125801 10/31/06 21:31 jschaub Target: Target Movement
125782 10/31/06 18:40 jschaub Target: Baseline Snapshots
125780 10/31/06 18:20 jschaub Target: Fan Speed
125777 10/31/06 16:53 smithg Target: Target now 22K LD2- cooldown and switchover complete
125775 10/31/06 13:59 smithg & Mat Target: reverse polarity ramp
125772 10/31/06 12:38 smithg Target: Installed new valve MV75 during LH2 --> LD2 switch
125770 10/31/06 11:20 kenyon Target: Vacuum jackets pumped
Monday
125691 10/30/06 20:29 maud Target: Checklist for 30 Oct., 2006 owl shift - cerenkov yields out of range
125679 10/30/06 17:03 maud Target: stress overview of shift beginning.
125669 10/30/06 15:51 Alex Target: target condensed and back to 'normal' temperature
125668 10/30/06 14:54 Alex Target: condensing the target
125666 10/30/06 14:40 Alex Target: last snapshots before condensing the target again.
125663 10/30/06 14:00 Alex Target: target status snapshots for the past hour
125658 10/30/06 12:57 Alex Target: snapshots of target status for the past hour
125650 10/30/06 11:06 greg & Alex Target: running at 29.75K +- 0.25K GAS TARGET
125645 10/30/06 10:22 smithg Target: Changed JT pulse width factor
125643 10/30/06 10:16 smithg Target: Began warming the target to 30K for H2 gas tgt running
Sunday
125615 10/29/06 23:44 maud Target: shift overview and checklist screenshots
125595 10/29/06 16:53 jschaub Target: Target Motion Alarm and Shift Summary
125588 10/29/06 15:43 jschaub Target: Shift Checklist Screenshots
125586 10/29/06 15:42 jschaub Target: Shift Checklist Screenshots
Saturday
125538 10/28/06 23:48 maud Target: screen-shots of checklist
125520 10/28/06 17:18 maud, greg Target: put flyswatter out
125518 10/28/06 16:32 maud Target: LH2 target back in.
125508 10/28/06 14:42 smithg Target: cage temps returning to normal now
125504 10/28/06 13:57 smithg Target: Target out of beam now. FS in still.
125499 10/28/06 10:58 smithg Target: cage temps continue to rise
125498 10/28/06 10:49 smithg Target: Put flyswatter in
125493 10/28/06 09:34 smithg Target: moving to radiator tgt
Friday
125459 10/27/06 23:27 Louis TgT-Op Target: Summary of the shift as for Target Operator
125454 10/27/06 22:12 louis Tgt-Op Target: Set point for Alarm on VXI crate temperature back to 40.00
125450 10/27/06 21:57 Louis - TgT- Target: Alarm on VXI crate uotput temperature
125425 10/27/06 16:49 Louis Tgt-Op Target: Nitorgen level alarm + reference snapshot for 'no beam'
Thursday
125379 10/26/06 23:27 Louis tgT-Op Target: Target Swing shift summary
125356 10/26/06 16:37 Louis Tgt-Op Target: Reference snapshots
125351 10/26/06 15:44 jschaub Target: Screen Shots for Shift Checklist
125347 10/26/06 14:54 jschaub Target: Moved Hydrogen Target Back into Beamline
125344 10/26/06 14:35 smithg Target: Planning to switch to LD2 on Tuesday, October 31
125343 10/26/06 14:31 smithg Target: Added new alarm on sum of A&C 15K massflow
Wednesday
125296 10/25/06 23:47 louis TgT-Op Target: Summary of TgT Operator shift
125267 10/25/06 16:58 Louis TgT-Op Target: Reference snapshots
125243 10/25/06 12:35 C. Davis Target: Alarming woes
125231 10/25/06 08:09 C. Davis Target: IOC Re-boot
125230 10/25/06 08:07 saw Target: Changed gbheatm1
125188 10/25/06 02:23 saw Target: LH2 target in
Tuesday
125180 10/24/06 23:43 C. Davis Target: Radiator back IN while flyswatter OUT entry in progress.
125178 10/24/06 23:20 C. Davis Target: Cryo follies
125173 10/24/06 21:24 C. Davis Target: Move to "out of beam position", Flyswatter IN
125168 10/24/06 20:39 C. Davis Target: more instability from CRYO
125162 10/24/06 18:50 C. Davis Target: deliveries from CRYO
125159 10/24/06 18:13 C. Davis Target: Radiator target inserted.
125155 10/24/06 16:51 C. Davis Target: Reset JT valve and HPH for higher beam (coming soon to a Hall near you!) & re-boot of IOC
125149 10/24/06 15:45 Louis TGT-Op Target: Target Operator shift summary
125148 10/24/06 15:39 Louis TGT-Op Target: Transient alarms on Nitrogen level- same better format
125147 10/24/06 15:37 Louis TGT-Op Target: Transient alarms on Nitrogen level
125138 10/24/06 13:49 Louis Tgt-Op Target: Abnormal bump in gt1
125134 10/24/06 11:05 smithg Target: target recovering
125133 10/24/06 09:29 Louis TgT-)p Target: Some snapshots of the 'boiling' situations after cooling crash
125132 10/24/06 09:18 Louis Tgt-Op Target: Target is boiling !
125131 10/24/06 09:13 Louis Tgt-Op Target: Something has changed with the total heat load
125128 10/24/06 08:25 Louis Tgt-Op Target: Reference snapshots
125127 10/24/06 08:16 Louis Tgt-Op Target: Transient Alarm on gt1
125121 10/24/06 06:12 saw Target: Expanded strip charts
125117 10/24/06 05:34 saw Target: Target boiled off - waiting to recondense
125116 10/24/06 05:20 saw Target: Loss of coolant
125112 10/24/06 04:00 saw Target: Sudden coolant dropout
Monday
125101 10/23/06 23:42 C. Davis Target: 23 Oct., 2006 swing shift -- Target report
125081 10/23/06 15:53 Louis Tgt - Target: Target operator shift summary
125057 10/23/06 08:12 Louis TgT-Op Target: Reference Snapshots
125052 10/23/06 07:39 jmammei Target: shift summary
125043 10/23/06 04:32 jmammei Target: shift checklist snapshots
125038 10/23/06 02:49 jmammei Target: coolant flow rate oscillations
Sunday
125026 10/22/06 23:09 C. Davis Target: Target status
124996 10/22/06 13:17 Louis Tgt-Op Target: Snapshots of the shift for Checklist
124989 10/22/06 09:43 Louis Tgt-Op Target: Few Alarms on beam current
124986 10/22/06 09:21 Louis Tgt-Op Target: Reference snapshots
124979 10/22/06 05:51 jmammei Target: shift checklist page 2
124978 10/22/06 05:50 jmammei Target: shift checklist page 1
124974 10/22/06 05:22 jmammei Target: shift checklist snapshots
Saturday
124946 10/21/06 18:44 C. Davis Target: What the target did at the time of the HV shutdown
124930 10/21/06 13:47 Louis -Tgt-O Target: Checklist - Snapshots of the shift
124916 10/21/06 08:29 Louis Target: Snapshots for tuning reference
124908 10/21/06 04:58 jmammei Target: shift snapshots
Friday
124893 10/20/06 21:31 C. Davis Target: Small oscillations in cool flow back for a while
124873 10/20/06 17:14 C. Davis Target: Effects at the target level of the CRYO hiccup and SMS slowdump
124852 10/20/06 15:36 Louis Tgt-Op Target: Scan of the checklist
124849 10/20/06 14:24 Louis tgt op Target: Ckecklist Snapshot
124832 10/20/06 08:24 Louis - Tgt Target: Target Status at beginning of shift
124828 10/20/06 07:59 jmammei Target: shift summary
124821 10/20/06 04:44 jmammei Target: shift snapshots
Thursday
124812 10/19/06 23:53 C. Davis Target: 19 Oct., 2006 swing shift Target report
124787 10/19/06 16:15 C. Davis Target: is being moved to LH2 IN
124781 10/19/06 15:53 Louis Target: Target operator shift Summary
124778 10/19/06 15:16 Louis Target: Missing plot from checklist snapshot
124777 10/19/06 15:10 Louis Target: Checklist associated snapshot
124765 10/19/06 14:13 Louis Target: Carbon target put in Beam
124756 10/19/06 10:34 Louis Target: Target condition at beginning of shift
Wednesday
124721 10/18/06 23:56 C. Davis Target: shift summary 18 oct., 2006 swing
124696 10/18/06 16:18 Louis Target: Target operator shift summary
124685 10/18/06 13:48 Louis, Caris Target: Checklist snapshots
124665 10/18/06 09:14 Louis TGT op Target: Alarms this morning
124664 10/18/06 09:14 Louis TGT op Target: Alarms this morning
124659 10/18/06 07:53 jmammei Target: shift summary
124653 10/18/06 04:51 jmammei Target: shift checklist snapshots
Tuesday
124634 10/17/06 19:40 C. Davis Target: LH2 Target is going IN
124630 10/17/06 18:59 C. Davis Target: What hath Cryo wrought?
124570 10/17/06 08:49 saw Target: Target removed
124564 10/17/06 07:37 jmammei Target: owl shift summary
124557 10/17/06 05:18 jmammei Target: shift checklist snapshots
Monday
124513 10/16/06 16:01 saw Target: Day shift target summary
124459 10/16/06 07:30 jmammei Target: shift summary
124453 10/16/06 05:41 jmammei Target: shift checklist snapshots
Sunday
124392 10/15/06 07:54 jmammei Target: shift summary
124383 10/15/06 04:29 jmammei Target: shift check list snapshots (2 of 2 entries)
124380 10/15/06 04:25 jmammei Target: shift checklist snapshots (1 of 2 entries)
Saturday
124331 10/14/06 13:12 ellis Target: targt shift checklist screen shots
124307 10/14/06 04:13 Alex Target: Helium bottle empty
Friday
124256 10/13/06 16:03 jschaub Target: Shiznift Summary
124255 10/13/06 16:00 jschaub Target: Shift Checklist Scan
Thursday
124199 10/12/06 22:16 muether Target: Changed target g0bcm_alarm alarm
124180 10/12/06 15:49 horn Target: hydrogen target in
124170 10/12/06 12:25 horn Target: screen shot
124169 10/12/06 12:22 horn Target: carbon target in (late entry)
124143 10/12/06 07:40 DArko Target: Not a single alarm
Wednesday
124068 10/11/06 08:02 DArko Target: Shift Summary
Tuesday
124009 10/10/06 15:39 horn Target: hydrogen target in
123984 10/10/06 09:37 horn Target: screen shot
123970 10/10/06 08:03 DArko Target: Shift Summary
123953 10/10/06 01:14 DArko Target: Target moved: Al out LH2 in
Monday
123935 10/09/06 20:10 ellis Target: closed JT valve
123933 10/09/06 19:12 ellis Target: frame target moving in
123932 10/09/06 19:12 ellis Target: lots of alarms
123916 10/09/06 16:03 horn Target: shift checklist
123902 10/09/06 12:05 horn Target: G0 hydrogen target back into beam
123882 10/09/06 08:22 DArko Target: Closed JT valve to Out of Beam flow rate
123879 10/09/06 07:41 DArko Target: Target moved: out of beam; time 7:2
Sunday
123846 10/08/06 22:48 muether Target: Target Shift Check List screen grabs
123823 10/08/06 15:59 DArko Target: Shift Summary
Saturday
123771 10/07/06 23:21 muether Target: He Bottle was empty....so I changed it
123757 10/07/06 16:21 DArko Target: Target operator's summary
123734 10/07/06 08:02 jschaub Target: Shift Summary
123730 10/07/06 07:00 jschaub Target: Screenshots for the Shift Checklist
123722 10/07/06 03:57 jschaub Target: Coolant Alarm
Friday
123653 10/06/06 07:42 jschaub Target: Shift Summary
123638 10/06/06 02:54 jschaub Target: Shift Checklist Screen Grabs
123637 10/06/06 02:53 jschaub Target: Shift Checklist Screen Grabs
123636 10/06/06 02:53 jschaub Target: Shift Checklist Screen Grabs
Thursday
123629 10/05/06 23:55 Beise Target: Shift report
123602 10/05/06 16:23 Beise Target: Increase JT valve by 3 steps
123586 10/05/06 08:57 ellis Target: closed jt 4 clicks
123581 10/05/06 07:59 jschaub Target: Shift Summary and Screen Grabs
123571 10/05/06 03:41 jschaub Target: Re-Opened JT Valve
123568 10/05/06 03:18 jschaub Target: Closed JT Valve a Bit
Wednesday
123562 10/04/06 23:57 muether Target: Swing Shift Target Report (With beam trip screen grab)
123509 10/04/06 17:58 muether Target: Carbon Target moved in
123503 10/04/06 17:05 ellis Target: scanned checklist
123501 10/04/06 16:53 ellis Target: shift checklist pictures
123478 10/04/06 12:51 ellis Target: 2 uA / sec ramp rate good
123464 10/04/06 10:59 ellis Target: 2uA/sec ramp rate
123446 10/04/06 07:55 jschaub Target: Owl Shift Summary and Checklist Screen Captures
123427 10/04/06 00:02 muether Target: Close Target JT one click
Tuesday
123407 10/03/06 19:42 muether Target: Opened Jt Valve
123401 10/03/06 19:14 muether Target: Moved LH2 into beam
Monday
123379 10/02/06 17:47 muether Target: Moving target out of beam
123377 10/02/06 17:41 muether/smit Target: Rebooted the Target IOC (3 times)
123373 10/02/06 13:57 smithg Target: temp drop from coolant flow wiggles from esr power glitch
123367 10/02/06 10:58 Alex Target: temperature alarm
123365 10/02/06 07:52 jschaub Target: Owl Shift Target Summary
123354 10/02/06 04:12 jschaub Target: One More Screen Snapshot
123353 10/02/06 04:09 jschaub Target: Screen Captures for Shift Checklist
Sunday
123334 10/01/06 23:02 Breuer Target: Target screen snapshots
123280 10/01/06 04:44 Larry Target: Scan of Target Check-List