119521 07/31/06 22:30 Beck Beam: Lumi and parity-quality snapshots
119513 07/31/06 20:30 suleiman Beam: The G0 Cavity I measurement
119496 07/31/06 16:10 jmammei Beam: cavity monitor commissioning
119494 07/31/06 15:15 suleiman Beam: 0I02, 0I02A, & 0I05 are now fixed and 0I07 looks fine so far
119491 07/31/06 14:31 suleiman Beam: 0I07 Injector BPM is now in the Datastream
119490 07/31/06 14:29 Spayde Beam: Recent Beam Parameter Differences/Asymmetries as a Function of Time
119489 07/31/06 14:23 suleiman Beam: Injector BCM/BPM Calibration
119488 07/31/06 14:18 suleiman Beam: Injector BCM/BPM Calibration
119458 07/31/06 03:35 Page Beam: bpm and halo snapshots - 3:30 am log
Sunday
119408 07/30/06 12:59 pking Beam: Charge asymmetry distribution doesn't seem correlated with previous QRT polarities
119406 07/30/06 12:02 Pitt Beam: Flat-top charge distribution cut on QRTPOL = +1 and -1
119400 07/30/06 10:13 Pitt Beam: Position difference widths throughout Hall C
Saturday
Friday
119238 07/28/06 21:31 suleiman Beam: Position Differences and Charge Asymmetry for run 30020 (OUT)
119233 07/28/06 20:55 suleiman Beam: Position Differences and Charge Asymmetry for run 29999 (IN)
119232 07/28/06 20:49 Pitt/Suleima Beam: Origination of "flat-top" charge asymmetry distribution
Thursday
119116 07/27/06 16:48 suleiman Beam: Coil Modulation plot from the production run 30013
119104 07/27/06 14:09 suleiman Beam: Lowered the limit on few Position Coinls and the Energy
119102 07/27/06 13:22 suleiman Beam: Lowered the limit on the energy modulation
119101 07/27/06 12:56 suleiman Beam: For Coil Modulation to work: MCC must have "MODULATION ON"
119100 07/27/06 12:55 suleiman Beam: For Coil Modulation to work: MCC must have "MODULATION ON"
119099 07/27/06 12:45 suleiman Beam: Coil Modulation is now started by CODA at the begining of each run - both Position & Energy
119098 07/27/06 12:43 suleiman Beam: Coil Modulation is now started by CODA at the begining of each run - both Position & Energy
119087 07/27/06 11:30 saw Beam: Added Fastfeedback to EPICS logging
119036 07/27/06 00:12 suleiman | M Beam: G0 BPM Cavity Commissioning
Wednesday
119018 07/26/06 19:48 suleiman Beam: I swapped the two cables C20AXP with C20AXM - This is a temprorary fix
118992 07/26/06 13:07 Flores Beam: Back up beam
Tuesday
Monday
118806 07/24/06 13:30 suleiman Beam: A broken connection was found for C20AXP (not C20XM)
118802 07/24/06 12:13 B. Quinn Beam: Vacuum status/Hall activities
118799 07/24/06 11:02 suleiman | Beam: C20AXM signal
118798 07/24/06 10:56 suleiman Beam: G0 and G0B tested with the Oscillator ON and they are now fine
Sunday
118760 07/23/06 18:45 suleiman | s Beam: Changed G0 and G0B output from the Sample and Hold (S/H) cards from -ve to +ve
118699 07/23/06 02:10 jianglai/lar Beam: debugging of G0 and G0B
Saturday
118672 07/22/06 22:34 suleiman Beam: The raw signals for G0 and G0B seem to come and go
118669 07/22/06 22:29 suleiman Beam: Hall C Charge feedback is ON
118662 07/22/06 21:52 suleiman Beam: C20XM signal is missing
118661 07/22/06 21:48 suleiman Beam: The raw signals of G0 and G0B are zeros in "beam_nt"
118656 07/22/06 21:02 suleiman Beam: The part of the code that does Hall A charge feedback is enabled
Friday
Thursday
118394 07/20/06 00:07 beck/liu Beam: harp scan to determine the raster
Wednesday
118392 07/19/06 23:55 beck/liu Beam: some halo values
Tuesday
118269 07/18/06 16:28 suleiman | F Beam: G0 CAvity BPM Test with RF Generator
Monday
Sunday
Saturday
Friday
Thursday
Wednesday
Tuesday
Monday
Sunday
Saturday
Friday
117826 07/07/06 17:37 S. Bailey Beam: G0 Beam studies on Sunday