Jefferson Lab Hall C Logbook for September 06 - runstarts omitted

  • Main INDEX

    Saturday

  • 123264 09/30/06 23:46 Breuer brief analysis shift summary
  • 123263 09/30/06 23:25 Breuer Target info and snapshots, 09/30/06 23:24
  • 123260 09/30/06 22:35 pking Late entry: Beam tuning completed at 21:40
  • 123259 09/30/06 21:55 Breuer HV was off for more than one hour before run 31170
  • 123254 09/30/06 20:59 pking Beam tuning
  • 123250 09/30/06 19:28 Breuer HV trip during beam tuning
  • 123249 09/30/06 19:14 pking Sending tune beam
  • 123248 09/30/06 19:13 Breuer Shift checklist plots.
  • 123246 09/30/06 18:41 Williamson RC Summary Friday 09-29-2006 Swing through Saturday 09-30-2006 Day
  • 123243 09/30/06 17:54 pking Requested change in Y position at H00C
  • 123242 09/30/06 17:39 pking Slow drift in Y at the pivot over the past 90 minutes
  • 123239 09/30/06 16:33 pking Beam in Hall C and looks good
  • 123238 09/30/06 16:13 cdaq Beam Time Accounting
  • 123237 09/30/06 16:13 hamlet Day shift summary
  • 123236 09/30/06 16:00 Sarah K Target: Target Day Shift Summary
  • 123234 09/30/06 15:41 pking Analysis: The BCM/BPM calibrations from run31004 have been inserted in the database.
  • 123233 09/30/06 15:40
  • 123232 09/30/06 15:37 hamlet Will be no beam at least next 2 hours
  • 123231 09/30/06 14:41 Sarah K Analysis: Analysis Checklist (formatted)
  • 123230 09/30/06 14:41 Sarah K Analysis: Analysis Checklist
  • 123229 09/30/06 14:16 hamlet Will be No Beam next 1.0-1.5 hours.
  • 123222 09/30/06 11:34 hamlet No beam since 11:00
  • 123220 09/30/06 10:08 hamlet IHWP is IN
  • 123216 09/30/06 08:30 hamlet No beam next 30 min
  • 123214 09/30/06 08:05 cdaq Beam Time Accounting
  • 123213 09/30/06 07:50 DArko Owl shift summary
  • 123210 09/30/06 07:00 Larry Analysis: Analysis checklist
  • 123209 09/30/06 06:30 DArko Beam: Beam lost 06:50
  • 123207 09/30/06 06:28 Larry Detector HV's turned back on
  • 123206 09/30/06 06:16 DArko Beam: Beam lost 06:50
  • 123204 09/30/06 05:53 Larry Detector HV sniped
  • 123199 09/30/06 03:40 Larry Beam: Screenshots of Beam Parameters
  • 123191 09/30/06 00:34 cdaq Beam Time Accounting
  • 123190 09/30/06 00:33 pking September 29th Swing shift summary
  • Friday

  • 123189 09/29/06 23:55 pking Checked in with OPS; working on the seperator.
  • 123188 09/29/06 23:47 pking I have resolved the few runs marked with multiple "data_quality" flags
  • 123187 09/29/06 23:25 Breuer Moved large amount of shift lists to new folder.
  • 123186 09/29/06 23:20 Breuer/King Analysis: declared run 31067 as bad instead of good
  • 123185 09/29/06 23:16 Breuer/King Analysis: "good for" : check only 1 "data quality" box
  • 123184 09/29/06 22:49 pking OPS is going to insert a viewer and run viewer-limited beam; detector HV has been turned OFF
  • 123183 09/29/06 22:27 pking Operations is going to phase-up the SL
  • 123181 09/29/06 22:19 Breuer Analysis: Analysis check list 29-Sep-2004 20:50
  • 123180 09/29/06 21:33 Williamson RC Summary Thursday 09-28-2006 Swing through Friday 09-29-2006 Day
  • 123177 09/29/06 21:24 pking Fast feedback system isn't working; try to run beam without it.
  • 123176 09/29/06 21:16 pking Operations is going to try to bring beam back
  • 123175 09/29/06 21:10 pking No beam for about 10 minutes
  • 123172 09/29/06 20:35 pking Still lots of trips; Optics expert has been called.
  • 123171 09/29/06 20:18 pking Lots of trips
  • 123170 09/29/06 19:41 pking Run 31148 has IA==9
  • 123169 09/29/06 19:38 Breuer Target: Target info 29-Sep-2006 19:30
  • 123160 09/29/06 16:07 cdaq Beam Time Accounting
  • 123159 09/29/06 16:07 Lung Day shift summary
  • 123158 09/29/06 15:50 Alex Analysis: analysis checklist
  • 123153 09/29/06 14:08 Lung Charge Asymmetry - 2nd bump? (try snapshot again...)
  • 123152 09/29/06 14:05 Lung Charge Asymmetry - 2nd bump?
  • 123149 09/29/06 12:43 suleiamn Beam: Charge Asymmetries and Position Differences from run 31138 - OUT
  • 123148 09/29/06 12:34 Lung Correct title line for Run 31141: Wells Plot Run IA=1.0
  • 123147 09/29/06 12:30 suleiman Beam: How-to for the Well's Plots
  • 123143 09/29/06 12:05 Alex Beam: checklist snapshots
  • 123141 09/29/06 11:28 Williamson Phototube Delivery
  • 123136 09/29/06 09:36 Williamson SMS: Transport Protocol Error from Lookout (SMS control program)
  • 123133 09/29/06 09:24 Williamson Beam: Charge Asymmetry Width at the Limit
  • 123128 09/29/06 08:05 cdaq Beam Time Accounting
  • 123127 09/29/06 08:04 DArko Owl Shift Summary
  • 123124 09/29/06 07:29 Larry Analysis: Analysis checklist
  • 123119 09/29/06 05:14 Larry Beam: Screenshots of beam parameter plots
  • 123112 09/29/06 02:09 Larry Target: Alarm (transient) on gt1; cleared
  • 123107 09/29/06 00:01 cdaq Beam Time Accounting
  • Thursday

  • 123106 09/28/06 23:51 roos Swing Shift Summary
  • 123105 09/28/06 23:49 Breuer Paddle current reference value for good running conditions, 686 MeV
  • 123102 09/28/06 22:47 Breuer Analysis check list
  • 123095 09/28/06 20:54 Breuer two snapshots of target screens
  • 123094 09/28/06 20:46 roos swing shift checklist screens
  • 123091 09/28/06 18:53 Williamson RC Summary Wednesday 09-27-2006 Swing through Thursday 09-28-2006 Day
  • 123084 09/28/06 16:34 Lung Day shift summary
  • 123083 09/28/06 16:17 cdaq Beam Time Accounting
  • 123082 09/28/06 16:08 pking Analysis: Comparison of X position difference widths from last night and Tuesday
  • 123081 09/28/06 15:56 pking Analysis: The database asymmetry averages/widths include events with large asymmetries
  • 123078 09/28/06 14:50 Alex Beam: checklist snapshots
  • 123077 09/28/06 14:28 Alex Analysis: Analysis checklist
  • 123066 09/28/06 11:50 Lung Parity quality snapshot
  • 123065 09/28/06 11:45 Lung Beam plots following Mott and tune
  • 123063 09/28/06 11:20 suleiman Beam: Beam Trajectory after MCC re-tuned Hall C quad to fix the x-differences
  • 123061 09/28/06 11:02 Lung IHWP Flip
  • 123059 09/28/06 09:32 Lung Mott measurement
  • 123057 09/28/06 08:02 cdaq Beam Time Accounting
  • 123056 09/28/06 08:01 C. Furget Owl Shift Summary
  • 123053 09/28/06 07:14 C. Furget Ratio of detector asymmetry versus statistics
  • 123052 09/28/06 06:50 C. Furget Important change in the beam parameters in RCS during the last day
  • 123047 09/28/06 04:23 C. Furget Analysis: Beam charge asymmetry width in goat ???
  • 123046 09/28/06 04:20 Larry Shift checklist screens
  • 123041 09/28/06 02:51 C. Furget Analysis: Complete analysis check list
  • 123038 09/28/06 01:15 C. Furget Record : more than 100 min without any beam trip !
  • 123035 09/28/06 00:05 Roos Swing Shift Summary
  • 123034 09/28/06 00:00 cdaq Beam Time Accounting
  • Wednesday

  • 123033 09/27/06 23:58 Breuer 5" Cernkov test tube (upstream of Ferris wheel) results
  • 123030 09/27/06 23:25 roos lumi widths have improved
  • 123027 09/27/06 22:24 Williamson Scanned shift log
  • 123026 09/27/06 21:52 Williamson RC Summary Tuesday 09-26-2006 Swing through Wednesday 09-27-2006 Day
  • 123025 09/27/06 21:35 roos swing shift checklist screens (more)
  • 123024 09/27/06 21:26 Williamson Beam: X position asymmetry widths bigger since afternoon
  • 123021 09/27/06 21:22 roos shift check list screens (some)
  • 123019 09/27/06 20:14 roos Beam: beam parity quality
  • 123017 09/27/06 19:09 roos Beam: Integrity files/golden values
  • 123012 09/27/06 17:26 roos HV trip due to beam splatter
  • 123009 09/27/06 17:17 roos Beam: lumi asymmetry width
  • 123006 09/27/06 16:05 cdaq Beam Time Accounting
  • 123005 09/27/06 16:03 saw Shift Summary
  • 123003 09/27/06 15:30 saw HV Tripped
  • 123001 09/27/06 15:08 Alex Analysis: analysis checklist
  • 122995 09/27/06 14:23 Alex Target: LH2 Target in
  • 122993 09/27/06 13:51 Alex Target: Target out
  • 122990 09/27/06 13:10 saw Beam: Asked MCC to tune up beam
  • 122989 09/27/06 13:00 saw Beam: Beam restored with worse halo
  • 122988 09/27/06 12:58 Alex Beam: screenshots for the checklist
  • 122986 09/27/06 10:36 Alex Target: LH2 Target in
  • 122985 09/27/06 10:31 M Jones Beam: Beam Energy Measurement
  • 122984 09/27/06 09:28 saw HKS wire chamber current with beam off
  • 122983 09/27/06 09:22 Alex Target: Target out of beam
  • 122981 09/27/06 09:04 saw Another HV trip
  • 122978 09/27/06 08:49 saw Sniper shut off HV
  • 122975 09/27/06 08:06 cdaq Beam Time Accounting
  • 122974 09/27/06 08:03 C. Furget Owl Shift Summary
  • 122971 09/27/06 07:20 DArko Beam: Shift check list snapshots
  • 122968 09/27/06 06:28 Darko Beam: Dave's Beam for shift check list
  • 122967 09/27/06 06:19 DArko Target: HPH alarm momitored
  • 122960 09/27/06 02:44 C. Furget Analysis: Analysis Check list
  • 122955 09/27/06 00:09 roos Swing Shift Summary
  • 122954 09/27/06 00:00 cdaq Beam Time Accounting
  • Tuesday

  • 122953 09/26/06 23:59 Williamson RC Summary Monday 09-25-2006 Swing through Tuesday 09-26-2006 Day
  • 122952 09/26/06 23:40 pking Analysis: Turned on the comparison to the "golden" file in the G0Integrity checks
  • 122951 09/26/06 23:39 Breuer Oct 1, pixel CED3/FPD12 fixed before run 31077 (unfixed during run 31079)
  • 122946 09/26/06 23:12 Breuer evening 26-sep-06 shift mini-analysis check list results
  • 122943 09/26/06 21:33 roos screen snapshots from shift check
  • 122936 09/26/06 20:16 Roos HV sniper trip
  • 122925 09/26/06 16:01 cdaq Beam Time Accounting
  • 122924 09/26/06 15:50 S. Bailey Day Shift Summary
  • 122921 09/26/06 14:56 mack cavity BPM nonlinearity: maybe not cross-talk on the board
  • 122920 09/26/06 14:38 saw Beam: Shift checklist screen grabs.
  • 122917 09/26/06 14:17 S. Bailey Lumis were off during first half of run 31067
  • 122916 09/26/06 14:07 S. Bailey Lotsa beam trips! MCC reports that the machine is in an unhappy state
  • 122915 09/26/06 14:02 horn/gaskell Moller Summary
  • 122914 09/26/06 13:49 S. Bailey IHWP OUT to IN
  • 122912 09/26/06 13:35 saw Target: Hydrogen target back in
  • 122911 09/26/06 13:06 horn/gaskell Moller backout
  • 122908 09/26/06 12:42 horn/gaskell Moller controls screen grab
  • 122907 09/26/06 12:39 gaskell/horn Half wave plate changed from OUT to IN
  • 122904 09/26/06 12:27 horn/gaskell Moller tuned
  • 122900 09/26/06 12:08 gaskell Change Q2 to 85.35 A
  • 122899 09/26/06 12:07 gaskell Change Q2 to 85.35 A
  • 122891 09/26/06 09:55 S. Bailey Analysis Task List (runs 31041-31049)
  • 122890 09/26/06 09:27 horn/gaskell Changed quad currents
  • 122889 09/26/06 08:16 saw Target: Target moved out
  • 122888 09/26/06 08:10 gaskell/horn Setup for Moller
  • 122887 09/26/06 08:05 cdaq Beam Time Accounting
  • 122886 09/26/06 08:04 S. Bailey Moller measurement commences
  • 122884 09/26/06 07:56 C. Furget Owl shift summary
  • 122877 09/26/06 04:56 suleiman Beam: Beam Trajectory (again - beam was off before)
  • 122876 09/26/06 04:50 C. Furget Analysis check list summary
  • 122875 09/26/06 04:47 suleiman Beam: Shift Check List Screens
  • 122874 09/26/06 04:43 suleiman Beam: Beam Halo
  • 122873 09/26/06 04:41 suleiman Beam: Beam Trajectory
  • 122872 09/26/06 04:40 suleiman Beam: Feedback Screens
  • 122871 09/26/06 04:30 C. Furget More accurate ABU calculation
  • 122868 09/26/06 03:39 C. Furget Analysis: Asymmetry width to counting statistic ratio
  • 122865 09/26/06 03:06 suleiman Beam: Charge Asymmetries and Position Differences from run 31058- OUT
  • 122864 09/26/06 02:54 suleiman Beam: G0 Cavity Data from run 31058
  • 122861 09/26/06 01:39 suleiman Beam: Coil Modulation cycle from run 31050
  • 122860 09/26/06 01:23 suleiman Beam: RealTime Screens showing Beam Quality (from run 31060)
  • 122857 09/26/06 00:52 Breuer Analysis: Plots ADC left vs right for FPDs, gain calibration runs 31017 to 31020
  • 122856 09/26/06 00:20 suleiman Beam: G0 Parity Quality
  • 122855 09/26/06 00:01 cdaq Beam Time Accounting
  • 122854 09/26/06 00:00 Breuer shift summary, evening of September 25, 2006
  • Monday

  • 122853 09/25/06 23:54 Bosted Coulomb counter
  • 122852 09/25/06 23:51 Bosted Lumi asymmetry
  • 122847 09/25/06 21:34 Williamson RC Summary Sunday 09-24-2006 Swing through Monday 09-25-2006 Day
  • 122844 09/25/06 21:17 Roos Screen Snapshots for Shift Checklist
  • 122835 09/25/06 18:52 Bosted Beam quality
  • 122834 09/25/06 18:52 ppillot Analysis: first study of the last current scan
  • 122833 09/25/06 18:49 ellis Lumi 4 okay--bad pedestal
  • 122832 09/25/06 18:36 Williamson Updated run-plan and shift "calendar of events"
  • 122829 09/25/06 17:24 C. Furget Small correction on e/(e+pi) ratio using a more accurate elastic locus
  • 122826 09/25/06 17:02 Williamson SMS: Magnet response to ESR transient
  • 122823 09/25/06 16:02 cdaq Beam Time Accounting
  • 122822 09/25/06 16:01 saw Target: Target controls tweaking
  • 122821 09/25/06 15:53 S. Bailey Day Shift Summary
  • 122818 09/25/06 14:25 ppillot Analysis: evolution of randoms and deadtime between spring and today
  • 122817 09/25/06 14:16 S. Bailey HV trip during run 31047
  • 122813 09/25/06 13:46 S. Bailey MCC doing PZT test
  • 122812 09/25/06 13:45 Williamson G0 Status Transparencies for Hall C 3PM Meeting
  • 122811 09/25/06 13:01 cdaq Beam Time Accounting
  • 122810 09/25/06 12:52 saw Beam: Shift Checklist screen grabs
  • 122809 09/25/06 12:38 Fatiha CED_FPD Coincidence Locuses for 687MeV
  • 122808 09/25/06 12:31 S. Bailey Controlled Access: MCC works in BSY
  • 122804 09/25/06 12:12 S. Bailey (CED,FPD) rates snapshot
  • 122803 09/25/06 11:42 saw Target: Target temperature fluctuations during runs 31043, 31044 and 31045
  • 122801 09/25/06 11:12 S. Bailey HV trip during run 31044
  • 122799 09/25/06 11:05 Fatiha Empty cell in teh coincidence matrix
  • 122793 09/25/06 09:56 Williamson SMS: LN2 Flow Meter Working Again
  • 122790 09/25/06 08:42 C. Furget Analysis: Comparison of e/(e+pi) between 5 and 60 muA
  • 122789 09/25/06 08:01 cdaq Beam Time Accounting
  • 122788 09/25/06 08:01 C. Furget Owl shift summary
  • 122785 09/25/06 06:59 C. Furget Correction : This is a low beam current run (5muA)
  • 122782 09/25/06 05:59 C. Furget Deadtime study on LH2
  • 122765 09/25/06 04:59 C. Furget This run is junk !
  • 122759 09/25/06 04:51 suleiman check items on target-operator checklist
  • 122757 09/25/06 04:46 breuer target shift summary, evening September 24, 2006
  • 122756 09/25/06 04:45 suleiman Beam: Beam Halo
  • 122754 09/25/06 04:43 suleiman Beam: Beam Trajectory
  • 122752 09/25/06 04:41 suleiman Beam: Feedback Screens
  • 122751 09/25/06 04:28 C. Furget/pp Analysis: Cerenkov current scan
  • 122750 09/25/06 03:51 C. Furget/pp Analysis: Cerenkov current scan
  • 122745 09/25/06 02:24 ppillot new timing adjustment performed for french meantimers
  • 122743 09/25/06 02:15 ppillot New HV values from second pass of gain matching
  • 122739 09/25/06 00:16 suleiman Beam: How to Start the MCC Modulation-Enable Screen
  • 122738 09/25/06 00:07 cdaq Beam Time Accounting
  • 122737 09/25/06 00:03 Roos Swing shift summary
  • Sunday

  • 122734 09/24/06 23:59 pking Analysis: Reanalysis of BCM calibration run 31004 is in progress
  • 122733 09/24/06 23:22 Breuer Octant 5 electron matrix problem solution; muliplicity switch
  • 122732 09/24/06 23:19 Williamson New (shorter) run plan starting on Owl shift, Monday 9/25
  • 122731 09/24/06 23:17 Breuer Octant 5, FPD 3L: cable problem, now ok
  • 122730 09/24/06 23:12 roos Octant 5 electron problem
  • 122725 09/24/06 22:04 roos screens for shift check list
  • 122724 09/24/06 22:01 Breuer Target operator's analysis checks
  • 122723 09/24/06 22:00 Williamson RC Summary Saturday 09-23-2006 through Sunday 09-24-2006 Day
  • 122720 09/24/06 21:15 Roos Beam: MCC made entry to the BSY
  • 122718 09/24/06 21:11 Breuer 1 Hz Analysis run 31015 (60 uA production run)
  • 122717 09/24/06 20:33 Roos No end of run for 31018
  • 122707 09/24/06 17:08 roos Beam: MCC takes beam to do pzt test
  • 122703 09/24/06 16:02 cdaq Beam Time Accounting
  • 122702 09/24/06 15:57 DArko Shift summary
  • 122700 09/24/06 15:55 DArko Shift summary
  • 122694 09/24/06 12:52 Fatiha Updated the DBPlotter
  • 122683 09/24/06 08:15 suleiman Analysis: Tried to Analyze the BCM/BPM Cal run but stopped with these plots. Some one should check and continue ...
  • 122682 09/24/06 08:13 C. Furget Owl shifft summary
  • 122681 09/24/06 08:07 cdaq Beam Time Accounting
  • 122678 09/24/06 07:27 suleiman Beam: Run 31004 is A BCM/BPM Calibration
  • 122677 09/24/06 05:51 suleiman Beam: ... whan the iocs in forced gain at the 60 uA step
  • 122672 09/24/06 04:00 suleiman Beam: Beam Position for Check List
  • 122671 09/24/06 03:54 suleiman Beam: Beam Trjectory
  • 122670 09/24/06 03:27 suleiman Beam: Change to the Procedure to Perform a BCM/BPM Calibration
  • 122669 09/24/06 03:12 C. Furget Cerenkov current scan
  • 122668 09/24/06 03:00 C. Furget This was Cerenkov Current scan Mult=3
  • 122666 09/24/06 02:57 suleiman Beam: Now MCC has "MODULATION ON"
  • 122664 09/24/06 02:51 suleiman Beam: The MCC should have "MODULATION ON" for it to work
  • 122657 09/24/06 02:16 C. Furget This is a production run at 60 ,uA
  • 122656 09/24/06 02:13 suleiman Beam: The Flat Top Charge Aymmetry and the RealTime plots from run 30998
  • 122655 09/24/06 01:50 C. Furget New FR Cerenkov HV
  • 122654 09/24/06 01:38 suleiman Beam: Source Configuration
  • 122653 09/24/06 01:33 suleiman Beam: Hall C and Hall A Charge Feedback Screens
  • 122648 09/24/06 01:10 suleiman Beam: G0 Cavity Signals from run 30992
  • 122647 09/24/06 01:07 suleiman Beam: Charge Asymmetries and Position Differences from run 30992 - OUT
  • 122646 09/24/06 00:53 Larry New HV's for NA Cerenkov PMTs
  • 122643 09/24/06 00:03 cdaq Beam Time Accounting
  • Saturday

  • 122642 09/23/06 23:56 roos Swing Shift Summary
  • 122641 09/23/06 23:55 Breuer target shift summary, evening September 23, 2006
  • 122640 09/23/06 23:41 Breuer manual adjustment octant 1 FPD 3L HV
  • 122639 09/23/06 23:36 roos Oct 3, CED 9 electrons missing
  • 122638 09/23/06 23:36 Breuer HV change before run 30995 based on new philosophy; explanation
  • 122637 09/23/06 23:27 ppillot Re: new HV from gain matching
  • 122636 09/23/06 23:23 roos Detector problem, Oct 1, CED 6R HV off
  • 122635 09/23/06 23:19 ppillot new HV from gain matching
  • 122634 09/23/06 23:14 Breuer check items on ananlysis/target-operator checklist
  • 122629 09/23/06 22:03 roos Beam: bpms, halo
  • 122626 09/23/06 21:48 Williamson Beam: Correctors used for doing the beam position scan
  • 122625 09/23/06 21:38 Williamson RC Summary Thursday Friday 09-22-2006 through Saturday 09-23-2006 Day
  • 122623 09/23/06 20:43 Roos Beam: Beamtrajectory for Run 30984
  • 122622 09/23/06 20:34 Alex Analysis: today's bpo scan results
  • 122621 09/23/06 20:27 roos Beam: MCC pzt test
  • 122620 09/23/06 20:27 Williamson Updated Run Plan
  • 122619 09/23/06 20:09 Breuer/Lee BPO scan (delay curve to check NA CED 8 delay change)
  • 122608 09/23/06 19:33 Roos Beam: x-y beam scan of target(table formatted)
  • 122606 09/23/06 19:31 Roos Beam: x-y beam scan of target
  • 122597 09/23/06 16:15 DArko Day shift summary
  • 122594 09/23/06 16:04 cdaq Beam Time Accounting
  • 122593 09/23/06 15:05 Williamson/A Pre-amp may be bad for Oct 5, FPD 3 Left
  • 122592 09/23/06 14:40 Williamson/A Octant 5, FPD 3 Left seems to be dead
  • 122591 09/23/06 14:11 Darko Androc Beam: CED-FPD coincidence pattern at 60uA beam current testing
  • 122584 09/23/06 12:25 pking Cleaning bad gzerol3 records out of data_tracker database
  • 122581 09/23/06 12:10 pking Analysis: Restarted the autoanalyzers
  • 122580 09/23/06 11:53 pking Analysis: The correct database is now "gzero_687MeV_comm2"
  • 122579 09/23/06 11:52 Williamson Beam: Unser Temp Control Chassis Out of Control
  • 122578 09/23/06 11:51 pking Analysis: Changed the default BCM used for normalization to BCM1
  • 122577 09/23/06 11:41 cdaq Beam Time Accounting
  • 122574 09/23/06 11:10 Williamson Analysis: good-for GUI started but...
  • 122571 09/23/06 10:07 pking Analysis: Stopped the autoanalyzer temporarily
  • 122566 09/23/06 08:58 Larry Cerenkov anode currents
  • 122559 09/23/06 08:06 C. Furget Owl shift summary
  • 122558 09/23/06 07:52 C. Furget Beam asymmetries (charge and lumi)
  • 122555 09/23/06 07:33 C. Furget ACM procedure
  • 122553 09/23/06 07:24 C. Furget Correction : ACM - 55 muA
  • 122551 09/23/06 06:45 C. Furget ACM measurement at 55 muA
  • 122548 09/23/06 06:01 C. Furget ACM monitor at 30 muA
  • 122545 09/23/06 05:53 C. Furget Beam current for ACM
  • 122543 09/23/06 05:23 no_name Preliminary ACM picture at 10 muA
  • 122539 09/23/06 04:55 Larry Target: He 15K Supply flow rate
  • 122538 09/23/06 04:50 Larry Target: Move to LH2 target
  • 122535 09/23/06 04:46 C. Furget Detector HV turned ON
  • 122533 09/23/06 04:33 C. Furget Beam properties
  • 122532 09/23/06 04:32 Larry Target: Almost ready for beam (?), opening up JT valve
  • 122531 09/23/06 00:45 C.Furget Herbert's swing shift summary
  • 122530 09/23/06 00:42 Breuer shift summary evening Friday September 23, 2006
  • Friday

  • 122527 09/22/06 22:44 Breuer put in 11 mm halo target
  • 122526 09/22/06 22:06 Breuer beam is still being tuned
  • 122525 09/22/06 20:29 Williamson RC Summary Thursday 09-21-2006 Swing through Friday 09-22-2006 Day
  • 122524 09/22/06 19:33 Run Plan -- Beginning Day Shift on 9/22/06 -- second try
  • 122523 09/22/06 19:29 Williamson Run Plan -- Beginning Day Shift on 9/22/06
  • 122522 09/22/06 17:44 Williamson New shift check list
  • 122521 09/22/06 16:01 Roos Day shift summary/Better format(perhaps)
  • 122520 09/22/06 15:59 Roos Day shift summary
  • 122519 09/22/06 15:29 suleiman Beam: The plots again in gif format.
  • 122518 09/22/06 15:26 Alex triggers back to normal
  • 122517 09/22/06 15:09 cdaq Beam Time Accounting
  • 122516 09/22/06 15:07 Williamson SMS: Magnet Ramped to 3500A
  • 122515 09/22/06 14:01 mack BCM1,2 are connected
  • 122514 09/22/06 13:13 Roos Beam: Moller small quad in local
  • 122513 09/22/06 11:16 S. Bailey Beam Parity Quality
  • 122512 09/22/06 11:10 Roos Beam: BCM2 repaired
  • 122511 09/22/06 10:33 Roos Beam: Removing vertical polarization/fixing BCM2
  • 122510 09/22/06 10:29 pking Analysis: Reinstalled one of the mysql libraries on cdaql3
  • 122509 09/22/06 10:23 S. Bailey Hall/Injector BPM Calibration Run 30959 Pedestals
  • 122508 09/22/06 10:22
  • 122507 09/22/06 09:59 Williamson Beam: BCM2 is not working
  • 122505 09/22/06 09:55 Roos Beam: BCM2 not working
  • 122504 09/22/06 09:54 Williamson Beam: Temperature Control by the Unser Chassis is Working
  • 122503 09/22/06 09:06 S. Bailey moved IHWP from IN to OUT
  • 122500 09/22/06 08:38 hcf Arbon bottle valved on. Empty one replaced.
  • 122499 09/22/06 08:17 S. Bailey Injector & Hall Calibration Run 30959 : snapshot of IOCs in auto gain (formatted)
  • 122496 09/22/06 07:58 suleiman Beam: Measuring the ratio of G0 and G0 raw signals - again: this time use different run to measure offsets
  • 122495 09/22/06 06:47 suleiman Low PSI sound Alarm for SOS and HMS Gas System Interlock
  • 122493 09/22/06 06:34 S. Bailey Injector & Hall BPM Calibration Run 30959 : snapshot of IOCs in auto gain
  • 122492 09/22/06 06:07 real Comments about Bfield scan for French PMts, NO EFFECT DUE TO THE FIELD
  • 122491 09/22/06 05:50 suleiman Target: Moved to Carbon
  • 122489 09/22/06 05:30 S. Bailey Can't start Realtime and Beam Feedback
  • Thursday

  • 122482 09/21/06 22:48 Williamson Plans for the next few weeks
  • 122481 09/21/06 22:37 Williamson RC Summary Wednesday 09-20-2006 Day through Thursday 09-21-2006 Day
  • 122480 09/21/06 21:45 C. Furget Bfield scan on FR CER
  • 122479 09/21/06 21:41 Breuer removed delay from all NA CEDs 8
  • 122478 09/21/06 21:38 Williamson Field scan for Fr. Ch. PMT move
  • 122477 09/21/06 20:30 Williamson Beam: Temperature Control of BCMs Not Working
  • 122472 09/21/06 19:46 pking Late Entry: Rebooted cdaql3 at 18:30
  • 122466 09/21/06 19:19 ppillot Target: changed G0:PSCurrent alarm settings
  • 122463 09/21/06 19:06 ellis Lumi 4's non-linear behavior
  • 122460 09/21/06 18:23 S. Bailey I need CODA on owl shift tonight
  • 122459 09/21/06 18:18 Breuer 5" test tube setup, HV and cabling
  • 122457 09/21/06 17:48 Williamson SMS: Ramping magnet to 2000 A
  • 122453 09/21/06 17:08 smithg Target: More Target gui pictures
  • 122452 09/21/06 16:41 smithg Target: Target (LH2) cooldown completed
  • 122448 09/21/06 15:42 beaufait bcm1 temp controler
  • 122438 09/21/06 15:04 C.Furget/ppi Change coinc board of octant 2
  • 122436 09/21/06 14:35 smithg Target: 15K mass flow signal fixed. Re-Pre-Cooling our cold return line
  • 122431 09/21/06 13:21 smithg Target: LH2 condensed but still on warm return!
  • 122430 09/21/06 12:43 Williamson SMS: SMS JT1 increased to 65
  • 122429 09/21/06 12:09 C. Furget HV ON
  • 122427 09/21/06 12:01 C. Furget CHange on FR CER PMT 4 Oct 6
  • 122425 09/21/06 11:38 kenyon SMS: Dump window purge
  • 122424 09/21/06 11:31 kenyon HMS exit window thickness & LC
  • 122423 09/21/06 11:06 C. Furget HV must stay OFF for at least 1 hour
  • 122421 09/21/06 11:03 smithg Target: cool down pause
  • 122420 09/21/06 10:39 Alex cosmic runs
  • 122418 09/21/06 09:51 Alex HV ON
  • Wednesday

  • 122417 09/20/06 20:11 muether/will SMS: Zeroed DQP Voltages
  • 122416 09/20/06 20:11 muether SMS: Ramped SMS Down
  • 122415 09/20/06 19:04 muether/will SMS: SMS Full Power Test (3500A)
  • 122414 09/20/06 17:49 Alex HV OFF
  • 122412 09/20/06 17:46 muether/will SMS: Changed EBC IP Address
  • 122411 09/20/06 17:43 smithg Target: rebooted tgt ioc
  • 122410 09/20/06 17:19 smithg Target: Target pump & purge completed (Hydrogen!)
  • 122407 09/20/06 15:02 Alex/Paul/Ma !DAQ changes!
  • 122394 09/20/06 10:52 suleiman Beam: Measuring the ratio of G0 and G0 raw signals
  • 122393 09/20/06 08:39 kenyon Target: VJ pumping
  • 122392 09/20/06 00:20 muether SMS: PLC Heartbeat Stopped
  • Tuesday

  • 122391 09/19/06 18:35 Fatiha Conditions for a cosmic run
  • 122373 09/19/06 16:38 Alex HV ON
  • 122372 09/19/06 12:03 pitt | sulei Beam: BPM Screens showing the IOC Calibrations
  • 122371 09/19/06 12:00 pitt | sulei Beam: BPM Calibration Test
  • 122369 09/19/06 11:56 Alex, saw Restoring HV
  • Monday

  • 122361 09/18/06 13:05 muether SMS: SMS Pager number set back to 584-5574
  • 122360 09/18/06 11:43 gaskell Moller cooldown complete
  • 122359 09/18/06 10:28 beaufait Argon flow to hms chambers
  • 122358 09/18/06 10:02 hcf HMS gas mixture now OK
  • Sunday

  • 122357 09/17/06 15:06 S. Bailey flipper is ready for the 687 running
  • Friday

  • 122356 09/15/06 16:54 hcf HKS (HMS) gas mixer status
  • Thursday

  • 122354 09/14/06 16:19 beaufait gas flow to drift chambers
  • 122353 09/14/06 15:16 Bailey & Sul G0 Beam Studies In Injector
  • 122337 09/14/06 12:55 smithg Target: moved to out of beam position
  • 122333 09/14/06 10:26 suleiman gzerol3 reboot
  • Wednesday

  • 122322 09/13/06 18:34 S. Bailey Beam Studies in MCC on Thursday, Require CODA
  • 122321 09/13/06 13:34 jmammei Analysis: Lumi asymmetries for longitudinal data
  • 122320 09/13/06 08:24 kenyon SMS: No clean power
  • Tuesday

  • 122319 09/12/06 16:16 S. Bailey We are done with CODA today.
  • 122318 09/12/06 16:14 Bailey & Sul G0 PC Install Summary
  • 122231 09/12/06 09:43 pking Analysis: Added a locus file to the new 687MeV DB; also changed the run_fill_* scripts
  • Monday

  • 122230 09/11/06 17:50 pking Analysis: Configured gzero analyser to use the new gzero_687MeV_comm2 database
  • 122229 09/11/06 12:18 S. Bailey Pockels Cell Alignment Scheduled for Tuesday, September 12th
  • Friday

  • 122228 09/08/06 23:45 muether SMS: SMS back in PID
  • 122227 09/08/06 17:05 kenyon SMS: G0 full and on cold return
  • 122226 09/08/06 14:57 kenyon SMS: Status HMS
  • 122225 09/08/06 14:56 kenyon SMS: New plan
  • 122224 09/08/06 14:45 kenyon SMS: U-tubes
  • 122223 09/08/06 14:42 kenyon SMS: Cooling cold return
  • 122222 09/08/06 13:53 kenyon SMS: LHe reservoir full
  • 122221 09/08/06 10:07 kenyon SMS: Perimeter line
  • 122220 09/08/06 09:13 kenyon SMS: Started cooldown
  • 122219 09/08/06 08:29 kenyon SMS: A can vacuum okay, u-tubes
  • 122218 09/08/06 07:55 kenyon SMS: LN2 Status
  • Thursday

  • 122217 09/07/06 15:26 kenyon SMS: A can/perimeter pump, LN2
  • 122216 09/07/06 11:39 muether SMS: JT4 Setpt mode
  • 122215 09/07/06 07:19 kenyon SMS: JT4 setpoint problem
  • 122214 09/07/06 07:11 kenyon SMS: G0 LHe supply closed, switched to warm return
  • Wednesday

  • 122213 09/06/06 14:26 kenyon SMS: Opening cold return
  • 122212 09/06/06 12:43 Fatiha gzerol3 and electronics ON
  • Tuesday

  • 122191 09/05/06 16:47 saw Target: G0target logging back on
  • 122190 09/05/06 14:14 saw Target: G0 Target logger off for disk diagnostics
  • 122189 09/05/06 14:13 smithg Target: Pumped and backfilled tgt with Helium
  • 122188 09/05/06 13:36 jmammei, pit Analysis: asymmetries for "good" and "bad" lumi widths
  • Friday

  • 122187 09/01/06 16:06 Louis BIMBOT French Splitters OFF
  • 122186 09/01/06 15:46 jmammei Analysis: lumi yields
  • 122185 09/01/06 15:27 jmammei Analysis: good_for_gui_values updated? and new transverse asymmetry plots
  • 122184 09/01/06 15:23 jmammei Analysis: good_for_gui_values updated? and new transverse asymmetry plots
  • 122183 09/01/06 13:21 Louis BIMBOT Most of devices of the electronics cage POWERED OFF