Main INDEX, Monthly INDEX, PREV, NEXT
Make New Entry, Make Followup Entry

User name gzero

Log entry time 18:48:57 on September 27, 2006

Entry number 123015

keyword=End of Run 31098:

Experiment gzeroback

End of Run #31098 - /data1/raw/ts_Fullinj_31098.dat.0


****************************
 Run Number: 31098
End of Run Comment:
LH2 production run, stopped for MCC to reset the Hall C to power permit and then back up.


EPICS values at end of run
Beam current BCM1 =    -0.36 uA
Beam current BCM2 =    -0.29 uA
Beam Energy =   685.92 MeV
G0 magnet current setting =  3495.71 A
G0 magnetic field  = ??? G
 
Half-Wave Plate position = IN
 *******************************************
 *** PRESCALE FACTORS *** 
  PS1 =   16777215 :  
  PS2 =   16777215 :  
  PS3 =   16777215 :  
  PS4 =        400 :  
  PS5 =      65535 :  
  PS6 =      65535 :  
  PS7 =      65535 :  
  PS8 =      65535 :  
  nawidth =          0.0 :  
  nathresh =         13.0 :  
  keywords:  
 

****************************