Jefferson Lab Hall C Logbook for October 06 - Target

  • Main INDEX

    Tuesday

  • 125801 10/31/06 21:31 jschaub Target: Target Movement
  • 125782 10/31/06 18:40 jschaub Target: Baseline Snapshots
  • 125780 10/31/06 18:20 jschaub Target: Fan Speed
  • 125777 10/31/06 16:53 smithg Target: Target now 22K LD2- cooldown and switchover complete
  • 125775 10/31/06 13:59 smithg & Mat Target: reverse polarity ramp
  • 125772 10/31/06 12:38 smithg Target: Installed new valve MV75 during LH2 --> LD2 switch
  • 125770 10/31/06 11:20 kenyon Target: Vacuum jackets pumped
  • Monday

  • 125691 10/30/06 20:29 maud Target: Checklist for 30 Oct., 2006 owl shift - cerenkov yields out of range
  • 125679 10/30/06 17:03 maud Target: stress overview of shift beginning.
  • 125669 10/30/06 15:51 Alex Target: target condensed and back to 'normal' temperature
  • 125668 10/30/06 14:54 Alex Target: condensing the target
  • 125666 10/30/06 14:40 Alex Target: last snapshots before condensing the target again.
  • 125663 10/30/06 14:00 Alex Target: target status snapshots for the past hour
  • 125658 10/30/06 12:57 Alex Target: snapshots of target status for the past hour
  • 125650 10/30/06 11:06 greg & Alex Target: running at 29.75K +- 0.25K GAS TARGET
  • 125645 10/30/06 10:22 smithg Target: Changed JT pulse width factor
  • 125643 10/30/06 10:16 smithg Target: Began warming the target to 30K for H2 gas tgt running
  • Sunday

  • 125615 10/29/06 23:44 maud Target: shift overview and checklist screenshots
  • 125595 10/29/06 16:53 jschaub Target: Target Motion Alarm and Shift Summary
  • 125588 10/29/06 15:43 jschaub Target: Shift Checklist Screenshots
  • 125586 10/29/06 15:42 jschaub Target: Shift Checklist Screenshots
  • Saturday

  • 125538 10/28/06 23:48 maud Target: screen-shots of checklist
  • 125520 10/28/06 17:18 maud, greg Target: put flyswatter out
  • 125518 10/28/06 16:32 maud Target: LH2 target back in.
  • 125508 10/28/06 14:42 smithg Target: cage temps returning to normal now
  • 125504 10/28/06 13:57 smithg Target: Target out of beam now. FS in still.
  • 125499 10/28/06 10:58 smithg Target: cage temps continue to rise
  • 125498 10/28/06 10:49 smithg Target: Put flyswatter in
  • 125493 10/28/06 09:34 smithg Target: moving to radiator tgt
  • Friday

  • 125459 10/27/06 23:27 Louis TgT-Op Target: Summary of the shift as for Target Operator
  • 125454 10/27/06 22:12 louis Tgt-Op Target: Set point for Alarm on VXI crate temperature back to 40.00
  • 125450 10/27/06 21:57 Louis - TgT- Target: Alarm on VXI crate uotput temperature
  • 125425 10/27/06 16:49 Louis Tgt-Op Target: Nitorgen level alarm + reference snapshot for 'no beam'
  • Thursday

  • 125379 10/26/06 23:27 Louis tgT-Op Target: Target Swing shift summary
  • 125356 10/26/06 16:37 Louis Tgt-Op Target: Reference snapshots
  • 125351 10/26/06 15:44 jschaub Target: Screen Shots for Shift Checklist
  • 125347 10/26/06 14:54 jschaub Target: Moved Hydrogen Target Back into Beamline
  • 125344 10/26/06 14:35 smithg Target: Planning to switch to LD2 on Tuesday, October 31
  • 125343 10/26/06 14:31 smithg Target: Added new alarm on sum of A&C 15K massflow
  • Wednesday

  • 125296 10/25/06 23:47 louis TgT-Op Target: Summary of TgT Operator shift
  • 125267 10/25/06 16:58 Louis TgT-Op Target: Reference snapshots
  • 125243 10/25/06 12:35 C. Davis Target: Alarming woes
  • 125231 10/25/06 08:09 C. Davis Target: IOC Re-boot
  • 125230 10/25/06 08:07 saw Target: Changed gbheatm1
  • 125188 10/25/06 02:23 saw Target: LH2 target in
  • Tuesday

  • 125180 10/24/06 23:43 C. Davis Target: Radiator back IN while flyswatter OUT entry in progress.
  • 125178 10/24/06 23:20 C. Davis Target: Cryo follies
  • 125173 10/24/06 21:24 C. Davis Target: Move to "out of beam position", Flyswatter IN
  • 125168 10/24/06 20:39 C. Davis Target: more instability from CRYO
  • 125162 10/24/06 18:50 C. Davis Target: deliveries from CRYO
  • 125159 10/24/06 18:13 C. Davis Target: Radiator target inserted.
  • 125155 10/24/06 16:51 C. Davis Target: Reset JT valve and HPH for higher beam (coming soon to a Hall near you!) & re-boot of IOC
  • 125149 10/24/06 15:45 Louis TGT-Op Target: Target Operator shift summary
  • 125148 10/24/06 15:39 Louis TGT-Op Target: Transient alarms on Nitrogen level- same better format
  • 125147 10/24/06 15:37 Louis TGT-Op Target: Transient alarms on Nitrogen level
  • 125138 10/24/06 13:49 Louis Tgt-Op Target: Abnormal bump in gt1
  • 125134 10/24/06 11:05 smithg Target: target recovering
  • 125133 10/24/06 09:29 Louis TgT-)p Target: Some snapshots of the 'boiling' situations after cooling crash
  • 125132 10/24/06 09:18 Louis Tgt-Op Target: Target is boiling !
  • 125131 10/24/06 09:13 Louis Tgt-Op Target: Something has changed with the total heat load
  • 125128 10/24/06 08:25 Louis Tgt-Op Target: Reference snapshots
  • 125127 10/24/06 08:16 Louis Tgt-Op Target: Transient Alarm on gt1
  • 125121 10/24/06 06:12 saw Target: Expanded strip charts
  • 125117 10/24/06 05:34 saw Target: Target boiled off - waiting to recondense
  • 125116 10/24/06 05:20 saw Target: Loss of coolant
  • 125112 10/24/06 04:00 saw Target: Sudden coolant dropout
  • Monday

  • 125101 10/23/06 23:42 C. Davis Target: 23 Oct., 2006 swing shift -- Target report
  • 125081 10/23/06 15:53 Louis Tgt - Target: Target operator shift summary
  • 125057 10/23/06 08:12 Louis TgT-Op Target: Reference Snapshots
  • 125052 10/23/06 07:39 jmammei Target: shift summary
  • 125043 10/23/06 04:32 jmammei Target: shift checklist snapshots
  • 125038 10/23/06 02:49 jmammei Target: coolant flow rate oscillations
  • Sunday

  • 125026 10/22/06 23:09 C. Davis Target: Target status
  • 124996 10/22/06 13:17 Louis Tgt-Op Target: Snapshots of the shift for Checklist
  • 124989 10/22/06 09:43 Louis Tgt-Op Target: Few Alarms on beam current
  • 124986 10/22/06 09:21 Louis Tgt-Op Target: Reference snapshots
  • 124979 10/22/06 05:51 jmammei Target: shift checklist page 2
  • 124978 10/22/06 05:50 jmammei Target: shift checklist page 1
  • 124974 10/22/06 05:22 jmammei Target: shift checklist snapshots
  • Saturday

  • 124946 10/21/06 18:44 C. Davis Target: What the target did at the time of the HV shutdown
  • 124930 10/21/06 13:47 Louis -Tgt-O Target: Checklist - Snapshots of the shift
  • 124916 10/21/06 08:29 Louis Target: Snapshots for tuning reference
  • 124908 10/21/06 04:58 jmammei Target: shift snapshots
  • Friday

  • 124893 10/20/06 21:31 C. Davis Target: Small oscillations in cool flow back for a while
  • 124873 10/20/06 17:14 C. Davis Target: Effects at the target level of the CRYO hiccup and SMS slowdump
  • 124852 10/20/06 15:36 Louis Tgt-Op Target: Scan of the checklist
  • 124849 10/20/06 14:24 Louis tgt op Target: Ckecklist Snapshot
  • 124832 10/20/06 08:24 Louis - Tgt Target: Target Status at beginning of shift
  • 124828 10/20/06 07:59 jmammei Target: shift summary
  • 124821 10/20/06 04:44 jmammei Target: shift snapshots
  • Thursday

  • 124812 10/19/06 23:53 C. Davis Target: 19 Oct., 2006 swing shift Target report
  • 124787 10/19/06 16:15 C. Davis Target: is being moved to LH2 IN
  • 124781 10/19/06 15:53 Louis Target: Target operator shift Summary
  • 124778 10/19/06 15:16 Louis Target: Missing plot from checklist snapshot
  • 124777 10/19/06 15:10 Louis Target: Checklist associated snapshot
  • 124765 10/19/06 14:13 Louis Target: Carbon target put in Beam
  • 124756 10/19/06 10:34 Louis Target: Target condition at beginning of shift
  • Wednesday

  • 124721 10/18/06 23:56 C. Davis Target: shift summary 18 oct., 2006 swing
  • 124696 10/18/06 16:18 Louis Target: Target operator shift summary
  • 124685 10/18/06 13:48 Louis, Caris Target: Checklist snapshots
  • 124665 10/18/06 09:14 Louis TGT op Target: Alarms this morning
  • 124664 10/18/06 09:14 Louis TGT op Target: Alarms this morning
  • 124659 10/18/06 07:53 jmammei Target: shift summary
  • 124653 10/18/06 04:51 jmammei Target: shift checklist snapshots
  • Tuesday

  • 124634 10/17/06 19:40 C. Davis Target: LH2 Target is going IN
  • 124630 10/17/06 18:59 C. Davis Target: What hath Cryo wrought?
  • 124570 10/17/06 08:49 saw Target: Target removed
  • 124564 10/17/06 07:37 jmammei Target: owl shift summary
  • 124557 10/17/06 05:18 jmammei Target: shift checklist snapshots
  • Monday

  • 124513 10/16/06 16:01 saw Target: Day shift target summary
  • 124459 10/16/06 07:30 jmammei Target: shift summary
  • 124453 10/16/06 05:41 jmammei Target: shift checklist snapshots
  • Sunday

  • 124392 10/15/06 07:54 jmammei Target: shift summary
  • 124383 10/15/06 04:29 jmammei Target: shift check list snapshots (2 of 2 entries)
  • 124380 10/15/06 04:25 jmammei Target: shift checklist snapshots (1 of 2 entries)
  • Saturday

  • 124331 10/14/06 13:12 ellis Target: targt shift checklist screen shots
  • 124307 10/14/06 04:13 Alex Target: Helium bottle empty
  • Friday

  • 124256 10/13/06 16:03 jschaub Target: Shiznift Summary
  • 124255 10/13/06 16:00 jschaub Target: Shift Checklist Scan
  • Thursday

  • 124199 10/12/06 22:16 muether Target: Changed target g0bcm_alarm alarm
  • 124180 10/12/06 15:49 horn Target: hydrogen target in
  • 124170 10/12/06 12:25 horn Target: screen shot
  • 124169 10/12/06 12:22 horn Target: carbon target in (late entry)
  • 124143 10/12/06 07:40 DArko Target: Not a single alarm
  • Wednesday

  • 124068 10/11/06 08:02 DArko Target: Shift Summary
  • Tuesday

  • 124009 10/10/06 15:39 horn Target: hydrogen target in
  • 123984 10/10/06 09:37 horn Target: screen shot
  • 123970 10/10/06 08:03 DArko Target: Shift Summary
  • 123953 10/10/06 01:14 DArko Target: Target moved: Al out LH2 in
  • Monday

  • 123935 10/09/06 20:10 ellis Target: closed JT valve
  • 123933 10/09/06 19:12 ellis Target: frame target moving in
  • 123932 10/09/06 19:12 ellis Target: lots of alarms
  • 123916 10/09/06 16:03 horn Target: shift checklist
  • 123902 10/09/06 12:05 horn Target: G0 hydrogen target back into beam
  • 123882 10/09/06 08:22 DArko Target: Closed JT valve to Out of Beam flow rate
  • 123879 10/09/06 07:41 DArko Target: Target moved: out of beam; time 7:2
  • Sunday

  • 123846 10/08/06 22:48 muether Target: Target Shift Check List screen grabs
  • 123823 10/08/06 15:59 DArko Target: Shift Summary
  • Saturday

  • 123771 10/07/06 23:21 muether Target: He Bottle was empty....so I changed it
  • 123757 10/07/06 16:21 DArko Target: Target operator's summary
  • 123734 10/07/06 08:02 jschaub Target: Shift Summary
  • 123730 10/07/06 07:00 jschaub Target: Screenshots for the Shift Checklist
  • 123722 10/07/06 03:57 jschaub Target: Coolant Alarm
  • Friday

  • 123653 10/06/06 07:42 jschaub Target: Shift Summary
  • 123638 10/06/06 02:54 jschaub Target: Shift Checklist Screen Grabs
  • 123637 10/06/06 02:53 jschaub Target: Shift Checklist Screen Grabs
  • 123636 10/06/06 02:53 jschaub Target: Shift Checklist Screen Grabs
  • Thursday

  • 123629 10/05/06 23:55 Beise Target: Shift report
  • 123602 10/05/06 16:23 Beise Target: Increase JT valve by 3 steps
  • 123586 10/05/06 08:57 ellis Target: closed jt 4 clicks
  • 123581 10/05/06 07:59 jschaub Target: Shift Summary and Screen Grabs
  • 123571 10/05/06 03:41 jschaub Target: Re-Opened JT Valve
  • 123568 10/05/06 03:18 jschaub Target: Closed JT Valve a Bit
  • Wednesday

  • 123562 10/04/06 23:57 muether Target: Swing Shift Target Report (With beam trip screen grab)
  • 123509 10/04/06 17:58 muether Target: Carbon Target moved in
  • 123503 10/04/06 17:05 ellis Target: scanned checklist
  • 123501 10/04/06 16:53 ellis Target: shift checklist pictures
  • 123478 10/04/06 12:51 ellis Target: 2 uA / sec ramp rate good
  • 123464 10/04/06 10:59 ellis Target: 2uA/sec ramp rate
  • 123446 10/04/06 07:55 jschaub Target: Owl Shift Summary and Checklist Screen Captures
  • 123427 10/04/06 00:02 muether Target: Close Target JT one click
  • Tuesday

  • 123407 10/03/06 19:42 muether Target: Opened Jt Valve
  • 123401 10/03/06 19:14 muether Target: Moved LH2 into beam
  • Monday

  • 123379 10/02/06 17:47 muether Target: Moving target out of beam
  • 123377 10/02/06 17:41 muether/smit Target: Rebooted the Target IOC (3 times)
  • 123373 10/02/06 13:57 smithg Target: temp drop from coolant flow wiggles from esr power glitch
  • 123367 10/02/06 10:58 Alex Target: temperature alarm
  • 123365 10/02/06 07:52 jschaub Target: Owl Shift Target Summary
  • 123354 10/02/06 04:12 jschaub Target: One More Screen Snapshot
  • 123353 10/02/06 04:09 jschaub Target: Screen Captures for Shift Checklist
  • Sunday

  • 123334 10/01/06 23:02 Breuer Target: Target screen snapshots
  • 123280 10/01/06 04:44 Larry Target: Scan of Target Check-List
  • Saturday