 07:48 pate Target: shift summary
114028 04/04/06 07:06 gzero Run 28530: -30Hz+fastbus, 37 uA - NA/FR 100 mV threshold, LH2 target, NO fast clear
114027 04/04/06 07:04 pate Target: LH2 target now IN
114026 04/04/06 06:50 gzero End of Run 28529:
114025 04/04/06 06:48 breuer runs with no target: summary
114024 04/04/06 06:44 Breuer HMS gas alarm, changed ethane bottle
114023 04/04/06 06:27 gzero Run 28529: -30Hz+fastbus, 37 uA - NA/FR 100 mV threshold, no target, NO fast clear
114022 04/04/06 06:10 gzero End of Run 28528:
114021 04/04/06 06:09 real Problem with rates of cerenkov octant 6 PM1
114020 04/04/06 05:47 Breuier HV tripped, Oct 6 Cer 1
114019 04/04/06 05:06 gzero Run 28528: -30Hz+fastbus, 37 uA - NA/FR 100 mV threshold, no target, NO fast clear
114018 04/04/06 05:01 gzero End of Run 28527:
114017 04/04/06 04:39 gzero Run 28527: -30Hz+fastbus, 37 uA - NA/FR 50 mV threshold, no target,WITH fastclear
114016 04/04/06 04:36 gzero End of Run 28526:
114015 04/04/06 04:34 breuer No-target run real-time data features
114014 04/04/06 03:47 gzero Run 28526: -30Hz+fastbus, 37 uA - NA/FR 100 mV threshold, no target,WITH fastclear
114013 04/04/06 03:40 gzero End of Run 28525:
114012 04/04/06 03:25 gzero Run 28525: -30Hz+fastbus, 37 uA - NA/FR 100 mV threshold, no target,WITH fastclear
114011 04/04/06 03:24 gzero End of Run 28524:
114010 04/04/06 03:21 gzero Run 28524: -30Hz+fastbus, 37 uA - NA/FR 100 mV threshold, no target,WITH fastclear
114009 04/04/06 03:14 pate Beam: BPM screens
114008 04/04/06 03:11 gzero End of Run 28523:
114007 04/04/06 02:23 pate Target: modified upper limits on "ghtot"
114006 04/04/06 02:22 gzero Run 28523: -30Hz+fastbus, 37 uA - NA/FR 100 mV threshold, no target
114005 04/04/06 02:02 Breuer HV octant 6 (most) sudenly are off
114004 04/04/06 00:55 pate Target: moved to TARGET OUT position
114003 04/04/06 00:23 Pitt Beam: Results of G0/G0B BPM test
114002 04/04/06 00:20 gzero End of Run 28522:
114001 04/04/06 00:19 Pitt Swring shift summar
114000 04/04/06 00:14 pate helium bottle in gas shed was empty
Monday
113999 04/03/06 23:14 gzero Run 28522: adymmetry production - 39.3 uA - NA/FR 100 mV threshold
113998 04/03/06 23:11 gzero End of Run 28521:
113997 04/03/06 22:55 gzero Run 28521: Short test run to test BPMS G0/G0B
113996 04/03/06 22:54 Serge Run plan for tonight
113995 04/03/06 22:33 arvieux Target: Beam goes wild, red alarm due to target temp increase
113994 04/03/06 22:02 gzero End of Run 28520:
113993 04/03/06 21:57 pking Helicity board signal timing checks
113992 04/03/06 21:50 gzero Run 28520: Short test at 40 uA to check G0/G0B
113991 04/03/06 21:45 gzero End of Run 28519:
113990 04/03/06 21:34 Pitt Normalized halo current plots - late entry
113989 04/03/06 21:27 arvieux Target: target IN, Beam 40 muA, reset Heat Load Hi limits
113988 04/03/06 21:00 gzero Run 28519: DAQ test
113987 04/03/06 20:14 Serge RC Report Sunday/Monday
113986 04/03/06 20:09 gzero End of Run 28518:
113985 04/03/06 19:33 gzero Run 28518: DAQ test with PS4=1000
113984 04/03/06 19:32 gzero End of Run 28517:
113983 04/03/06 19:26 arvieux Target: LH2 target IN beam
113982 04/03/06 19:22 gzero Run 28517: DAQ test with PS4=500
113981 04/03/06 19:21 gzero End of Run 28516:
113980 04/03/06 19:19 gzero Run 28516: DAQ test with PS4=1000
113979 04/03/06 19:17 gzero End of Run 28515:
113978 04/03/06 19:16 gzero Run 28515: DAQ test with PS4=2500
113977 04/03/06 19:14 gzero End of Run 28514:
113976 04/03/06 19:13 Muether A note on the current state of shielding upstream of the magnet
113975 04/03/06 19:10 gzero Run 28514: DAQ test with PS4=5000
113974 04/03/06 19:06 gzero End of Run 28513:
113973 04/03/06 19:05 gzero Run 28513: DAQ test with PS4=5000
113972 04/03/06 18:08 gaskell more Moller commissioning
113971 04/03/06 17:58 Larry Correction: NA Cerenkov Pulseheights & Thresholds
113970 04/03/06 17:17 gaskell Moller backout
113969 04/03/06 17:10 arvieux Target: Moeller studies (ct'd), target is still out
113968 04/03/06 17:00 Vulcan day shift summary
113967 04/03/06 16:55 cdaq Moller Run 61510: Moller tuneup - solenoid OFF
113966 04/03/06 16:32 cdaq Moller Run 61509: Moller tuneup - solenoid OFF
113965 04/03/06 16:20 cdaq Moller Run 61508: Moller tuneup - solenoid OFF
113964 04/03/06 16:14 saw Target: Target Reboot
113963 04/03/06 16:09 gzero End of Run 28512:
113962 04/03/06 16:08 cdaq Moller Run 61507: Moller tuneup - solenoid OFF
113961 04/03/06 16:00 cdaq Moller Run 61506: Moller tuneup - solenoid OFF
113960 04/03/06 15:55 Vulcan day shift summary
113959 04/03/06 15:22 saw Target: EPICS Gateway back
113958 04/03/06 14:57 saw Target: Target Alarm (White)
113957 04/03/06 14:52 Larry Re: Analysis: Plots of Cherenkov rates from threshold study
113956 04/03/06 14:50 cdaq Moller Run 61505: Moller tuneup - solenoid OFF
113955 04/03/06 14:40 cdaq Moller Run 61504: Moller tuneup - solenoid OFF
113954 04/03/06 14:30 cdaq Moller Run 61503: Moller tuneup - solenoid OFF
113953 04/03/06 14:21 cdaq Moller Run 61502: Moller tuneup - solenoid OFF
113952 04/03/06 14:13 ppillot Study of lost and random coincidences vs beam current with 100mV PMT threshold
113951 04/03/06 14:11 cdaq Moller Run 61501: Moller tuneup - solenoid OFF
113950 04/03/06 13:43 cdaq Moller Run 61500: Moller tuneup
113949 04/03/06 13:36 mack forgot to look at the figures until now: G0 BPM problem is clearly dropped bits
113948 04/03/06 13:26 cdaq Moller Run 61499: Moller tuneup
113947 04/03/06 13:03 suleiman Beam: New IF and S/H cards for G0 and G0B
113946 04/03/06 12:46 real Cerenkov threshold study, the numbers
113945 04/03/06 12:30 S. Bailey Beam: G0 and G0B BPMs exhibit good behavior during forward angle experiment
113944 04/03/06 12:22 cdaq Moller Run 61498: Moller test - collimator 5 out
113943 04/03/06 12:05 cdaq Moller Run 61497: Moller test - collimator 5 out
113942 04/03/06 12:05 pking Analysis: NA Coincidence histogramming "IS NOT" and "WAS NOT" correct.
113941 04/03/06 12:05 pking Analysis: NA Coincidence histogramming "IS NOT" and "WAS NOT" correct.
113940 04/03/06 11:35 cdaq Moller Run 61496: Moller test - collimator 5 out
113939 04/03/06 11:04 ellis beam position--beam ntuple vs EPICs
113938 04/03/06 10:57 real Cerenkov rates Fr-NA and versus threshold
113937 04/03/06 10:52 Serge Run plan for Monday
113936 04/03/06 10:49 cdaq Moller Run 61495: Moller test - collimator 5 out
113935 04/03/06 10:40 cdaq Moller Run 61494: Moller test - collimator 5 out
113934 04/03/06 10:12 Furget FR counting rates at 100 mV
113933 04/03/06 10:00 cdaq Moller Run 61493: Moller test - collimator 5 out
113932 04/03/06 09:48 cdaq Moller Run 61491: Moller test - collimator 5 out
113931 04/03/06 09:31 Furget FR counting rates vs beam current at 50 mV
113930 04/03/06 09:26 cdaq Moller Run 61490: Moller daq test
113929 04/03/06 09:20 gaskell Moller beam setup
113928 04/03/06 09:00 saw Beam: Half wave plate insertedf, flipper script ran
113927 04/03/06 08:49 gaskell halo target out
113926 04/03/06 08:32 gaskell setup for more Moller commissioning
113925 04/03/06 08:32 saw Target: Target taken out
113924 04/03/06 08:19 breuer shift summary night shift 00:00-08:00 April 03 2004
113922 04/03/06 08:07 cdaq Beam Time Accounting
113921 04/03/06 08:06 vardan Target: shift summary
113920 04/03/06 07:47 Breuer/Mamma Anode currents f(sms current), f(ferris wheel position)
113919 04/03/06 07:45 gzero Run 28512: adymmetry production - 38.0 uA - NA/FR 100 mV threshold
113918 04/03/06 07:26 gzero End of Run 28511:
113917 04/03/06 06:59 gzero Run 28511: adymmetry production - 38.0 uA - NA/FR 100 mV threshold
113916 04/03/06 06:59 gzero End of Run 28510:
113915 04/03/06 06:19 Breuer Oct 6, cernkov1 HV tripped
113914 04/03/06 06:05 gzero Run 28510: adymmetry production - 38.0 uA - NA/FR 100 mV threshold
113913 04/03/06 05:52 gzero End of Run 28509:
113912 04/03/06 05:34 gzero End of Run 28509:
113911 04/03/06 05:33 gzero Run 28509: adymmetry production - 38.0 uA - NA/FR 100 mV threshold
113910 04/03/06 04:29 vardan Beam: BPM screens
113909 04/03/06 04:14 gzero Run 28508: asymmetry production - 38.0 uA - NA/FR 100 mV threshold
113908 04/03/06 04:13 gzero End of Run 28507:
113906 04/03/06 03:39 Fatiha NA Coincidence decoding "IS" and "WAS" correct.
113905 04/03/06 03:30 mack suggest dosimeters near PMT windows
113904 04/03/06 02:53 gzero Run 28507: adymmetry production - 38.0 uA - NA/FR 100 mV threshold
113903 04/03/06 02:50 gzero End of Run 28506:
113902 04/03/06 02:21 Breuer small real time problem: oct 3 fpd 1 shows in MT without HV
113901 04/03/06 02:09 Breuer/Pitt Ran Flipper program before run 28506
113900 04/03/06 01:45 Pitt Anode current plots
113899 04/03/06 01:45 gzero Run 28506: adymmetry production - 38.0 uA - NA/FR 100 mV threshold
113898 04/03/06 01:38 gzero End of Run 28505:
113897 04/03/06 01:33 Pitt Normalized halo rates from current scan
113896 04/03/06 01:23 arvieux/kox changed base for 6-04-FL
113895 04/03/06 01:18 gzero Run 28505: adymmetry production - 38.0 uA - NA/FR 100 mV threshold
113894 04/03/06 01:05 gzero End of Run 28504:
113893 04/03/06 01:04 gzero Run 28504: adymmetry production - 38.0 uA - NA/FR 100 mV threshold
113892 04/03/06 00:49 gzero End of Run 28503:
113891 04/03/06 00:46 gzero Run 28503: BPM calibration oscillator run
113890 04/03/06 00:36 gzero End of Run 28502:
113889 04/03/06 00:33 gzero Run 28502: BPM calibration oscillator test
113888 04/03/06 00:20 Pitt Sniper tripped high voltages
113887 04/03/06 00:15 Pitt Swing Shift Summary
113886 04/03/06 00:11 cdaq Beam Time Accounting
113885 04/03/06 00:06 pking Analysis: Updated the G0Scripts
113884 04/03/06 00:04 gzero End of Run 28501:
Sunday
113883 04/02/06 23:42 Juliette Target: Shift Summary
113882 04/02/06 23:25 gzero Run 28501: Beam current scan - 10.0 uA - NA/FR 50 mV threshold
113881 04/02/06 23:23 gzero End of Run 28500:
113880 04/02/06 23:09 Pitt End run failed, restart CODA
113879 04/02/06 23:08 gzero Run 28500: Beam current scan - 10.0 uA - NA/FR 100 mV threshold
113878 04/02/06 23:03 gzero End of Run 28499:
113877 04/02/06 22:59 gzero End of Run 28499:
113876 04/02/06 22:47 spwells Octant 7 multiple hits
113875 04/02/06 22:45 gzero Run 28499: Beam current scan - 11.0 uA - NA/FR 100 mV threshold
113874 04/02/06 22:42 gzero End of Run 28498:
113873 04/02/06 22:40 gzero Run 28498: DAQ testing
113872 04/02/06 22:32 gzero End of Run 28497:
113871 04/02/06 22:27 Pitt Incorrect comment line for Run 28497
113870 04/02/06 22:17 gzero Run 28497: Beam current scan - 19.9 uA - NA/FR 50 mV threshold
113869 04/02/06 22:15 gzero End of Run 28496:
113868 04/02/06 21:53 gzero Run 28496: Beam current scan - 20.1 uA - NA/FR 50 mV threshold
113867 04/02/06 21:50 gzero End of Run 28495:
113866 04/02/06 21:19 gzero Run 28495: Beam current scan - 24.6 uA - NA/FR 50 mV threshold
113865 04/02/06 21:15 gzero End of Run 28494:
113864 04/02/06 21:01 gzero Run 28494: Beam current scan - 24.7 uA - NA/FR 100 mV threshold
113863 04/02/06 20:57 gzero End of Run 28493:
113862 04/02/06 20:51 pking Analysis: Installed a new analysis_minder.pl
113861 04/02/06 20:40 gzero Run 28493: Beam current scan - 30.5 uA - NA/FR 100 mV threshold
113860 04/02/06 20:33 gzero End of Run 28492:
113859 04/02/06 20:11 pking Analysis: Started the automatic analysis on cdaql1, cdaql2, cdaql4
113858 04/02/06 20:08 gzero Run 28492: Beam current scan - 30.1 uA - NA/FR 50 mV threshold
113857 04/02/06 20:04 gzero End of Run 28491:
113856 04/02/06 19:45 Serge (sketchy) Run Plan for the swing and owl shifts
113855 04/02/06 19:42 gzero Run 28491: Beam current scan - 34.5 uA - NA/FR 50 mV threshold
113854 04/02/06 19:35 gzero End of Run 28490:
113853 04/02/06 19:18 gzero Run 28490: Beam current scan - 34.5 uA - NA/FR 100 mV threshold
113852 04/02/06 19:16 pking Analysis: Modifed the "g0cuts" file for the analyzer installed on gzero account.
113851 04/02/06 19:16 spwells Near future NA electronic plans
113850 04/02/06 19:13 gzero End of Run 28489:
113849 04/02/06 18:57 gzero Run 28489: Beam current scan - 38.0 uA - NA/FR 100 mV threshold
113848 04/02/06 18:54 gzero End of Run 28488:
113847 04/02/06 18:53 gzero Run 28488: Electronics check for Steve Wells
113846 04/02/06 18:52 gzero End of Run 28487:
113845 04/02/06 18:45 spwells More NA electronics optimization
113844 04/02/06 18:30 gzero Run 28487: Beam current scan - 38.0 uA - NA/FR 50 mV threshold
113843 04/02/06 18:27 gzero End of Run 28486:
113842 04/02/06 18:19 gzero Run 28486: DAQ test
113841 04/02/06 18:04 gzero End of Run 28485:
113840 04/02/06 17:53 gzero ASCS summary for Sat Apr 01 2006
113839 04/02/06 17:45 gzero Run 28485: Electronics check for Steve Wells - NA CER sum out + NA 15 nsec trig width
113838 04/02/06 17:44 Serge RC report- Saturday/Sunday
113837 04/02/06 17:39 gzero End of Run 28484:
113836 04/02/06 17:29 gzero Run 28484: Electronics check for Steve Wells - NA Cernkov sum removed from trigger
113835 04/02/06 17:27 gzero End of Run 28483:
113834 04/02/06 17:17 muether Analysis: Coinsidence Matrix Study
113833 04/02/06 17:16 pking Analysis: Added warnings to G0Integrity files for "MPS out of order" and "MPS skipped"
113832 04/02/06 17:16 gzero Run 28483: Electronics check for Steve Wells - NA Cerenkov sum removed from trigger
113831 04/02/06 17:12 gzero End of Run 28482:
113830 04/02/06 17:07 gzero Run 28482: Electronics check for Steve Wells - nominal conditions
113829 04/02/06 17:04 gzero End of Run 28481:
113828 04/02/06 17:00 Juliette Target: temperature variation with 40uA beam trip
113827 04/02/06 16:53 gzero Run 28481: Electronics check for Steve Wells
113826 04/02/06 16:46 gzero End of Run 28480:
113825 04/02/06 16:32 benesch shift summary
113824 04/02/06 16:30 benesch shift summary
113823 04/02/06 16:21 cdaq Beam Time Accounting
113822 04/02/06 16:10 Juliette Target: high total heat load limit restored
113821 04/02/06 16:06 pking Minor change to the data_tracker database
113820 04/02/06 16:03 muether Target: Target Day Shift Summary
113819 04/02/06 15:54 gzero Run 28480: 20 uA beam, SMS=3300 A, asymmetry data, LH2 target, 30Hz+fastbus
113818 04/02/06 15:47 muether Target: Hydrogen Target back in
113817 04/02/06 15:37 mack Mean Cerenkov PE is a function of distance from PMT's therefore CED number
113816 04/02/06 15:37 benesch Beam: omission re halo
113815 04/02/06 15:34 gzero End of Run 28479:
113814 04/02/06 15:30 benesch Beam: halo goes non-linear at 40 uA independent of target
113813 04/02/06 14:36 gzero ASCS summary for Sat Apr 01 2006
113812 04/02/06 14:36 gzero Run 28479: halo rates with carbon target as function of current
113811 04/02/06 14:24 muether Target: Inserting Carbon Target to check for similar halo behaviour seen with LH2
113810 04/02/06 14:18 muether Target: Heater Power dropped to zero
113809 04/02/06 14:17 benesch Beam: halo rates OK with LH2 to 40 uA, balloon at 48 uA
113808 04/02/06 12:41 muether Target: Hydrogen target moved in
113807 04/02/06 12:37 Beck Analysis: Comparison of electron, pion rates for LH2 (run 28447)
113806 04/02/06 12:25 benesch Beam: switch back to combined optics
113805 04/02/06 12:01
113804 04/02/06 11:57
113803 04/02/06 11:56
113802 04/02/06 11:46
113801 04/02/06 10:27 Serge My (lost cause) fight for cleaning/washing
113800 04/02/06 10:25 muether Target: Carbon target moved in
113799 04/02/06 09:19 muether Target: Target moved to out position for beam tuning
113798 04/02/06 09:12 gzero End of Run 28478:
113797 04/02/06 09:04 muether Target: Heat Load high alarm
113796 04/02/06 08:59 ppillot Study of lost and random coincidences vs PMT threshold
113795 04/02/06 08:58 Fatiha
113794 04/02/06 08:54 benesch Beam: sniper took down HV coincident with a beam excursion
113793 04/02/06 08:35 Breuer Updated operating instructions for run g0acm (anode current monitor)
113792 04/02/06 08:25 arvieux Analysis: problem with some run_summary files (flyswater data)
113791 04/02/06 08:21 gzero Run 28478: 20 uA beam, SMS=3300 A, asymmetry data, LH2 target, 30Hz+fastbus
113790 04/02/06 08:12 breuer shift summary 04/02/06 00:00 to 08:00
113789 04/02/06 08:06 gzero End of Run 28477:
113788 04/02/06 08:03 cdaq Beam Time Accounting
113787 04/02/06 07:23
113786 04/02/06 06:57 gzero Run 28477: 20 uA beam, SMS=3300 A, asymmetry data, LH2 target, 30Hz+fastbus
113785 04/02/06 06:54 gzero End of Run 28476:
113784 04/02/06 06:47 Fatiha Offline analysis
113783 04/02/06 05:36 gzero Run 28476: 20 uA beam, SMS=3300 A, asymeetry data, LH2 target, 30Hz+fastbus nofastclear
113782 04/02/06 05:29 gzero End of Run 28475:
113781 04/02/06 05:29 gzero Run 28475: junk
113780 04/02/06 05:26 gzero End of Run 28474:
113779 04/02/06 04:57 gzero Run 28474: 20 uA beam, SMS=3300 A, asymeetry data, LH2 target, 30Hz+fastbus
113778 04/02/06 04:55 gzero End of Run 28473:
113777 04/02/06 03:55 gzero Run 28473: 20 uA beam, SMS=3300 A, asymeetry data, LH2 target, 30Hz+fastbus
113776 04/02/06 03:53 gzero End of Run 28472:
113775 04/02/06 01:49 gzero Run 28472: 20 uA beam, SMS=3300 A, asymeetry data, LH2 target, 30Hz+fastbus
113774 04/02/06 01:46 gzero End of Run 28471:
113773 04/02/06 01:42 arvieux Target: Flyswatter removed, beam back on, 20 muA, LH2 target
113772 04/02/06 01:11 gzero Run 28471: 20 uA beam, SMS=3300 A, asymeetry data, LH2 target, 30Hz+fastbus
113771 04/02/06 01:08 Serge 06-04-FL contin'd
113770 04/02/06 01:08 gzero End of Run 28470:
113769 04/02/06 01:07 gzero Run 28470: junk
113768 04/02/06 00:51 arvieux Target: Beam off for controlled access, LH2 target is still in
113767 04/02/06 00:35 Fatiha Hall is going to Controlled access
113766 04/02/06 00:22 gzero End of Run 28469:
113765 04/02/06 00:01 cdaq Beam Time Accounting
113764 04/02/06 00:00 Pitt Swing Shift Summary
Saturday
113763 04/01/06 23:59 Serge Follow-up on 06-04-FL
113762 04/01/06 23:46 Juliette Target: Shift Summary (target and "SMS")
113761 04/01/06 23:32 Juliette Target: total heat load high limit reset to 500
113760 04/01/06 23:31 gzero Run 28469: Background Studies: Flyswatter + lH2, 20 uA beam, SMS=3300 A
113759 04/01/06 23:29 Juliette Target: LH2 target in position
113758 04/01/06 23:13 gzero End of Run 28468:
113757 04/01/06 22:41 gzero Run 28468: Background Studies: Flyswatter only, 20 uA beam, SMS=3300 A
113756 04/01/06 22:39 Juliette SMS: ramped to 3300 A
113755 04/01/06 22:36 gzero End of Run 28467:
113754 04/01/06 22:32 Beck Analysis: Plots of Cherenkov rates from threshold study
113753 04/01/06 22:08 gzero Run 28467: Background Studies: Flyswatter only, 20 uA beam, SMS=3100 A
113752 04/01/06 22:07 Juliette SMS: ramped to 3100 A
113751 04/01/06 22:01 gzero End of Run 28466:
113750 04/01/06 21:29 gzero Run 28466: Background Studies: Flyswatter only, 20 uA beam, SMS=2500 A
113749 04/01/06 21:28 Juliette SMS: ramped to 2500 A
113748 04/01/06 21:17 gzero End of Run 28465:
113747 04/01/06 21:04 arvieux/kox 6-04FL signal missing
113746 04/01/06 21:01 mack toy model of MT rate suggests Real's platueau is deadtime; but can't explain steep increase
113745 04/01/06 20:47 Juliette SMS: ramped to 3500 A
113744 04/01/06 20:37 gzero Run 28465: Background Studies: Flyswatter only, 20 uA beam, SMS=3500 A
113743 04/01/06 20:14 gzero End of Run 28464:
113742 04/01/06 19:57 Serge French PMT finally missing
113741 04/01/06 19:20 gzero Run 28464: Background Studies: Flyswatter only, 20 uA beam, SMS=5000 A
113740 04/01/06 19:18 gzero End of Run 28463:
113739 04/01/06 19:17 gzero Run 28463: Test run for J. Arvieux
113738 04/01/06 19:13 gzero End of Run 28461:
113737 04/01/06 18:50 gzero Run 28461: Test run for J. Arvieux
113736 04/01/06 18:42 Juliette SMS: ramped to 5000 A
113735 04/01/06 18:39 S. Bailey Beam: G0 & G0B : Problem is not V/F module or scalers
113734 04/01/06 18:30 gzero End of Run 28459:
113733 04/01/06 18:17 Pitt run 28459: incorrect comment line
113732 04/01/06 18:14 S. Bailey Beam: Instructions about the Insertable Half Wave Plate
113731 04/01/06 18:02 gzero Run 28459: Background Studies: Flyswatter only, 20 uA beam, SMS=4000 A
113730 04/01/06 17:40 suleiman Beam: Change Pockels Cell's HV and RWP angle to match the IN state of IHWP
113729 04/01/06 17:37 Pitt Controlled access - ferris wheel move
113728 04/01/06 17:21 Juliette Target: moved to out of beam position
113727 04/01/06 16:55 gzero End of Run 28458:
113726 04/01/06 16:21 gzero Run 28458: Background Studies: Flyswatter + LH2, 20 uA beam, SMS=4000 A
113725 04/01/06 16:16 gzero Run 28457: Background Studies: Flyswatter + LH2, 20 uA beam, SMS=4000 A
113724 04/01/06 16:11 gzero Run 28456: Background Studies: Flyswatter + LH2, 20 uA beam, SMS=4000 A
113723 04/01/06 16:10 Juliette SMS: ramped to 4000 A
113722 04/01/06 16:01 cdaq Beam Time Accounting
113721 04/01/06 15:59 Armstrong Day Shift Summary
113720 04/01/06 15:56 gzero End of Run 28455:
113719 04/01/06 15:53 muether Target: TArget Shift Summary
113718 04/01/06 15:45 mack Re: suspect BPM electronics.
113717 04/01/06 15:43 muether Octant 6 Fpd 4 Problem
113716 04/01/06 15:37 Armstrong CED-FPD matrix flyswatter and lH2
113715 04/01/06 15:23 gzero Run 28455: Background Studies: Flyswatter +lH2, 20 uA beam, SMS=2500 A
113714 04/01/06 15:21 gzero End of Run 28454:
113713 04/01/06 15:16 muether Target: Hydrogen Target in and Flyswatter In
113712 04/01/06 14:59 Armstrong CED-FPD matrix with flyswatter alone
113711 04/01/06 14:32 pking Analysis: Changed the "online_integrity" script and the location of the G0Online rootfiles
113710 04/01/06 14:22 Williamson Beam: Relation between vacuum and halo rate
113709 04/01/06 14:14 gzero Run 28454: Background Studies: Flyswatter only, 20 uA beam, SMS=2500A
113708 04/01/06 14:06 gzero End of Run 28453:
113707 04/01/06 14:05 gzero Run 28453: DAQ test for g0online
113706 04/01/06 13:53 muether SMS: Magnet Ramped to 2500
113705 04/01/06 13:50 gzero End of Run 28452:
113704 04/01/06 13:07 gzero Run 28452: Background Studies: Flyswatter only, 20 uA beam, SMS=5000 A
113703 04/01/06 13:06 gzero End of Run 28451:
113702 04/01/06 13:02 S. Bailey Beam: G0 & G0B after patch cable change
113701 04/01/06 12:31 Armstrong beam off - septum box supply
113700 04/01/06 12:15 pking Somehow "dosetupcoda" got clobbered at 11:32
113699 04/01/06 11:55 gzero Run 28451: Background Studies: Flyswatter only, 20 uA beam, SMS=4000 A
113698 04/01/06 11:49 gzero Run 28450: Background Studies: Flyswatter only, 20 uA beam, SMS=4000 A
113697 04/01/06 11:44 gzero End of Run 28449:
113696 04/01/06 11:44 muether SMS: SMS ramped to 4000A
113695 04/01/06 11:40 gzero End of Run 28449:
113694 04/01/06 11:11 S. Bailey Beam: G0 & G0B: Problem is electronic
113693 04/01/06 10:57 gzero Run 28449: Background Studies: flyswatter at 20 muA
113692 04/01/06 10:44 muether/smit Target: tachometer alarm re-enabled, loosely
113691 04/01/06 10:31 muether/smit Target: Flyswatter alarm temp raised
113690 04/01/06 10:28 ppillot Study of lost and random coincidences vs beam current
113689 04/01/06 10:26 muether/kox/ Target: Flyswatter in Hydrogen out
113688 04/01/06 10:23 gzero Run 28448: Background Studies: flyswatter only, 5 uA beam, SMS=3300 A
113687 04/01/06 10:17 spwells "hole" in octant 7 pion coincidence matrix
113686 04/01/06 10:03 Serge French PMT are "durs a cuire"
113685 04/01/06 09:59 Armstrong Controlled access for flyswatter insertion
113684 04/01/06 09:56 gzero End of Run 28447:
113683 04/01/06 09:44 pking Why you need to restart CODA and analysis processes in order!
113682 04/01/06 09:24 spwells "hole" in CED 4 - FPD 14
113681 04/01/06 08:59 Armstrong Target back in, go to 20 uA
113680 04/01/06 08:56 saw G0 Logbook merged into hclog
113679 04/01/06 08:52 gaskell halo spec
113678 04/01/06 08:23 Armstrong changed prescale to 2400
113677 04/01/06 08:21 gzero Run 28447: Background Studies: LH2, 20 uA beam, SMS=3300 A
113676 04/01/06 08:19 gzero End of Run 28446:
113675 04/01/06 08:17 Armstrong Target back in, go to 20 uA
113674 04/01/06 08:15 gzero Run 28446: Background Studies: LH2, 20 uA beam, SMS=3300 A
113673 04/01/06 08:13 muether Target: Hydrogen target in
113672 04/01/06 08:04 cdaq Beam Time Accounting
113671 04/01/06 08:03 Spayde Owl Shift Summary
113670 04/01/06 08:00 gzero End of Run 28445:
113669 04/01/06 07:59 Sarah K Target: Target Operator Owl Shift Summary
113668 04/01/06 07:59 Sarah K Target: Target Operator Owl Shift Summary
113667 04/01/06 07:40 Sarah K Target: Changed High Alarm for Total Heat Load
113666 04/01/06 07:32 Spayde Background Studies Anode Current Studies
113665 04/01/06 06:51 gzero Run 28445: No Target, 20 uA beam, SMS=5000 A, Ferris Wheel at 8 in
113664 04/01/06 06:50 gzero End of Run 28444:
113663 04/01/06 06:49 gzero Run 28444: No Target, 20 uA beam, SMS=5000 A, Ferris Wheel at 8 in
113662 04/01/06 06:48 gzero End of Run 28443:
113661 04/01/06 06:47 gzero Run 28443: No Target, 20 uA beam, SMS=5000 A, Ferris Wheel at 8 in
113660 04/01/06 06:46 gzero End of Run 28442:
113659 04/01/06 06:46 gzero Run 28442: No Target, 20 uA beam, SMS=5000 A, Ferris Wheel at 8 in
113658 04/01/06 06:42 Sarah K Target: Target Out Now
113657 04/01/06 06:34 gzero End of Run 28441:
113656 04/01/06 06:33 Spayde SMS: Ramping Magnet to 3300 A
113655 04/01/06 06:27 gzero Run 28441: Background Studies: LH2, 20 uA beam, SMS=5000 A, ACM Run
113654 04/01/06 06:25 gzero End of Run 28440:
113653 04/01/06 05:53 gzero Run 28440: Background Studies: LH2, 20 uA beam, SMS=5000 A
113652 04/01/06 05:52 gzero End of Run 28439:
113651 04/01/06 05:52 gzero Run 28439: Background Studies: LH2, 20 uA beam, SMS=5000 A
113650 04/01/06 05:50 Spayde Beam Feedback Not Updating
113649 04/01/06 05:41 gzero End of Run 28438:
113648 04/01/06 05:41 Spayde SMS: Ramping Magnet to 5000 A
113647 04/01/06 05:36 gzero Run 28438: Background Studies: LH2, 20 uA beam, SMS=4200 A, ACM Run
113646 04/01/06 05:32 gzero End of Run 28437:
113645 04/01/06 05:02 gzero Run 28437: Background Studies: LH2, 20 uA beam, SMS=4200 A
113644 04/01/06 05:00 gzero End of Run 28436:
113643 04/01/06 04:59 Spayde SMS: Ramping Magnet to 4200 A
113642 04/01/06 04:57 Larry Modified g0daq_config GUI to allow loading of predefined NA Cerenkov thresholds
113641 04/01/06 04:53 gzero Run 28436: Background Studies: LH2, 20 uA beam, SMS=4000 A, ACM run
113640 04/01/06 04:51 gzero End of Run 28435:
113639 04/01/06 04:48 Sarah K Target: Dips in the Tachometer Stripchart
113638 04/01/06 04:36 Sarah K Target: Changed SMS Low Alarm Limit Back on Target Computer
113637 04/01/06 04:31 jroche magnet scan some results
113636 04/01/06 04:26 Sarah K Beam: BCMs, BPMs, and Halos for the Shift Checklist
113635 04/01/06 04:21 Sarah Adjusted Flow On Helium Bottle in the Gas Shed
113634 04/01/06 04:19 gzero Run 28435: Background Studies: LH2, 20 uA beam, SMS=4000 A
113633 04/01/06 04:17 gzero End of Run 28434:
113632 04/01/06 04:17 Spayde SMS: Ramping Magnet to 4000 A
113631 04/01/06 04:12 Spayde Killed Beam Feedback Process
113630 04/01/06 04:09 gzero Run 28434: Background Studies: LH2, 20 uA beam, SMS=3800 A, ACM run
113629 04/01/06 04:07 gzero End of Run 28433:
113628 04/01/06 03:36 gzero Run 28433: Background Studies: LH2, 20 uA beam, SMS=3800 A
113627 04/01/06 03:34 gzero End of Run 28432:
113626 04/01/06 03:32 Spayde Error Relaunching CODA
113625 04/01/06 03:25 gzero Run 28432: DAQ Test
113624 04/01/06 03:23 gzero End of Run 28431:
113623 04/01/06 03:22 Spayde SMS: Ramping Magnet to 3800 A
113622 04/01/06 03:20 Spayde Fast Feedback: Cause of Long Downtime
113621 04/01/06 03:08 gzero Run 28431: Background Studies: LH2, 20 uA beam, SMS=2500 A, ACM run
113620 04/01/06 03:07 Spayde CODA Failed to End Run
113619 04/01/06 03:01 gzero End of Run 28430:
113618 04/01/06 03:00 gzero End of Run 28430:
113617 04/01/06 02:51 Spayde Tube 06-04-FR is Dead?
113616 04/01/06 02:27 Spayde Beam is back
113615 04/01/06 02:25 Spayde Some French High Voltage Tripped Off
113614 04/01/06 02:19 gzero Run 28430: Background Studies: LH2, 20 uA beam, SMS=2500 A
113613 04/01/06 01:27 gzero End of Run 28429:
113612 04/01/06 01:15 Spayde MCC Rebooting iocse14
113611 04/01/06 01:13 gzero Run 28429: Background Studies: LH2, 20 uA beam, SMS=2500 A
113610 04/01/06 01:12 Sarah Target: SMS Alarm on Target Computer
113609 04/01/06 01:08 Sarah Target: SMS Alarm on Target Computer
113608 04/01/06 01:07 Spayde Ramping Magnet to 2500 A
113607 04/01/06 01:05 gzero End of Run 28428:
113606 04/01/06 00:52 gzero Run 28428: 30 Hz data lh2, 20 uA beam, SMS=3300 A, ACM run
113605 04/01/06 00:51 jroche cerenkov threshold study
113604 04/01/06 00:51 gzero End of Run 28427:
113603 04/01/06 00:37 breuer questions concerning acm
113602 04/01/06 00:14 gzero Run 28427: 30 Hz data lh2, 20 uA beam, SMS=3300 A
113601 04/01/06 00:12 jroche swing shift summary
113600 04/01/06 00:10 cdaq Beam Time Accounting
113599 04/01/06 00:02 Spayde SMS: Ramping Magnet to 3300 A
This file generated by /group/hallc/www/hallcweb/apps/logbooks/hclog/src/hclogscript version HC2.10
If you have any comments or problems, please contact:
Stephen A. Wood
saw@jlab.org
(757) 269-7367