Main INDEX, Monthly INDEX, PREV, NEXT
Make New Entry, Make Followup Entry

User name horn/gaskell

Log entry time 12:27:47 on September 26, 2006

Entry number 122904

Followups:

keyword=Moller tuned

The Moller is again tuned at 687 MeV with the solenoid at 3 T (see
attached tune plot). The quad currents are:

Q1 = 91.151 A Q2 = 85.35 A

Note that we had to set the beam position to (x,y) = (-0.5 mm, -1 mm) at 3C17A (see figure below).






Moller tune plot



BPMs for good Moller tune