Jefferson Lab Hall C Logbook for April 06 - runstarts omitted
Main INDEX
Sunday
116795 04/30/06 23:46 Armstrong/Bo Run plan for last shift
116794 04/30/06 23:32 Armstrong SMS: Magnet polarity change underwy (started at 23:10)
116793 04/30/06 22:46 muether SMS: Magnet Ramped Down
116792 04/30/06 22:16 Bosted Started SMS ramping to zero
116782 04/30/06 19:31 muether SMS: LN2 Bayonet Vacuum Alarm
116779 04/30/06 18:54 Armstrong Snapshot of the matrix
116778 04/30/06 18:44 Armstrong Beam: Halo snapshot
116776 04/30/06 18:22 muether SMS: LN2 Bayonet/Cryobox Vacuum Burp
116775 04/30/06 17:58 Armstrong Plan for some PMT swaps
116774 04/30/06 17:51 muether SMS: SMS: Back on track
116773 04/30/06 17:27 Bosted arget: lowered gpt5 low limit from 6.4 to 6.2
116772 04/30/06 16:52 muether Target: lowered gpt5 low limit from 6.5 to 6.4
116771 04/30/06 16:48 muether Target: Recieving repeated gpt5 low pressure alarms
116770 04/30/06 16:45 Armstrong Plan to reverse SMS polarity this evening
116769 04/30/06 16:05 hamlet Day Shift Summary
116768 04/30/06 16:04 cdaq Beam Time Accounting
116767 04/30/06 15:32 muether SMS: SMS Fastdump
116765 04/30/06 14:35 hamlet Controlled Access for SMS
116759 04/30/06 12:58 muether Target: Rebooted IOC after receiving a communication error
116754 04/30/06 11:10 muether/haml G0 beam feedback not updating since 1:20am
116749 04/30/06 09:32 hamlet Half wave plate OUT
116746 04/30/06 09:15 ramsay Sunday morning RC report
116743 04/30/06 08:03 cdaq Beam Time Accounting
116742 04/30/06 08:01 muether X variation in beam position
116740 04/30/06 07:28 ellis Owl Summary
116736 04/30/06 06:31 Juliette Target: some target alarms
116729 04/30/06 03:07 Juliette Target: LD2 target in place
116728 04/30/06 03:03 ellis pzt complete--35 min total
116726 04/30/06 02:32 Juliette Target: moving target out for PZT scan
116725 04/30/06 02:30 ellis PZT scan
116721 04/30/06 00:07 cdaq Beam Time Accounting
116720 04/30/06 00:04 saw Swing shift summary
Saturday
116717 04/29/06 23:15 J.W. Martin report on results of threshold scan - conclusion = ?
116714 04/29/06 21:59 saw IHWP IN, return to production running
116713 04/29/06 21:58 muether Analysis: B field scan at 2uA on LD2
116711 04/29/06 21:52 J.W. Martin Target: reduce JT by 3 clicks for 10 uA running.
116707 04/29/06 21:29 saw Fastclear disabled for run 29179
116706 04/29/06 21:24 J.W. Martin Target: two more clicks open on JT
116703 04/29/06 21:15 J.W. Martin Target: opened JT two clicks
116702 04/29/06 20:33 saw Feedbacks not running due to low beam current
116699 04/29/06 19:57 cdaq Beam Time Accounting
116698 04/29/06 19:42 mack pulsed mode run on LD2? plus less useful background musings.
116695 04/29/06 18:33 ramsay Note on the threshold runs
116694 04/29/06 18:22 ramsay Matrix Crosstalk run
116691 04/29/06 17:45 saw Loaded new CED8 HV settings
116684 04/29/06 16:24 saw Run 29172 is a threshold scan run
116681 04/29/06 15:58 beise day shift summary
116680 04/29/06 15:57 beise Analysis: Simulation of rates at 360 MeV, for future reference
116679 04/29/06 15:52 Breuer/Guill Changed ARS cabling: summed signals replace octants 3, 4
116663 04/29/06 12:59 beise SMS: ramping the SMS current down to 1900 Amps
116661 04/29/06 12:38 beise Beam: Lower beam current for magnet scan
116658 04/29/06 11:35 beise Analysis: Corrupt file for Carbon boiling run 29154
116653 04/29/06 10:08 beise Analysis: Pedestal values for LUMIS have been wrong for a while
116652 04/29/06 09:51 ramsay Saturday Morning RC report
116651 04/29/06 09:46 Beise Beam: Half wave plate state changed to OUT
116648 04/29/06 08:38 ellis Owl shift summary
116645 04/29/06 08:29 cdaq Beam Time Accounting
116642 04/29/06 07:23 Juliette Target: LD2 target in before run 29155
116639 04/29/06 05:38 Juliette Target: JT valve setting
116636 04/29/06 05:14 ellis keyword correction--run29151
116635 04/29/06 05:10 ellis keyword correction
116633 04/29/06 04:38 ellis 29153 Junk due to Coda
116631 04/29/06 04:27 Juliette Target: C target in place before run 29153
116630 04/29/06 03:28 ellis Coda restart
116627 04/29/06 02:40 ellis PZT scan
116625 04/29/06 02:17 Breuer Cerenkov Deuterium rates/current maybe not that strange
116624 04/29/06 01:45 Juliette Target: problems increasing HPH/opening JT valve
116623 04/29/06 01:40 ellis Boiling/dead time LD2--Run 29152
116618 04/29/06 01:06 Breuer clarification: this new HV file has Cerenkovs at 1/2 gain
116616 04/29/06 01:03 J.W. Martin Target: a few items about the gui that I had to call Greg about
116614 04/29/06 00:49 J.W. Martin Analysis: scaling of paddle and Cherenkov rates
116613 04/29/06 00:02 cdaq Beam Time Accounting
Friday
116612 04/28/06 23:59 hamlet Swing Shift Summary
116611 04/28/06 23:59 hamlet Swing Shift Summary
116609 04/28/06 23:50 J.W. Martin Target: moved back to LD2
116606 04/28/06 23:22 Breuer New saved HV backup file HV.2006-04-28-CEDs8etc.hvc
116605 04/28/06 23:17 hamlet Will take short run on "Radiator"
116604 04/28/06 23:16 Breuer Changed one HV before run 29147, left others as changed last night
116603 04/28/06 23:16 J.W. Martin Target: moving to radiator
116601 04/28/06 22:36 hamlet From Run 29147 new HV on octan5 04FL
116600 04/28/06 22:36 J.W. Martin/ Analysis: paddle theory
116591 04/28/06 20:12 hamlet Screen capture funny due to cdaqs1
116590 04/28/06 19:49 ramsay Screen capture funny
116587 04/28/06 18:23 hamlet Cerenkov Rates at 10 uA on LD2
116586 04/28/06 18:14 J.W. Martin Target: tweaked JT back down one click
116584 04/28/06 18:02 J.W. Martin Target: D2 in, tweaked JT up one click, and loloalarm
116582 04/28/06 17:55 hamlet SOS Cerenkov pmts HV now ON.
116581 04/28/06 17:53 hamlet Moved from 12C to LD2. Will start production data taking.
116580 04/28/06 17:43 J.W. Martin Target: moving to D2
116579 04/28/06 17:19 ellis Lumi yields (normalized) LH2 vs LD2
116578 04/28/06 16:36 suleiman Beam: The Parity Quality of G0 Beam
116575 04/28/06 16:08 cdaq Beam Time Accounting
116574 04/28/06 15:51 S. Bailey Day Shift Summary
116573 04/28/06 15:49 Goulven Target: Carbon moved in
116572 04/28/06 15:48 S. Bailey Cherenkov rate with carbon
116570 04/28/06 15:12 S. Bailey Escorted access to remove flyswatter
116568 04/28/06 15:01 S. Bailey Cherenkov rate with radiator out, empty target, flyswatter in
116567 04/28/06 14:57 Goulven Target: Radiator removed
116565 04/28/06 14:50 S. Bailey radiator out, empty target in
116563 04/28/06 13:55 S. Bailey Cherenkov rates with no target, radiator in, flyswatter in
116562 04/28/06 13:43 Maud, Philip Analysis: Gain Matching
116557 04/28/06 13:35 smithg Target: rebooted IOC to improve tach readout
116555 04/28/06 13:24 S. Bailey All HV turned ON
116554 04/28/06 13:18 Furget Delays on NA ARS
116553 04/28/06 13:14 Breuer Argon gas flow in Cerenkov octant 6.
116552 04/28/06 13:14 S. Bailey beam in hall 1 uA
116551 04/28/06 12:50 smithg Target: reduce4d coolant flow
116550 04/28/06 12:40 Breuer moved paddle higher up
116549 04/28/06 12:39 S. Bailey Halo and Lumi HV turned on
116548 04/28/06 12:34 S. Bailey magnet is ramping up
116547 04/28/06 12:32 S. Bailey Target OUT, radiator IN
116546 04/28/06 12:31 S. Bailey Flyswatter In
116545 04/28/06 12:29 S. Bailey HV crates turned back on in the cage
116544 04/28/06 12:29 S. Bailey When HV turned off, HV control is constant beeping (Stephanie go crazy)
116543 04/28/06 12:05 pking Analysis: Updated and recompiled G0Scripts on the gzero account
116542 04/28/06 12:02 J.W. Martin some borated poly available in Hall C electronics room
116541 04/28/06 11:20 real pion efficiency from c12 32 ns runs
116540 04/28/06 10:51 J.W. Martin/ inserted lexan sheets over octant 4 cryostat exit
116539 04/28/06 10:11 ramsay Friday morning RC report
116538 04/28/06 09:37 S. Bailey MCC is delivering beam to other halls now
116537 04/28/06 09:14 S. Bailey Flipped IHWP from OUT to IN for Halls B and C
116536 04/28/06 09:06 S. Bailey Hall in restricted access
116535 04/28/06 09:05 S. Bailey Turned off HV crates in cage with key
116534 04/28/06 09:00 S. Bailey Turned off all HV
116533 04/28/06 08:55 S. Bailey Ramping down magnet
116532 04/28/06 08:41 muether Analysis: Field scan results for LD2
116530 04/28/06 08:20 S. Bailey Beginning procedure to go to restricted access now
116528 04/28/06 08:03 cdaq Beam Time Accounting
116527 04/28/06 08:03 Furget Shift summary
116526 04/28/06 08:03 muether SMS: Ramping to 3500A
116523 04/28/06 07:50 muether SMS: ramping to 4900
116520 04/28/06 07:40 muether SMS: ramping to 4700
116517 04/28/06 07:29 muether SMS: ramping to 4500
116513 04/28/06 07:16 muether SMS: ramping to 4300
116511 04/28/06 07:05 muether SMS: ramping to 4100
116508 04/28/06 06:56 muether SMS: SMS ramped to 3900
116505 04/28/06 06:46 muether SMS: ramped to 3700
116501 04/28/06 06:34 muether SMS: ramping to 3500A
116499 04/28/06 06:24 muether SMS: ramped to 3300A
116496 04/28/06 06:12 muether SMS: ramping to 3100A
116493 04/28/06 06:01 muether SMS: ramping the 2900
116489 04/28/06 05:49 muether SMS: ramping to 2700A
116487 04/28/06 05:37 muether SMS: ramping to 2500A
116485 04/28/06 05:33 muether Target: Tachometer readback problems?
116482 04/28/06 05:21 muether Target: More target craziness
116480 04/28/06 05:16 Furget Temperature changed during the run29119
116478 04/28/06 05:00 muether Target: Target Upset Summary
116474 04/28/06 04:31 muether Target: Rebooted Target IOC - Target cold again
116473 04/28/06 03:54 muether Target: Heater going crazy
116472 04/28/06 03:28 muether Target: LD2 moving back in
116471 04/28/06 03:27 muether SMS: RAmping down to 1900A
116469 04/28/06 03:18 Furget Reduced halo rates (numbers)
116468 04/28/06 03:14 Furget Reduced halo rates
116465 04/28/06 03:07 muether wrong attachment
116464 04/28/06 03:03 Dave's position plot
116463 04/28/06 03:00 Furget HV killed by the sniper
116462 04/28/06 02:34 muether Beam noise in Couting room dead
116461 04/28/06 02:26 Furget Herbert paddle on 12C
116459 04/28/06 02:07 Furget Flipper running
116458 04/28/06 01:56 muether Target: Moving Carbon Target in
116457 04/28/06 01:17 muether Target: Target moving out
116456 04/28/06 01:08 Breuer Paddle location details, before and after move
116454 04/28/06 01:05 muether Plant Services On Call: Paul Powers 584-7258
116452 04/28/06 01:03 Breuer New threshold files for changed Cerenkov HVs.
116451 04/28/06 01:00 Furget Paddle current after moving it
116450 04/28/06 00:51 muether Cage temperature alarm again
116449 04/28/06 00:49 Breuer Change of Cerenkov HVs: gain reduced to 50 %
116448 04/28/06 00:30 J.W. Martin run-by-run Cherenkov in Octant 3
116447 04/28/06 00:26 J.W. Martin Beam: half wave plate reversal in 5 mins
116446 04/28/06 00:07 cdaq Beam Time Accounting
116445 04/28/06 00:05 hamlet Swing Shift Summary
116443 04/28/06 00:03 hamlet Controlled Access to move Paddle
Thursday
116442 04/27/06 23:54 J.W. Martin beam motion in y affects g0rate3,4,5,6
116441 04/27/06 23:24 J.W. Martin Target: increased JT
116436 04/27/06 22:02 hamlet New position, 1/2 gain and new thresholds started run 29112
116433 04/27/06 21:28 hamlet Ready for beam
116432 04/27/06 21:00 hamlet Ask MCC for Controlled Access to move Ferris wheel
116429 04/27/06 19:35 spwells nominal SMS setting for 8"
116426 04/27/06 18:44 Furget Configuration file for FR Cerenkov
116425 04/27/06 18:44 Furget Configuration file for FR Cerenkov
116424 04/27/06 18:39 J.W. Martin Target: target movement - final entry until next shift
116423 04/27/06 18:36 muether Analysis: Effect of field on Cerenkov rates
116422 04/27/06 18:25 hamlet HV trip on 6CER1
116420 04/27/06 18:14 hamlet Run 29108 ended, need to reboot ROC5
116419 04/27/06 18:12 J.W. Martin Target: false target movement alarm, again
116418 04/27/06 18:08 J.W. Martin Target: false target movement alarm
116417 04/27/06 17:52 J.W. Martin Target: target movement alarm - yes - again.
116414 04/27/06 17:38 ramsay Hall-C restricted access tomorrow 8am
116413 04/27/06 17:21 J.W. Martin Target: target movement alarm - again
116410 04/27/06 16:09 cdaq Beam Time Accounting
116409 04/27/06 16:07 Goulven Analysis: Quick ARS-based analysis of a deuterium run
116408 04/27/06 15:50 S. Bailey Day Shift Summary
116403 04/27/06 14:30 S. Bailey current snapshot of CED FPD Coincidence Matrix
116400 04/27/06 13:44 S. Bailey HV trip on Oct 6, Che 1
116399 04/27/06 13:42 S. Bailey HV Trip on Halos and Lumis
116396 04/27/06 12:27 mack Same ideas as a month ago, but now with less time for long term procurements/simulations/R&D
116391 04/27/06 11:19 Breuer Ideas for improving Cerenkov rates.
116390 04/27/06 11:08 Breuer Cerenkov tripping base
116389 04/27/06 10:52 S. Bailey HV trip on oct 6, che 1
116388 04/27/06 10:41 mack suggest swapping any tripping HV channels before summer run
116385 04/27/06 10:09 S. Bailey MCC lost RF cavity ->Beam down for a few minutes
116384 04/27/06 09:59 Furget FR Cerenkov thresholds
116383 04/27/06 09:58 ramsay Thursday morning RC report
116382 04/27/06 09:58 gzero ASCS summary for Wed Apr 26 2006
116381 04/27/06 09:49 S. Bailey Beam feedback updating again
116380 04/27/06 09:41 S. Bailey Beam Feedback not updating
116376 04/27/06 09:35 pking Analysis: Corrected G0RateMonitor display of CED SDMCH rates
116374 04/27/06 09:14 S. Bailey Cherenkov rates @ 8 in position (still too high)
116373 04/27/06 09:06 ramsay "things to fix" job list
116372 04/27/06 09:03 ramsay Don' t forget the half-wave plate
116370 04/27/06 08:59 S. Bailey Beam is back, 10 uA
116369 04/27/06 08:44 S. Bailey Flip IHWP from OUT to IN
116367 04/27/06 08:39 S. Bailey Hall C to controlled access to move ferris wheel from 4 in to 8 in
116366 04/27/06 08:35 S. Bailey HV trip on Oct 6, Che 1
116365 04/27/06 08:10 cdaq Beam Time Accounting
116364 04/27/06 08:09 Furget Shift summary
116358 04/27/06 07:00 Furget Counting rates in G0realtimemonitor to be changed
116356 04/27/06 06:43 Furget Run 29093 is : FR CER test 0.75 p.e., LD2 3500 A 5 muA prescale=3000 FastClear disable
116353 04/27/06 06:25 muether Target: More target motion alarms
116350 04/27/06 05:07 muether Analysis: Cerenkov PMT rates vs run number
116349 04/27/06 04:58 Furget Wrong heading for run 29090
116346 04/27/06 04:09 muether Analysis: Rate Matrices for LD2
116345 04/27/06 04:04 Furget Problem in the G0Integrity file related to CODA
116343 04/27/06 03:47 muether Target: Repeated Target Motion Alarms
116340 04/27/06 03:30 Furget g0beam feedback was off
116337 04/27/06 02:50 Furget Oct6 Cer 1 has tripped
116335 04/27/06 02:36 Furget Anode current on the FR Cerenkov
116331 04/27/06 01:43 muether Target: LD2 Target moved in
116330 04/27/06 01:34 Breuer First look at anode currents and rates for LD2 running.
116329 04/27/06 01:27 muether Target: Target moved out
116327 04/27/06 01:10 Furget Single counting on LD2
116326 04/27/06 01:06 Furget CED-FPD coincidence on LD2
116325 04/27/06 00:53 Breuer HV's for French CED 9s changed before run 29085
116322 04/27/06 00:01 cdaq Beam Time Accounting
Wednesday
116321 04/26/06 23:58 hamlet Swing shift summary
116320 04/26/06 23:49 hamlet Turned OFF SOS Cerenkov HV
116308 04/26/06 19:59 Breuer/Ellis New pre/post-amplifiers installed for CED 8 s, new prelim. HVs; revised
116307 04/26/06 19:58 hamlet Paddle current on 12C with beam
116305 04/26/06 19:51 J.W. Martin Target: moving LD2 target in
116304 04/26/06 19:26 hamlet Paddle anode current
116303 04/26/06 19:23 Breuer/Ellis New pre/post-amplifiers installed for CED 8 s, new prelim. HVs
116302 04/26/06 19:16 J.W. Martin Target: moving to carbon target
116301 04/26/06 19:00 J.W. Martin Target: target moving out
116299 04/26/06 17:32 hamlet Ask MCC for "sweep" and go to beam permit
116298 04/26/06 17:21 suleiman Beam: T Allison Entry Regarding Hall C Current
116297 04/26/06 16:47 muether SMS: Ramping Magnet to 3500A after target switch over
116296 04/26/06 16:44 smithg Target: Setup new alarm file. Fan now at 30.4 Hz.
116295 04/26/06 16:00 smithg Target: LD2 cooldown complete
116294 04/26/06 16:00 cdaq Beam Time Accounting
116293 04/26/06 15:54 suleiman Beam: IA Slopes from run 29006. This time CAV1C1 plot is included
116292 04/26/06 15:53 S. Bailey Day Shift Summary
116291 04/26/06 15:33 mack More Unser checkout
116288 04/26/06 14:54 S. Bailey HV trip on all Cherenkov
116286 04/26/06 13:58 gaskell SOS cerenkov - signal!
116285 04/26/06 13:37 Furget Beam position
116284 04/26/06 13:01 S. Bailey Target ready at 4 pm +/- 1 hour
116283 04/26/06 12:24 smithg Target: Max loop temp rise during cold swap
116282 04/26/06 12:10 smithg Target: Pumping coolant IV
116281 04/26/06 11:41 smithg Target: Pumping coolant IV
116280 04/26/06 11:39 smithg Target: On D2 tank now. Pump & purge finished. Started cooldown.
116279 04/26/06 10:51 S. Bailey HV trip on Oct6, Cherenkov 1
116278 04/26/06 09:47 ramsay Wednesday Morning RC report
116277 04/26/06 09:33 S. Bailey Magnet is off
116276 04/26/06 09:23 S. Bailey Hall C is in restricted access now
116275 04/26/06 09:22 smithg Target: Completed 15K warmup procedure. Switching to deuterium.
116274 04/26/06 09:05 beise Target: Piminus rates in deuterium
116273 04/26/06 09:05 muether SMS: Ramping down magnet
116272 04/26/06 09:04 S. Bailey I requested restricted access
116271 04/26/06 09:03 S. Bailey MCC secured beam for beam studies
116269 04/26/06 08:50 S. Bailey Oct4_eCED_FPD fixed
116268 04/26/06 08:42 S. Bailey 30 Hz Gas target run -> Oct4_eCED_FPD is empty
116265 04/26/06 08:20 cdaq Beam Time Accounting
116262 04/26/06 08:03 Furget Shift summary
116261 04/26/06 07:42 Furget Gas target at 5 muA NOT at 60uA !
116258 04/26/06 07:24 muether Target: Warming up the target to 30K for gas running
116256 04/26/06 06:19 Furget Pion coincidence of oct 2 and 4 are wrong !
116254 04/26/06 06:02 real Fr cerenkov efficiency after timing change
116251 04/26/06 05:22 Furget FR Cer timing
116247 04/26/06 05:07 Furget AC system works again
116246 04/26/06 05:02 muether Chiller back on
116245 04/26/06 04:47 Furget Electronics crate is now too high
116241 04/26/06 04:10 Furget G0 electronics temperature is still growing
116240 04/26/06 03:50 muether Temps still on the rise
116239 04/26/06 03:33 muether Alarm on Cage Temperature
116238 04/26/06 03:11 Furget Trouble with CAEN HV Oct 2 and last runs junk
116231 04/26/06 02:19 Furget halo rates are unstable
116230 04/26/06 02:10 Furget Change in the FR Cerenkov timing
116228 04/26/06 01:37 muether Target: LH2 Target moved back in
116227 04/26/06 01:11 muether Target: Target moved out for PZT scan
116226 04/26/06 01:03 J.W. Martin Analysis: Cherenkov and G0 beam
116224 04/26/06 00:42 Furget Gas Cerenkov threshold
116220 04/26/06 00:01 hamlet Swing shift summary, April 25
116219 04/26/06 00:01 cdaq Beam Time Accounting
Tuesday
116218 04/25/06 23:52 hamlet Beam Strip Chart during run 29063
116217 04/25/06 23:22 J.W. Martin/ Analysis: a search for SOS Cherenkov information
116213 04/25/06 21:45 hamlet 6CER1 HV was off ~2 min during run 29061
116210 04/25/06 19:53 ellis 31Mhz quicklook
116207 04/25/06 19:40 hamlet Evnt/q Beam monitor histogram look strange
116206 04/25/06 19:27 Fatiha The matrix for the Double peak with the 31 ns beam structure.
116205 04/25/06 18:47 Fatiha Changed the Delays for teh ARS in the soft
116202 04/25/06 18:27 Beise Target: LD2 quasielastic rate simulation
116201 04/25/06 18:27 Beise Target: LD2 quasielastic rate simulation
116200 04/25/06 18:17 hamlet Run 29057 is a 31 MHz run with different thresholds
116199 04/25/06 17:42 hamlet Beam back. Start production data taking
116197 04/25/06 17:34 J.W. Martin Target: JT opened
116196 04/25/06 17:33 muether Analysis: "Blair" plots for recent fielf scan
116195 04/25/06 17:21 pking Where in the datastream is the Gas Cerenkov, and how can you look at the data
116194 04/25/06 17:05 hamlet Beam OFF. MCC will change time structure
116189 04/25/06 16:06 cdaq Beam Time Accounting
116188 04/25/06 15:50 S. Bailey Special Instructions to Swing Shift : change gain of BCMs back to 3 before production data taking
116187 04/25/06 15:47 S. Bailey Day Shift Summary
116184 04/25/06 15:19 mack BCM calibration for gain setting 3
116183 04/25/06 15:19 ramsay Plan for overnight and tomorrow.
116180 04/25/06 14:38 pking Removed extra splitter on 499 MHz signal and resynched our TDC start
116178 04/25/06 14:23 Goulven Target: Target changed to carbon
116177 04/25/06 14:13 pking Found the 499 MHz signal in G0 cage and resynched our TDC start signal
116175 04/25/06 14:00 ramsay Update on 31 MHz running
116174 04/25/06 13:31 S. Bailey "Real" data taking begins with run 29053
116173 04/25/06 13:18 S. Bailey King & Mack save the day! Hooray!!!!!
116168 04/25/06 12:37 S. Bailey HV trip on octant 6, cherenkov 1
116167 04/25/06 12:09 S. Bailey 31 MHz update (uh oh)
116164 04/25/06 11:32 ellis beam parameter script
116163 04/25/06 11:20 S. Bailey Turned off HV on all octant 7 except ...
116159 04/25/06 10:37 gaskell SOS cerenkov setup
116156 04/25/06 10:19 S. Bailey MCC is sending 0.7 uA
116155 04/25/06 10:18 ramsay Tuesday Morning RC report
116153 04/25/06 10:14 S. Bailey Problems with CODA : no events
116152 04/25/06 10:13 S. Bailey HV Trip
116150 04/25/06 10:05 cdaq Beam Time Accounting
116148 04/25/06 09:52 S. Bailey MCC is sending pulsed beam now
116147 04/25/06 09:25 S. Bailey MCC is going to bypass the RF zone. 31 MHz beam in 10 or 15 minutes.
116144 04/25/06 09:07 S. Bailey MCC almost ready to deliver beam : problem with RF zone
116143 04/25/06 08:43 S. Bailey I turned up the gain on our BCM1 and BCM2 from 3 to 4
116142 04/25/06 08:05 S. Bailey MCC secured beam top begin 31 MHz preparation
116140 04/25/06 08:00 Furget Shift summary
116139 04/25/06 07:53 Furget Oct5 FPD 3 Left is coming back completely
116136 04/25/06 06:45 Furget Oct5 FPD 3 Left is coming back partially !
116133 04/25/06 05:43 muether Analysis: Some results from the most recent field scan
116132 04/25/06 05:27 muether Octant 6 CER1 HV Tripped off
116127 04/25/06 04:46 Furget Looking at beam properties
116126 04/25/06 04:10 Furget FR Cerenkov configuration files
116123 04/25/06 03:31 Furget Oct5 FPD 3 is missing
116120 04/25/06 02:06 Furget Oct6 det6 is solved
116119 04/25/06 01:47 muether Dave's Beam position plot
116116 04/25/06 01:38 muether Target: LH2 target back in
116115 04/25/06 01:20 muether Target: HPH too high with target out
116114 04/25/06 01:09 muether Target: Target moved out for PZT measurement
116112 04/25/06 00:49 C. Furget Oct6 CED6 problem
116110 04/25/06 00:42 J.W. Martin Analysis: ARS as a tighter-gated charge ADC
116109 04/25/06 00:01 cdaq Beam Time Accounting
Monday
116108 04/24/06 23:57 suleiman Swing Shift Summary
116107 04/24/06 23:55 suleiman Reboot ROC5
116105 04/24/06 23:37 J.W. Martin shift checklist scans
116104 04/24/06 23:35 suleiman Coda Frozen
116101 04/24/06 23:16 J.W. Martin coinc matrix for real this time
116100 04/24/06 23:15 J.W. Martin/ Analysis: coincidence matrix plots for 29031 offline and CED 6 / Octant 6 problem
116097 04/24/06 22:03 gzero ASCS summary for Sun Apr 23 2006
116094 04/24/06 20:50 suleiman Coda ER Warning durin run 29031
116093 04/24/06 20:40 suleiman Beam: Charge Asymmetry and Position Differences for runs:29008-29024 ... IN
116090 04/24/06 19:52 suleiman Beam: Beam Halo and Position
116089 04/24/06 19:43 J.W. Martin Target: tweaked JT upward one click
116087 04/24/06 19:32 J.W. Martin Target: reopened JT one click
116086 04/24/06 19:07 gaskell Moller summary
116085 04/24/06 19:06 J.W. Martin Target: moving target in, and tweaked JT valve
116084 04/24/06 19:06 pking G0cage temperature summary; how hot is too hot
116083 04/24/06 18:49 gaskell Moller backout
116075 04/24/06 17:30 gaskell ramping Moller solenoid to 3 T
116073 04/24/06 17:19 ramsay Update on the Tuesday 31 MHz running
116072 04/24/06 17:16 gaskell Moller setup
116071 04/24/06 17:15 ramsay Update on the Tuesday 31 MHz running
116070 04/24/06 17:11 J.W. Martin Target: target out for Moller run
116064 04/24/06 16:25 ellis, J.W. cage temp alarm limits modified to avoid target crash
116063 04/24/06 16:07 S. Bailey Day Shift Summary
116062 04/24/06 16:04 cdaq Beam Time Accounting
116060 04/24/06 15:45 S. Bailey Flip IHWP from IN to OUT for Hall B
116058 04/24/06 15:34 S. Bailey More info on closed valve
116054 04/24/06 15:25 ppillot Analysis: PMT threshold study for French CED/FPD (30Hz data)
116053 04/24/06 15:24 S. Bailey Beam is back -> A valve was closed
116052 04/24/06 15:08 S. Bailey MCC cannot deliver beam -> there is something blocking the beamline at 3C17
116051 04/24/06 14:47 gaskell/haml SOS cerenkov installation
116050 04/24/06 14:40 S. Bailey Turn off all HV, turn on HALO, LUMI, Herbert's Paddle
116049 04/24/06 14:17 S. Bailey Sweeping the hall
116048 04/24/06 12:43 S. Bailey Turned off Halo, Lumi, and Herbert's paddle HV to test SOS Cherenkov
116047 04/24/06 12:32 pking G0 cage thermocouple sensors
116046 04/24/06 12:04 S. Bailey Analysis: Shielding wall reduces yield of second peak by a factor of 1.5 in CED 9
116045 04/24/06 10:34 S. Bailey HV Trip on Octant 6, Cherenkov 1
116044 04/24/06 10:34 ellis G0Gage Blower
116043 04/24/06 10:30 ellis G0CageTemp2 Alarm
116042 04/24/06 09:55 ellis G0gagetemp1 Yellow alarm
116041 04/24/06 09:42 ramsay Monday morning RC report
116040 04/24/06 09:38 S. Bailey Hall C in Restricted Access
116038 04/24/06 09:24 ramsay Monday run plan
116037 04/24/06 09:02 S. Bailey Beam: MCC took away beam to begin pass change
116036 04/24/06 08:07 cdaq Beam Time Accounting
116035 04/24/06 08:06 Furget Shift summary
116032 04/24/06 06:52 Furget FR Cerenkov timing
116023 04/24/06 02:41 Furget Beam position
116020 04/24/06 02:20 muether SMS: Collimators now down to temperatures prior to cryo outage
116019 04/24/06 02:15 muether Dave's Beam postion script
116018 04/24/06 01:47 Furget Beam position and halo rates
116017 04/24/06 01:15 Furget Lumi and halo HV control silenced
116014 04/24/06 00:01 cdaq Beam Time Accounting
Sunday
116012 04/23/06 23:59 suleiman Swing Shift Summary
116010 04/23/06 23:46 suleiman Beam: Coil Modulation Cycle from Production Run 29015 - Reduce the Energy Limit
116007 04/23/06 22:59 suleiman Beam: Hall A and Hall B confirmed that G0 Coil Modulation (position + Energy) did not affect the Quality of their Data
116006 04/23/06 22:58 suleiman Beam: Hall A and Hall C confirmed that G0 Coil Modulation (position + Energy) did not affect the Quality of their Data
116005 04/23/06 22:50 suleiman Beam: Modulation Should be Kept ON
116000 04/23/06 21:37 suleiman Beam: IHWP IN vs. OUT Data: 23.1 hours IN vs 42.2 hours OUT
115998 04/23/06 21:18 suleiman Beam: Slugs Update
115997 04/23/06 21:14 J.W. Martin electronics cage temperature update 3
115995 04/23/06 20:37 suleiman Beam: Charge Asymmetry and Position Differences for runs: 28988 & 2995-29004 ... OUT
115992 04/23/06 19:47 suleiman Beam: Charge Asymmetry and Position Differences for runs: 28958-28960 & 2984-28987 ... IN
115989 04/23/06 19:27 suleiman Beam: Charge Asymmetry and Position Differences for runs: 28946-28957 ... OUT
115988 04/23/06 19:15 J.W. Martin electronics cage temperatures update 2
115987 04/23/06 19:10 suleiman Beam: Charge Asymmetry and Position Differences for runs: 28937, 28939, & 28945 ... IN
115986 04/23/06 18:55 suleiman CED - FPD Coincidence Plot from run 29010
115985 04/23/06 18:38 suleiman Beam: Charge Feedback medm Screens
115982 04/23/06 18:27 suleiman Beam: Hall C BPMs Raw Signals and Position Differences during run 29004
115981 04/23/06 18:12 J.W. Martin electronics cage temperatures update
115980 04/23/06 17:52 suleiman Beam: PITA Slopes for IN (29007)
115979 04/23/06 17:41 muether Analysis: Octant averaged asymmetries
115978 04/23/06 17:31 suleiman Feedback did not update ... kill coda and Realtime
115977 04/23/06 17:28 muether Analysis: Asymmetry properties per octant
115974 04/23/06 17:19 ellis G0 Cage
115973 04/23/06 17:11 suleiman Back to production
115972 04/23/06 17:06 suleiman/Ell Beam: PITA Scan ... IHWP=IN
115969 04/23/06 16:56 suleiman Beam: New G0 IA Slope for Charge Feedback = -492.0
115968 04/23/06 16:54 suleiman Beam: IA Slopes (29006)
115967 04/23/06 16:38 muether SMS: Asymetries for "good runs"
115966 04/23/06 16:38 ellis G0 Cage Cooling Problem
115965 04/23/06 16:37 suleiman Beam: Beam Halo
115964 04/23/06 16:36 ellis G0cage cooling
115963 04/23/06 16:34 muether Analysis: Comparison of runs before and after Herberts wall
115962 04/23/06 16:14 ellis Day Shift Summary
115961 04/23/06 16:11 cdaq Beam Time Accounting
115959 04/23/06 16:06 suleiman Beam: IHWP Changed to IN, Ran flipper
115958 04/23/06 16:03 suleiman/ell Beam: IA Scan
115956 04/23/06 15:58 ellis g0cagetemp alarm
115955 04/23/06 15:50 suleiman Beam: PITA Slopes for OUT (29005)
115953 04/23/06 15:12 suleiman/ell Beam: PTA Scan ... IHWP=OUT
115951 04/23/06 14:57 ramsay More pictures of the diagnostic wall
115950 04/23/06 14:33 ellis cerenkov 1 oct 6 tripped
115947 04/23/06 14:09 ellis End of Run 29003
115945 04/23/06 13:32 mack lumi carbon rise at low beam currents: least count again?
115944 04/23/06 13:28 ppillot/furg pictures of the shielding wall
115943 04/23/06 13:24 ppillot Analysis: Comparison between target out runs with and without magnetic field
115939 04/23/06 12:01 ellis Intermittent alarm that "G0 or G0B wire readouts appears STUCK!!!"
115936 04/23/06 10:38 ellis Coda back
115934 04/23/06 10:31 ellis DAQ problems
115931 04/23/06 09:52 ellis Oct 6, Cer 1 Tripped
115928 04/23/06 09:02 ramsay Corrected Sunday morning report
115927 04/23/06 08:23 ramsay Sunday morning RC report
115926 04/23/06 08:15 Ramsay Sunday-Monday runplan
115923 04/23/06 08:01 cdaq Beam Time Accounting
115922 04/23/06 07:54 S. Bailey Owl Shift Summary
115919 04/23/06 06:35 S. Bailey Ask MCC to Reboot IOCSE20
115915 04/23/06 06:10 S. Bailey Halo Rates to the Moon!
115913 04/23/06 05:39 S. Bailey Intermittent alarm that "G0 or G0B wire readouts appears STUCK!!!"
115912 04/23/06 05:24 S. Bailey CODA: End of run failed, CODA crashed
115906 04/23/06 04:53 ppillot Analysis: Threshold study for French and NA CED/FPD
115903 04/23/06 03:07 S. Bailey HV trip on Octant 6 Cherenkov 1
115902 04/23/06 03:02 S. Bailey Analysis: Summary of my analysis on the double peak structure
115901 04/23/06 02:56 S. Bailey Beam: Halo/Lumi HV silenced after HV trip
115898 04/23/06 01:39 S. Bailey Beam: Beam trip -> HV Trip
115895 04/23/06 00:42 S. Bailey Beam: IHWP now OUT
115892 04/23/06 00:07 cdaq Beam Time Accounting
Saturday
115891 04/22/06 23:57 Bosted Swing shift summary
115888 04/22/06 23:24 J.W. Martin shift checklist scans
115883 04/22/06 20:31 Bosted Strange-looking FPD/CED pattern for no-target runs
115882 04/22/06 20:27 Bosted Target for runs 28980 to 83 is really "out of beam"
115880 04/22/06 20:21 J.W. Martin Target: target in
115872 04/22/06 19:21 Bosted HV trip Octant 6, CER 1
115871 04/22/06 19:16 J.W. Martin Target: target out
115857 04/22/06 17:58 ellis graph info
115856 04/22/06 17:53 ellis graphs of beam parameters vs run number
115842 04/22/06 16:18 cdaq Beam Time Accounting
115838 04/22/06 16:02 benesch shift summary
115824 04/22/06 13:38 Goulven Target: conditionned air temperature limit change
115815 04/22/06 09:06 ramsay Saturday Morning RC report
115812 04/22/06 08:09 ppillot HV change for French and North-American CED/FPD PMTs
115811 04/22/06 08:05 cdaq Beam Time Accounting
115810 04/22/06 08:04 Franklin Owl Shift Run Summary
115809 04/22/06 08:01 ramsay note to Owl shifters - "daily PZT monitoring"
115806 04/22/06 07:37 ramsay Run Plan for Saturday
115799 04/22/06 04:25 Franklin Correction to Correction
115798 04/22/06 04:18 Franklin Correction to run 28949 comment
115791 04/22/06 01:33 Breuer Prediction of anode currents for LD2; needed change of gain
115788 04/22/06 00:11 suleiman Swing Shift Summary
115787 04/22/06 00:09 cdaq Beam Time Accounting
115786 04/22/06 00:05 suleiman Beam: New Epics Constants
Friday
115785 04/21/06 23:58 suleiman BCM/BPM Calibration constants
115783 04/21/06 23:51 suleiman Beam: IHWP is Changed to OUT, Ran Flipper
115780 04/21/06 22:48 muether SMS: Comparison of run with and without Herberts wall
115779 04/21/06 22:48 suleiman Beam: BCM/BPM Calibration
115777 04/21/06 21:42 Breuer ACM measurements, good beam, 53 to 60 uA, LH2 target
115776 04/21/06 21:26 suleiman Beam: Charge Asymmetry and Position Differences for runs: 28937 & 28939 ... IN
115775 04/21/06 21:07 pking Analysis: Installed the new G0Analysis version on the gzero account
115772 04/21/06 19:51 suleiman Beam: G0B Raw Signal at 60 uA (from run 28937)
115771 04/21/06 19:48 suleiman Target: Something wrong with C07A Y+
115770 04/21/06 19:39 suleiman Beam: Charge Asymmetry and Position Differences for runs:28932-28936 ... OUT (at IN Settings)
115766 04/21/06 18:52 ellis Target: Target at 19
115763 04/21/06 18:10 ellis Target: Target at 19.5 K
115762 04/21/06 18:03 suleiman Beam: Lost communication with iocse20
115758 04/21/06 16:47 ramsay New RC contact information
115757 04/21/06 16:46 suleiman Beam: Halo rates
115756 04/21/06 16:41 Lassiter Cryo burps
115755 04/21/06 16:38 ramsay Halfwave Plate IN
115754 04/21/06 16:21 suleiman Beam: Hall C Current Reading (53.2) vs. MCC Current Reading (59.7 uA)
115751 04/21/06 16:01 cdaq Beam Time Accounting
115750 04/21/06 15:55 benesch shift summary
115747 04/21/06 14:34 S. Bailey Analysis: Coil Modulation - Yup, we are scraping
115746 04/21/06 14:26 muether SMS: Cryo Upset
115745 04/21/06 14:25 spwells Octant 6 Cerenkov 1 trip
115743 04/21/06 14:19 Fatiha Lumi Results From DataBase and Ntuple
115742 04/21/06 14:17 ppillot Analysis: double peak study from LH2 target runs (fastbus data)
115739 04/21/06 12:23 muether SMS: LHe Level stabalized...try to ramp again
115738 04/21/06 11:16 muether SMS: Another Slow Dump
115737 04/21/06 11:00 gaskell Moller cooldown complete
115736 04/21/06 10:41 muether SMS: Ramp SMS back to 3500A
115735 04/21/06 10:23 benesch Beam: energy lowered when A went to fourth pass
115734 04/21/06 10:08 spwells Thursday/Friday RC Report
115733 04/21/06 09:31 gaskell Moller cooldown: switching to cold return
115732 04/21/06 08:37 ppillot Analysis: comparison of coincidence rates before and after the shielding wall was built
115731 04/21/06 08:34 muether SMS: More on slow dump
115730 04/21/06 08:13 muether SMS: Slow Dump
115729 04/21/06 08:09 cdaq Beam Time Accounting
115728 04/21/06 08:08 Bosted Owl shift summary
115724 04/21/06 07:42 Bosted Beam on/off sound box broken
115723 04/21/06 07:39 Bosted BCM display frozen
115722 04/21/06 07:25 gaskell Begin Moller cooldown
115719 04/21/06 06:26 ppillot double peak study from the target out run 28924 (fastbus data)
115718 04/21/06 06:24 Bosted Beam: Beam halo
115715 04/21/06 04:31 Bosted Analysis: Octant 6, Cerenkov 1 HV trip
115713 04/21/06 03:39 ppillot effects of the shielding wall on the rates in target out runs
115712 04/21/06 03:23 Bosted Beam: Charge feedback turned on
115709 04/21/06 02:33 Breuer NA Scaler matrices EMPTY! -->Cycle power on encoder/decoder VME crates<--!!! Run 28929.
115708 04/21/06 02:03 Breuer Octant 5, mult. switch bad, single photon = electron for last few runs, repaired during run 20930
115700 04/21/06 00:09 cdaq Beam Time Accounting
115698 04/21/06 00:00 Armstrong Swing Shift Summary
Thursday
115697 04/20/06 23:59 ellis Target: LH2 target In
115691 04/20/06 22:11 Armstrong The CFD hit patterns
115690 04/20/06 22:02 muether SMS: Picture of the recent cooldown
115689 04/20/06 22:00 Armstrong The matrix...
115688 04/20/06 22:00 ellis Target: Target HPH gui reading
115687 04/20/06 21:46 ellis Target: Target at 19, gui problem
115686 04/20/06 21:42 muether SMS: Magnet Ramped to 3500A
115684 04/20/06 21:30 Armstrong cdaql6 rebooted
115683 04/20/06 21:28 Armstrong How to: launch edm to see fancy halo monitor
115682 04/20/06 21:24 muether SMS: rebooted cdaql6 Epics variables now updating.
115681 04/20/06 21:18 muether SMS: Not reading in EPICS variable
115680 04/20/06 20:59 muether SMS: Slowly Ramping Up
115678 04/20/06 20:33 Armstrong Realtime:a look at the CFD TDC hits
115677 04/20/06 20:26 ellis Target: Lowered target temp to 19.5
115675 04/20/06 19:43 ramsay cerenkov anode current
115674 04/20/06 19:23 Armstrong Beam: Halo monitors better than golden
115673 04/20/06 19:19 ellis Beam: Gaskell plot following tune
115672 04/20/06 19:17 Armstrong Beam: Beam positions
115671 04/20/06 19:08 Armstrong Beam: Halo and paddle rates with beam current
115670 04/20/06 19:08 Armstrong Halo picture at 37 µA
115669 04/20/06 19:06 ellis Beam: Paddle strip readout during beam tune
115668 04/20/06 19:05 Armstrong Beam: Halo and paddle rates with beam current
115667 04/20/06 18:18 spwells Status and Run Plan - Mini RC report
115666 04/20/06 18:18 ellis Target: Target is out
115665 04/20/06 18:17 ellis Target: target
115664 04/20/06 18:14 Armstrong Target: Target ready; moved out for tuning
115663 04/20/06 17:39 smithg Target: Target cool down finished
115662 04/20/06 17:07 S. Bailey Analysis: New distances for theta x and theta y calculations
115661 04/20/06 16:35 S. Bailey Analysis: Linear Regression - Now we're cookin
115660 04/20/06 16:30 smithg Target: Completed transition to cold return
115659 04/20/06 14:26 muether SMS: VCL Flow
115658 04/20/06 14:05 smithg Target: STarted to open JT
115657 04/20/06 12:46 smithg Target: Put "LH2" tgt IN, rebooted IOC, restarted archiver
115656 04/20/06 12:44 Fatiha Analysis: Work Disk is Full
115655 04/20/06 12:28 smithg Target: Started 15K target cooldown procedure
115654 04/20/06 12:20 muether SMS: SMS Cooldown Status - Back in PID
115653 04/20/06 11:55 muether SMS: SMS Switchover to cold return sucessful
115646 04/20/06 09:13 muether SMS: SMS Cooldown Status
115645 04/20/06 07:24 real Trying to use fastbus data for cerenkov efficiency determination
115644 04/20/06 06:30 Breuer Beam status; possibly delayed until day shift.
115643 04/20/06 04:49 Breuer beam status
115642 04/20/06 03:42 muether SMS: SMS Cooldown Status
115641 04/20/06 00:12 muether SMS: SMS Cooldown Status
Wednesday
115639 04/19/06 22:25 Breuer NA Cerenkov relative timing with Cosmics
115638 04/19/06 21:09 Breuer Cahnges for NA CED-9 signals / preamplifiers / capacitive couplers
115637 04/19/06 20:29 Breuer Delayed 12 of 16 NA Cerenkov signals into ARS
115636 04/19/06 20:27 Breuer Added 3 more NA Fastbus trigger TDC channels
115635 04/19/06 20:17 muether SMS: SMS Cooldown Status
115631 04/19/06 19:58 ellis Lumi Carbon run
115630 04/19/06 19:54 Fatiha Coda Configuration with G0inj
115629 04/19/06 19:50 Fatiha Integrity of the Coil Modulation in CODA / Changing the Online starting event.
115628 04/19/06 19:50 ellis HV gui error msg
115614 04/19/06 18:28 suleiman Beam: Coil Modulation is now launched by CODA
115612 04/19/06 18:23 muether SMS: Problems switching to cold return
115603 04/19/06 17:28 smithg Target: moved tgt out
115595 04/19/06 15:18 smithg Target: target cooldown plans for tomorrow
115594 04/19/06 15:06 vulcan Beam: clarification
115593 04/19/06 14:49 ellis Lumis vs Beam position
115592 04/19/06 14:38 vulcan Removal of protector cover for raster magnet
115591 04/19/06 14:09 muether SMS: Reservior Level at 45%
115590 04/19/06 13:46 S. Bailey Analysis: More linear regression
115589 04/19/06 13:12 Maud Analysis: Coinc count rates vs B field analysis
115588 04/19/06 12:39 mueter SMS: Level apearing in the reservior
115587 04/19/06 12:37 mueter SMS: JT6 Opened to 55%
115586 04/19/06 12:24 ppillot PMT Threshold for French and NA CEDs
115585 04/19/06 11:56 suleiman Beam: This will only give us more level arm to measure the angle of the beam at G0 target - Will not change how the beam hits the target
115584 04/19/06 11:48 muether SMS: Increase JT6 to 50%
115583 04/19/06 11:44 suleiman Beam: Using one of the Pivot BPMs - Pahse advance is good now
115582 04/19/06 11:21 muether SMS: CC Vacuum
115581 04/19/06 11:17 muether SMS: Switch over to JT6
115578 04/19/06 09:10 muether SMS: Cooling Down
Tuesday
115577 04/18/06 23:35 muether SMS: SMS vacuum status
115576 04/18/06 23:33 muether SMS: LN2 back on PID
115575 04/18/06 21:30 Goulven NA ARS : problem solved.
115572 04/18/06 19:58 muether SMS: Plug Valve Frozen Shut
115571 04/18/06 17:07 S. Bailey Analysis: Linear Regression continued
115567 04/18/06 16:59 muether SMS: LN2 Status
115566 04/18/06 16:51 suleiman Beam: Start Slugs Counting: Charge Asymmetry and Position Differences vs. Slug Number
115565 04/18/06 16:14 gaskell more quads a bad idea
115564 04/18/06 14:29 spwells Hall C optics and angle differences
115563 04/18/06 14:01 suleiman Beam: G0B Y+ & Y- signals are now fine
115562 04/18/06 13:29 S. Bailey Analysis: Linear Regression
115545 04/18/06 11:55 S. Bailey New distances inserted into analyzer
115544 04/18/06 11:15 spwells Pseudo RC report for Monday/Tuesday
115543 04/18/06 09:30 muether SMS: cc Vaccum alarm raised
115542 04/18/06 09:16 muether SMS: Previous Cool-down curves
115541 04/18/06 06:54 muether SMS: Vaccum CC Alarm
115540 04/18/06 01:21 muether SMS: LN2 status
Monday
115539 04/17/06 23:44 Breuer returned NA trigger to normal CED/FPD coinc.
115538 04/17/06 23:42 Breuer Added TDC signal for NA fastbus trigger
115537 04/17/06 21:28 Breuer NA trigger currently any CED from trigger/splitter module!
115536 04/17/06 21:27 Breuer HV off
115534 04/17/06 21:18 Fatiha/Goulv NA ARS : problem solved ?
115533 04/17/06 21:17 Fatiha/Goulv NA ARS : problem solved ?
115532 04/17/06 21:14 cellis Lumi graph
115529 04/17/06 20:50 suleiman Beam: An example of good phase advace from Happex
115526 04/17/06 20:32
115525 04/17/06 20:15 muether SMS: LN2 Status
115522 04/17/06 19:12 muether SMS: LN2 Status
115521 04/17/06 18:56 Fatiha/Goulv Changed the delay in the readout of the ARS.
115515 04/17/06 17:17 muether SMS: LN2 Flow low, Level dropping
115514 04/17/06 16:09 M Jones Beam: Beam Energy Measurement
115513 04/17/06 15:55 suleiman Beam: The run number for the last OUT state.
115512 04/17/06 15:52 suleiman Beam: Charge Asymmetry and Position Differences for runs: 28864-28877 ( OUT)
115511 04/17/06 15:20 suleiman Beam: We still have problem with G0B Y+ & Y-
115504 04/17/06 13:38 ellis Lumi cal and boiling plots--quick look
115502 04/17/06 12:47 suleiman Beam: G0B Autogain Max
115501 04/17/06 12:44 carlini Beam: Cu Disk
115500 04/17/06 12:14 suleiman Beam: Phase Advance in Hall C Line
115497 04/17/06 09:56 cdaq Beam Time Accounting
115496 04/17/06 08:58 spwells No RC report for Sunday/Monday
115495 04/17/06 08:54 spwells Potential uses of beam during down time
115494 04/17/06 08:50 spwells The Skinny on the ESR Failure
115493 04/17/06 01:12 muether SMS: LN2 back on PID control
115492 04/17/06 01:03 muether Analysis: Asymmetries since new cuts and "good" beam
Sunday
115491 04/16/06 23:15 muether SMS: LN2 Level recovering
115490 04/16/06 22:35 Muether SMS: LN Level dropped below 50%
115489 04/16/06 20:53 Breuer Shall we remove "HALO ENHANCER" disk from beam line?
115488 04/16/06 20:45 Breuer changed NA ARS trigger signal width/delay, beginning of run 28880
115487 04/16/06 19:17 ppillot position where the straight line between CEDi and FPDj crosses the beam axis
115485 04/16/06 18:47 Breuer HV: removed SMS interlock cable, turned on HV
115484 04/16/06 17:13 muether SMS: Closed Jt4
115483 04/16/06 15:44 muether SMS: 4K Helium stopped
115482 04/16/06 14:58 neven If you want to know more:
115481 04/16/06 14:43 neven Day shift summary
115480 04/16/06 14:34 gaskell warming up Moller
115479 04/16/06 13:58 tforest Target: Performed Warm up procedure
115478 04/16/06 13:56 neven Good news and bad news.
115477 04/16/06 12:28 spwells coincidnece matrices for 12C
115476 04/16/06 12:27 spwells coincidnece matrices for 12C
115475 04/16/06 11:55 neven Target saga
115473 04/16/06 11:25 spwells 12C target run and ABU's
115472 04/16/06 10:53 tforest Target: Lost Hydrogen target
115471 04/16/06 10:42 spwells RC report for Saturday/Sunday
115469 04/16/06 10:10 tforest Target: 15 K LHe supply warming up
115468 04/16/06 09:28 gzero ASCS summary for Sat Apr 15 2006
115467 04/16/06 09:10 neven RF Cavity Problem
115466 04/16/06 08:50 neven IWHP was changed and fliper was runned. Current status: INN
115465 04/16/06 08:49 neven PzT Test
115463 04/16/06 08:29 neven Reduced beam current. Helium cullant problem.
115462 04/16/06 08:03 seva owl hift summary
115461 04/16/06 08:03 cdaq Beam Time Accounting
115460 04/16/06 07:32 ppillot Target: increase of the coolant temperature
115448 04/16/06 02:03 seva RF whole zone triped, no beam for 30 min
115444 04/16/06 00:01 cdaq Beam Time Accounting
Saturday
115443 04/15/06 23:49 suleiman Swing Shift Summary
115440 04/15/06 23:28 suleiman Beam: A Coil Modulation Cycle from run 28869
115439 04/15/06 22:39 gzero ASCS summary for Fri Apr 14 2006
115437 04/15/06 22:37 suleiman Beam: Coil Modulation Run 28869
115433 04/15/06 21:53 Breuer Adjusted NA Cerenkov 7 timing, Cerenkov 1,2 width during run 28867
115428 04/15/06 19:49 suleiman Beam: Feedback How-to
115427 04/15/06 19:23 suleiman Beam: Charge Asymmetry and Position Differences for IN - 60 uA
115426 04/15/06 19:20 Breuer empty target background, geometric origin
115423 04/15/06 17:58 suleiman Beam: Charge Asymmetry and Postion differences for OUT - 60 uA
115420 04/15/06 17:32 suleiman Beam: The width of postion Differences in Hall C
115419 04/15/06 17:10 Breuer Paddle strip charts 15-April-2006, 16:55
115418 04/15/06 16:58 suleiman Beam: Charge Asymmetry and Position differences for runs: 28842-28854 (IN - ad PC HV & angle)
115417 04/15/06 16:37 cdaq Beam Time Accounting
115415 04/15/06 16:36 suleiman Beam: Change IHWP to OUT, Ran Flipper, Start run 28864
115413 04/15/06 15:51 neven Day Shift Summary
115404 04/15/06 12:20 neven Correction: beam 60,50,40,25,10 uA
115402 04/15/06 12:07 neven Target boiling studies
115400 04/15/06 12:05 ppillot Time difference between Cerenkov and CED/FPD in the Fastbus TDCs
115399 04/15/06 11:32 ppillot Analysis: coincidences counting rates from target out run and WITHOUT HALO MONITOR
115397 04/15/06 10:50 neven RF Problem
115395 04/15/06 10:40 spwells RC Report Friday/Saturday
115392 04/15/06 10:31 cdaq Beam Time Accounting
115391 04/15/06 10:30 cdaq Beam Time Accounting
115389 04/15/06 09:23 neven RF Cavity off
115385 04/15/06 08:23 neven Laser Polarization and Parity Control
115384 04/15/06 08:08 cdaq Beam Time Accounting
115383 04/15/06 08:08 vipuli Owl Shift Summary
115374 04/15/06 03:44 ppillot Analysis: ... if you want t compare with a previous target out run
115371 04/15/06 03:02 Breuer Oct 7 Cernkov discr. signal short; change for run 28847,28848,28849 ff (now formatted)
115370 04/15/06 03:00 Breuer Oct 7 Cernkov discr. signal short; change for run 28847,28848,28849 ff
115363 04/15/06 01:41 ppillot Analysis: coincidences counting rates from target out run
Friday
115355 04/14/06 21:44 Breuer changed some NA Cerenkov HVs for gain matching
115354 04/14/06 21:33 T>A> Forest Target: Target out runs at 40 microamp
115350 04/14/06 20:15 Korkmaz Target: Target changes
115348 04/14/06 19:55 wells/zorani More tomfoolery with the NA electronics
115343 04/14/06 19:21 ellis lumi pedestals
115342 04/14/06 18:52 spwells Weekend run plan
115341 04/14/06 18:37 Goulven/pkin Changed NA ARS trigger signal during run 28837.
115338 04/14/06 17:44 T.A. Forest Analysis: rubbon cable dislodged
115337 04/14/06 17:12 suleiman Beam: Charge Asymmetry and Position Differences for run 22823-28833 (OUT, 60 uA)
115334 04/14/06 16:41 smithg Target: Planned date to switch to deuterium
115333 04/14/06 16:31 smithg Target: Target logger has been dead all week
115332 04/14/06 16:02 cdaq Beam Time Accounting
115329 04/14/06 15:54 neven Day shift summary
115328 04/14/06 15:47 suleiman Beam: G0B plots from a good compared to bad run
115327 04/14/06 15:02 suleiman Beam: We are still having problems with G0 and G0B
115326 04/14/06 15:00 neven New threshold file
115323 04/14/06 14:23 Fatiha Analysis: DataBase
115320 04/14/06 13:50 neven PzT Test
115317 04/14/06 12:46 neven HV Octant6 Cerenkov 1 Tripped during this run
115316 04/14/06 12:29 mack electrons at JLab are (fortunately) not exactly minimum ionizing
115314 04/14/06 11:54 neven High Voltages OFF
115312 04/14/06 11:45 Goulven Information : What does an ARS look like ?
115311 04/14/06 11:44 mack mack
115310 04/14/06 11:42 suleiman Beam: Here how it looks for runs 28820 and 28822
115309 04/14/06 11:38 suleiman Beam: Charge asymmetry and Position Differences for run 28821 (IN)
115308 04/14/06 11:33 spwells RC Report for Thursday/Friday
115307 04/14/06 11:25 neven Fast Feedback
115306 04/14/06 11:23 real Energu loss in simulation for pions and electrons
115305 04/14/06 11:14 Serge comments on double peak in ADC spectra
115304 04/14/06 10:43 suleiman Beam: The width of G0 and G0B position differences are back to normal
115299 04/14/06 08:04 vipuli Owl shift summary
115298 04/14/06 08:03 cdaq Beam Time Accounting
115296 04/14/06 07:57 ppillot Analysis: lost and random coincidences at 60 uA beam current before and after halo problem was solved
115295 04/14/06 07:32 ppillot Analysis: 2 pic in ADC spectra using Cerenkov !
115283 04/14/06 02:39 vipuli Half Wave Plate ( Laser polarization and Parity control GUI)
115282 04/14/06 02:35 vipuli Half wave plate OUT
115278 04/14/06 00:41 Beck Swing shift summary 13 Apr 2006
115276 04/14/06 00:09 cdaq Beam Time Accounting
Thursday
115275 04/13/06 23:25 Breuer octant 2, cerenkov 2 disconnected during run 28819
115274 04/13/06 23:23 Breuer Cerenkov anode c. with new 60 uA beam; comparison with rate
115269 04/13/06 22:40 Beck Beam: Instructions for beam charge and position feedback monitor screen
115266 04/13/06 21:18 mack ... which suggests the Cerenkov gains are stunningly high
115265 04/13/06 21:13 Beck Analysis: Another try at plot
115264 04/13/06 20:48 Beck Beam: Progress on 60 uA beam
115263 04/13/06 20:39 Beck Analysis: Another try with the figure
115262 04/13/06 20:35 Beck Analysis: Preliminary look at field scan data
115259 04/13/06 20:10 Korkmaz Target: Alarm limits change
115258 04/13/06 20:05 Korkmaz Target: LH2 in @ 60 microA
115254 04/13/06 19:46 muether Analysis: One last try
115252 04/13/06 19:44 muether Analysis: plot
115251 04/13/06 19:41 muether Analysis: Cut definition
115250 04/13/06 19:41 muether Analysis: Cut definition
115249 04/13/06 19:41 muether Analysis: Cut definition
115248 04/13/06 19:28 S. Bailey Beam: double peak structure: my final and failing attempt to shed some light
115246 04/13/06 18:56 Korkmaz Target: Carbon target in
115245 04/13/06 18:13 Breuer
115244 04/13/06 17:41 suleiman Beam: The raw signals of G0 and G0B for a good and a bad run
115243 04/13/06 17:40 Maud, Philip Final GainMatching Overview
115242 04/13/06 17:30 suleiman Beam: The Width of G0 & G0B Position Differences became large since Saturday April 07, 2006
115241 04/13/06 17:16 gaskell Spin dance results
115240 04/13/06 16:57 gaskell Moller backout
115239 04/13/06 16:56 gaskell Spin dance run summary
115238 04/13/06 16:51 Korkmaz Helium bottle
115237 04/13/06 16:42 mack Stephanie's TDC peaks
115232 04/13/06 16:03 cdaq Beam Time Accounting
115231 04/13/06 15:57 benesch shift summary
115230 04/13/06 15:39 suleiman Beam: Charge Asymmetries and Position Differences - Summary
115223 04/13/06 14:51 ppillot Study of lost and random coincidences at different FW positions (2 in and 4 in)
115222 04/13/06 14:49 suleiman Beam: Charge Asymmetries and Position Differences for runs: 28805, 28806, 28807, 28808, 28810, 28811 (IN)
115215 04/13/06 14:09 suleiman Beam: Charge Asymmetries and Position Differences for runs: 28793, 28794, 28795, 28796, 28804 (OUT)
115214 04/13/06 13:32 mack general PID efficiency comment
115212 04/13/06 12:50 muether Analysis: 4in Field Scan Study
115204 04/13/06 12:02 saw Beam: BCM calibration entered into EPICS
115203 04/13/06 11:46 suleiman Beam: Since we are doing moller, I changed the IA back to 5.3
115202 04/13/06 11:46 Carlini Analysis: Figure of merit plots
115201 04/13/06 11:44 gaskell Moller setup
115200 04/13/06 11:39 suleiman Beam: IHWP was changed to IN but flipper was not run
115195 04/13/06 10:28 spwells Wednesday/Thursday RC Report
115194 04/13/06 10:28 S. Bailey Analysis: Double peaks structure -> contribution by electrons and "not" electrons
115187 04/13/06 08:04 vipuli Owl Shift Summary
115186 04/13/06 08:03 cdaq Beam Time Accounting
115185 04/13/06 07:34 Fatiha Reseted Roc7
115179 04/13/06 05:57 Serge Cherenkov PMT anode current
115177 04/13/06 05:40 Serge Suggestion ...
115156 04/13/06 00:20 Beck Swing shift summary
115153 04/13/06 00:08 cdaq Beam Time Accounting
Wednesday
115152 04/12/06 23:39 Breuer files and thresholds for Cerenkov threshold scans tonight
115147 04/12/06 21:46 muether Analysis: 4in field scan study
115146 04/12/06 21:05 Beck Increase prescale for production run 28794
115143 04/12/06 21:02 Beck Production - try to increase to 45 uA for next run - drop back to 40 uA
115142 04/12/06 20:33 Beck Charge feedback turned on at ~20:30
115141 04/12/06 20:10 Beck Beam: Hall C fast position feedback is off
115140 04/12/06 20:03 Beck Oops
115139 04/12/06 19:53 muether Analysis: Pion Asymmetry Plots
115136 04/12/06 19:45 muether Analysis: More asymmetry plots (ela,sup,inel)
115135 04/12/06 19:44 Beck Back to production running
115129 04/12/06 19:27 Korkmaz Target: Target pump speed
115127 04/12/06 19:21 muether Analysis: Asymetries Averaged over octants by run
115125 04/12/06 19:05 Korkmaz Target: Target pump speed
115123 04/12/06 18:59 pking Added g0rate9 and g0rate10 to the epics.dictionary for CODA
115122 04/12/06 18:50 Beck Target boiling baseline
115121 04/12/06 18:48 spwells Run plan for Wednesday/Thursday
115119 04/12/06 18:41 suleiman Beam: BCM Calibration plots for GAIN=3
115118 04/12/06 18:35 Breuer Paddle anode current readings during BCM calibration: 3% of beam current
115116 04/12/06 18:32 suleiman Beam:
115115 04/12/06 18:30 Beck Completing BCM (lumi) calibration
115114 04/12/06 18:23 Korkmaz Target: Target
115113 04/12/06 18:20 S. Bailey Beam: New BCM Pedestals with BCM gain = 3
115112 04/12/06 18:20 Breuer New EPICs variable for Paddle current
115111 04/12/06 17:39 S. Bailey Beam: New BCM/BPM Calibrations Entered Into Database
115110 04/12/06 17:34 suleiman Beam: Charge Asymmetry and Position Differences for run:28757-28762 (IHWP=OUT)
115109 04/12/06 17:21 smithg Target: changed target helium bottle, went back to house helium
115108 04/12/06 17:20 Korkmaz Target: Target
115105 04/12/06 16:30 saw Beam: Beam current rough calibration
115104 04/12/06 16:26 Beck BCM (lumi) calibration, LH2 target
115103 04/12/06 16:01 cdaq Beam Time Accounting
115102 04/12/06 15:57 benesch shift summary
115100 04/12/06 15:49 suleiman Beam: Change gain on BCM1 and BCM2 to 3 from 2.
115099 04/12/06 15:37 suleiman Beam: Charge Asymmetry and Position Differences for run:28731-28739 (IHWP=IN)
115098 04/12/06 15:35 Carlini Analysis: Suggestion
115096 04/12/06 14:36 mack belated notes: counting experiments with randoms
115095 04/12/06 13:07 S. Bailey Beam: Error in run comment line : Run 28785 is actually a BPM/BCM Calibration
115092 04/12/06 12:46 Maud, Philip Gain Matching Overview
115089 04/12/06 12:06 benesch Beam: VIP3H00G ion pump current is climbing again
115088 04/12/06 11:27 Carlini Beam: Lumi rate
115085 04/12/06 10:57 mack asymmetry width benchmarks needed
115081 04/12/06 10:39 ppillot Study of lost and random coincidences at 60 uA beam current
115079 04/12/06 10:33 mack headline: Ellis lumi data indicts halo for the crime of excess noise
115075 04/12/06 10:20 spwells Tuesday/Wednesday RC Report
115047 04/12/06 08:23
115045 04/12/06 08:23 Maud Target Reboot and pressure alarm lowered
115044 04/12/06 08:10 cdaq Beam Time Accounting
115042 04/12/06 08:04 vipuli Shift summary
115035 04/12/06 06:38 ppillot Target: decreased low alarm value of PT11 from 290 to 280
115030 04/12/06 04:21 ppillot Target: decreased low alarm value of PT11 from 300 to 290
115027 04/12/06 02:29 Breuer 60 uA beam with low halo rates makes dangerously high detector anode currents.
115026 04/12/06 02:28 ppillot Target: reduced He coolant flow
115022 04/12/06 01:11 Beck Swing shift summary 11 Apr 2006
115021 04/12/06 00:54 ellis beam parameter vs run number graphs
115019 04/12/06 00:42 ellis Lumi Data and Pedestals
115018 04/12/06 00:34 cdaq Beam Time Accounting
115017 04/12/06 00:05 ppillot Target: JT valve open a litle bit more
Tuesday
115014 04/11/06 23:46 breuer turned on and off IA feedback during run 28755
115013 04/11/06 23:38 Beck Anode current measurement, IHWP now OUT
115010 04/11/06 23:28 Beck Magnet ramped to 3500 A
115008 04/11/06 22:51 Beck Move ferris wheel to 4 in.
115006 04/11/06 22:22 Beck Run 28753 6 mm hole
115003 04/11/06 22:12 Beck Short baseline run at 60 uA, 11 halo 'target'
115002 04/11/06 22:07 Korkmaz Target:
115000 04/11/06 22:05 spwells modified overnight runplan
114998 04/11/06 21:52 Beck Stepped current run 28751
114997 04/11/06 21:52 Breuer Copy of text (entry 113920) for entry 113900: Anode current as function of FW location and Magnet current
114996 04/11/06 21:52 muether Analysis: Asymetries and asymetry widths
114994 04/11/06 21:32 Breuer test
114993 04/11/06 21:18 Breuer Collection of (some) effects of FW at 8 vs 2 inch setting
114991 04/11/06 21:10 Korkmaz Target: target change
114989 04/11/06 20:56 Beck Ramp beam current up in steps for lumi, LH2 target check
114986 04/11/06 20:16 Beck Beam: Beam back at 60 uA
114984 04/11/06 18:53 Beck Beam: Tuning for 60 uA!
114983 04/11/06 18:50 Breuer Dates and times of shielding installation phases
114982 04/11/06 17:54 spwells Tues Swing/Wed Owl shift run plan
114979 04/11/06 17:38 Fatiha A_Lumi3 versu A_Lumi(i) for some runs taken on saturday or sunday,
114978 04/11/06 17:31 suleiman Beam: Charge asymmetry and position differences for run 28702
114977 04/11/06 17:14 wells/warner NA electronics
114975 04/11/06 16:18 mack Target hypothesis: 1, Halo hypothesis: 0? and general suggestions for debugging
114974 04/11/06 16:07 cdaq Beam Time Accounting
114973 04/11/06 16:03 suleiman Beam: Charge Asymmetry and Position Differences for run 28602
114970 04/11/06 15:31 suleiman Beam: The results from others PBMs in Hall C for these runs
114968 04/11/06 15:14 benesch Beam: multiple possible causes of halo
114967 04/11/06 15:12 Fatiha ALUMI(i) Versus LUMI(j) Plots
114966 04/11/06 14:11 pking Analysis: Removed empty G0Pass1 files and reset the autoanalyzer for some runs from last night
114965 04/11/06 14:04 Serge RC Report Monday/Tuesday
114964 04/11/06 13:58 Maud, Philip Gain Matching Overview
114963 04/11/06 13:41 lumi oddness
114962 04/11/06 12:24 pking Analysis: Changed option list for G0Pass1 replay beginning for run 28747
114961 04/11/06 12:23 suleiman Beam: Charge Feedback was not working for these runs
114960 04/11/06 12:22 seva LUMI behaviour up to now
114959 04/11/06 12:12 suleiman Beam: Beam Quality for IN, Runs:28602-28607
114958 04/11/06 12:07 smithg Target: IOC reboot to implement some new heater algorithms
114956 04/11/06 11:53 Carlini Beam: LUMI noise
114955 04/11/06 11:51 smithg Target: Lumi widths unaffected by faster target fan speed
114954 04/11/06 10:47 mack G0 forward target .NEQ. G0 backward target
114953 04/11/06 09:59 Armstrong If it is boiling, how bad a problem is it?
114951 04/11/06 09:55 gaskell Reminder: Moller collimators are in (again - better format)
114950 04/11/06 09:52 gaskell Reminder: Moller collimators are in
114946 04/11/06 08:14 cdaq Beam Time Accounting
114941 04/11/06 07:59 seva owl shift summary
114940 04/11/06 07:58 jschaub Target: owl shift summary
114939 04/11/06 07:56 gzero ASCS summary for Mon Apr 10 2006
114938 04/11/06 07:56 seva it looks like they went up on monday after moller test
114937 04/11/06 07:48 seva lumi 1 RMS values in last couple of days
114932 04/11/06 06:07 jschaub Target: temperature fluctuations
114925 04/11/06 02:51 seva LUMI snapshot at 30uA run 28738
114924 04/11/06 02:50 jschaub Target: closing the JT valve
114922 04/11/06 01:53 seva running at 30uA
114916 04/11/06 01:29 Armstrong Target boiling?
114915 04/11/06 01:28 seva LUMI snapshot at 25uA
114913 04/11/06 01:23 seva LUMI snapshot at 30uA
114909 04/11/06 01:12 seva LUMI snapshot at 35uA
114908 04/11/06 01:01 seva LUMI snapshot at 40uA
114903 04/11/06 00:36 pking Analysis: Clearing space on the ROOT file directory; Don't run non-official analysis jobs on cdaq machines overnight
114900 04/11/06 00:28 Armstrong Snapshot of Lumis
114899 04/11/06 00:25 Armstrong Swing Shift Summary
114898 04/11/06 00:17 cdaq Beam Time Accounting
Monday
114897 04/10/06 23:53 Armstrong OK, that last problem was silly...
114896 04/10/06 23:42 Armstrong Why so few entries in asymmetry histograms?
114893 04/10/06 22:43 Armstrong Launch angle
114892 04/10/06 22:40 muether Analysis: Elastic Asymmetry vs Run Number for all octant
114889 04/10/06 22:16 Armstrong CED-FPD matrix
114888 04/10/06 22:11 Armstrong Second peak looks big too...
114887 04/10/06 22:03 Armstrong Lumi widths are crazy - why?
114886 04/10/06 21:47 Armstrong Snapshot of y position differences
114885 04/10/06 21:35 Armstrong Snapshot of X position differences
114882 04/10/06 20:44 wells/warner limited NA electronics success
114878 04/10/06 20:10 Serge RC report Sunday/Monday 04/09
114875 04/10/06 19:28 Armstrong bta aid is not working properly?
114874 04/10/06 19:01 Armstrong Coincidence matrix realtime snapshot
114872 04/10/06 18:46 Armstrong Halo snapshot at 45 uA
114871 04/10/06 18:40 Korkmaz Target: target change
114869 04/10/06 18:06 wells/warner NA electronics debugging
114867 04/10/06 17:34 ellis Updated beam assym plots
114866 04/10/06 17:33 Serge Run plan (my last ??) for swing and owl shifts
114865 04/10/06 17:10 Armstrong Comment on polarimetry result
114863 04/10/06 17:00 Goulven 58 ns delay for 4th PM, Octant 7
114862 04/10/06 16:52 Benesch Beam: backed out all Moller-related changes and still halo rates aren't back
114860 04/10/06 16:13 cdaq Beam Time Accounting
114859 04/10/06 16:06 ellis day shift summary
114858 04/10/06 16:00 suleiman Beam: A coil Modulation Cycle from run 28706
114857 04/10/06 15:33 suleiman Beam: A coil Modulation Cycle from run 28572
114856 04/10/06 15:26 ellis solenoid ramped down
114855 04/10/06 15:26 ellis beam accounting
114854 04/10/06 15:24 gaskell solenoid is off
114853 04/10/06 14:59 ellis beam current ioc tripped
114852 04/10/06 14:36 muether Analysis: Some more Asymmetry Plots
114849 04/10/06 13:48 ellis Plots of charge & position asymmetries vs run number
114847 04/10/06 12:56 gaskell Moller summary
114846 04/10/06 12:35 muether Analysis: Some Asymmetry Plots
114845 04/10/06 12:34 real Count in CED-FPD matrix normalized
114844 04/10/06 12:25 gaskell Moller backout
114843 04/10/06 12:19 gaskell Moller is tuned!
114842 04/10/06 12:11 gaskell Moller controls screen grab
114836 04/10/06 11:43 gaskell Put in 4 um foil
114830 04/10/06 10:50 mack impact of low efficiency on achieving counting statistics: probably negligible, except for the obvious
114826 04/10/06 10:12 gaskell Moller BPM positions
114824 04/10/06 10:03 pking When the ER3 is backed up, it may mean that there is something taking too much resources
114818 04/10/06 09:26 wells/warner replaced NA electronics boards/ALTERA chips
114816 04/10/06 08:10 gaskell Moller setup
114814 04/10/06 08:03 cdaq Beam Time Accounting
114813 04/10/06 08:02 seva CFD TDC hits
114812 04/10/06 08:00 seva owl shift summary
114811 04/10/06 07:42 jschaub Target: owl shift summary
114808 04/10/06 07:32 seva hall a changed IWHP state to IN; fliper was runed
114806 04/10/06 07:30 seva warning for ER3
114803 04/10/06 06:49 jschaub halo rates
114800 04/10/06 05:51 Target: target alarm
114799 04/10/06 05:34 seva coda froze; reboot
114787 04/10/06 00:09 Serge 11 and 6 mm halo target.
114785 04/10/06 00:07 beise Target: Swing Shift Target Summary
114784 04/10/06 00:02 cdaq Beam Time Accounting
114783 04/10/06 00:00 suleiman Swing Shift Summary
Sunday
114782 04/09/06 23:51 suleiman Analysis: Coinc Yield in (CED,FPD) for Target out of beam and 6mm halo target
114780 04/09/06 23:40 suleiman 6 mm Halo Target: running at 5 uA
114779 04/09/06 23:40 mack BCM gain settings: educated guess says 3 is okay, but Mark Pitt may know better.
114777 04/09/06 23:29 suleiman Move to 6 mm Halo Target
114775 04/09/06 23:11 suleiman Analysis: Coinc Yield in (CED,FPD) for Target out of beam and 11mm halo target
114774 04/09/06 22:47 Serge Run Plan for the end of swing and owl night shifts
114770 04/09/06 22:24 beise Target: Target is now out of beam
114766 04/09/06 20:37 suleiman Beam: Coil Modulation Run
114765 04/09/06 20:33 Serge RC Report Saturday/Sunday
114760 04/09/06 20:05 pking Analysis: Updated the analyzer on gzero account and the farm; run 28703 is the first run analyzed with this version.
114758 04/09/06 19:38 beise Beam: target temperature excursion
114757 04/09/06 19:29 suleiman Beam: BCM signal is small and the charge asymmetry is affected by the bit resolution
114753 04/09/06 18:10 pking Found a runaway runinfo2html process
114752 04/09/06 17:58 muether Analysis: Flyswatter minus target out with super elastic contribution removed
114749 04/09/06 16:45 cdaq Beam Time Accounting
114748 04/09/06 16:41 beise Target: Day shift Target summary
114747 04/09/06 16:35 beise Analysis: Summary of runs taken for Wells plot
114745 04/09/06 16:19 B. Quinn Day shift run summary
114743 04/09/06 15:50 beise Beam: restored IA to 5.3 V
114742 04/09/06 15:49 B. Quinn Beam: Hardware limit at 40uA ??
114741 04/09/06 15:48 muether Analysis: Flyswatter minus target out analysis
114740 04/09/06 15:42 B. Quinn Beam: Increasing to 45uA
114739 04/09/06 15:38 beise Target: Exercising the target
114738 04/09/06 15:37 suleiman Beam: IHWP Changed to OUT. Ran Flipper.
114736 04/09/06 14:59 Beise Beam: Changed IA DAC voltage to 9.3V
114735 04/09/06 14:58 beise Analysis: Asymmetry widths in Integrity Files
114734 04/09/06 14:45 pking Analysis: Found the autoanalyzers had gotten hung up.
114730 04/09/06 14:06 S. Bailey Beam: Changed IA to 1.5 DAC Volts
114728 04/09/06 13:59 pking Analysis: Added the "bf_tests" table to the gzero_back_comm1 database on g0dbserver
114726 04/09/06 13:32 S. Bailey Beam: Changed IA to 6.0 DAC Volts.
114724 04/09/06 13:24 pking Modifed the SIS3801 library to try to make the TS0/ROC31 readouts more robust
114723 04/09/06 13:15 ellis lumi pedestal change
114721 04/09/06 12:58 S. Bailey Beam: Wells plot -> IA set to 4 DAC V
114716 04/09/06 12:35 jroche Analysis: Asymmetry width in Integrity files
114714 04/09/06 12:02 Goulven Analysis: ARS overview : NA octants
114711 04/09/06 11:08 B. Quinn HV trip
114710 04/09/06 11:02 Goulven Analysis: ARS overview : french octants
114707 04/09/06 10:06 Serge Run plan for Sunday (if no new developments)
114706 04/09/06 09:51 beise Analysis: zeros in asymmetry histograms
114705 04/09/06 09:48 B. Quinn TS0 problems
114704 04/09/06 09:43 B. Quinn Beam: Increased to 40 uA
114703 04/09/06 09:41 beise,quinn Analysis: Asymmetry widths in Integrity Files
114698 04/09/06 08:04 seva owl shift summary
114697 04/09/06 08:03 cdaq Beam Time Accounting
114696 04/09/06 08:02 jschaub target owl shift report
114694 04/09/06 07:43 seva TS error
114692 04/09/06 07:25 seva CFD tdc hits screenshot
114690 04/09/06 07:18 seva beam back
114689 04/09/06 06:12 seva problems with liquid level in 2L10
114688 04/09/06 05:44 seva no beam; mcc have some problems; its going to take a while
114685 04/09/06 05:17 seva coda is stuck; end run failed
114683 04/09/06 04:33 seva octant 6 cerenkov 1 tripped
114681 04/09/06 04:30 seva TS error
114678 04/09/06 03:56 seva TS error
114676 04/09/06 03:01 seva TS error; end run
114674 04/09/06 02:23 jschaub halo rates with the fast feedback on
114673 04/09/06 02:22 seva TS error; end run
114672 04/09/06 02:21 seva MCC called, they want to use fast feedback to stabilize the beam
114670 04/09/06 02:18 seva G0BeamFeedback alarm due to IA voltage value; high value from alarm is set to low?
114663 04/09/06 00:43 seva magnet trip; MCC says a couple of minutes
114662 04/09/06 00:18 seva coda rates with fast clear ON are 85 Hz
114661 04/09/06 00:17 seva changed prescale factor to 1000; fast clear ON(enabled)
114660 04/09/06 00:17 seva TS error; coda is stuck ; reboot
114657 04/09/06 00:12 cdaq Beam Time Accounting
114656 04/09/06 00:01 Serge Mini-Run plan for the night
114655 04/09/06 00:00 mgericke swing shift summary
Saturday
114654 04/08/06 23:52 beise Analysis: g0beamfeedback is crashing and making big core files.
114653 04/08/06 23:46 mgericke Correction about previous message
114652 04/08/06 23:38 mgericke Beam: About previous two runs (feedback off)
114647 04/08/06 22:27 mack not so-o-o funky Moeller ridge
114645 04/08/06 21:28 mgericke CFD-TDC Plots from g0realtime for run 28674
114643 04/08/06 21:06 mgericke Beam: Bad Halo
114642 04/08/06 21:04 mgericke Beam: HWP switch
114641 04/08/06 20:57 mgericke High Voltage Change
114639 04/08/06 20:26 Goulven Analysis: duplicate ARS are back
114638 04/08/06 19:44 mgericke Continue production running at 34 muAmps
114637 04/08/06 19:43 mgericke DAQ problems with ending runs...
114634 04/08/06 19:27 Breuer added 3 ns delay cables in Octant 1, CED 8 left and right.
114633 04/08/06 19:22 Breuer Changed oct 7 PBP/LATCH/RESET time by -2ns
114629 04/08/06 19:09 mgericke Plot for run 28672
114628 04/08/06 19:08 mgericke Plots for run 28671
114627 04/08/06 18:59 mgericke Run 28670 CED_FPD coinc plots (Oct 7 delay cable tests)
114626 04/08/06 18:54 mgericke Oct 7 low efficiency tests
114625 04/08/06 18:53 Serge RC Report Friday/Saturday
114616 04/08/06 17:47 Serge ...
114615 04/08/06 17:34 pking Analysis: Modified the local version of G0Analysis and recompiled G0Scripts
114612 04/08/06 17:21 Fatiha Romoved Roc31 from the data stream
114611 04/08/06 16:39 Serge Halo rates and specific beam trip
114610 04/08/06 16:37 Serge PS4 = 2000, fastbus enable
114609 04/08/06 16:37 Brian Quinn Day shift summary
114608 04/08/06 16:32 cdaq Beam Time Accounting
114603 04/08/06 15:31 mack achieving counting statistics in counting experiments with large nonlinearities and large incoherent background fields
114602 04/08/06 15:01 B. Quinn Crashes of ROC31 (and TS0)
114598 04/08/06 14:11 beise, quinn Analysis: More disk cleanup under /net/cdaqfs/home and cdaql3 processes
114596 04/08/06 14:06 Furget Comment about Gremlin bkg
114595 04/08/06 13:45 Fatiha Cleaned up the core files in the /net/cdaqfs/home/gzero/ account
114588 04/08/06 11:26 Brian Quinn, Analysis: How to for shift takers error
114587 04/08/06 11:17 B. Quinn Beam: Halo target was found to be out
114586 04/08/06 11:15 Serge Halo rates decreasing steadely
114584 04/08/06 10:56 mack little bit of good news
114583 04/08/06 10:42 Serge Run plan for WE (intermediate)
114581 04/08/06 09:35 beise Beam: Follow up on Halo rates for Mark Pitt
114580 04/08/06 09:20 jschaub checklist question
114578 04/08/06 08:44 seva double peak in "time difference between CED and FPD"
114575 04/08/06 08:17 seva owl shift summary
114574 04/08/06 08:17 cdaq Beam Time Accounting
114573 04/08/06 07:56 jschaub Target: Target owl shift report
114571 04/08/06 07:39 seva TS and ROC 31 errors
114567 04/08/06 06:07 seva restarted CODA; end run failed
114558 04/08/06 03:19 seva BPM error still not fixed; getting beam back
114557 04/08/06 02:29 Breuer Restored Oct 7 CED8 to non-amplifier condition.
114556 04/08/06 02:04 Breuer Oct7-CED8 not present in coincidence matrix, source of problem not found yet
114555 04/08/06 01:50 seva hall in contolled access
114551 04/08/06 01:06 seva halo rates per uA at 30 uA halo target at 39.7 mm
114550 04/08/06 00:54 seva changed prescale to 2000
114545 04/08/06 00:15 Beise Target: Target swing shift report
114542 04/08/06 00:05 cdaq Beam Time Accounting
114541 04/08/06 00:02 mgericke swing shift summary
114540 04/08/06 00:01 mgericke Target: Halo Target is out
Friday
114535 04/07/06 23:29 mgericke Beam: BPMs not updating
114534 04/07/06 23:23 Serge RC report Thursday/Friday
114531 04/07/06 22:22 mgericke CFD-TDC Plots from g0realtime for run 28643
114530 04/07/06 22:07 mgericke Some detector plots for the current run (28643)
114527 04/07/06 21:13 beise Beam: Ask for 30 uA
114526 04/07/06 21:06 ellis Lumi setting change
114523 04/07/06 20:47 mgericke 20 microamps on LH2
114522 04/07/06 20:42 Beise Target: LH2 target is now in beam
114516 04/07/06 18:57 cdaq Beam Time Accounting
114515 04/07/06 18:56 muether Field Scans at 2" and 8" FW position
114511 04/07/06 18:13 benesch Beam: halo rates up again - gas desorbed during Moller attempts?
114507 04/07/06 17:40 tiefen Beam: HALLC:p apparent error was only "apparent"
114504 04/07/06 17:10 Breuer removed lead covering Octant 4 Ti window
114503 04/07/06 17:06 Beise Target: Temporary Target-on-Call information -- this weekend only
114502 04/07/06 17:03 Breuer Octant 3 Cerenkov 4 signal restored
114501 04/07/06 17:01 Beise Target: Erroneous heat load alarm (ghtot) while LH2 target is out of beam
114500 04/07/06 16:58 B. Quinn SMS: Removal of lead from cryostat exit window
114499 04/07/06 16:54 Beise Beam: Beam coming up, tuning
114497 04/07/06 16:21 B. Quinn Shift Summary for day shift
114496 04/07/06 15:51 mack coincidence matrix data vs simulation: a gremlin bkg, some weak cer.effi bounds, and CED9 oddness
114495 04/07/06 15:14 gaskell Moller summary
114494 04/07/06 15:03 Beise SMS: Ramping down SMS
114493 04/07/06 14:51 gaskell Late entry: Moller backout
114492 04/07/06 14:20 muether pi/e+pi ratio for flyswatter run
114491 04/07/06 14:17 mack target out cerenkov efficiency
114485 04/07/06 13:40 gaskell BCM 2 gain
114483 04/07/06 12:59 smithg Target: HP Heater current readback
114482 04/07/06 12:55 real cerenkov efficiency with no target
114480 04/07/06 12:36 real comparison with simulation (at 2 inches this time) with pions
114478 04/07/06 12:21 arvieux New default file for FR Cerenkov threshold
114477 04/07/06 12:19 S. Bailey Analysis: Correction to my previous entry 114473
114475 04/07/06 12:10 gaskell solenoid at 3 T
114474 04/07/06 11:50 ppillot News about the double peak structure w/wo Cerenkov
114473 04/07/06 11:47 S. Bailey Analysis: 2nd peak with target in and out
114472 04/07/06 11:15 real Elastic rates in measured coincidence is very closed to the simulation
114470 04/07/06 10:25 gaskell Moller target and collimator controls hosed
114469 04/07/06 09:43 gaskell Moller tune plot for solenoid off
114468 04/07/06 09:30 gaskell Ramping solenoid to 1 T
114466 04/07/06 09:01 pking Cleaned up some core files; please clean up your own.
114459 04/07/06 08:04 cdaq Beam Time Accounting
114458 04/07/06 08:03 gaskell cdaql3 problems
114457 04/07/06 08:02 pate Target: owl shift summary
114456 04/07/06 08:00 pate Target: moved LH2 target OUT to prepare for Moeller operation
114455 04/07/06 07:57 pate Target: odd recovery when no beam?
114454 04/07/06 07:57 seva owl shift summary
114453 04/07/06 07:57 gaskelld Moller setup
114452 04/07/06 07:45 seva target out; halo target out; Moeller commissioning
114451 04/07/06 07:31 Fatiha Long runs
114450 04/07/06 07:21 seva mcc called, one of magnet power supply triped; 15 min break
114445 04/07/06 06:12 seva same error again
114442 04/07/06 05:35 pate Beam: BPM screens
114441 04/07/06 05:24 pate multiple medm manifestations
114440 04/07/06 05:06 seva rebooted roc 31 because didnt respond
114437 04/07/06 04:41 seva error in TC and roc 31; reboot
114434 04/07/06 03:40 breuer oct 3 cerenkov 4 no signal
114429 04/07/06 02:12 Breuer New Cerenkov anode currents and average pulse hights
114428 04/07/06 02:06 seva no signal on cherenkov octant 3-4
114427 04/07/06 01:21 seva TS rebooted
114419 04/07/06 00:21 seva coda is stuck, kill, reboot
114417 04/07/06 00:19 Breuer HV changes for NA CED's 8 due to amplifier insertion
114414 04/07/06 00:06 Breuer HV changes for NA CED's 8 due to amplifier insertion
114413 04/07/06 00:04 arvieux Target: target summary Swing 04-07-06
114412 04/07/06 00:01 cdaq Beam Time Accounting
Thursday
114411 04/06/06 23:58 suleimn Swing Shift Summary
114410 04/06/06 23:56 suleimn Swing Shift Summary
114409 04/06/06 23:55 arvieux/breu Measured Cerenkov signal without beam
114408 04/06/06 23:53 jroche/breue Analysis: spot checked the output of G0Integrity against visual scaler : all fine
114405 04/06/06 23:50 pate SMS: ramped down to 3300 A
114403 04/06/06 23:22 arvieux SMS: SMS ramped up to 3500 A
114401 04/06/06 23:15 pking Analysis: I have restarted the autoanalysis processes on cdaql1, cdaql2, cdaql4.
114400 04/06/06 23:10 Breuer NA Cerenkov oct 1 ADC cable fallen out
114398 04/06/06 22:51 pking Analysis: The simple approach to get rates per microamp from the online/offline histograms is WRONG.
114397 04/06/06 22:42 arvieux SMS: SMS ramped down to 3100A
114396 04/06/06 22:29 Serge RC Report Wednesdat/Thursday
114393 04/06/06 21:56 ellis/breuer NA CED 8 Pre-amps installed
114391 04/06/06 21:22 tiefen Beam: Hall C beam energy HALLC:p has apparent systematic error
114387 04/06/06 20:06
114386 04/06/06 20:01 Serge Run plan for the night
114385 04/06/06 19:52 suleiman Beam: Adjust PC HV and RHW angle to match the OUT state. It was for the IN.
114384 04/06/06 19:42
114383 04/06/06 19:40 breuer Cerenkov rates with nearly no beam (run 28613)
114380 04/06/06 19:09 suleiman Beam: Wrong labels: The run number label is right but IHWP and RHWP is as in this entry
114379 04/06/06 19:03 Serge Nice summary by Joe of the work by accelarator people in hall today
114378 04/06/06 19:01 suleiman Beam: PITA Slopes for IN and OUT
114377 04/06/06 17:34 arvieux Target: SMS is at 3297 A, LH2 target IN, beam off
114375 04/06/06 16:51 S. Bailey Beam: Progression of Position Differences & Charge Asymmetry in Hall
114374 04/06/06 16:19 muether/breu Current Shielding Configuration upstream of the SMS
114373 04/06/06 16:12 muether Ferris Wheel pushed back to 2in pos. and plastic covers removed from all SMS exit windows.
114372 04/06/06 16:12 muether Ferris Wheel pushed back to 2in pos. and plastic covers removed from all SMS exit windows.
114371 04/06/06 16:09 B. Quinn SMS: Ramping up SMS
114370 04/06/06 16:09 vulcan Day Shift Summary
114369 04/06/06 16:04 cdaq Beam Time Accounting
114368 04/06/06 15:59 Pitt Recommended normalized halo rates - after voltage changes of April 6,
114367 04/06/06 15:31 S. Bailey Beam: Position Differences when charge feedback is turned off
114366 04/06/06 15:12 mack Multi-hit misc.
114365 04/06/06 15:05 ppillot display of single CFD counting rates versu octant
114364 04/06/06 14:59 arvieux SMS: Reconnected SMS interlock to sniper
114363 04/06/06 14:53 gaskell Re-installed lead shielding for Moller scintillators
114360 04/06/06 14:17 ppillot New double peak structure depending on the Cerenkov
114359 04/06/06 13:36 arieux SMS: Disconneted SMS from sniper
114357 04/06/06 13:20 muether lexan covers installed on octants 4,5,6
114354 04/06/06 12:56 Serge Work related to Moeller commissioning
114353 04/06/06 12:52 pking ASCS cleanup report
114352 04/06/06 12:44 mack Do randoms make G0 backward different from G0 forward? No, and Yes.
114351 04/06/06 12:08 B. Quinn SMS: Low current alarm
114350 04/06/06 11:56 cdaq Beam Time Accounting
114349 04/06/06 11:56 gaskell increased delay for Moller Memory write-strobe
114348 04/06/06 11:40 B. Quinn SMS: Ramping down SMS
114347 04/06/06 11:34 mack Do randoms make G0 backward different from G0 forward? No, and Yes.
114345 04/06/06 11:26 pking Problems with prescales last night were due to file permissions
114344 04/06/06 11:17 pking Analysis: Killed several analysis jobs on cdaql4; don't run batch analysis on Hall C CPUs
114343 04/06/06 11:11 Serge Help to have an "Instruction list for beginners"
114342 04/06/06 11:08 S, Bailey Beam: BPM/BCM Calibration 28545 : my thoughts
114341 04/06/06 11:05 seva here is the snapshot of NA cherenkov 1-1 for run 28609
114340 04/06/06 11:04 Serge Run plan for the day
114339 04/06/06 11:02 C. Furget Multi-hits versus beam current
114338 04/06/06 10:45 seva big rates for NA CER octant 1 tube 1, look TDC histogram
114336 04/06/06 10:25 S. Bailey Beam: Power surge yesterday: G0 Database is updating again
114334 04/06/06 09:27 B. Quinn Target: LH2 target in
114332 04/06/06 09:14 C. Furget Multi-hits shape and CED9
114331 04/06/06 09:04 vulcan fastbus monitoring triggers
114330 04/06/06 08:44 benesch halo calibration current
114329 04/06/06 08:34 B. Quinn Target: Changed to Carbon target
114327 04/06/06 08:09 seva owl shift summary
114326 04/06/06 07:45 pate Target: shift summary
114323 04/06/06 06:03 seva cherenkov tipr octsn 6-1
114320 04/06/06 05:54 pate Beam: BPM screens
114319 04/06/06 05:30 pate scanned checklist
114311 04/06/06 02:23 seva beam back
114310 04/06/06 02:07 seva WRONG DEFINITION OF THIS RUN; production 30Hz+fastbus/noclear {prescale=1000;} feedback on
114309 04/06/06 01:59 seva MCC called - magnet trip, 10-15 min no beam
114299 04/06/06 01:33 Pitt Executive summary of the halo status
114298 04/06/06 01:25 Pitt Swing shift summary
114297 04/06/06 01:10 Pitt Jay Benesch's comments on the 6 mm halo rates
114296 04/06/06 01:06 Pitt Calibrated determination of halo fraction
114295 04/06/06 00:54 Breuer French and NA Cerenkov signals and anode currents at 39.5 uA beam (now full table)
114294 04/06/06 00:51 seva data rates?
114293 04/06/06 00:51 suleiman Beam: PITA Slopes
114292 04/06/06 00:50 seva 12:30 we had HV trip of G0 detectors; reset crates
114277 04/06/06 00:24 seva check data
114276 04/06/06 00:23 Breuer French and NA Cerenkov signals and anode currents at 39.5 uA beam
114275 04/06/06 00:22 seva changed charge feeback ON
114272 04/06/06 00:16 Pitt Summary of halo rates during the swing shift runs
114271 04/06/06 00:14 suleiman Beam: PITA Scan, IHWP=IN
114270 04/06/06 00:10 suleiman Beam: PITA Scan, IHWP=OUT
114269 04/06/06 00:10 suleiman Beam: PITA Scan, IHWP=OUT
114268 04/06/06 00:03 Serge After-pulse run plan
114267 04/06/06 00:01 cdaq Beam Time Accounting
Wednesday
114262 04/05/06 23:47 arvieux Target: Target summary swing shift 04-05-06
114261 04/05/06 23:30 Pitt Minutes of Hall C Beam Halo Working Group (4/5/06) from Joe Grames
114260 04/05/06 23:23 Pitt Jay Benesch's summary of his aperture scan
114259 04/05/06 23:15 Fatiha Rebooted the injector crate
114258 04/05/06 23:06 Pitt IHWP to IN
114253 04/05/06 22:35 Pitt Note on halo monitor anode currents
114252 04/05/06 22:33 ellis Analysis: Beam variables vs run number
114251 04/05/06 22:31 Pitt Old halo operating voltages for comparison
114250 04/05/06 22:20 Pitt Further notes on halo calibration exercise
114239 04/05/06 21:13 arvieux Target: Beam back to 40 muA for the night, close JT valve
114236 04/05/06 20:37 arvieux Target: beam 50 muA, target OK
114233 04/05/06 20:29 arvieux Beam: beam going up 44 muA, heater down to 0, open JT valve
114230 04/05/06 20:11 arvieux Target: LH2 target IN, beam 39 muA
114225 04/05/06 19:38 Serge RC Report (more and more subscribers ;-)
114223 04/05/06 18:47 gaskell Moller checkout with no solenoid
114222 04/05/06 18:37 arvieux Target: target out, end of Moeller studies
114220 04/05/06 18:16 Fatiha Cleaned the disks
114214 04/05/06 17:20 smithg Target: target checklist=ksnapshot
114210 04/05/06 16:36 spwells NA electronics testing/fixing
114208 04/05/06 16:09 cdaq Beam Time Accounting
114207 04/05/06 16:08 vulcan Day Shift Summary
114205 04/05/06 16:03 B. Quinn Target: Target shift summary
114203 04/05/06 14:58 B. Quinn Analysis: Re-started DAQ and Realtime Monitor
114201 04/05/06 14:39 pking Analysis: G0Analysis has been updated on gzero account.; all logins need to be refreshed.
114199 04/05/06 14:28 smithg Target: Still a small house He leak
114198 04/05/06 14:28 S. Bailey Beam: Halo Anode Currents for new operating voltages
114197 04/05/06 14:25 S. Bailey Beam: New Halo Operating Voltage
114196 04/05/06 14:23 S. Bailey Beam: New Halo Calibration
114195 04/05/06 14:22 B. Quinn Target: Moved target out of beam
114194 04/05/06 14:15 gaskell Pre-Moller setup
114193 04/05/06 14:12 Serge Real-Time Run plan
114189 04/05/06 13:17 suleiman G0 and G0B position differences, now it is fixed
114188 04/05/06 13:06 vulcan holo monitor repaired
114186 04/05/06 12:51 pking Analysis: G0Analysis 2.10 is installed on gzero account; will be made default at 2pm
114185 04/05/06 12:47 suleiman Coil Modulation Calibration
114177 04/05/06 11:42 real effect of shielding in front of cerenkov 4,6
114175 04/05/06 11:32 Serge Real-Time Run plan
114174 04/05/06 11:31 real cerenkov rates vs threshold
114149 04/05/06 09:11 vulcan Fixing the Halo Monitor
114148 04/05/06 08:33 Quinn Target: heat load alarm
114147 04/05/06 08:07 breuer shift summary 00:00 - 08:00, april 5, 2006
114145 04/05/06 08:04 cdaq Beam Time Accounting
114144 04/05/06 08:03 pate Target: shift summary
114138 04/05/06 05:40 pate Beam: BPM screens
114135 04/05/06 04:02 Breuer French Gain for Cerenkovs too high?? + oct 6 Cer 1
114131 04/05/06 03:33 pate/breuer Beam: beam position on realtime monitor differs from G0BPM.adl
114118 04/05/06 02:02 pate Target: moved LH2 target IN
114116 04/05/06 00:09 Pitt Swing Shift Summary
114115 04/05/06 00:07 cdaq Beam Time Accounting
Tuesday
114114 04/04/06 22:11 Pitt Forced gain values for BPM/BCM calibration
114112 04/04/06 21:25 arvieux Target: 40 muA beam unstable, gt5 increased from 19.1 to 19.2, move to carbon target
114111 04/04/06 20:41 arvieux Target: Red alarm: short beam glitch at 40 muA
114110 04/04/06 20:12 Breuer Please not not rename the HV shutdown circuit
114109 04/04/06 20:08 arvieux Target: Some beam back, LH2 target is IN
114108 04/04/06 19:33 Serge RC Report Monday/Tuesday
114107 04/04/06 19:26 Pitt Larry's Cerenkov threshold setting scripts
114106 04/04/06 19:03 mack toy models for Cerenkov triggers
114105 04/04/06 18:38 Maud/Serge Analysis: Counting rates and magnetic field
114104 04/04/06 18:38 Larry Cerenkov Threshold files and g0daq_config GUI
114103 04/04/06 18:28 Serge Run plan for Monday, contin'd
114102 04/04/06 16:11 cdaq Beam Time Accounting
114101 04/04/06 15:57 vulcan Day Shift Summary
114100 04/04/06 15:38 gaskell scintillator mapping tests
114083 04/04/06 14:45 pking G0 Cage temperatures are going into EPICS archiver again.
114082 04/04/06 14:23 saw Target: Target reboot again
114081 04/04/06 13:50 saw Target: Target reboot
114080 04/04/06 13:24 mack intermittent feedback in 8-stage PMT's
114079 04/04/06 13:10 suleiman G0XM signal after and before the fix
114078 04/04/06 12:44 suleiman New plots of G0 and G0B with calib oscillator after the fix
114077 04/04/06 12:41 smithg Target: house helium
114076 04/04/06 12:39 saw Beam: New variables in EPICS archiver
114075 04/04/06 12:34 pking CODA and the beamfeedback/realtime analyzers have been relaunched
114074 04/04/06 12:30 real cerenkov random rates versus current
114071 04/04/06 12:09 suleiman How to start the feedback MEDM
114068 04/04/06 12:00 suleiman G0 and G0B are now fixed
114065 04/04/06 11:50 arvieux Changed cables on 6-CER1
114056 04/04/06 11:23 muether Shield configuration clarification
114055 04/04/06 11:20 cdaq Beam Time Accounting
114050 04/04/06 10:52 muether/breu New Shielding installed/total accounting of shielding upstream of SMS
114049 04/04/06 10:51 Serge Run plan for Tuesday (Day + Swing)
114044 04/04/06 10:20 mack G0 BPM satellites: FR leaking in?
114038 04/04/06 10:07 ludwig Beam Time Accounting
114037 04/04/06 09:29 pking Beam feedback analyzer is on ET out of order; was it working?
114036 04/04/06 09:24 saw Target: IOC stuck
114035 04/04/06 09:23 saw Beam: BPM's at time of target alarm and HV sniper
114034 04/04/06 08:40 saw Target: G0 beam position
114032 04/04/06 08:11 pate Scanned checklists
114031 04/04/06 08:06 Breuer Shjift summary for night shift 04/04/06
114029 04/04/06 07:48 pate Target: shift summary
114027 04/04/06 07:04 pate Target: LH2 target now IN
114025 04/04/06 06:48 breuer runs with no target: summary
114024 04/04/06 06:44 Breuer HMS gas alarm, changed ethane bottle
114021 04/04/06 06:09 real Problem with rates of cerenkov octant 6 PM1
114020 04/04/06 05:47 Breuier HV tripped, Oct 6 Cer 1
114015 04/04/06 04:34 breuer No-target run real-time data features
114009 04/04/06 03:14 pate Beam: BPM screens
114007 04/04/06 02:23 pate Target: modified upper limits on "ghtot"
114005 04/04/06 02:02 Breuer HV octant 6 (most) sudenly are off
114004 04/04/06 00:55 pate Target: moved to TARGET OUT position
114003 04/04/06 00:23 Pitt Beam: Results of G0/G0B BPM test
114001 04/04/06 00:19 Pitt Swring shift summar
114000 04/04/06 00:14 pate helium bottle in gas shed was empty
Monday
113996 04/03/06 22:54 Serge Run plan for tonight
113995 04/03/06 22:33 arvieux Target: Beam goes wild, red alarm due to target temp increase
113993 04/03/06 21:57 pking Helicity board signal timing checks
113990 04/03/06 21:34 Pitt Normalized halo current plots - late entry
113989 04/03/06 21:27 arvieux Target: target IN, Beam 40 muA, reset Heat Load Hi limits
113987 04/03/06 20:14 Serge RC Report Sunday/Monday
113983 04/03/06 19:26 arvieux Target: LH2 target IN beam
113976 04/03/06 19:13 Muether A note on the current state of shielding upstream of the magnet
113972 04/03/06 18:08 gaskell more Moller commissioning
113971 04/03/06 17:58 Larry Correction: NA Cerenkov Pulseheights & Thresholds
113970 04/03/06 17:17 gaskell Moller backout
113969 04/03/06 17:10 arvieux Target: Moeller studies (ct'd), target is still out
113968 04/03/06 17:00 Vulcan day shift summary
113964 04/03/06 16:14 saw Target: Target Reboot
113960 04/03/06 15:55 Vulcan day shift summary
113959 04/03/06 15:22 saw Target: EPICS Gateway back
113958 04/03/06 14:57 saw Target: Target Alarm (White)
113957 04/03/06 14:52 Larry Re: Analysis: Plots of Cherenkov rates from threshold study
113952 04/03/06 14:13 ppillot Study of lost and random coincidences vs beam current with 100mV PMT threshold
113949 04/03/06 13:36 mack forgot to look at the figures until now: G0 BPM problem is clearly dropped bits
113947 04/03/06 13:03 suleiman Beam: New IF and S/H cards for G0 and G0B
113946 04/03/06 12:46 real Cerenkov threshold study, the numbers
113945 04/03/06 12:30 S. Bailey Beam: G0 and G0B BPMs exhibit good behavior during forward angle experiment
113942 04/03/06 12:05 pking Analysis: NA Coincidence histogramming "IS NOT" and "WAS NOT" correct.
113941 04/03/06 12:05 pking Analysis: NA Coincidence histogramming "IS NOT" and "WAS NOT" correct.
113939 04/03/06 11:04 ellis beam position--beam ntuple vs EPICs
113938 04/03/06 10:57 real Cerenkov rates Fr-NA and versus threshold
113937 04/03/06 10:52 Serge Run plan for Monday
113934 04/03/06 10:12 Furget FR counting rates at 100 mV
113931 04/03/06 09:31 Furget FR counting rates vs beam current at 50 mV
113929 04/03/06 09:20 gaskell Moller beam setup
113928 04/03/06 09:00 saw Beam: Half wave plate insertedf, flipper script ran
113927 04/03/06 08:49 gaskell halo target out
113926 04/03/06 08:32 gaskell setup for more Moller commissioning
113925 04/03/06 08:32 saw Target: Target taken out
113924 04/03/06 08:19 breuer shift summary night shift 00:00-08:00 April 03 2004
113922 04/03/06 08:07 cdaq Beam Time Accounting
113921 04/03/06 08:06 vardan Target: shift summary
113920 04/03/06 07:47 Breuer/Mamma Anode currents f(sms current), f(ferris wheel position)
113915 04/03/06 06:19 Breuer Oct 6, cernkov1 HV tripped
113910 04/03/06 04:29 vardan Beam: BPM screens
113906 04/03/06 03:39 Fatiha NA Coincidence decoding "IS" and "WAS" correct.
113905 04/03/06 03:30 mack suggest dosimeters near PMT windows
113902 04/03/06 02:21 Breuer small real time problem: oct 3 fpd 1 shows in MT without HV
113901 04/03/06 02:09 Breuer/Pitt Ran Flipper program before run 28506
113900 04/03/06 01:45 Pitt Anode current plots
113897 04/03/06 01:33 Pitt Normalized halo rates from current scan
113896 04/03/06 01:23 arvieux/kox changed base for 6-04-FL
113888 04/03/06 00:20 Pitt Sniper tripped high voltages
113887 04/03/06 00:15 Pitt Swing Shift Summary
113886 04/03/06 00:11 cdaq Beam Time Accounting
113885 04/03/06 00:06 pking Analysis: Updated the G0Scripts
Sunday
113883 04/02/06 23:42 Juliette Target: Shift Summary
113880 04/02/06 23:09 Pitt End run failed, restart CODA
113876 04/02/06 22:47 spwells Octant 7 multiple hits
113871 04/02/06 22:27 Pitt Incorrect comment line for Run 28497
113862 04/02/06 20:51 pking Analysis: Installed a new analysis_minder.pl
113859 04/02/06 20:11 pking Analysis: Started the automatic analysis on cdaql1, cdaql2, cdaql4
113856 04/02/06 19:45 Serge (sketchy) Run Plan for the swing and owl shifts
113852 04/02/06 19:16 pking Analysis: Modifed the "g0cuts" file for the analyzer installed on gzero account.
113851 04/02/06 19:16 spwells Near future NA electronic plans
113845 04/02/06 18:45 spwells More NA electronics optimization
113840 04/02/06 17:53 gzero ASCS summary for Sat Apr 01 2006
113838 04/02/06 17:44 Serge RC report- Saturday/Sunday
113834 04/02/06 17:17 muether Analysis: Coinsidence Matrix Study
113833 04/02/06 17:16 pking Analysis: Added warnings to G0Integrity files for "MPS out of order" and "MPS skipped"
113828 04/02/06 17:00 Juliette Target: temperature variation with 40uA beam trip
113825 04/02/06 16:32 benesch shift summary
113824 04/02/06 16:30 benesch shift summary
113823 04/02/06 16:21 cdaq Beam Time Accounting
113822 04/02/06 16:10 Juliette Target: high total heat load limit restored
113821 04/02/06 16:06 pking Minor change to the data_tracker database
113820 04/02/06 16:03 muether Target: Target Day Shift Summary
113818 04/02/06 15:47 muether Target: Hydrogen Target back in
113817 04/02/06 15:37 mack Mean Cerenkov PE is a function of distance from PMT's therefore CED number
113816 04/02/06 15:37 benesch Beam: omission re halo
113814 04/02/06 15:30 benesch Beam: halo goes non-linear at 40 uA independent of target
113813 04/02/06 14:36 gzero ASCS summary for Sat Apr 01 2006
113811 04/02/06 14:24 muether Target: Inserting Carbon Target to check for similar halo behaviour seen with LH2
113810 04/02/06 14:18 muether Target: Heater Power dropped to zero
113809 04/02/06 14:17 benesch Beam: halo rates OK with LH2 to 40 uA, balloon at 48 uA
113808 04/02/06 12:41 muether Target: Hydrogen target moved in
113807 04/02/06 12:37 Beck Analysis: Comparison of electron, pion rates for LH2 (run 28447)
113806 04/02/06 12:25 benesch Beam: switch back to combined optics
113805 04/02/06 12:01
113804 04/02/06 11:57
113803 04/02/06 11:56
113802 04/02/06 11:46
113801 04/02/06 10:27 Serge My (lost cause) fight for cleaning/washing
113800 04/02/06 10:25 muether Target: Carbon target moved in
113799 04/02/06 09:19 muether Target: Target moved to out position for beam tuning
113797 04/02/06 09:04 muether Target: Heat Load high alarm
113796 04/02/06 08:59 ppillot Study of lost and random coincidences vs PMT threshold
113795 04/02/06 08:58 Fatiha
113794 04/02/06 08:54 benesch Beam: sniper took down HV coincident with a beam excursion
113793 04/02/06 08:35 Breuer Updated operating instructions for run g0acm (anode current monitor)
113792 04/02/06 08:25 arvieux Analysis: problem with some run_summary files (flyswater data)
113790 04/02/06 08:12 breuer shift summary 04/02/06 00:00 to 08:00
113788 04/02/06 08:03 cdaq Beam Time Accounting
113787 04/02/06 07:23
113784 04/02/06 06:47 Fatiha Offline analysis
113773 04/02/06 01:42 arvieux Target: Flyswatter removed, beam back on, 20 muA, LH2 target
113771 04/02/06 01:08 Serge 06-04-FL contin'd
113768 04/02/06 00:51 arvieux Target: Beam off for controlled access, LH2 target is still in
113767 04/02/06 00:35 Fatiha Hall is going to Controlled access
113765 04/02/06 00:01 cdaq Beam Time Accounting
113764 04/02/06 00:00 Pitt Swing Shift Summary
Saturday
113763 04/01/06 23:59 Serge Follow-up on 06-04-FL
113762 04/01/06 23:46 Juliette Target: Shift Summary (target and "SMS")
113761 04/01/06 23:32 Juliette Target: total heat load high limit reset to 500
113759 04/01/06 23:29 Juliette Target: LH2 target in position
113756 04/01/06 22:39 Juliette SMS: ramped to 3300 A
113754 04/01/06 22:32 Beck Analysis: Plots of Cherenkov rates from threshold study
113752 04/01/06 22:07 Juliette SMS: ramped to 3100 A
113749 04/01/06 21:28 Juliette SMS: ramped to 2500 A
113747 04/01/06 21:04 arvieux/kox 6-04FL signal missing
113746 04/01/06 21:01 mack toy model of MT rate suggests Real's platueau is deadtime; but can't explain steep increase
113745 04/01/06 20:47 Juliette SMS: ramped to 3500 A
113742 04/01/06 19:57 Serge French PMT finally missing
113736 04/01/06 18:42 Juliette SMS: ramped to 5000 A
113735 04/01/06 18:39 S. Bailey Beam: G0 & G0B : Problem is not V/F module or scalers
113733 04/01/06 18:17 Pitt run 28459: incorrect comment line
113732 04/01/06 18:14 S. Bailey Beam: Instructions about the Insertable Half Wave Plate
113730 04/01/06 17:40 suleiman Beam: Change Pockels Cell's HV and RWP angle to match the IN state of IHWP
113729 04/01/06 17:37 Pitt Controlled access - ferris wheel move
113728 04/01/06 17:21 Juliette Target: moved to out of beam position
113723 04/01/06 16:10 Juliette SMS: ramped to 4000 A
113722 04/01/06 16:01 cdaq Beam Time Accounting
113721 04/01/06 15:59 Armstrong Day Shift Summary
113719 04/01/06 15:53 muether Target: TArget Shift Summary
113718 04/01/06 15:45 mack Re: suspect BPM electronics.
113717 04/01/06 15:43 muether Octant 6 Fpd 4 Problem
113716 04/01/06 15:37 Armstrong CED-FPD matrix flyswatter and lH2
113713 04/01/06 15:16 muether Target: Hydrogen Target in and Flyswatter In
113712 04/01/06 14:59 Armstrong CED-FPD matrix with flyswatter alone
113711 04/01/06 14:32 pking Analysis: Changed the "online_integrity" script and the location of the G0Online rootfiles
113710 04/01/06 14:22 Williamson Beam: Relation between vacuum and halo rate
113706 04/01/06 13:53 muether SMS: Magnet Ramped to 2500
113702 04/01/06 13:02 S. Bailey Beam: G0 & G0B after patch cable change
113701 04/01/06 12:31 Armstrong beam off - septum box supply
113700 04/01/06 12:15 pking Somehow "dosetupcoda" got clobbered at 11:32
113696 04/01/06 11:44 muether SMS: SMS ramped to 4000A
113694 04/01/06 11:11 S. Bailey Beam: G0 & G0B: Problem is electronic
113692 04/01/06 10:44 muether/smit Target: tachometer alarm re-enabled, loosely
113691 04/01/06 10:31 muether/smit Target: Flyswatter alarm temp raised
113690 04/01/06 10:28 ppillot Study of lost and random coincidences vs beam current
113689 04/01/06 10:26 muether/kox/ Target: Flyswatter in Hydrogen out
113687 04/01/06 10:17 spwells "hole" in octant 7 pion coincidence matrix
113686 04/01/06 10:03 Serge French PMT are "durs a cuire"
113685 04/01/06 09:59 Armstrong Controlled access for flyswatter insertion
113683 04/01/06 09:44 pking Why you need to restart CODA and analysis processes in order!
113682 04/01/06 09:24 spwells "hole" in CED 4 - FPD 14
113681 04/01/06 08:59 Armstrong Target back in, go to 20 uA
113680 04/01/06 08:56 saw G0 Logbook merged into hclog
113679 04/01/06 08:52 gaskell halo spec
113678 04/01/06 08:23 Armstrong changed prescale to 2400
113675 04/01/06 08:17 Armstrong Target back in, go to 20 uA
113673 04/01/06 08:13 muether Target: Hydrogen target in
113672 04/01/06 08:04 cdaq Beam Time Accounting
113671 04/01/06 08:03 Spayde Owl Shift Summary
113669 04/01/06 07:59 Sarah K Target: Target Operator Owl Shift Summary
113668 04/01/06 07:59 Sarah K Target: Target Operator Owl Shift Summary
113667 04/01/06 07:40 Sarah K Target: Changed High Alarm for Total Heat Load
113666 04/01/06 07:32 Spayde Background Studies Anode Current Studies
113658 04/01/06 06:42 Sarah K Target: Target Out Now
113656 04/01/06 06:33 Spayde SMS: Ramping Magnet to 3300 A
113650 04/01/06 05:50 Spayde Beam Feedback Not Updating
113648 04/01/06 05:41 Spayde SMS: Ramping Magnet to 5000 A
113643 04/01/06 04:59 Spayde SMS: Ramping Magnet to 4200 A
113642 04/01/06 04:57 Larry Modified g0daq_config GUI to allow loading of predefined NA Cerenkov thresholds
113639 04/01/06 04:48 Sarah K Target: Dips in the Tachometer Stripchart
113638 04/01/06 04:36 Sarah K Target: Changed SMS Low Alarm Limit Back on Target Computer
113637 04/01/06 04:31 jroche magnet scan some results
113636 04/01/06 04:26 Sarah K Beam: BCMs, BPMs, and Halos for the Shift Checklist
113635 04/01/06 04:21 Sarah Adjusted Flow On Helium Bottle in the Gas Shed
113632 04/01/06 04:17 Spayde SMS: Ramping Magnet to 4000 A
113631 04/01/06 04:12 Spayde Killed Beam Feedback Process
113626 04/01/06 03:32 Spayde Error Relaunching CODA
113623 04/01/06 03:22 Spayde SMS: Ramping Magnet to 3800 A
113622 04/01/06 03:20 Spayde Fast Feedback: Cause of Long Downtime
113620 04/01/06 03:07 Spayde CODA Failed to End Run
113617 04/01/06 02:51 Spayde Tube 06-04-FR is Dead?
113616 04/01/06 02:27 Spayde Beam is back
113615 04/01/06 02:25 Spayde Some French High Voltage Tripped Off
113612 04/01/06 01:15 Spayde MCC Rebooting iocse14
113610 04/01/06 01:12 Sarah Target: SMS Alarm on Target Computer
113609 04/01/06 01:08 Sarah Target: SMS Alarm on Target Computer
113608 04/01/06 01:07 Spayde Ramping Magnet to 2500 A
113605 04/01/06 00:51 jroche cerenkov threshold study
113603 04/01/06 00:37 breuer questions concerning acm
113601 04/01/06 00:12 jroche swing shift summary
113600 04/01/06 00:10 cdaq Beam Time Accounting
113599 04/01/06 00:02 Spayde SMS: Ramping Magnet to 3300 A