Log entry time 23:59:52 on August 25, 2006
Entry number 121678
keyword=Swing shift summary
Aug. 25 Swing Shift Summary
SL: Hamlet Mkrtchyan
Target: Steve Wood
Analysis:
Guests:
Highlights
- N
- Begin shift. Continuing production run 30707 (started at 15:45).
- Beam current 60 uA, halo~20, charge asymmetry rms~300ppm.
Time-line
- 16:00: Production run 30707 (started at 15:45).
- 16:00: Continuing LH2 production.
- 21:15 We lost light in Hall C counting room. Hall A also lost
light.On the second floor all lights are ON. G0 electronic and DAQ
working normal.We continuing data taking,
- 21:30: Steve and Brion found that air conditioning in G0
electronic area lost power. Call MCC, they will try to find some one.
- 21:50: Power back. We have light in Hall C electronic room. G0
air conditioning is ON.
- 22:20: Need to reboot cdaql5.
- 22:30: Steve did check list.
- 23:15: MCC took beam for PTZ test (after end of run 30713).
- 23:30: Production.
- :
Run list
- 30707 : LH2 production, 60 ľA (started at 15:45).
- 30708 : LH2 production, 60 ľA.
- 30709 : LH2 production, 60 ľA.
- 30710 : LH2 production, 60 ľA.
- 30711 : LH2 production, 60 ľA.(Halo~20, asymmetry rms~320).
- 30712 : LH2 production, 60 ľA.(G0 airconditioning was off ~20 min
OFF due to electricity).
- 30713 : LH2 production, 60 ľA.(G0 electronic room temperature
back to nominal).
- 30714 : LH2 production, 60 ľA.